Loading...
HomeMy WebLinkAboutC2008-165 - 5/27/2008 - ApprovedC~iANGE ORDt;R Department of Engineering Services City of Corpus Christi, Texas WATER - 550910-4475-OOD00-17054D :RANGE ORDER NO: 4 FUNDING SOURCE: W.W. - SSD9lD-4500-OODDO-170540 CONTRACT T1ME: 730 C.D. )perating Department: DATE: Ma 9, 2008 ]ame of Project: Cimarron Boulevard, Phase 1 -Saratoga to Yorktown - P.R. 5261 :onuactor: Bay, LTD CHANGE ADD Add the following item to the contract: Add water and sewer for proposed subdivision, $86,109.86 to include two 8" waterlines with valves and appurtenances and one 5' did. manhole and 8" sanitary sewer lines (See Attached Breakdown} TOTAL NET: $86,109.85 DEDtJ r1+hy was this chaage necessary? {lf lefl off the plans and specifications, explain why? f o add utility services for futtu~e proposed development. riow can similar changes be avoided in the Future? during design phase -Consultant 1~ngineer provide better foresight for future_deve~ments. ~1. CONTRACT PRICE $ 10.540,640.75 3. TOTAL CHANGE ORDER (inc. current) $ 115,5 [3.74 ~. NEW CONTRACT PRICE $ 10,657, l 54.49 ~~-dt- 9: :F' ~. TH15 CHANGE ORDER 85,109.85 Project Manager E. PERCENT TOTAL CHANGE {B/A} 1.11 % ~n PREVIOUS TIME AUTHORIZED 0 C.D. ~~ 3[t2 .;. ADDN'L CONTRACT TIME THIS CHANCE ORDER 0 C.D. ~ ot3 :{. TOTAL ADDITIONAL TIME 0 C.D. C[TY OF Ry: APPROVE I, TEXAS CONTRA OR: BAY, LTD. Bring Servi -`` ~~ fS~~L7~ Tille: ESr.re~+4~-~ns ``ner. crating D art ent ~ rj / !f 5 o D~ -ofG[Management & Budget ,(N ~/~ __ ~ Lego? De'pC„aJ_r5tbm/eni ta_y, Ltd. 2008-165 M2008-127 S7 05/27/08 gpµ~pp p,{qp~, _ C1TY 3ECiiE7AR*' ~` PROJECT: Cimarron Phase 7 CONTRACTOR: Bay Ltd. DATE: March 20, 2008 REVISED 518IZ008 Unit Total REQUEST FOR CHANGE ~ Quantity Units Price Price SCOPE: Add water and sewer for ro sed subdEvlsian to include iwo 8" waternnes wish ~alvas and a urtanar~ces and one 5' dia Manhole and 8" sanita Sawar lines Water DEDUCT: C23 18" x S" MJ WYE -INSTALLED 1.OD EA $ - $ _ C1 D ~ 8" MJ 45 BEND -INSTALLED 1.00 EA $ $ _ SUBTOTAL $ ADD: C22 16" X 8" MJ TEE 1.00 F~4 $ 1 100.00. $ 1 100.00 NEW 8" MJ TEE 2.00 EA $ 484.60 $ 968.20 CB 8" MJ Gats Valve wlBax and Covex 2.OD EA 9D0.00 $ 1 800.00 C2 8" PVC Pie 35A0 tF . $ 36.00 $ 1260.00 NEW 8" MJ CAp 2A0 EA $ 439.45 $ 878.90 SUBTOTAL $ 6,008.iD Wastewater ADD: NEW 5' DIA MANHOLE BY#~A55 PUMPING 1.00 LS $ 25 435.0'1 $ 25 436A1 WELL POINTS 1.00 LS $ 18 827.55 $ 16,821.55 TRENCH PROTECTION 1.44 LS $ 4357.95 $ 4 357.95 5't7ia MH 1.00 EA $ 24,229.16 $ 24,229.16 S' ©IA MANHOL SUBTOTAL 1.00 EA $ 70,843.67 Nk1+V 8" SS 10'-12' 55.00 LF $ 108.56 $ 5,970.80 NE1N 8" CAP 1.00 i;A 287.29 $ 287.29 SUBTOTAL $ 6,258.09 TRAFFIC CONTROL ALLOWANCE 1 EA $ 3,000.00 $ 3,000.06 TOTAL $ 8fi,109.Sfi