Loading...
HomeMy WebLinkAboutC2008-201 - 6/10/2008 - ApprovedCITY OF CORPUS CHRISTI AMENDMENT NO. 1 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, hereinafter called "City", and MEI Maverick Engineering, Inc., hereinafter called "Engineer", agree to the following amendments to the Contract for Engineering Services for North Port Avenue from IH 37 to US 181 (Project No. 6264), as authorized and amended by: Ori final Contract Aril 10, 2007 Motion No. M2007-095 $749,221.00 EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION A. BASIC SERVICES shall be modified to include Item No. 2 Design Phase (PS&E Development) as follows: 2. Desican Phase (PS&E Development). Upon approval of the preliminary phase (schematic design), designated by receiving authorization to proceed, the A/E will: a. Study, verify, and implement comments and recommendations from the 30% Schematic Design including construction sequencing, connections to the existing facilities, and restoration of property and incorporate these plans into the construction plans. Development of the construction sequencing will be coordinated with the City Operating Department(s) and Engineering Services staff. b. Prepare hydraulic analysis based on 5, 25, & 100-year design storm return frequency runoff coefficients, time of concentration, rainfall intensities and drainage areas utilizing WinStorm software. c. Conduct an interim design review meeting with the City, TxDOT and the Port to verify the design scope and design parameters. d. Prepare one (1) set of Construction Bid and Contract Documents in City format (using City Standards as applicable) for each phase, including Contract agreement forms, general provisions and special provisions, notice to bidders, insurance requirements, bond requirements, and preparation of other contract and bid related items; TxDOT specifications and drawings to fix and describe, for one bid, the size and character of the entire Project; description of materials to be utilized; and such other essentials as may be necessary for construction and cost analysis. e. Provide assistance identify testing, handling and disposal of any hazardous materials and/or contaminated soils that may be discovered during construction (to be included under Additional Services). f. Prepare final quantities and estimates of probable costs with the recommended construction schedule in accordance with TxDOT PS&E procedure. The construction schedule will provide a phased approach to better track progress and payments. g. Assimilate all pertinent review comments, modifications, additions/deletions and proceed to next phase, upon Notice to Proceed. h. Provide 1 copy of pre-final plans and bid documents to the City staff for review and approval purposes with revised estimates of probable costs. Compile comments and incorporate any requirements into the plans and specifications, and advise City of responding and non-responding participants. 2008-201 M2008-147 06/10/08 AMEND. NO. 1 Pa e1of7 MEI Maverick Engineering ~TAVENUE~CONSl1LTANTWMENDMENTNO.iWMEN~MENTN0.IFREESE i. Provide Quality Assurance/Quality Control (QA/OC) measures to ensure that submittal of the pre-final and final complete plans and complete bid documents with specifications accurately reflect the percent completion designated and do not necessitate an excessive amount of revision and correction by City staff. The Consultant A/E and sub-consultant A/E shall submit a letter declaring that all engineering disciplines of all phases of the submittals have been checked, reviewed, and are complete prior to submission, and include signature of all disciplines including but not limited to structural, civil, mechanical, electrical, etc. Required with the pre-final plans is a "Plan Executive Summary" which will identify and summarize the project by distinguishing key elements such as: • Pipe Size or Building Size • Pipe Material, etc. • Why one material is selected over another • Advantages of selections • ROW requirements and why Permit requirements and why • Easement requirements and why • Embedment type and why • Constructability, etc. • Specific requirements of the City • Standard TxDOT specifications items • Non-standard specifications • Any unique requirements • Cost, alternatives, etc. • Owner permit requirements and status j. Provide Traffic Control Plan with illumination, markings and striping, signalization for review and approval by the City Traffic Engineering Department and TxDOT. k. Upon approval by the Director of Engineering Services, provide one (1) set (hard copy and electronic) of final plans and contract documents suitable for reproduction (In City Format) and said bid documents henceforth become the sole property and ownership of the City of Corpus Christi. I. The City agrees that any modifications of the submitted final plans (for other uses by the City) will be evidenced on the plans and be signed and sealed by a professional engineer prior to re-use of modified plans. m. Prepare and submit monthly status reports with action items developed from monthly progress and review meetings. n. Provide a Storm Water Pollution Prevention Plan. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION A. BASIC SERVICES shall be modified to include Item No. 3 Bid Phase (Letting Phase) as follows: 3. Bid Phase (Letting Phase). The A/E will: a. Participate in the pre-bid conference and provide a recommended agenda for critical construction activities and elements impacted the project. AMEND. NO. 1 Pa e2of7 H:\USER52\HOME\VELMA%GEMSTREET6264 NORTH PORT AVENUE\CONSULTANMMENDMENT NO. 1UMENOMENT NO. 1 FREESE b. Assist the City in solicitation of bids by identification of prospective bidders, and review of bids by solicited interests. c. Review all pre-bid questions and submissions concerning the bid documents and prepare, in the City's format, for the Engineering Services' approval, any addenda or other revisions necessary to inform contractors of approved changes prior to bidding. d. Attend bid opening, analyze bids, evaluate, prepare bid tabulation, and make recommendation concerning award of the contract. e. In the event the lowest responsible bidder's bid exceeds the project budget as revised by the Engineering Services in accordance with the A/E's design phase estimate required above, the Engineer will, at its expense, confer with City staff and make such revisions to the bid documents as the City staff deems necessary to re-advertise that particular portion of the Project for bids. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION A. BASIC SERVICES shall be modified to include Item No. 4 Construction Phase as follows: 4. Construction Phase. The A/E will perform contract administration to include the following: a. Participate in pre-construction meeting conference and provide a recommended agenda for critical construction activities and elements impacted the project. b. Review for conformance to contract documents, shop and working drawings, materials and other submittals. c. Review field and laboratory tests. d. Provide interpretations and clarifications of the contract documents for the contractor and authorize required changes, which do not affect the contractor's price and are not contrary to the general interest of the City under the contract. e. Make regular visits to the site of the Project to confer with the City project inspector and contractor to observe the general progress and quality of work, and to determine, in general, if the work is being done in accordance with the contract documents. This will not be confused with the project representative observation or continuous monitoring of the progress of construction. f. Prepare change orders as authorized by the City (coordinate with the City's construction division); provide interpretations and clarifications of the plans and specifications for the contractor and authorize minor changes which do not affect the contractor's price and are not contrary to the general interest of the City under the contract. g. Make final inspection with City staff. h. As applicable, review and assure compliance with plans and specifications, the preparation of operating and maintenance manuals (by the Contractor) for all equipment installed on this Project. These manuals will be in a "multimedia format" suitable for viewing with Microsoft's Internet Explorer, version 3.0. As a minimum the Introduction, Table of Contents, and Index will be in HTML (HyperText Markup Language) format, with HyperText links to the other parts of the manual. The remainder of the manual can be scanned images or a mixture of scanned images and text. use the common formats for scanned images - GIF, TIFF, JPEG, etc.. Confirm before delivery of the manuals that all scanned image formats are compatible with the image-viewing software available on the City's AMEND. NO. 1 Pa e3of7 H:\USERS2\HOME\VELMAP\GEMSTREET6264 NORTH PORT AVENUE\CONSULTANPAMENOMENT N0. 1\AMENOMENT NO. 1 FREESE computer -Imaging for Win95 (Wang) and Microsoft Imaging Composer. Deliver the manuals on a CD-ROM, not on floppy disks. i. Review construction "red-line" drawings, prepare record drawings of the Project as constructed (from the "red-line' drawings, inspection, and the contractor provided plans) and deliver to the Engineering Services a reproducible set and electronic file (AutoCAD r.14 or later) of the record drawings. All drawings will be CADD drawn using DWG format in AutoCAD, and graphics data will be in DXF format with each layer being provided in a separate file. Attribute data will be provided in ASCII format in tabular form. All electronic data will be compatible with the City GIS system. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL SERVICES, ITEM NO. 1 PERMIT PREPARATION shall be modified to include additional services for the U. S. Army Corp of Engineers (USAGE) Nationwide Permit No. 14. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL SERVICES, ITEM NO. 2 TOPOGRAPHIC SURVEY shall be modified to include additional Topographic Survey services. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL SERVICES, ITEM NO. 4 ENVIRONMENTAL CLEARANCE AND PUBLIC INVOLVEMENT shall be modified to include Programmatic Categorical Exclusion services. Prepare and submit a Historic Resources Study of the project corridor to support the Environmental Categorical Exclusion Report as required by the Texas Department of Transportation (TXDOT). The Historic Resources Study will evaluate the project corridor and identify/document the presence of historically significant properties in the Area of Potential Effects. Prepare and submit an Archeological Reconnaissance Survey of the project corridor to support the Environmental Categorical Exclusion Report as required by TXDOT. The Archeological Reconnaissance Survey will evaluate the project corridor and identify/document the presence of potential archeological significant sites. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL SERVICES, ITEM NO. 5 CONSTRUCTION OBSERVATIONS SERVICES. Upon receiving authorization from the City to proceed, the A/E will provide a project representative (PR) to provide full time construction inspection. A. Through such additional observations of Contractor's work in progress and field checks of materials and equipment by the PR and assistants, the A/E shall endeavor to provide further protection for the CITY against defects and deficiencies in the Work. B. The duties and responsibilities of the PR are described as follows: 1. General: PR will act as directed by and under the supervision of A/E, and will confer with A/E regarding PR's actions. PR's dealings in matters pertaining to the Contractor's work in progress shall in general be with A/E and Contractor, keeping the CITY advised as necessary. 2. Conference and Meetings: Attend meetings with Contractor, such as pre-construction conferences, progress meetings, job conferences and other project-related meetings as required by the City, and prepare and circulate copies of minutes thereof. 3. Liaison: A. Serve as liaison with Contractor, working principally through Contractor's superintendent and assist in understanding the intent of the Contract Documents. B. PR shall communicate with CITY with the knowledge of and under the direction of A/E. AMEND. NO. 1 Page 4 of 7 H:\USERS2\HOME\VELMAP\GEN\STREET6264 NORTH PORT AVENUE\CONSULTANPAMENDMENT NO. 7\AMENDMENT NO. 1 FREESE 4. Interpretation of Contract Documents: Report when clarifications and interpretations of the Contract Documents are needed and transmit to Contractor clarifications and interpretations as issued. 5. Shop Drawings and Samples: A. Receive Samples, which are furnished at the Site by Contractor, and notify of availability of Samples for examination. B. Record date of receipt of Samples and approved Shop Drawings. C. Advise Contractor of the commencement of any portion of the Work requiring a Shop Drawing or Sample submittal for which PR believes that the submittal has not been approved. 6. Review of Work and Rejection of Defective Work: A. Conduct on-Site observations of Contractor's work in progress to assist A/E in determining if the Work is in general proceeding in accordance with the Contract Documents. B. Report whenever PR believes that any part of Contractor's work in progress will not produce a completed Project that conforms to the Contract Documents or will prejudice the integrity of the design concept of the completed Project, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise City and A/E of that part of work in progress that PR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval. C. Observe whether Contractor has arranged for inspections required by Laws and Regulations, including but not limited to those to be performed by public agencies having jurisdiction over the Work. 7. Records: A. Maintain orderly files for correspondence, reports of job conferences, reproductions of original Contract Documents including all Change Orders, Field Orders, Work Change Directives, Addenda, additional Drawings issued subsequent to the Contract, A/E's clarifications and interpretations of the Contract Documents, progress reports, Shop Drawing and Sample submittals received from and delivered to Contractor, and other Project related documents. B. Prepare a daily report utilizing approved City format, recording Contractor's hours on the Site, weather conditions, data relative to questions of Change Orders, Field Orders, Work Change Directives, or changed conditions, Site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to A/E and the City. AMEND. NO. 1 Pa e5of7 H:\USERS2IHOME\VELMAP\GENISTREET\6264 NORTH PORT AVENUE\CONSULTANTIAMENUMENT NO. 1\AMENDMENT N0. 1 FREESE 8. Reports: A. Furnish periodic reports as required of progress of the Work and of Contractor's compliance with the progress schedule and schedule of Shop Drawing and Sample submittals. B. Report immediately to the CITY and A/E the occurrence of any Site accidents, any Hazardous Environmental Conditions, emergencies, or acts of God endangering the Work, and property damaged by fire or other causes. C. Provide project photo report on CD-ROM at the rate of a minimum of two photographs per day, including an adequate amount of photograph documentation of utility conflicts. 9. Completion: A. Before the issue of Certificate of Completion, submit to Contractor a list of observed items requiring completion or correction. B. Participate in a final inspection in the company of A/E, the CITY, and Contractor and prepare a final list of items to be completed or corrected. C. Observe whether all items on final list have been completed or corrected and make recommendations concerning acceptance and issuance of the Notice of Acceptability of the Work. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL SERVICES, ITEM NO. 6 WARRANTY PHASE. Provide a maintenance guaranty inspection toward the end of the one-year period after acceptance of the Project. Note defects requiring contractor action to maintain, repair, fix, restore, patch, or replace improvement under the maintenance guaranty terms of the contract. Document the condition and prepare a report for the City staff of the locations and conditions requiring action, with its recommendation for the method or action to best correct defective conditions and submit to City Staff. Complete the inspection and prepare the report no later than sixty (60) days prior to the end of the maintenance guaranty period. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL SERVICES, ITEM NO. 8 GEOTECHNICAL INVESTIGATION AND TESTING shall be modified to include Construction Testing Program. Upon receiving authorization from the City to proceed, conduct a subsurface geotechnical investigation to determine in-situ soil types and characteristics and existing pavement materials along the Project corridor. Perform laboratory testing of soil samples and develop alternative pavement sections for the projected traffic volumes based on a 20-year pavement life. Document findings (including boring logs) and recommendations in a written report. The scope of services for materials testing during construction will be prepared upon completion of the Design Phase. EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL SERVICES, ITEM NO. 11 ROW ACQUISITION SURVEY. Upon receiving authorization from the City to proceed, the A/E will review existing ROW and easements to ascertain any conflicts and provide field ROW surveys and submit ROW descriptions for the City's use in the acquisition process. All work must comply with Category 1-A, Condition I specifications of the Texas Society of Professional Surveyors' Manual of Practice for Land Surveying in the State of Texas, Ninth Edition. All work must be tied to and conform with the City's Global Positioning System (GPS) control network and comply with all TxDOT requirements as applicable. A/E Consultant will be required to perform all necessary deed research. The scope of services and associated fees for preparing metes & bounds descriptions for additional ROW parcels to be acquired will be prepared at the beginning of the Design Phase. AMEND. NO. 1 Pa e6of7 H:\USERS2\HOME\VELMAP\GEN\STREET\6260 NORTH PORT AVENUE\CONSULTANTWMENOMENT NO. 1 W MENDMENT NO. 1 FREESE EXHIBIT "A", PART 3. FEES shall be modified and is attached as Exhibit "B" Summary of Fees. All other terms and conditions of the April 10, 2007 contract, as amended, between the City and the Engineer will remain in full force and effect. CITY Of CORPUS CHRISTI gy ~`w•- -d 3 D8 g I R. Escobar, P. E. Da e Interim Assistant City Manager MEI MAVERICK GI RING I l . By ~ 3 G-~--. . " ill" Hu Date Division Manager 400 Mann Street, Suite 200 Corpus Christi, TX 78401 Phone (361) 696-3500 Fax (361) 696-3599 RECOMMENDE gy `~ ~ .~~ Kevin Sto ers, Date Interim Director of Engineering Services ATTEST By Armando Chapa, City e~retary '= ~Q~ D" ~~~,,, AUTHORita sr caulrca... oc~~~o~Q~~. f11A1~]~J. APPRO)/ED AS TO FORM Assistan City Attorney Date AMEND. NO. 1 Pa e7of7 H:\USERS2\HOME\VELMAP\GEN\STREET\6264 NORTH PORT AVENUE\CONSULTANT\AMENDMENT NO. 1 WMENDMENT NO. 1 FREESE lV~l MAVERICK ENGINEERING!, INC. Apri125, 2008 Kevin Stowers Interim Director of Engineering Services City of Corpus Christi, TX P.O. Box 9277 Corpus Christi, TX 78469 SUBJECT: NORTH PORT AVENUE FROM III 37 TO US 181 PROJECT N0.6264 Dear Mr. Stowers: Maverick Engineering, Inc. (MAVERICK) submitted a Draft of the Engineering Letter Report to the City on 11/28/2007. The City conducted a document review meeting with all required parties on 1/30/08. MAVERICK is in receipt of all comments and is now in the process of finalizing the Letter Report. As we aze all aware, the North Port Avenue project has a very tight design development window therefore MAVERICK requests authorization to proceed with the Design Phase of the project. The Design Phase will incorporate the following: prepaze plans, specifications, estimates (PS&E) and other required contract documents for street, drainage and utility improvements to North Port Avenue from IH 37 to US 181. The construction consists of approximately 7800 LF of new 4- lane C3 Collector roadway (48-ft. back-to-back of curbs) and associated pavement marking and signage improvements; new traffic signalization improvements at the Port Avenue/Winnebago Street intersection; new 5-ft. wide concrete sidewalks; new concrete driveways; new 18" to 6x4 reinforced concrete storm sewer conduits, inlets, and manholes; new 6" to 12" PVC waterlines and appurtenances; new 8" PVC wastewater main with associated manholes; new seeding for erosion control; and temporary traffic control; together with all appurtenances. The pavement design will be a 20-year design pavement life using a terminal serviceability index of 2.0 along with a required SN of 4.45. Our design package will include a flexible pavement section in the base bid with a rigid section identified as an additive alternate bid item. Pursuant to Team meeting with the City of Corpus Christi we will continue to address the following items during final design. 1. Consultant has met with TxDOT in order to collect all Draft Engineering Letter Report comments for inclusion into fmal document submission. 2. Consultant has met with AEP to provide utility relocation preferences along with cleazance requirements of project. Team provided AEP with strip maps that identified 400 Mann S[., Suite 200 Corpus Christi, Texas 78401 AMEND. NO. 7 361.696-3500 • Fax 361.696-3599 • www.maverickengineering.com EXHIBIT "A" Page 1 of 3 all utility poles which were in conflict with proposed improvements. Team will monitor AEP progress. 3. Consultant has met with PCCA staff to verify lane widths and associated curb radius required for proper vehicle movement on and onto Port Avenue. 4. Consultant has received the Traffic/Pazking study prepared by Wilbur Smith Associates for project azea. Consultant has provided traffic projections to Wilbur Smith for comparative analysis. Team received concurrence from Wilbur Smith on February 15, 2008. 5. Consultant to provide pazking lot landscape design in accordance with City ordinance requirements. 6. Consultant to use approved way finding signage. Consultant to provide proper budget for signage program in overall budget development. 7. Consultant to provide adequate street and pedestrian lighting throughout project corridor. 8. Consultant to coordinate improvements with UPRR. Team to commence permitting process requirements with UPRR. 9. Consultant to provide flap gates at Salt Flat Drainage Ditch. Team to pursue improvements under nationwide permit. 10. Consultant to coordinate proposed effluent line with new Broadway WWTP consultant. 11. Consultant to include design of new alternative off street pazking lot in design package. City has identified property located at the SW corner of Port/Dempsey intersection. 12. Consultant to include rigid pavement as an alternate bid item in project. 13. Consultant will pursue USACOE nationwide permit for storm water outfalis into Salt Flats Drainage Channel. Maverick Engineering, Inc. proposes to complete this additional work for the Lump Sum Fee of $1,970,108.00. The following presents the detail breakdown of fees for this Amendment #1. FEE FOR BASIC SERVICES 1. Design Phase (PSBcE Development) 2. Bid Phase (Letting Phase) 3. Construction Phase Subtotal Basic Services Fees FEE FOR ADDITIONAL SERVICES (Allowances) 1. Permit Preparation (as applicable) 1.1 US ACOE (Nationwide Permit #14) $1,226,299.00 24,755.00 20.166.00 $1,271,220.00 2. Topographic Survey 3. Environmental Clearance and Public Involvement (CE Process) 3.1 Programmatic Categorical Exclusion 4. Construction Observation Services 9,682.00 47,500.00 23,974.00 365,000.00 AMEND. NO. 1 EXHIBIT "A" Page 2 of 3 5. Wamm-ty Phase 6. Geotechnical Investigation and Testing 6.1 Construction Testing Program 7. ROW Acquisition Survey Subtotal Additional Services Fees TOTAL FEE TO BE AUTHORIZED FOR AMENDMENT #1 9,140.00 175,972.00 67.620.00 $ 698,888.00 $ 1,970,108.00 Submittal to the TDLR for plan review and approval will be initiated immediately upon issuance of the fmal plans to the City. The Consultant design team will submit design phase documents in July, 2008. If you have any questions, please call me at (361) 696-3500 or (832) 654-4767. Sincerely, Maverick Engineering, Inc. ~~~~ W.D. "Bill" Huff, P.E. Infrastructure Division Manager APPROVED: Kevin Stowers Date Interim Director of Engineering Services CC: Jerry Shoemaker, P.E., City of Corpus Christi-Engineering Services AMEND. NO. 1 EXHIBIT "A" Page 3 of 3 O O O F n M.~y = coo W O ~ LL O LL ~ZO LL ~ LZ11 ' ~ O ¢a~ ~ ~ H O LL x O Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f0 0 0 0 f0 n N N N a N f0 0 0 0 n O W O O O aD a 0 0 c0 0 N r O O (O O) N aD O O OD n N O n M r N ~p ~O N ~ f0 O) O D) 0 0 t0 O) a0 n a0 N n O) h N p ~ N c0 ~- t0 r ~ th n M `° N M ~ N O ~ R ~ ~ p j a 0 t 0 N n EA N 0 0 0 0 0 O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O ~ (D O G C f~ 0 0 M O O N a D (O 10 0 0 0 1 n a 0 0 0 0 i G A m co m o rn in n o o ~n M a 3 O O M t0 N O tO O) N N N O W V ~ t0 <O O N ~ f0 U ~ ~ ° 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i 0 i n° Z 0 0 0 0 0 o o o o oi o o r o o v oi co o o 0 0 n ~o o c o ~ ~ O N N n n M r (O 10 V M cD ~ (O M ~ N LD 7 V O) W V N OD M N W j ~ O! 1n 10 Ih a0 M ~ w O O J Z > _ Z ~ c C7 a K 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ° ~ p ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I~ O O O h x0 0 0 aD X0 0) W N O O OI M tO M 0 0 0 t0 In 0 0 0 0 Nf j ~ of 00 M N O l0 M n ~ tp aO (O M O N n t`') n O) M O O M 7 Ol O! > V O O O N M ~ E N N N M ~O O ~ ' W U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 ~ 0p 0 0 0 OD M (V IV O M M f~ W O O fV I~ N 0 0 0 0 0 0 0 0 (0 0 0 fV C ~ ~ ~ a ~ rn V m e ~ ~ m rn v v m v ~ w ~o ~L ~ n ~ m ~ ~i ~ fO ~ m rn n m ° c O n M ~ J ~ ~ N U Q a U c m ~ E • - ~ a i > c ~ N w C c m ~ 5 X f? QQ W E ~ E iu . u a y m " c o a W H ~ ~ m i a f d a ~ c y ~ ~ 'y ~ o Q m w m a c E y Z o c > a °: ~ w ~ `° d N 0 3 ~ c y ? a i iA m ~ ~ 0 3 m > Z U w - O L m a i y U N - O m m > ¢ 0 ~ O N N ~ I w ~ W t LL m ~ ~ ~ ~ ~ ~ ~ ~ ~ v ~ ~ ~ w LL ' Z m N w C y :: o v (% U m w ~ a c w m w N o ~ ~ Z N ._ m E ~ y E y a m > o .. c o c Z j ~ m L m ~ m .c a m u ~ Q m t-- o m a W w J m ~ U E a c o w m - =_ c - m c7 ~ 2 y - g o ' m m m a w J C ~ Z Z m O 2' O J ^ W c U > !~ s~ - m 0 A F O C L ^ - - % l c 0 N W O O > p Q W w .. . O Q. m U ~ l O C LL ~~ m I L N L m :.-• m m U O X ~ 2 a LL c fn fn m o o s u ~ ~ ~ ~ c y ~ c 2 u o a ~ ~ ~ ~ r r » > m ~ E a LL w 2 .~ ~ ~ - N ~ a ~ N Q E ._ t a w w G E ~ N t a ~ (O n N 0) O O ~ '~-~ N M N ~ ~ N v ~ N d Q > > ~ •O C m ~ y a o m Q ~ ~ ~ h ~ ~ ~ ~ .- ~ ~ r ~ 0 0 c v v a o m ~ a°~ ao m m ^ O Q Y °- m ~ ~ w c~ 3 w c~ H M S a ^ U o: a ~ ~ N o M ~ w W ~ N M V o a w •- N M a in co n ao rn ° ~ a `~° °' r IWL fq LL N1 H ^ Q AMEND. NO. 7 EXHIBIT "B" Pa e 7 of 3 00 O F r _ ~ W O ~ LL O LL ~ZO WU Q. w~~ O ¢a~ ~ .., vi O a x O Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 l0 0 O O O O O O O O N O 0 0 7 0 0 0 0 0 O N O O O C O O D fA O 0 0 N N O 1~ O ~ f~ N W O N I~ N t0 N m O ~ t° CO " ~- o m v o ~ rn A c~ ui of u~ r ao 0 F- N N N N V N ~ r 0 ~ r ~ N O t O O 7 O O O O O O O O O N O 0 0 ( 0 0 0 0 0 0 O a 0 0 0 0 N N O ~ N O aD O O O O O O O O N 0 0 0 0~ 0 0 0 (° O O a0 0 0 aD lff P9 0 0 co ao 0 0 0 0 0 0 0 0 t~ 0 0 0 ac 0 0 0 ui 0 0 e6 0 0 v vi et F» ~ rn o v ro o ~ o m M o ~n o 3 o rn ao ao M rn rn o M o n °~ m d O) O d' Ih N N H ~ N N m > ~ O M t O N 0 0 0 0 0 0 0 0 0 0 0 0 x 0 0 0 0 0 0 O a 0 0 0 f D t° Z O O) N (° O 0 0 0 0 0 0 0 0 1 0 0 0 X 0 0 0 0 0 0 O O O O C' ~ N a p ~ O O N ~ 111 O O O O O O O O f~ 0 0 0 0] O O G O O~ M O O OJ O O th M {V N 1` O 00 OO d fA V W M 1~ a OD O! f~ 0 N th r t0 LL] (° M I~ 07 Of O W ~ ~ ~ ~ M N (V V' ~ f`A') 0 N ~ Z Z W c ° Q O a 0 0 N 0 ' 0 0 0 0 0 0 0 0 0 0 V 0 0 0 0 0 0 O N N O 0 O 0 O 0 O 0 O 0 O O ~ 0 0 0 0 0 V { O M (D 1 ~ ~ O O I" In - 0 M 0 V W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V 0 0 0 0 0 O M 0 0 0 Yl ~ M b9 GD h V ~ M V t0 t0 ~ O ~ r N O ch 0 h r aD N h N V E °' M ~ r N O O 00 N ~ ~ ~ N M C ° N N e- N O N O M l n N O O O O O O O O O a 0 0 0 N 0 0 0 0 0 O ~ 0 0 0 t 0 t 0 O M 0 N O O O O O O O O O O O O In 0 0 0 0 0 O N O O V Ol M ~ O O l n ~ l~ O O O O O O O O t 0 0 ~ 0 0 N O O O M O O ~ O O N ~ f V N c _ fA N t0 O LL~ ~ In ~ A 0 7 N Op 0 O N N N ~ O O) O M N A W y.c N N (O ~ M ,- y co ~ co ~ ro n v ~ w J 0 ap N V t+! ~ ~ w U Q a w U c N ~ j O N N d F O d c C C 'C C (.1 Q W C ~ y m OC W a " .y m E y ~ c o d o a H ' ~ a i E m r c ~ ~ . y Q ~ Q ~ W p d d c E E w ~ c ° v c m c d ~ ~ o - - ~ m - Z v o m w y ~ m m a E > N w ~ Z y m °: ~ o ~ ~ ~ _ m ~ ~' m o tl ~ c _ o a i L m ~ ~ ~ O m c ~ m j m L H m Z y f/) W (A W °ti a d m w Q m E ~ o ~ o - c Z c «~ ~n o m c ~ ~ ~ tn ~ V N U N ii H e O !E U Z Z L N m m E a O O m ~ > ° o C ~ ._ C N N N '.. -. ~ O 01 K t d d d ~ Q '~ ~ ~ W 4' U ~ N ~ U ~ ~ o ~ t 7 ~ C9 2 X c w H m W a N J C t Z m O d' O O ^ W c Q LL Y N « C a m W N W O N W m V1 m ° O W J ~ O H O p ._ L N C € > O U U Y C O LL L d am= m vi d U D X X I d a c lq fO d E o c c g m C •° V ~ a ~ o F a ~ ~ f- r i-- ~ ~ » > ~O ~ E a LL w ~ c ~ ~ S C y E Q ° N Q E c 2 0 > ' ~N a C N O E ~ N M a ~n co n ao rn ° ° ~ Q ~ N M C C a ~O '- N y Q > ~ C c an d a m 0 ~ m o U m Q o iu a .= ~ ~ ~ ~ .= .= ~ ~ ~ 0 ~ 0 ~ c w v v v o U m l ~ m m c9 ao m a~ H 0 M 0 ~ 0 t ~ o N O ~ ~ Q LL W ~ N M C o d LL W •- N M V O 0 I~ 0 01 ~ ° a `3 dt .... IWL fq IWL M F ~ Q AMEND. NO. 1 EXHIBIT "B" Pa e2of3 0 U O H n MAN __ c`YO W ~ O LL U D LL ~ Z O W U K w ~ E O ¢a~ ~ ... N O a x O 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 (p °j 1[j (p tG I~ N N O a N (D O N O f~ V OD O O O O O V N O (D OM O1 O O H l1 S O N t O W N N O N O a D V' N O H O h f~ M N O N In N r ~ ~ ~ (p ~ 0 Q) O O C0 t0 V O f~ W O N 1~ m T (O t0 M ~ (O ~ O N N tp .- (O ~ ~ M IS W M O ~ N m ~ d' N tD ~{+1 01 ~ tD N N N M V 00 7 M ~ <O N I~ r (O N r v ~ ~ N N O (0 0 0 0 O O O O O O O O N O 0 0 t 0 0 0 0 0 0 0 0 0 D O 0 0 N N 0 0) N f 0 0 0 O O O O O O O O N O O O ~ O O O t D O 0 0 0 D O 0 0 p N { h r O O O 1 (p O O O I~ O O C M r O N W V 10 O O 1° LL ~ O ~ 0 0 0 O C ~ ~ ~c ln w o o o rn u~ ~ m o o ~ 1n o 1o ~ M o01 0 3 O O O a0 01 M M 1n N W t0 t° M N O hr N r m Op °l OD (O ~ (O tp V O ~ f~ N r y EA V N t0 ~ j M W > W LL O M 1l') N O 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 ~ 0 0 0 t 0 i 0 N V 0 °1 of fD V O O O O O O O O h 0 0 0 ~ O O O N O 0 0 0 0 0 V ~ O O N ~ 1 f 1 O O O O m 0 0 1~ 1~ 0 O) M V O C O W I~ O c 0 0~ O O M V 0 f~ ~ M H M ~ (O 1p r ~ !n V t° to M W W M i0 r F d aD W h V OD a' O D7 ~ O ~ N N O M M V„ M N 1~ W ' A i0 T 1!'i ~ ~- OD aD 1t) m N ~ d 001 a00 O 3 M N W r, U 'p J Q ~"~ O ap 0 N O 0 0 0 0 0 0 0 0 V' 0 0 0 N 0 0 0 0 0 0 0 'Q 0 0 0 i0 tp O O I~ ~ O a O O O O O O O O O O O O N O O O a 0 0 0 0 a D 0 0 V t+1 h ~ ~ ~ (p tp If> oJ O O aD N W W (V O O O M O M O O C tD O In f`M O O C000 M j ~ Op ~ M ~ CO N N t~ (O (O M N f~ 10 O O M I~ a <O ~ I~ ~ V ~ M O M .- eD M ~ N M N M M O a) V h a0A CO ' > W m O V m! f0 ~ N 1~ N r a O N a1 V OD ~N V E N N ~ N N W M M N O O ~ N M I H ~ U O M 1 n N 0 0 0 0 0 0 0 0 0 7 0 0 0 a 0 0 0 O O O O O ~ O O O i O 10 O M a 0 N V 0 0 0 0 0 0 0 0 ° J O O O 1 n 0 0 0 N O 0 0 N O 0 a W M V a0 0 1n ~ Yf M N N O M M h cp (O O h I~ V O O O M O O W O (O to a0 c N N a 0 ~ d' W ~ ~ W 0 ~ n n l O N M O M O W m e ~ co 1n 1n ao u~ ~o rn a v v ~° a u~ ~ co rn rn M r 10 NL I~ (O M ~ ~ t0 ~ N 1° t0 0 O O ~ V f0 I~ r O V V ~ N ~ N ` ~ 0 i ( N W CO J W 01 ~ fA r w 0 ` a w U c m # > O N m C c c ~ ~ x Q w a ~ E m o a rn a i W H ' ~ c m y O m d a V C N U ~ y J ~ E Q m w m a ~c E y Z o c > a w: ~ ~ `° ~ ~ c o > y i ~ t° ~ 3 m ~ H n m i a V O N N ~ N ~ O C U U C ¢ ~ y N C d N m N Z L m m F m C ° ° m > L ~- m V w ~ m H o ~ Z Z ~ adi E ~ m y > ° Z m ~- c '- L a m J :~ m rn ° ~ - a E a m y = c $ ~ ~ g c o m C L m m a ~ Q `~ ~ ~ ~ ~' U 3 ~ ' 4 U ~ m o ~ t ~ - ~ ~ y 'X c 'wN m W a N J c 't Z m C7 R: O C7 p > w o Q tl ~ . m '3 E .. c a m ° m y w o ~- m a i a fR N ° m O W J ~ U > 0 ._ L d c Q > O " ~ ._ = c i O c m L m '- T N _ y U ~ X X 2 d d C !n (n m m O c 10 C O 0 ° o 'O U C a v1 f0 i ~ a r ~ F- t- r ~ ~ » > Q' E a LL W ` c 'C L U 5 U ~ E Q :± m ~ U 2 N ._ ~ N p Q _ ,_ d to N Q ~ ~ N M 7 1(1 c0 I~ a0 ~ ~ i •- N M C N N Q i L O ID ~ N a` ~ o 9 'm p U m _ Q ~ a ~ ~ ~ r ~ ~ ~ ~- ~ ~ p t- O ~ C w S R V O U N ~ ~ rn C7 N aO N H D M UQ ~ . ~ .~ O :°. O c Q c W ~ N M 7 ~ W ~ N M ? l° t0 f~ O O ° ~ ~+ a '.4 mL .... ' LL r'n LL in f°- o ¢ AMEND. NO. 1 EXHIBIT "B" Pa e3of3 ~,y~ City of ^ COI'pl1S CITY OF CORPUS CHRISTI Ct1T1St1 DISCLOSURE OF INTERESTS war City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "N/A". FIRM NAME: Maverick Engineering, lnc STREET: 400 Mann Street. Suite 200 CITY: Corpus Christi, TX ZIP: 78401 FIRM is: 1. Corporation X 2. Partnership- 3. Sole Owner- 4. Association 5. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each employee of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name Job Title and City Department (if known) N/A 2. State the names of each official of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name Title N/A 3. State the names of each board member of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name Board, Commission or Committee N/A 4. State the names of each employee or officer of a consultant for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an ownership interest constituting 3%or more of the ownership in the above named firm. Name Consultant N/A CERTIFICATE I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: W.D. "Bill" Huff P. Title: Division Manaoer Signature of Certifying Person: Date: ~ ~3U- D~ EXHIBIT "C" Pa e 1 of 2 DEFINITIONS a. Board Member. A member of any board, commission or committee appointed by the City Council of the City of Corpus Christi, Texas. b. Employee. Any person employed by the City of Corpus Christi, Texas, either on a full or part time basis, but not as an independent contractor. c. Firm. Any entity operated for economic gain, whether professional, industrial or commercial and whether established to produce ordeal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership corporation, 1oint stock company, joint venture, receivership or trust and entities which, for purposes of taxation, are treated as non-profit organizations. d. Official. The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads and Municipal Court Judges of the Ci y of Corpus Christi, Texas. e. Ownership Interest. Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate or holding entity. Constructively held refers to holding or control established through voting trusts, proxies or special terms of venture or partnership agreements. f. Consultant. Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. EXHIBIT "C" Pa e2of2