Loading...
HomeMy WebLinkAboutC2008-223 - 6/30/2008 - NACITY OF CORPUS CHRISTI AMENDMENT NO. 10 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City", and MAVERICK ENGINEERING, hereinafter called "Consultant", agree to the following amendments to the Contract for Engineering Services for Cimarron Boulevard • Phase 1 from Saratoga to Yorktown (Project No. 6261) • Phase 2 from Yorktown to Bison (Mireles) (Project No. 62621, as authorized and Ori final Contract Ma 10, 2005 Motion No. M2005-134 $1,359,999.00 Amendment No. 1 December 13, 2005 Motion No. M2005-411 $73,912.00 Amendment No. 2 Janua 24, 2006 Motion No. M2006-017 $412,603.00 Amendment No. 3 Au ust 18, 2006 Administrative A royal $20,020.00 Amendment No. 4 Se tember21, 2006 Administrative A royal $19,161.00 Amendment No. 5 Se tember26, 2006 Motion No. 2006-324 $1,143,024.00 Amendment No. 6 March 1, 2007 Administrative A royal $24,922.00 Amendment No. 7 March 30, 2007 Administrative A royal $24,950.00 Amendment No. 8 Au ust 30, 2007 Administrative A royal $0.00 Amendment No. 9 Aril 29, 2008 Administrative A royal $0.00 - As described in the attached "Amendment No. 10, Exhibit'A"', the proposed Amendment No. 10 amends Phase 1 from Saratoga to Yorktown (Project No. 6261) for the Master Channel 27 Drainage Improvements (Project No. 2263) Project: Exhibit "A", Section A. Scope of Services, Part A. Basic Services, Item No. 2 Design Phase is amended to modify the ditch confluence at the northern portion of Lateral "A", Land Parcel 12A; and for coordination and correspondence with surveyor and City Land Acquisition Department on the survey and metes and bounds fora 4-acre wetland site and buffer zone at the southeast corner of Master Channel 27 and CR 7B. - Exhibit "A", Section A. Scope of Services, Part B. Additional Services, Item No. 3 Topographic Survey is amended to revise two drawings and metes and bounds for Parcel 12A and 15' utility easement, find or set corners, and calculate new area for Parcel 12A and 15' utility easement; and for research, calculations, set corners, and preparation of map and legal description for 4- acre wetland site and buffer zone. - The Summary of Fees is modified and is attached as Exhibit "B:' This is a $13,714 amendment. The total fee for Cimarron Blvd., Phases 1 and 2 is $3,092,305.00. All other terms and conditions of the original contract between the City and Consultant and any amendments which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI MAVERICK EN JEERING INC. w 6 o/p8 --26 -r~~~ n .Escobar, P.E. ate . "Bill" , P.E. Date Int rim Assistant City Manager 400 Mann St., Suite 200 Corpus Christi, TX 78401 RE MMEN ED (361) 696-3711 Office; (361) 696-3599 Fax ~ ~~~~ Kevin R. to ers Date Interim Director of Engineering 2008-223 06/30/08 Maverick Engineering, InC. 263 MASTER CHANNEL 27WMENDMENT NO. tOWMEN~MENT N0.1U AMD. NO. 10 Pa e 1 of 2 ATTEST ~~_~_ _ Armando Chapa, City Sec ary Project Number: 2263 CIP # SW 77 Funding Source: 550950-3492-00000-170578 Encumbrance Number: APP.ROVEQ AS TO FOR ~~ Assistant City Attorney Date MASTER CHANNEL 27W MENDMENT NO. 101AMENDMENT NO. 10 AMD. NO. 10 Pa e2of2 June 25, 2008 Mr. Kevin Stowers Interim Director -Engineering Services P.O. Box 9277 Corpus Christi, Texas 78469 Re: Contract Amendment No. 10 Master Channe127 Drainage Improvements Project No. 2263 Dear Mr. Stowers: Maverick Engineering, Inc. (MEI) is pleased to submit our fee proposal for providing additional services for the Master Channe127 Drainage Improvements (Project No. 2263) as outlined in the attached Man Hour Estimates. The scope of services and corresponding fees aze shown below: Scope of Services and Fees 1. Description: Design modifications to the ditch confluence at the northern portion of Lateral `A', Land Pazcel 12 A a. Survevina: Revise two drawings and metes and bounds for Parcel 12A and 15' utility easement; find or set corners; and calculate new area for Pazcel 12A and 15' utility easement. Additional Services Fee: $1,392.00 b. EnQineerine: Design modifications to Lateral `A' Baseline Aligmnent Plan, and Storm Water Plans to accommodate the ditch confluence modifications. This work will require revisions to three construction drawings. Additional Services Fee: $4,025.00 The total fee for Amendment 10 (1. Description) is $5,417.00. 400 Mann St., Christi, Texas 78401 AMEND. NO. 10 EXHIBIT "A" Pa e 1 of 8 361.696-3500 • Fax 361.696-3599 • www.maverickengineering.com 2. Description: Survey and metes and bounds fora 4 acre wetland site and buffer zone at S.E. corner of Master Channel 27 and C.R. 7B a. Survevin¢: Reseazch, calculations, set corners, and prepare map and legal description for 4 acre site and buffer zone. Additional Services Fee: $7,490.98- 00 J~v/'~ b. Enaineerin¢: Coordination and Correspondence with surveyor and City Land Acquisition Department Additional Services Fee: $807.00 The total fee for Amendment 10 (2. Description) is $8,297.00. The total fee for Amendment No. 10 is $13,714.4,8- oo,~ a~ We appreciate the opportunity to provide these profession services to the City of Corpus Christi. If you have any questions regarding this proposal, please feel free to contact me at (361) 696-3711. Respectfully, Maverick Engineerin ,Inc. W.D. "Bill" Huff, P.E. Infrastructure Division Manager Attachments: Man Hour Estimates cc: MEI Project File No. 0527-510 AMEND. NO. 10 EXHIBIT "A" Pa e2of8 Amendment No. 10 1. Description AMEND. NO. 10 EXHIBIT "A" Pa e3of8 Maverick Engineering, Inc w sAPEn ~ G TASK Sr. RPLS RPLS MANAGER SR. SUP' ' O ~ rise drawings (2) and Metes and Bounds (2) of " m w m ~cel 12A and the 15' Utll. Easement csi m n ~ ~ ~ ablish Control and Traverse Project Limits • • w A N Id Surveying Boundary-Find (5) andlor set corners s $ = o. D least 1) for 12A.; remove 2 IR's ~ ~ Z a N ~ ~ ~ T C culate new area for 12A ~ c m N a ra - A o o0 w ~ IQC 1 ~ o sc+ i ~ c a 0 = ~ x $143.00 y y m n Estimate $0.00 $0, ~ Gear Rental 0 trios CD 0 cars CrD 0 miles/ea ~ IA I~ $1 AMEND. NO. 10 EXHIBIT "A" Pa e4of8 W U ~ W wV ~ 2 w H Z J W W Z W Z U ~ Z F a wo w~ za aV' N QO ~¢ ~ W ~ p N p a F Jd• ~(n za ~p a Za U O ~? ~ Y LL ~ WO Q ~ g mZ ~ ~ 00 y K 2 U a O U w U i ' ' ~I " ! ' w ~' ~ _ ! ~ ~ '~ it I ~ O y~ I i ~ I '- N U I ',. ~ _ ~ I I. O aD V (O (O N H ~ I ( I I N r ~~ I ii ! O ~ O ~ m ~ ~ 'i (O i N ' M M ~ ~ ~ N ~ ~ ~ t . ~ ~ ~i ~ rn O ~ ~ i ~ ~ I O y ~ '' i ~~., I ii I II ' C C ~ ' ' ~ ' i w , I . i I I ~-- i- I ~' u' I a i rn~ ' c W ~ ~ ~ v m i I I I II ~ °o _ ~ i ! ~ i , ~ a `si ' ', '~ i is> p ~ I N y w _ I ~ ~ LL O ~ ~ V ~ I ~ N w W w y o ' i ~ I o I- F iC U i t i ~ ~ ~ ~i I H '~' I I ~ !o', i ja m m IUj ~ Ic D ~ tj 3 d O i -O o ~w f P I 3i a o I ,, I ' ~j m . Ai E m; I m ~ ICI t~ ~ ~ ~ i w ~~ iwi¢ ' a ,~lo V o 0 0 itq ;GIN ~ ! C O C N fA C C ~ jO y~ I O O N N ~ p UI IN:~ - I ~, ~ ' ~ ~a o , ~~ ~i~ ~ ~ m m~ m .y . ~. ~N m m W ' , N ~ O'~ N'.. I N N N N N O (/1 ~ .x'. r C O O a U 2 d ~~ O O 2 c E v d Q m c U N w 5 x C f0 F~- N W Q R U ~_ W w ai ~z EXHIBIT "A" o...... C ..f Q Amendment No. 10 2. Description AMEND. NO. 10 EXHIBIT "A" Pa e6of8 Maverick Engineering, Inc A O M A n TASK Sr. RPLS RPLS SAFETY MANAGER SR. SUPS n ~ C W ~ I Abstractin •Title 8 Plat Data Gathering ~ ~ l7 ~: m a t7 c m > Establish Control and Traverse Project Limits D ~ ~ M ~ A ~ a W Fleld Surveying Boundary-Find and/or set corners for 3 the 4 ac. And the buffer zone N ' ~ Z = a ~ 1 Calculate positions of corners for 4-ae. And the buffer tzone ~ z N o ~ N ~ A u ~ and Le al Descri tions for the 4 Pre are Ma Tract m p p p g -ac. i and the buffer zone 4 g ao ~ W ~ CJUQC m m ~ _ ~ N Final Submittal ~ = K m Total 0 m m N Rate $143.00 72. _ Total Estimate $0.00 $0.00 Miscellaneous ao ~ w w GPS Gear (1 unit) Boat Rental Lodgin & Food Per diem ($143/person/da ) special order rods for wetland/buffer delineations corners o Deliveries (rods from bernsten ehicle Milea e 0 tri s 0 cars 0 miles/ea Cadd Machine /PlotterTime Reproduction Total Miscellaneous 8 supplies $979.08 13.07% $7,490.08 AMEND. NO. 10 EXHIBIT "A" Pa e7of8 F Z W W ~a ~~~ U Q N ~ QZ Z p p U U N ~ LL `~ W ~ r Z d U U W jW i (n )W ~~ ~w ~~ W ~a ~O J Q ~w _ ?> a. Q >~ ] a . ~ C ~ w O I I ~~ ', l ~ ~ I N C I d X I i I ~ ~ W i I N ~ ~ O U n N I ~ N r ~ V I ', I ~ I _ EA -. _-' ~ ~ ~ H '. i '. O p N r '. I a ti rn~ v ~ v '~ ~ •d ~ ~'. '' ~ ~ u9 M ~ I d ~ C ~ . ~ ~ W ! '. ~ " i I '~. I I ' ~ I w i' II n ~ o `fl ` a . I ~ I N li ~ li O ~ I V ~ ~ ~ I i I I _ y W W w d a . ~ ~. ~, i ~ m «~ y W ~ I ~ ~ H ~ t6 U ~ ~ I ~+ ~ i Ali i H ~~ ~.. ~ ~ I N i. C i i i -gy p ~ Id y V ~ '~ ~ ~ I V I. i I t I W ~ V '.. i I c ~ I ~' 'i ~., Z O O 'm H c 'v' Q' U' EXHIBIT "A" Dann R ..f f! O N C N O '~ n o. U Z pNj . O W v O O Z c N E v c d Q U N W O 2 N H N E c > C O R D. '= E U d ~ R ~ CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO VORKTOWN (PROJECT NO. 8281) PHASE 2 FROM VORKTOWN TO BISON (MIRELES) (PROJECT N0.8282) SUMMARY OF FEES IN ITIAL CON RA CT Cimarron Blvtl, Phase 1 Pro act No. 8287 Street Storm Water Wa r Wa water Total Basic Services 1 Prelimina Phase $24,040.29 E13,410.11 $7791.90 $7396.70 $52,639.00 2 Desi n Phase 210,983.00 177,678.00 66,377.00 64,809.00 487 928.00 3 Bid Phase 5,822.02 3,247.83 7 887.03 1,791.32 12,748.00 4 COnaWC[len Phase 19,208.85 10,715.04 6,225.94 5970.77 42060.00 Subtotal Basic Services Fees 260034.78 145057.78 84,287.87 80,007.19 589,375.00 Addttional Services 1 Permltlin Authorized 4,261.93 2,377.36 7 3(11.37 7 371.37 8,332.00 2 ROW A ulei8on Surve 0.00 0.00 0.00 0.00 0.00 ' 3 To re hk Surve AuthOrizetl 4,938.94 2 753.97 1800.75 7 578.99 10,810.00 4 Environmental issues 0.00 0.00 0.00 0.00 0.00 5 ConsWCtion Observation Services 124 244.61 89 305.90 40 289.97 38,227.52 272 048.00 6 Warta Phase 3,385.07 1,888.25 1,097.18 1047.52 7472.00 7 H dro-E><ceva8on Authodzed 0.00 0.00 8592.00 8,592.00 13,184.00 8 Televising Existing Sanitary Sewer Lines Authored 0.00 0.00 0.00 31,250.00 31,250.00 9 Drelna a Cdleda Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Interface of Cimarton with Kin 's Point Uni[ 7 Subd. - 0.00 0.00 0.00 0.00 0.00 Subtotal AddiOOnal Services Fees 138,825.55 76,325.45 50,940.86 79 941.34 344 038.00 Total Authored Fee $396,862.70 $221,377.24 $135,222.53 $159,948.54 $973471.00 Cimarron BNd Phase 2 Pro act No. 6262 S r Storm Water Water Wastewater To I Basic Services 1 Prelimina Phase $21,789.87 $9,004.82 $6,217.48 $5,500.88 $42,493.00 2 Des' n Phase 705 353.00 43 578.00 30 089.00 28 827.00 205 841.00 3 Bid Phase 5,395.19 2,237.68 7540.88 1,363.28 10,531.00 4 Constmrdion Phase 13,859.88 5,850.24 3,901.28 3,457.63 28,863.00 Subtotal Basic Services Fees 748 777.06 80,484.77 41,748.85 38938.79 285,328.00 Atldttional Services 7 Pem18tin Authorized 4852.85 1,924.59 1,328.88 1,175.70 9,082.00 2 ROW uisttion Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authoretl 4,723.55 1,953.84 1349.05 1,183.56 8,220.00 4 Environmental Issues 0.00 0.00 O.OD 0.00 0.00 5 ConsWUtion Observation Services 48,669.94 20137.73 13900.22 72298.11 95,000.00 8 Warta Phase 1805.40 746.78 515.62 456.20 3,524.00 7 H tlro-Excevalion Authored 0.00 0.00 8582.00 8592.00 73,184.00 e Televising EnisBng Sanitary Sewer Lines Authored 0.00 0.00 0.00 37,250.00 31,250.00 9 12-Inch Watedine Re lacement 0.00 0.00 0.00 0.00 0.00 10 Re lacement of Yofktown Ditch 0.00 0.00 0.00 0.00 0.00 77 Im rovements to Bear Creek DBCh 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 58,851.73 24758.95 23885.78 52985.58 781,260.00 TotalAuthodzed Fee $206,029.59 $85,227.88 $85434.47 $89902.35 $448,588.00 Combined Total Street Storm Water Water Wastewater Total Basic Services 1 Prellmina Phase $45,810.09 $22,414.83 $14,009.40 $12,897.58 $95,132.00 2 Desi n Phase 316,316.00 781 257.00 98,488.00 91 530.00 887,589.00 3 Bid Phase 77,217.22 5,478.28 3,427.80 3,154.60 23,279.00 4 L`.OnsiNetlOn Phase 32,868.70 18 385.28 10 727.22 9,387.79 68,723.00 Subtotal Basic Services Fees 408 212.07 205,516.50 126,030.52 116,943.97 854 703.00 Additional Services 1 PermttOn Auhodzed 8,914.78 4,301.98 2 710.23 2,487.01 18,414.00 2 ROW uisttion Surve 0.00 0.00 0.00 0.00 0.00 3 To re hk: Surve Authorized 9,660.48 4,707.75 2949.21 2,712.56 20,030.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 ConsWCOon ObservaBon Services 172,814.55 89437.84 59,770.18 50525.83 367,048.00 8 Werra Phase 5790.47 2,635.03 1,812.78 1,497.71 10938.00 7 H ro-Fxcevation Authored 0.00 0.00 13,184.00 73,184.00 28388.00 e Televising Existing Sanllary Sewer Lines Authorized 0.00 0.00 0.00 62,500.00 62,500.00 9 Dreina a Crttede Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 72-inch Waterline Re lacement-Ph. 2 0.00 0.00 0.00 0.00 0.00 70 Re lacement of Yorktown Dttch-Ph.2 0.00 0.00 0.00 0.00 0.00 17 Im rovements to Bear Creek Dttch-Ph.2 0.00 0.00 0.00 0.00 0.00 72 Motlifica0ons (orlntedace of Cimarron wtth Kin 's Poim Untt 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 796,880.28 101,002.40 74,626.41 732,906.97 505,298.00 Total Authorized Fee $fi02892.29 $306,598.90 $200858.93 $249,850.88 $1359,999.00 May 10, 2005 Motion No. M2005-134 AMEND. NO. 10 EXHIBIT "B" Pa e1 of 12 CIMARRON BOULEVARD PHASE i FROM $ARATOGA TO VORKTOWN (PROJECT N0. 6261) PHASE 2 FROM VORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES A MENDMENT N0 .1 Cimarron Blvtl Phase 1 Pro act No. 8281 Street Storm Water Water Wastewater Total Basic Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Cons[mction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Faes 0.00 0.00 0.00 0.00 0.00 AdtlAional Services 1 Permdtin Authorfzetl 0.00 0.00 0.00 0.00 0.00 2 ROW uisttion Surve 0.00 0.00 0.00 0.00 0.00 3 TO re hit Surve AWhodzed 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Excevatlon AWhodzed 0.00 0.00 0.00 0.00 0.00 8 Televising Existing SanBary Sewer Lines Authorized 0.00 0.00 0.00 0.00 0.00 9 Drains Cdteda Technical Guitle 0.00 - 0.00 0.00 0.00 0.00 10 Modifications for Interface of Cimarron with Kin 's Point Untt 7 Subtl. 0.00 0.00 0.00 O.OD 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Cimarron BNd Phase 2 Pro act No. 8282 Street Storm Water Wat r Wastewater Total Basic Services 7 Prelimina Phase $0.00 $0.00 50.00 $0.00 $0.00 2 Desi n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 ConslNCtlOn Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addttional Services 1 Permidin Aulhedzed 0.00 0.00 0.00 0.00 0.00 2 ROW Ac uisition Surve 0.00 O.OD 0.00 0.00 0.00 3 To re hic Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dm-Ezcevaticn Authorized 0.00 0.00 0.00 0.00 0.00 8 Televising Existing Sanitary Sewer Lines Authored 0.00 0.00 0.00 0.00 0.00 9 12-inch Watedine Re lacemenf 0.00 0.00 14,149.00 0.00 14,149.00 10 Re lacemem of Yorktown Dttch 0.00 19,337.00 15,753.00 0.00 35,090.00 t 1 Im rovement5 to Bear Creek DBCh 0.00 24,873.00 0.00 0.00 24,673.00 Subtotal Addttional Services Fees 0.00 44,010.00 29,902.00 0.00 73,812.00 Tofal Authorized Fee $0.00 $44,010.00 $29,902.00 50.00 $73,812.00 Combined Total Street Storm Walar Wa r Wastewater T I Basic Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desl n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constmction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Adtlkional Services 7 Permttlin Amhodzetl 0.00 0.00 0.00 0.00 0.00 2 ROW Ac uisfilon Surve 0.00 0.00 0.00 0.00 0.00 3 TO re hic Surve Authored 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 ConsWCtion Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warren Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Excevation Authored 0.00 0.00 0.00 0.00 0.00 e Televising Existing Sanitary Sewer Lines Authodzed 0.00 0.00 0.00 0.00 0.00 9 Drains a Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12-inch Waledlne Re lacemenf-Ph. 2 0.00 0.00 74,149.00 0.00 14,149.00 10 Re lacemenf of VorMOwn Ditch-Ph. 2 0.00 19,337.00 15 753.00 0.00 35,090.00 71 Im rovements to Bear Creek Ditch-Ph.2 0.00 24,873.00 0.00 O.OD 24,873.00 72 Modifications for Interface of Cimarron wtth Kin 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 44,010.OD 29,802.00 O.OD 73 912.00 Total Authorized Fee $0.00 $44,010.00 $29,902.00 $0.00 $73,912.00 December 73, 2005 Motlan No. M2005-011 AMEND. NO. 70 EXHIBIT "B" Page 2 of 12 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT NO. 8261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO. 6262) SUMMARY OF FEES A MENDMENT N0 .2 Clmarton Blvd Phase 7 Pro ect No. 8281 Street Storm Water Water Wastewater Total Basic Services 1 Prelimina Phase $0.00 $95,980.00 $0.00 $0.00 $95,960.00 2 Dasi nPhase 17,372.00 0.00 0.00 117,289.00 728887.00 3 Bld Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 71,372.00 95980.00 0.00 777289.00 224,621.00 Adtlttlonal Services 1 Permttll Authorized 0.00 0.00 D.00 4 124.00 4,124.00 2 ROW uisilion Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authorize0 0.00 173,704.00 0.00 10,159.00 183,858.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Ezbavation Authorized 0.00 0.00 0.00 0.00 0.00 8 Televising Existing Sanitary Sewer Lines Authodzed 0.00 0.00 0.00 0.00 0.00 9 Draina a Crilerfa Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Interface of Cimarron wah Kin 's Paint UnH 7 Subtl. 0.00 0.00 0.00 0.00 0.00 Subtotal Atltlttional Services Fees 0.00 173,704.00 0.00 14,278.00 787,982.00 Total Authorize0 Fee $11,372.00 $269,664.00 $0.00 $731,567.00 $472,603.00 Cimarton BNd Phase 2 Pro act No. 8262 Street Storm Water Water Wastewater Total Basic Services 7 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi nPhase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Conslmcion Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Atltlhional Services 1 Permmin Authodzed 0.00 0.00 0.00 0.00 0.00 2 ROW Ac uisttion Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authodzetl 0.00 0.00 0.00 0.00 0.00 4 Envlronmerdal Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wanan Phase 0.00 0.00 0.00 0.00 0.00 7 Hdro-Excavation Aulhodzetl 0.00 0.00 0.00 0.00 0.00 8 Televising EZlsting Saniary Sewer Lines Authodzed 0.00 0.00 0.00 0.00 0.00 9 12-inch Waledine Re lacement 0.00 0.00 0.00 0.00 0.00 10 Re lacement of VorMOwn Ditch 0.00 0.00 0.00 0.00 0.00 77 Im rovements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Atltlttional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Combined Total Streef Storm Water Wa er Wast w r Total Basic Services 7 Prellmina Phase $0.00 $95,980.00 $0.00 $0.00 $95,960.00 2 Desi nPhase 11,372.00 0.00 0.00 117,289.00 128 661.00 3 Bitl Phase 0.00 0.00 0.00 0.00 0.00 4 Constucion Phase 0.00 0.00 0.00 0.00 0.00 Subtoal Bask Services Fees 11,372.00 95,960.00 0.00 117,289.00 224,621.00 Additional Services 1 Permihin Authorized 0.00 0.00 0.00 4,724.00 4,724.00 2 ROW uisilion Surve 0.00 0.00 0.00 0.00 0.00 3 To o re hk Surve Authorized 0.00 773,704.00 0.00 10154.00 783858.00 4 Environmental issues 0.00 0.90 0.00 0.00 0.00 5 Constucion Observation Services 0.00 o.DO 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Excavaton Authorfzetl 0.00 0.00 0.00 0.00 0.00 e Televising Ezisling Sanitary Sewer Lines Authodzed 0.00 0.00 0.00 0.00 0.00 9 Dr41na a Cdtena Technical Guitle-Ph. i 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Re lacement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 Re lacement of Yoddown Dttch-Ph. 2 0.00 0.00 0.00 0.00 0.00 71 Im rovemems to Bear Creek Ditch-Ph.2 0.00 0.00 0.00 0.00 0.00 12 Modifications for Interface of Cimarron wtth Kin 's Point Untt 7 Subtl. 0.00 0.00 0.00 0.00 0.00 Subtotal Atltlttienal Services Fees 0.00 773,704.00 0.00 74,278.00 187,982.00 Total Authorized Fee $11,372.00 $269,664.00 $0.00 $131,567.00 $472,803.00 January 24, 2006 Motion No. M2006-017 AMEND. NO. 10 EXHIBIT "B" Page 3 of 12 CIMARRON BOULEVARD PHASEIFROM SARATOGA TO YORKTOWN (PROJECT NO. 8281) PHASE 2 FROM VORKTOWN TO BISON (MIRELES) (PROJECT NO. 6262) SUMMARY OF FEES CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO VORKTOWN (PROJECT NO. 6267) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO. 8282) SUMMARY OF FEES A MENDMENT NO.4 Cimarron Blvd Phase 7 Pro ect No. 6281 Street Corm Water Water Wastewater Total Basic Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi nPhase 1,872.25 7,872.25 7,872.25 7,872.25 7,489.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constmction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Baslc Services Fees 1,872.25 1,872.25 1,872.25 7,872.25 7,489.00 Atld6ianal Servlces 7 Permittin Amherlzed 0.00 0.00 0.00 0.00 0.00 2 ROW uls9ion Surve 2,918.00 2,918.00 2,918.00 2,918.00 17,872.00 3 To o re hic Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Constmclion Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Fxcavalion Authodzed 0.00 0.00 0.00 0.00 0.00 Televisirg F~cisling San6ary Sewer Lines 8 Aumorizetl 0.00 O.OD 0.00 0.00 0.00 9 Drain a CMelia Technlcel Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications (er Intedace of Cimaron with Kin 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Add6ional Services Fees 2,978.00 2,978.00 2,918.00 2,918.00 17,672.00 Total Authorlzed Fee $4,790.25 $4,790.25 $4,790.25 $4,790.25 $19,161.00 Cimarron Blvd Phase 2 Pro act No. 8262 Street Storm Water Water Wastewater Total Basic Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi nPhase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constromion Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Additional Services 7 Permittin Authodzetl 0.00 0.00 0.00 0.00 0.00 2 ROW A uisdion Surve 0.00 0.00 0.00 0.00 0.00 3 To m hic Surve Autlrodzed 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 ConstmMlon Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Excavation Authodzed 0.00 0.00 0.00 0.00 0.00 6 Televising Exis9ng Sanitary Sewer Lines AWhorlzetl 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Re lacement 0.00 0.00 0.00 0.00 0.00 10 Re lecement of Yoddown Ditch 0.00 0.00 0.00 0.00 0.00 77 Im rovemenis to Bear Creek Dttch 0.00 0.00 0.00 0.00 0.00 Subtotal Addiional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authored Fee $0.00 $0.00 $0.00 $0.00 $0.00 Combinetl Total Street Storm Water Water Wastewater Total Basic Servces 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi nPhase 1,872.25 7,072.25 7,872.25 1,872.25 7,489.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constmction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Servlces Fees 1,872.25 1,872.25 1 872.25 1,872.25 7,489.00 Atldaional Services t Perm9tin Authorlzed 0.00 0.00 0.00 0.00 0.00 2 ROW A ulsttbn Surve 2,918.00 2 978.00 2,978.00 2,978.00 71,672.00 3 To hic Surve AMhoretl 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Censiromion Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Excavaton Authorzed 0.00 0.00 0.00 0.00 0.00 B Televising Existing Sanimry Sewer Lines Authorized 0.00 0.00 0.00 0.00 0.00 9 Draina aCMeda Techninal Guitle-Ph.i 0.00 0.00 0.00 0.00 0.00 9 12-Inch Waterline Ra lacement-Ph. 2 0.00 0.00 0.00 O.OD 0.00 10 Re lacement of YOrlnown ORch-Ph.2 0.00 0.00 0.00 0.00 0.00 11 Im rovemenis to Bear Creek Dgch-Ph.2 0.00 0.00 0.00 0.00 0.00 Motlificetions for Intedace of 12 Cimarron whh Kin 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal AtldiOOnal Services Fees 2,918.00 2,918.00 2,978.00 2916.00 11,872.00 Total Autfrodzed Fee $4,790.25 $4,790.25 $4,790.25 $4,790.25 $19,767.00 September 27, 2006 Administrative Approval AMEND. NO. 10 EXHIBIT "B" Page 5 of 12 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO VORKTOWN (PROJECT N0.6261) PHASE 2 FROM VORKTOWN TO BISON (MIRELES) (PROJECT NO. 8262) SUMMARY OF FEES AME NDMENT NO.S -MASTER CH ANNEL 27 No. 2283 Clmamon Blvd Phase 1 Pro'ect No. 8261 Street Storm Wa er Water Wastewater Total Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $O.OD 2 Desi n Phase 0.00 662,988.00 0.00 0.00 682,986.00 3 Bid Phase 0.00 77,693.00 0.00 0.00 17,693.00 4 Constmclion Phase 0.00 53,982.00 0.00 0.00 53982.00 Subt otal Basic Services Fees 0.00 734841.00 0.00 0.00 734,641.00 Atld8 lonal Services 1 Pemlittin Authodzed 0.00 48,510.00 0.00 0.00 48510.00 2 ROW uisition Surve 0.00 13,529.00 0.00 0.00 13,528.00 3 To re hic SUrve Authorized 0.00 33,134.00 0.00 0.00 33,734.00 4 Environmental Issues 0.00 17,807.00 0.00 0.00 77,807.00 5 Constmc8an Observation Services 0.00 214,826.00 0.00 0.00 214,626.00 6 Warra Phase 0.00 8,284.00 0.00 0.00 8,284.00 7 H dm-Excavation Authodzetl 0.00 17,586.00 73,175.00 4,392.00 35,133.00 8 Televising Ezisting Sanitary Sewer Lines Authorized 0.00 0.00 0.00 0.00 0.00 9 Dreina a Crttada Technical Guide 0.00 37,160.00 0.00 0.00 37,180.00 70 Modifications for Intertace of Cimarron wtth Kin 's Point Untt 7 Subd. D.DD 0.00 0.00 0.00 0.00 Subtotal Addhional Services Fees 0.00 390,878.00 13175.00 4,392.00 408,383.00 Total Authorized Fee $0.00 $],125,457.00 $73,175.00 $4,392.00 $7,143,024.00 Cimarron Bivd, Phase 2 Pro ect No. 8282 Street Storm Water Water Wastewater Total Basi c Services 1 Prelimina Phasa $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 O.OD 0.00 0.00 4 Constmclion Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Services 1 Permil8n Authorized 0.00 0.00 O.OD 0.00 0.00 2 ROW Ac uisition Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authorized 0.00 0.00 O.OD 0.00 0.00 4 Errvironmentallssues 0.00 0.00 0.00 0.00 0.00 5 Conslmction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H dm-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 8 Televising Ezisting SanBary Sewer Lines Authorized 0.00 0.00 0.00 0.00 0.00 9 12-inch Watedine Re lacement 0.00 0.00 0.00 0.00 0.00 10 Re acement of YOrlctown Ditch 0.00 0.00 0.00 0.00 0.00 17 Im rovements to Bear Creek Ditch O,DO 0.00 0.00 0.00 0.00 Subt otal Addttional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Com bined Total Street Storm Water Water Wastewater Total Basi c Services 1 Prelimina Phase $0.00 $O.OD $0.00 $0.00 $0.00 2 Desi n Phase 0.00 662,986.00 0.00 0.00 662,986.00 3 Bitl Phase 0.00 77,693.00 0.00 0.00 77,893.00 4 Conslmction Phase 0.00 53,962.00 0.00 0.00 53,962.00 Subt otal Basic Services Fees 0.00 734,641.00 0.00 0.00 734 841.00 Addtt ional Services 7 Permittin Authorized 0.00 40,570.00 0.00 0.00 48,510.00 2 ROW uisition Surve - 0.00 13,529.00 0.00 0.00 13,528.00 3 To re hic Surve Authored O.OD 33,134.00 0.00 0.00 33,134.00 4 Environmental Issues 0.00 77807.00 0.00 0.00 17007.00 5 Conslroction Observation Services 0.00 214,826.00 0.00 0.00 214,826.00 8 Wanan Phase 0.00 8,284.00 0.00 0.00 8,284.00 7 H ro-Excava9on Authorized 0.00 77,588.00 13 775.00 4,392.00 35,133.00 8 Televising ExisBng Sanitary Sewer Lines Authorized 0.00 0.00 0.00 0.00 0.00 9 Dreina Criteria Technical Guide-Ph. 1 0.00 37,160.00 0.00 0.00 37,160.00 9 72-inch Watedine Re lacemem-Ph. 2 0.00 0.00 0.00 O.OD 0.00 70 Re lacement of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 O.OD 0.00 11 Im rovements to Bear Creek DNch-Ph. 2 0.00 0.00 0.00 0.00 0.00 72 Modifications for Intertace of Cimarron wish Kin 's Point Unil7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Addttional Services Fees 0.00 390,816.00 73,175.00 4,392.00 408383.00 Total Authoretl Fee $0.00 $1,725,457.00 $73175.00 $4,39200 $1,143,024.00 September 26, 2006 Motion No. M2006-324 AMEND. NO. 10 EXHIBIT "B" Page 6 of 12 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO VORKTOWN (PROJECT NO. fi261) PHASE 2 FROM VORKTOWN TO BISON (MIRELES) (PROJECT NO. 8262) SUMMARY OF FEES A MENDMENT NO .e Cim arton Blvd Phase 1 Pro'ect No. 6261 Street Storm Water Water Wastewater Tofal Basi c Services 1 Prelimina Phase $0.00 $O.OD $0.00 $0.00 $0.00 2 Desi n Phase 0.00 21,128.00 0.00 0.00 21,128.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 COnstroctien Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 21,128.00 0.00 0.00 21,128.00 Addi tional Services 1 Pennttlin Authodzed 0.00 0.00 0.00 0.00 0.00 2 ROW Ac uisttlon Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 3,794.00 0.00 0.00 3,794.00 5 Construction Observaticn Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Excavation Authodzed 0.00 0.00 0.00 0.00 0.00 8 Televising Existing Santtary Sewer Lines Authodzetl 0.00 0.00 0.00 0.00 0.00 9 Dreina a CMada Technical Guitle 0.00 0.00 0.00 0.00 0.00 10 Motlificetions for Interface of Cimarron wtth Kin 's Point Untt 7 Subtl. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 3,794.00 0.00 0.00 3,784.00 Total Auhorzed Fee $0.00 $24,922.00 $0.00 $0.00 $24,922.00 Cinrarton Blvd Phase 2 Pro eet No. 8282 Street Storm Water Water Wastewater Tofal Basi c Services 7 Prelimina Phase $0.00 $0.00 $o.oo $0.00 $0.00 2 Desi n Phase 0.00 0.00 O.OD 0.00 0.00 3 Bitl Phese 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 O.OD 0.00 0.00 Atldtt ional Services 1 Pennitti Aulherfzed 0.00 0.00 O.OD 0.00 0.00 2 ROW A uisttion Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authodzetl 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 e Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Excava8on Aulhodzed 0.00 O.OD O.OD 0.00 0.00 8 Televising Existing Sanitary Sewer Lines Authodzetl 0.00 0.00 0.00 0.00 0.00 9 12-inch Watedine Re lacemenl 0.00 0.00 0.00 0.00 0.00 70 Re IacemeM of Yorktown D'RCh 0.00 0.00 0.00 0.00 0.00 11 Im rovemenis to BearCreek Ditch 0.00 0.00 0.00 0.00 0.00 Subt otal Atltlttional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authodzetl Fee $0.00 $0.00 $0.00 $0.00 $0.00 Com binetl Total Street Storm Water Water Wastew ter Total Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi n Phase 0.00 21,128.00 0.00 0.00 21,128.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Suhl otal Basic Services Fees 0.00 21,128.00 0.00 0.00 21,128.00 Addi tonal Services t Permidin Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW uisttion Surve 0.00 0.00 0.00 0.00 0.00 3 To 0 re hic Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 3794.00 0.00 0.00 3,794.00 5 ConstNClion Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H tlro-Excavatien Aulhodzetl 0.00 0.00 0.00 0.00 0.00 8 Televising Ezisling Sanitary Sewer Lines Auihor¢etl p.00 0.00 0.00 0.00 0.00 9 Dreina a CMeda Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12dnch Watedine Re lacement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 Re IacemeM Of Yorktown Ditch-Ph.2 0.00 0.00 0.00 0.00 0.00 17 Im rovemenis to Bear Creek Dttch-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 Modificetions forlMerface of Cimarron with Kin 's Point Untt 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 3,794.00 0.00 0.00 3,794.00 Total Authonzetl Fee $0.00 $24,922.00 Atlm E0.00 March 1, 2007 inisiretive Appr $0.00 oval $24,922.00 AMEND. NO. 10 EXHIBIT "B" Pa e7of12 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT NO. 6261) PHASE 2 FROM VORKTOWN TO BISON (MIRELES) (PROJECT NO. 82fi2) SUMMARY OF FEES A MENDMENT N0 .7 Cim arron Bivtl Phase 1 Pro ect No. 8281 Street Storm Water Wa r Wastewater Total Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi nPhase 0.00 0.00 0.00 24,950.00 24950.00 3 BIO Phase O.OD 0.00 - 0.00 0.00 0.00 4 Canstroction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Bask Services Fees 0.00 0.00 0.00 24,950.00 24,850.00 Atltli tbnal Services t Permittin Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A u1691on Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Constroclion Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warren Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-EXfaVMlen Aulhodzetl 0.00 0.00 0.00 0.00 0.00 8 Televising Existing Sanitary Sewer Lines Aulhodzetl 0.00 0.00 0.00 0.00 0.00 9 Dreina a CMeria Technical Guide 0.00 0.00 0.00 0.00 0.00 70 Motlificetions for lntertace of Cimarron with Kin 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Auhodzed Fee $0.00 $0.00 $0.00 $24,950.00 $24,950.00 Cimarron Blvd, Phase 2 Pro ecl No. 6282 Street Storm Walar Water Wastewater Total Basi c Services t Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi nPhase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 ConslNMlan Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 D.00 0.00 0.00 0.00 Addit ional Services 1 Parmidin Authorized 0.00 O.OD 0.00 0.00 0.00 2 ROW A uisNion Surve 0.00 0.00 0.00 0.00 0.00 3 To ra hlc Surve Aulhodzetl 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 O.OD 0.00 0.00 0.00 S Constroc9on Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warrant Phase 0.00 O.OD - 0.00 0.00 0.00 7 H tlro-Ezcevalion Aulhodzetl 0.00 0.00 0.00 0.00 0.00 e Televising Ezisting SanBary Sewer Lines Authorizetl 0.00 0.00 0.00 0.00 0.00 9 72-inch WMedine Re lacement 0.00 0.00 0.00 0.00 D.DD 10 Re lacemenl of YorMOwn Ditch 0.00 0.00 0.00 0.00 0.00 t t Im rovemeMS to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subt otal Addkional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee 50.00 $0.00 $O.OD $0.00 $0.00 Com bined Total Street Storm Water Water Wastewater Total Basic Services 7 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi nPhase 0.00 0.00 0.00 24,950.00 24,950.OD 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 DODa1mCllen Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 0.00 24,950.00 24,950.00 Addit ional Services 1 Pennalin Authodzed 0.00 0.00 0.00 0.00 0.00 2 ROW uisbion Surve 0.00 0.00 0.00 0.00 0.00 3 To o re hic Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Constroclion Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Evcavation Authodzed o.oD 0.00 0.00 0.00 0.00 e Televising Ezisling Sanitary Sewer Lines Authorized 0.00 0.00 0.00 0.00 0.00 9 Dreina a Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Re IacemeM-Ph.2 0.00 0.00 0.00 0.00 0.00 10 Re lacement of VorMOwn Dflch-Ph. 2 0.00 0.00 0.00 0.00 0.00 17 Im rovemenls to Bear Creek Ditch-Ph.2 0.00 0.00 0.00 0.00 0.00 12 Modifications (or Interlace of Cimarron w8h Kin 's Point Unit 7 Subtl. 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee $0.00 $0.00 $0.00 $24,950.00 $24,950.00 Maroh 30, 2007 Administrative Approval gMEND. NO. 10 EXHIBIT "B" Page 8 of 12 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT NO. 6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO. 8282) SUMMARY OF FEES A MENDMENT NO.e Cimarron Blvd Phase 1 Pro eel No. 8281 Street Storm Wa r Water Wastewater Total Bask Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 §0.00 2 Desi n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 ConsWCtion Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 AtldBional Services 7 PermiBin Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW uishion Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authored 0.00 0.00 0.00 0.00 0.00 4 Environmeral Issues 0.00 0.00 0.00 0.00 0.00 5 Consauction Observation Services 24859.00 0.00 0.00 0.00 24859.00 5 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Fxcevation Aulhodzetl 0.00 0.00 0.00 0.00 0.00 8 Televising Foisting Sanitary Sewer Lines Authorized 0.00 D.DD 0.00 0.00 0.00 9 Dreina a Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Intertace of Cimarron w8h Kln 's Point Un8 7 Subtl. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 24,859.00 0.00 0.00 0.00 24,859.00 Total Authodzed Fee 24,859.00 §0.00 $0.00 $0.00 24,859.00 Cimarron BNtl, Phase 2 Pro act No. 8282 Siree Storm Water Water Wastewater Total Basic Servces 1 Prelimina Phase $0.00 $o.DD $0.00 $0.00 $0.00 2 Desi n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 O.OD 0.00 0.00 0.00 4 Constmalon Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Bask Services Fees 0.00 O.OD 0.00 0.00 0.00 Atltlhional Services 1 Pertnl0l Authorizetl 0.00 0.00 0.00 0.00 O.OD 2 ROW uisBion Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Constmd'an Observation Services 24,859.00 0.00 0.00 0.00 24,859.00 6 Wartan Phase 0.00 0.00 0.00 O.OD 0.00 7 H dro-Eacavetion Authorized 0.00 0.00 0.00 0.00 0.00 e Televising Existing Sanitary Sewer Lines Authodzed 0.00 0.00 0.00 0.00 0.00 9 12-Inch Watedine Re lacement 0.00 0.00 0.00 0.00 0.00 10 Re lacement of Voddown Ditch 0.00 0.00 0.00 0.00 0.00 11 Im rovemerds to Bear Creek DBCh 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Faes 24,859.00 0.00 0.00 0.00 24,859.00 Total Authorized Fee $24,858.00 $0.00 $0.00 $0.00 $24 859.00 Combined Total S reel St rm Water Water Wastewater Total Basic Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constmction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Additional Services 1 PermitOn Authodzed 0.00 0.00 0.00 0.00 0.00 2 ROW uis8ion Surve 0.00 0.00 0.00 0.00 0.00 3 To re hk Surve Authored 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 ConsWCtion Observation Services 0.00 0.00 0.00 0.00 0.00 e Warta Phase 0.00 0.00 0.00 0.00 0.00 7 Hdro-Excavation Authored 0.00 0.00 0.00 0.00 0.00 8 Televising Existing Sanitary Sewer Lines Authodzed 0.00 0.00 0.00 0.00 0.00 9 Dreina a Cdteda Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 72-inch Watedine Re lacement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 Re lacement of VorMOwn DOCK-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 Im rovements to Bear Creek DBCh-Ph.2 0.00 0.00 0.00 0.00 0.00 12 Modifica0ons for Interface of Cimaron with Kin 's Point Untt 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authored Fee $0.00 $0.00 $0.00 $0.00 $0.00 August 30, 2007 Administrative Approval AMEND. NO. 10 EXHIBIT "B" Pa e9of12 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM VORKTOWN TO BISON (MIRELES) (PROJECT NO. 8282) SUMMARY OF FEES A MENDMENT NO .B Cimarron Blvd, Phase 1 Pro act No. 8281 Street Storm Water Water Wastewater Total Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 ' 2 Desi n Phase 0.00 0.00 0.00 0.00 D.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constmgion Phase 0.00 0.00 0.00 O.OD 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Atld8lonal Services 7 Permiain Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW Ac uisition Surve 0.00 0.00 0.00 0.00 0.00 3 To re hk Surve Authorizetl 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Conslmgion Observation Services 3,681.00 0.00 0.00 0.00 3,681.00 e Warran Phase 0.00 0.00 0.00 0.00 0.00 7 H tlro{xcevation Authorized 0.00 O.DO 0.00 0.00 0.00 8 Televising Existing Sanitary Sewer Lines Authorized 0.00 0.00 0.00 0.00 0.00 9 Drama a Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Interiace of Cimarton w8h Kin 's Paint Unil7 Suhd. 3,681.00 0.00 0.00 0.00 3,687.00 Subtotal AddBional Services Fees 0.00 0.00 0.00 D.DO 0.00 Total Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Cimarron BNd Phase 2 Pro eq No. 8282 Street Starm Water Water Wastewater Total Basic Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Des n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 O.OD 0.00 0.00 0.00 4 Constmgbn Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Atltlalonal Services 1 Permiain Authorizetl 0.00 0.00 0.00 0.00 0.00 2 ROW uisition Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Constmgion Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Ezcavation Amherized 0.00 0.00 0.00 0.00 0.00 6 Televising Existing Sanitary Sewer Lines Authorizetl 0.00 0.00 0.00 0.00 0.00 9 12-inch Watedine Re lacement 0.00 O.OD 0.00 0.00 0.00 70 Re lacement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 17 Im rovements to Beer Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal AtltlBional Services Fees 0.00 0.00 - 0.00 0.00 0.00 Total Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Combined Total Street Storm Water Water Wastewater Total Basic Services 7 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desi n Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constmgion Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 AddI1 10ne1 $BNI6e6 1 PermBtln Authorizetl 0.00 0.00 0.00 0.00 0.00 2 ROW Ac uisition Surve 0.00 0.00 0.00 0.00 0.00 3 To re hic Surve Authorizetl 0.00 0.00 0.00 0.00 O.OD 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 ConsWgion Observation Services 3,681.00 0.00 0.00 0.00 3887.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H dro-Excavation Authorized 0.00 0.00 .0.00 0.00 0.00 e Televising Existing Sanitary Sewer Lines Authorizetl 0.00 0.00 0.00 0.00 0.00 9 Dreina a Criteria Technical Guitle-Ph. 1 17.00 0.00 0.00 0.00 0.00 B 72-inch Waleriine Re lacemen[-Ph. 2 0.00 0.00 0.00 O.OD 0.00 10 Re lacemem of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 Im rovements to Bear Creek Ditch-Ph.2 0.00 0.00 0.00 0.00 0.00 12 Modifications for Intertace of Cimarton whh Kin 's Poiln UnR 7 Subtl. 3,681.00 0.00 0.00 0.00 3,681.00 Subtotal Adtlaional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Aulhorzed Fee $0.00 $0.00 $0.00 $0.00 $0.00 April 29, 2006 Administrative Approval AMEND. NO. 10 EXHIBIT "B" Pa e10of12 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO VORKTOWN (PROJECT NO. 6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO. 8282) SUMMARY OF FEES CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT NO. 8281) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES TO TAL RESTATE D FEE Cim arron Blvtl, Phase 1 Pro'ect No. 8281 Street Storm Water Water Wastewater To al Basi c Services 7 Prelimina Phase $24,040.29 $108,370.77 $7791.90 $7398.70 $748599.00 2 Desi nPhase 229,039.25 803,865.25 70,249.25 209,020.25 1,311,974.00 3 Bid Phase 5,822.02 20940.83 7,887.03 1,791.32 30,441.00 4 Construction Phase 19,208.85 64,677.04 8,225.94 5,970.17 98,022.00 Subt otal Basic Services Fees 278,110.41 998,853.03 88,154.12 224718.44 1,587,036.00 Atld0 ional Services 1 PermOtin Authodzed 4,267.93 50,887.38 1,381.37 5,435.31 61,965.98 2 ROWA uis0ion Surve 2,918.00 78,447.00 2,918.00 2,978.00 25201.00 3 To ra hic Surve Authodzed 73,878.94 209591.97 1,800.15 11,672.99 236,883.98 4 Environmental Issues 0.00 21,607.00 0.00 0.00 27 807.00 5 Conslmdion Observation Services 95704.87 284,731.90 40,269.97 38,227.52 458,334.00 e Warta Phase 3,385.07 10,172.25 7,097.78 1047.52 15898.00 7 H dro-Excavation Authorized 0.00 17568.00 19,787.00 10,984.00 48,317.00 B Televising Existing Sanitary Sewer Lines Authorized 0.00 0.00 0.00 31,250.00 31,250.00 9 Dreina a Criteria Technical Guide 0.00 37,760.00 O.DO 0.00 37,180.00 10 Modifications for Interlace of Cimarron with Kin 's Point Un0 7 Subtl. 3,887.00 0.00 0.00 0.00 3,887.00 Subt otal Additional Services Fees 123,769.55 647,557.44 67033.85 101,529.34 939,889.98 Total Authorized Fee $401,879.96 $7,848,210.47 $153,187.77 $325,647.70 $2,526,925.90 Cim arron Blvtl, Phase2 Pro'ecl NO. 8262 Street Storm Water Water Wastewater Total Basi c Services 7 Prelimina Phase $21,769.87 $9004.82 $6,217.49 $5,500.88 $42,483.00 2 Des' nPhase 110,358.00 48,583.00 35094.00 31,828.00 225,661.00 3 Bid Phase 5,395.19 2,231.66 1,540.88 1,363.28 10531.07 4 Constuction Phase 13,659.06 5850.24 3,901.28 3,451.63 26,663.01 Subt otal Besic Services Feas 751 782.88 65,469.72 48,753.85 41 941.79 305,348.02 AdtlB lonal Services i Pennibin Authodzed 4,652.85 7,924.59 7,320.88 1,175.70 9,082.00 2 ROW A uisilicn Surve 0.00 0.00 0.00 0.00 0.00 3 To m hic Surve Authodzed 4,723.55 7,953.84 1,349.05 1,193.$8 9,220.00 4 Environmental Issues 0.00 0.00 O.DO 0.00 0.00 5 Constmction Observation Services 73,528.94 20,731.73 13,900.22 12,290.11 719,859.00 6 Wanan Phase 1,805.40 748.78 575.62 456.20 3,524.00 7 H dro-Fxcavation Authodzed 0.00 0.00 6,592.00 6,592.00 13104.00 B Televising Existing Santary Sewer Lines Authodzetl 0.00 0.00 0.00 31,250.00 31,250.00 9 72-inch Waledine Re lacement 0.00 0.00 74,149.00 0.00 14,149.00 10 Re lacement of VorMown Ditch 0.00 79,337.00 75,753.00 0.00 35,090.00 11 Subt Total Im rovertren[s to Bear Creek Ditch otal Additional ServicesFees Authodzed Fee 0.00 84770.74 $235 893.80 24,673.00 88,766.94 $734,236.66 0.00 53,587.75 $700,341.40 0.00 52,965.57 $94,907.38 24,673.00 280031.00 $585,379.02 Com bined Total Street Storm Water Water Wastewater Total Basi c Services 1 Prelimina Phase $45,870.09 $718,374.93 $14,009.40 $12,897.58 $191,092.00 2 Desi nPhase 339,397.25 852,248.25 705,343.25 240,848.25 7 537,835.00 3 Bid Phase 17,217.22 23,772.29 3,427.90 3,154.60 40,972.01 4 Constmction Phase 32888.70 70,327.28 70,127.22 9381.79 122,684.99 Subt otal Basic Services Fees $429,293.26 $7,064,722.75 $132,907.77 $266,060.22 $7,892,384.00 AddB icnal Services 7 PennBlin Authodzed 8,914.78 52,811.98 2,710.23 6,671.01 71,048.00 2 ROW ulskion Surve 2918.00 16,447.00 2,978.00 297800 25,201.00 3 To m hic Surve Authodzetl 18,542.48 211,545.75 2949.27 72,886.56 245904.00 4 5 6 Environmental Issues DOrIStNLtlen Observation Services Wane Phase 0.00 169,233.55 5,180.47 21,601.00 304,263.64 10919.03 0.00 54,770.19 1,672.78 0.00 50,525.83 1,087.71 21,801.00 578,193.01 19,219.99 7 H tlro-Excevation Aulharizetl O.OD 17,566.00 26,359.00 17,578.00 61,501.00 8 Televising Existing Sanitary Sewer Lines Authodzed 0.00 0.00 0.00 82,500.00 62,500.00 9 Draina a Crgeda Technical Guide-Ph. i D.OD 37,180.00 0.00 0.00 37,180.00 9 12-inch Watedine Re lacemant-Ph. 2 0.00 0.00 14,749.00 0.00 14,149.00 10 Re lacement of Yorktown DOCK-Ph.2 0.00 19,337.00 15,753.00 0.00 35,090.00 17 Im rovements to Bear Creek DOCK-Ph.2 0.00 24,673.00 0.00 0.00 24,673.00 12 Modifcelions br InlerNace of Cimanon wah Kin 's Point Unh 7 Subtl. 3,687.00 0.00 0.00 0.00 3,887.00 Subt otal Atltlitional Services Fees 208,480.28 718,324.40 120,621.41 154,494.91 1,199,921.00 Tota l Authodzed Fee $637,773.54 $7,780,447.15 $253,529.18 $420,555.13 $3,092,305.00 AMC:N11 tin ~n EXHIBIT "B" Pa e12of12 ~~,,yy~~y,~ City of ^~1 COTpUS CITY OF CORPUS CHRISTI Chnsti DISCLOSURE OF INTERESTS w~.. City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "N/A". FIRM NAME: Maverick Engineering. Inc STREET: 400 Mann Street. Suite 200 CITY: Corpus Christi, TX ZIP: 78401 FIRM is: 1. Corporation X 2. Partnership- 3. Sole Owner- 4. Association 5. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each employee of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name Job Title and City Department (if known) NIA 2. State the names of each official of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name TiOe N/A 3. State the names of each board member of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name Board, Commission or Committee NIA 4. State the names of each employee or officer of a consultant for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an ownership interest constituting 3%or more of the ownership in the above named firm. Name Consultant N/A CERTIFICATE I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: W. D. "Bill" Huff P. E. Title: Infrastructure Division Manager Signature of Certifying Person: Date: G--~^O~ EXHIBIT "C" Pa e 1 of 2 DEFINITIONS a. Board Member. A member of any board, commission or committee appointed by the City Council of the City of Corpus Christi, Texas. b. Employee. Any person employed by the City of Corpus Christi, Texas, either on a full or part time basis, but not as an independent contractor. c. Firm. Any entity operated for economic gain, whether professional, industrial or commercial and whether established to produce ordeal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership corporation, joint stock company, joint venture, receivership or trust and entities which, for purposes of taxation, are treated as non-profit organizations. d. Official. The Mayor, members of the City Council, City Manager Deputy City Manager, Assistant City Managers, Department and Division Heads and Municipal Court Judges of the City of Corpus Christi, Texas. e. Ownership Interest. Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate or holding entity. Constructively held refers to holding or control established through voting trusts, proxies or special terms of venture or partnership agreements. f. Consultant. Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. EXHIBIT "C" Pa e2of2