Loading...
HomeMy WebLinkAboutC2008-244 - 7/22/2008 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 1 FUNDING SOURCE: 550910-3362-00000-140328 CONTRACT TIME: 148 C.D. Operating Department: Enaineerina Services DATE: Julv 9, 2008 Name of Project: Contractor: Longhorn Excavators. Inc. CHANGE AS FOLLOWS: ADD 1. Increase excavation quantity by 52,700 cy x $2.92/cy $156,519.00 2. Install 1920 If x $39/If (1.0-ft deep x 2.0-ft wide) groundwater underdrains with bottom of trench geotextile fabric with unit weight of > 8-oz/sf with drainage aggregate compliant with Section 02231 and perforated 6-in diameter HDPE single wall slotted corrugated D601 or equivalent and filter fabric with continuous dewatering or as needed to maintain stability of excavated area $ 74.880.00 Total $231,399.00 3. Revise start date of Notice to Proceed from June 23, 2008 to June 26, 2008. W by was this change necessary? (If left off the plans and specifications, explain why) A. CONTRACT PRICE ...............................................$ 2,369,450.00 B. TOTAL CHANGE ORDER (inc. current) ...............$ 231,399.00 C. NEW CONTRACT PRICE .....................................$ 2.600,849.00 D. THIS CHANGE ORDER ........................................$ 231,399.00 E. PERCENT TOTAL CHANGE (B/A) ....................... 9.76% F. PREVIOUS ADDN'L TIME AUTHORIZED............ 0 CD G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 7 CD H. TOTAL ADDITIONAL TIME .................................. 7 CD CITY OF~CO~RI By: ", City Engii APPROVED: CHRISTI, TEXAS CONTRACTOR ///~ Operating Department Project n ' eer By' ~_~4 DEDUCT Title:p/Lo.frcr /GrAi/,Q6'~ ~Dj~irector of Management & Budget CL~g~Department ATTEST. / ! d'31^'~~ 2008-244 ~Y"~ 07/22/08 M2008-185 IT COUNCIL Longhorn Excavators avoid delay in aroiect completion. How can similar changes be avoided in the future? Unavoidable.