CHANGE ORDER NO: 1 FUNDING SOURCE: 550910-3362-00000-140328 CONTRACT TIME: 148 C.D.
Operating Department: Enaineerina Services DATE: Julv 9, 2008
Name of Project:
Contractor: Longhorn Excavators. Inc.
CHANGE AS FOLLOWS: ADD
1. Increase excavation quantity by 52,700 cy x $2.92/cy $156,519.00
2. Install 1920 If x $39/If (1.0-ft deep x 2.0-ft wide) groundwater underdrains
with bottom of trench geotextile fabric with unit weight of > 8-oz/sf with drainage
aggregate compliant with Section 02231 and perforated 6-in diameter HDPE
single wall slotted corrugated D601 or equivalent and filter fabric with continuous
dewatering or as needed to maintain stability of excavated area $ 74.880.00
Total $231,399.00
3. Revise start date of Notice to Proceed from June 23, 2008 to June 26, 2008.
W by was this change necessary? (If left off the plans and specifications, explain why)
A. CONTRACT PRICE ...............................................$ 2,369,450.00
B. TOTAL CHANGE ORDER (inc. current) ...............$ 231,399.00
C. NEW CONTRACT PRICE .....................................$ 2.600,849.00
D. THIS CHANGE ORDER ........................................$ 231,399.00
E. PERCENT TOTAL CHANGE (B/A) ....................... 9.76%
F. PREVIOUS ADDN'L TIME AUTHORIZED............ 0 CD
G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 7 CD
H. TOTAL ADDITIONAL TIME .................................. 7 CD
CITY OF~CO~RI
By: ",
City Engii
APPROVED:
CHRISTI, TEXAS CONTRACTOR
///~
Operating Department
Project n ' eer
By' ~_~4
DEDUCT
Title:p/Lo.frcr /GrAi/,Q6'~
~Dj~irector of Management & Budget
CL~g~Department
ATTEST. / ! d'31^'~~
2008-244 ~Y"~
07/22/08
M2008-185
IT COUNCIL
Longhorn Excavators
avoid delay in aroiect completion.
How can similar changes be avoided in the future? Unavoidable.