Loading...
HomeMy WebLinkAboutC2008-336 - 9/9/2008 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 2 FUNDING SOURCE: 550910-3362-00000-140328 CONTRACT TIME: 148 C.D. Operating Department: Engineering Services DATE: September 9 2008 Name of Project: Contractor: Longhorn Excavators. Inc. CHANGE AS FOLLOWS: ADD Install Leachate Ponds service roads, culverts, and containment pad as required By TCEO, road repairs and correction of scrivener error (Change Order #1): 1. Equipment mobilization/demobilization $8,250.00 2. Compacted earthwork beneath limestone roadways (-10,434-cy ~ $4.95/cy) $51,648.00 3. 8-in compacted limestone base roadway (8,923-sy ~ $16.44/sy) $146,694.00 4. 20-ft x 60-ft earthen containment pad w/o stabilized limestone (133-sy @ $4.95/sy) $658.35 5. 3 ea. 36-in rcp culverts (150-If @ $300.00/If) $45,000.00 6. 5-in limestone groundwater monitor well site pads (15-ft x 15-ft @ 5 sites) $1,101.00 7. Mill and cement (45-Ibs/sy - 5%) stabilize CR-20, entry & perimeter road base failures (-3,030-sy), place milled HMAC over stabilized areas, and place City supplied RAP on shoulders with pending installation of HMAC on stabilized areas by City Street Department. $42,000.00 8. Correction of Change Order No. 1 unit price to bid price for additional excavation from $2.92/cy to $2.97/cy (52,700-cy x $0.05/cy) 2 635.00 Total $297,986.35 W by was this change necessary? (If left off the plans and specifications, explain Items 1 7 3 d F R R _ 1A/~.tr .e.,~~~.,..• •.. ,.,,.....~,. ...:.~ .~_ .,__v:. .._ ,~__ _.. How can be avoided in the future? A. CONTRACT PRICE ...............................................$ 2.369,450.00 B. TOTAL CHANGE ORDER (inc. current) ...............$ 529.385.35 C. NEW CONTRACT PRICE .....................................$ 2,898.835.35 D. LINE ITEM NO.8 ...................................................$ 2.635.00 E. THIS CHANGE ORDER ........................................$ 297.986.35 F. PERCENT TOTAL CHANGE (B/A) ....................... 22.36% G. PREVIOUS ADDN'L TIME AUTHORIZED ........... 0 CD H. ADDN'L CONTRACT TIME THIS CHANGE ORDER 7 CD I. TOTAL ADDITIONAL TIME .................................... 7 CD DEDUCT roject Engineer Project Engineer d1' CQtlI1CIL CITY OF CO US HRISTI, TEXAS . CONTRACTOR 'w"'~~' /G SECR TARP 1"b By: ~ ~7 /~ ~ By: . City Enginee ~~ ~ ~ Title: ~ yJr c,-r /uA,ykccn- APPROVED: erating Department 2008-336 ~,~ o Director of Management & Budget 09/09/08 M2008-236 Legal Department ~ ,onghorn Excavators AT7EST. ~~~~- _ ARMANDO CHAPA