HomeMy WebLinkAboutC2008-378 - 10/21/2008 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 3 FUNDING SOURCE: 550910-3362-00000-140328 CONTRACT TIME: 148 C.D. Operating Department: Engineering Services DATE: October 2. 2008 Name of Project: Contractor: Longhorn Excavators. Inc. CHANGE AS FOLLOWS: Sump modifications to address groundwater/silt conditions: 1. De-muck 46-ft x 46-ft sump area to permit excavator to sit in sump area, 2. Excavate sump area and install 250+ tons of 3-in x 5-in rock to elevation 17.0 and place geotextile fabric above 3-in x 5-in rock, 3. Provide, mix, and install the following materials between elevation 17.0 and 20.0 in sump area, and install at no additional charge the geotextile fabric specified by the original contract at elevation 20.0: • 143+ tons of oversized washed rock; • 143+ tons of 1.0-in washed gravel drain media; and • 284+ tons of washed concrete sand. 4. Install custom 12.0-in ADS perforated pipe and geotextile wrap flow line at elevation 17.0 to the extent practical 5. Install 24-in diameter ADS perforated pump riser pipes with geo-net, bull rock, geotextile and gravel drain media TOTAL: ADD DEDUCT $3,250.00 $13,875.00 $19,657.00 $16,320.00 6 500.00 $59,602.00 Why was this change necessary? (If left off the plans and specifications, explain why) Groundwater conditions have been more severe that was indicated by aeotechnical analysis and groundwater How can similar changes be avoided in the future? A. CONTRACT PRICE ....................................... .......$ 2,369.450.00 B. TOTAL CHANGE ORDER (inc. current) ........ .......$ 588.987.35 C. NEW CONTRACT PRICE ............................. .......$ 2.898,835.35 , D. THIS CHANGE ORDER ................................ ....... $ 59,602.00 E. PERCENT TOTAL CHANGE (B/A) ............... ....... 24.86% Project i er F. PREVIOUS ADDN'L TIME AUTHORIZED .... ....... 0 CD G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 7 CD H. TOTAL ADDITIONAL TIME ........................... ....... 0 CD CITY OF RPU CHRISTI, TEXAS d ~ CONTRACTOR ~~/ ~~ / ~ By : /6 By: ?r/l ~iC~ 1i Title: / /~-o, ~~T A/~ ~w~ ~ ~ Operating Department 2008-378 Director of Management & Budget 10/21/08 n~^ M2008-274 ~~~Legal Department t .onghorn Excavators IAIiGJ I. _ '^ CIiY SECAETAR" AT C-0UNCIL