HomeMy WebLinkAboutC2008-391 - 11/11/2008 - ApprovedSouth Shore Pipeline, LP 5847 San Felipe Suite 1910 Houston, Texas 75057 Mr. Kevin Stowers CITY OF CORPUS CHRISTI Dept of Engineering Services P.O. Box 9277 Corpus Christi, TX 78469-9277 SUBJECT: Pipeline Adjustment -Taxiway Rehabilitation ~ Airfield Drainage Phase V I By evidence of this Letter Agreement, South Shore Pipeline, LP as "Pipeline" and the City of Corpus Christi as "City" do herby mutually agree to the terms and conditions set forth below relative to the SUBJECT: Whereas Pipeline owns and operates an 85/8" OD natural gas pipeline located within an existing recorded easement across certain lands on which City wishes to excavate the surface of those lands held in common, for the purpose of installing a drainage ditch. Said installation will create a conflict with Pipeline's natural gas pipeline location at its current depth below existing surface of the ground. City has requested Pipeline to increase the depth of its pipeline at City's cost. Such request will require Pipeline to adjust its depth by approximately eight feet (8') for a distance of +/- one hundred and fifty feet (150'). Actual depth and distance shall be determined by Pipeline following adjustment by providing "as built" measurement. Pipeline will engage a third party contractor to perform the work necessazy to complete the requisite adjustment to its pipeline. City has requested an estimate of project costs (Exhibit A) and agrees to reimburse Pipeline for Pipeline's actual costs of the project. Actual costs, with backup, will be provided City upon contractor billing Pipeline following completion of the project. If the foregoing sets forth the agreement between City and Pipeline pursuant to earlier discussions between the parties, please indicate acceptance of the terms and conditions by siRninQ in the space nr~~ided below. M~ 80~',~XS AUTflORItt~ 2008-391 I I 11/11/OH I'ED this I day of, 2008. dh COUNCIL....LL~.LL.~.~g M2008-285 j-~~ South Shore Pipeline S CHRISTI SOUT/ \E PIPELI'NE~,"CP~"'gECRpfA~~~. Broadway, Corpus Christi, rX 78477 ~~.,/_., /,~tc %MlQ/>: j ~ GCS EXHIBIT A Estimated costs of adjustment to lower ~ 150' of 84x" OD pipeline Excavate and remove existing pipe Lower pipeline ditch to required depth Weld and hydrotest new piping Lower piping and reconnect to existing pipeline Tape field joints Backfill and re-grade Estimated cost: $61.400.00 Gas loss estimated cost: 5 3.037.50 Estimated Total: S64A37.50* *This amount shall be used for estimation purposes only and not for determining actual costs incurred in conpleting the pro,lect.