HomeMy WebLinkAboutC2008-411 - 10/14/2008 - NAAMENDMENT No. e3' CEFE VALENZUELA LANDFILL
CONTRACT FOR ARCHITECTURAL/ENGINEERING SERVICES
The City of Corpus Christi, a Texas Home Rule Municipal Corporation, P.O. Box 9277, Corpus Christi, Texas
78469-9277 (City) acting through its duly authorized City Manager or Designee (Director of Engineering
Services) and Chiang, Patel, and Yerby, Inc., a Texas corporation, 1820 Regal Row, Suite 200, Dallas, Texas
75235, (Architecf/Engineer-Consultant), hereby agree to the amendment of the contract administratively
approved December 21, 2007 and amended by Motion 2008-005, January 8, 2008 and amended
administratively by amendment Jerrtiaq~~-9988 as follows:
~~~: fa ;2~~ ~ l~rrr~u zv, ZooB
Section II. B.3 Basic Services; Bid Phase Services is amended to add the following:
• Provide services for the separate award of Cell 46 including bid opening, bid award, bid evaluation
and bid recommendation for Cell 4B.
Section II. C.1 Basic Services; Construction Phase Services is amended to add the following:
m. Additional construction support service for Cell 4A and Cell 46 mass excavation requiring up to two
additional months of construction services.
n. Additional documentation surveys for Cell 4A due to phased construction modification to meet
contractor's sequence of construction for subgrade completion, clay liner installation and protective
soil placement in two stages for the each sector.
Section III Fees Authorized is amended to read:
II. FEES AUTHORIZED
The City will pay the Consultant a total not to exceed fee of $298,276.00. The fee consists of:
• An original contract fee not to exceed fee of $50,000.00;
• a fee for Amendment No. 1 services not to exceed fee of $147,000.00;
• a fee for Amendment No. 2 services not to exceed $20,500.00;
• a fee for Amendment No. 3 services not to exceed $49,730.00;
• a fee for Amendment No. 4 services not to exceed $31,046.00.
Completion of design phase, bid phase and construction phase services are authorized by Amendment No. 1
as set forth in the original contract as amended. Consultant will be compensated for airfare, ground
transportation, lodging, and per diem meal expenses incurred due to out-of-town travel on a not to exceed
basis as set forth in the Summary of Fees. Travel will be will be documented by photocopies of receipts and
invoices. Per Diem will be at the GSA rate.
The table "Summary of Fees" shall be used when calculating the fee due for the proportion of services
completed. The City shall make prompt payments in response to Consultant's statements for Professional
Services.
Billing for services provided in Section II A, B, D, and E will be based on the Consultant's estimate of the
percent of services complete at the time of billing. The fee for additional services (Section II.E) is included as
part of the fee listed for Design, Bid and Construction phase services listed in the table "Summary of Fees'.
However, in no case will the billing exceed 90% of the fee for each phase until the delivery of documents
associated with each phase has been reviewed and accepted by thg City. Billing for services provided in _
Section I I.C.1 will be based on the amount of construction completed. Billing for services provided in Section
II.C.2 shall be payable upon delivery of the record drawings to the City Engineer. Billing for services provided
in Section II.C will be payable upon pertormance of inspections and delivery of all materials to the City.
Survey work will be invoiced at the billing rate of the sub-consultant performing the survey without markup.
Consultant will submit monthly statements for work authorized by the City Engineer and performed by the
Consultant. The statement will be based upon Consultant's estimate and concurrence by the City of the
propOrtlOn of }ha fntal ~>n.;,.as actually completed at the time of billing. The City will make prompt monthly
2008-411 sultant's monthly invoices.
10/24/08
~hlallg~ pat0~ & YOCb)' 'alenzuelaCells4A4B~.4EAmd4Contractdoc
All invoices shall be accompanied by a cover letter summarizing the fee in accordance with the Summary
Schedule of Fees. Invoices will be sequentially numbered for each project and state the project name. The
letter shall state the number of the current invoice, the contract fee for each task, the amount previously
invoiced for each task, and the current amount due. Invoices will be organized to accommodate funding
sources. During the construction phase, the Architect/Engineer will also submit a brief letterlmemo
summarizing observations during the site visit, the work of the contractor, construction progress forthe billing
period, and any pending items.
Summary of Fees:
Tasks Description Fee
Original Contract
Pre-design and Review Services
II.A Preliminary Design and Review 12,180.00
II.B Survey Update (Allowance) 10,000.00
II.C Travel 1,000.00
Pre-design Subtotal 23,180.00
Basic Services & Additional Services
II.B.1 Initial Design -Construction Document Phase 60% 26,820.00
Original Total Fee 50,000.00
Amendment No. 7 Authorized Services
11.6.2 Design -Construction Document Phase 100% 40,000.00
11.6.3 Bid Phase 5,000.00
Design/Bid Subtotal 45,000.00
Construction Services
II.C.1 Construction Phase 88,000.00
II.C.2 Record Drawings 5,000.00
Construction Service Subtotal 93,000.00
Post Construction Services
II.D Post Construction Phase 5,000.00
Post Construction Services Subtotal 5,000.00
Expense Allowance 4,000.00
Amendment No. 1 Fee 147,000.00
Amendment No. 2 Authorized Services
I.A.1.f. Surveying -Storm Water Pond for Disposal Cells 4A and 4B 20,500
Amendment No. 2 Fee 20,500
Amendment No. 3 Authorized Services
I.A.1.f. Cell Construction Schedule and Storm Water Pond 1 18,858
LA.2.k. Mass xcava Ion e - ~~96
I.A.2.1. Prepare Separate Bid Construction Documents for Cells 4A and 4B 11,904
Amendment No. 3 Fee 49,730
Amendment No. 4 Authorized Services
II.B.3 Bid Phase Services Cell 4B 3,712
II.C.1.m Construction Phase-Ce114A and Cell 46 10,150
IIC.1.n Construction Phase -Surveying -Topographic & Documentation 4A & 4B 17,184
31,046
TOTAL 298,276.00
Page 2 of 3
H:\HOM E\KE V I N S\GE N\LANDFILL\Valenzuela CeIIs4A4 BV+EAmd4Contract.doc
XI. DISCLOSURE OF INTEREST
In compliance with City of Corpus Christi Ordinance No. 17112, Consultant agrees to complete the City of
Corpus Christi Disclosure of Interests form which is incorporated in the contract as Exhibit "C".
All other terms and conditions of the originally authorized, as amended, between the City and Consultant
shall remain in effect.
CITY OF CORPUS CHRISTI CHIANG PATEL AND YE BY, INC.
Oscar Martinez Date Authorized Representative D e
Assistant City Manager
RECND D:
~ /~
Kevin R. Stowers Date
Interim Director- Engineering Services
APPROVED AS TOAPPROVED AS TO OR
J
~
~
AssAss stan
ney D e
ATTEST
Armando Chapa Date
City Secretary
~Ss g~Ac~
Page 3 of 3
H: W OME\KEVINS\GEN\LANDFILL\ValenzuelaCells4A4BW EAmd4ContraIX.doc
CITY OF CORPUS CHRISTI
DISCLOSURE OF INTERESTS
City of Corpus Christi Ordinance 17112, as amended, requires alI persons or firms seeking to do business with the City to
provide the following information. Eve question must be answered. If the question is not applipble, answer with'NA'.
FlRM NAME:
STREET: ~~~ 2 CITY: ~ /~ !/~-r ~ % Z1P: 7J ~'_. ~ ~t~
FlRM is: 1. Corporation ~ 2. Partnership ^ 3. Sole Owner ^ 4. Assoaation ^
5. Other ^
DISCLOSURE QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet
1. State the names of eactr "employee" of the City of Corpus Christi having an "ownership interest' constituting 3°k
or more of the ownership in the above named "firm°.
Name Job Trfle and City Department (d known)
~~G~
2. State the names of each "otfiaal" of the City of Corpus Christi having an "ownership interest" eonstibrting 3% or
more of the ownership in tite above named "firm".
Name Title
~./~
3. State the names of each "board rnerrrber" of the City of Corpus Christi having an "ownership interest" constituting
3% or more of the ownership in the above named "firm°.
Name Board, Comrtrission or Commdtee
~~~~~
4. State the names of each employee or officer of a "consultant" for the City of Corpus•Christi who worked on any
matter related 1b the subject of tins contract and has an "ownership irroerest" constituting 3% or more of the
ownership in the above named "firm°.
Name ConsullaM
f~Q/C~
CERTIFlCATE
I certify that alI information provided is true and correct as of the date of this statemetrt, that I have not Imowingly
w8hheld dtsdosure of any infomtation requested; and that supplemental statemerrts will be promptly submitted to the City
of Corpus Chrsti, Texas as changes occ~uJr. /
CertifyingPetson: LC/`~i3,-..,~, r]'indv~,a~ {~~ _ Tdle: U/Ge~'/~~ ` i'i/~