Loading...
HomeMy WebLinkAboutC2008-451 - 11/18/2008 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER No: 2 PROJECT No: 3295 CONTRACT TIME: 120 Operating Department: Park and Recreation Deoartment Date: November 11, 2008 Name of Project: Packerv Channel Boat Ramo Parkins Lot and Access Road Contractor: Garrett Construction Co. CONTRACT CHANGE ITEM ADD F-I (NEW) Contract Suspension Costs. Contractor was directed to suspend construction Operations on May 14, 2008 and directed [o resume work on September 1, 2008. See Contractor's letter dated September 25, 2008, 1 page, with enclosure, 3 pages requesting a change order for compensation for cost escalation due to the suspension..... $87,588.73 TOTAL THIS CHANGE ORDER ....................................................... $87,588.73 wny was this change necessary? (If left offthe plans and specifications, explain why) This provides compensation to the Contractor due to suspension of work without the fault or negligence of the Contractor and for the City's convenience. Portions of the Grant funds for this project were not made available in a timely fashion and the lateness of the funds was not made known to the Ciry until after contract award and after start of construction. This provides full compensation to the contractor for said suspension. How can similar changes be avoided in the future? Na A. CONTRACT PRICE ................... B. TOTAL CHANGE ORDERS (include current). . C. NEW CONTRACT PRICE ............... . D. THIS CHANGE ORDER ................ . E. PERCENT TOTAL CHANGE (B/A).......... . F. PREVIOUS ADDN'L TIME AUTHORIZED ..... . G. ADDN'L CONTRACT TIME THIS CHANGE ORDER. H. TOTAL ADDITIONAL TIME.... CITY OF CORPUS C RISTI, TEXAS By: ~ / / ~ jC g' hector of ngineering Services • $ _ 732.872 03 • . $ 112,546 73 • $ 845,418 76 • • $ _ 87.588 73 • • $ 15.4% •~$ 0 $ 110 ..$ ttn CONTRACTOR: By: PROJECT ENGINE , Title: ~~g . APPROVED: Operating Department !~a ~~.:~'~IA-UTHURIZE4~ n~. ~ 1 io o, •DirectorofManagementand Budget ~ QOUNCIL..,,~,j„~ fig' ~/ ~~ ~ ~ ~tCRETARY vWJ. w City Manager / `~" City Secretary 2008-451 11/18/08 M2008-302 Garrett Construction Co. Oct 21 OS '0:35a G GARRETr' conlsTCeucTloni cc September 25, 2008 Mr. Felix Ocanas, Jr., P.E. ECMS, LLC 4455 SPID, Ste. 34 Corpus Christi, Tx 78411 nom:-~: i!/ RE: Packery Channel Boat Ramp Parking Lot & Access Road Dear Mr. Ocanas: As per your request, the following will help explain the increase in costs for this project and consequently my request for achange-order to the contract. (1) I had a surveyor come back out to re-establish lines and grades that were lost during the pullout. Hayden Surve}nng quoted $600.00 but I am sure it wilt be more as they have had to come out three times. (2) Star Operations (electrical sub) had an increase in material prices in the amoum of $1659.50. (3) Texas Lehigh (cement supplier) had an increase in price of $2.73/ton which amourus to an increase of $1774.50. (4) Bay Hot Mix price when this job was bid was $58.69/ton-it has increased to $76.10/ton and is projected to increase another $2.00 b}• the time we resume paving. (5) As per the City's request, we will be installing an additional 1" HMAC overlay on the access road. (6) MG30 prime oil has gone up about $1.75/gal since bid date. (7) Traffic control (lump sum) done twice. (8) Ready-mix concrete & rebar has gone up. (9) All trucking prices have gone up from $5.00 to $10.00/hour, (10 My mobilization costs will double as I had already had all the equipment that I needed for the jobsite on site when we shut down. I basically will have to do it all over again. p.t I trust this will meet your approv you s ou nee ~hi~n -e1s , 1. Sinc~rel ~~ J n ett sident JJG/s P.O- F30X 1026 INGLE510E, TEXAS 76362-1026 OFFICE PHONE [3611 776-7675 • [3617 643-7575 FAX [3617 776.3893 ~ ~ € ~ a~ s ~ ~ nn Z ~ ~ fr ~ ar ~ ~ u ~ ~ 'n` » E u ~L u ~ ~ ~ ~ ~ ~ 33 u 3 ~ u ~ u ~ s 3 rc u E c3 u ~ a E ~ ox ~ ~ U ~ ~ o g l w 8 h a g g E 5 ~ ~ E s ~ s` C ~ ~ ~ ~ g ~ ~ ° 4 w z ~ u ° rc ° g E u g s :€ _ S F Sw ° rc w ~ " rc ~ ~ S 8 ~ s $ $ ~ $ $ ~ a j ~Z w g S 2 x ~ g a ]~ R ~ N ~ ~ ~ S F h U °o °o f a ~w _ ~~ e $ e o e v a ~ ~ O ~ %}N ~ w~ gl ~ ~ ~ ~ » a $ ~ ~ » s ~ g 4 F ~ O V `O z p0 z N J = - - (~ O ~ U H Y ~' ~ i 8 $ ° ~ ~ e $ g 8 8 ~ g ~ ° « n « a Z U ~ U O ~ ' S N IL Q ~ " ~ ~ . Z A J t7 W Z 2 C ~ ~ 'a ~ ~ = 8 9 ~ s ~ $ e m V ° $ a ° ` P y ~ w m m ~ ° 5 Y V ° o m ' ° Q a m EE ~ W n u 8 a = O laF ~` a ~ S 8 d F _. m uw ~ H o & w ~ u tl E '4 a° ~ d ~p u i s X ~ ~ E C m S 3 ,{;~J "" ~ ° 8 ~ w O . ~~ ae ma rc E€ ~ s o ~ . 's p a € _ __ 8 ~ 8 s 5 y c E O E a E 3 b B T F ~ ~ ~~ E - ' v m ~ pm E E8u_iV C n ~~' $ 8 ~ $~ ~. o$ ELL E ES N E ~ ° u $ F g gem = 3 0 w~ 0' E o ' m ~~ _ $ c $ >_ a~ ~e n' o u p~ n r u E u a' a~'~gm :'o e a ~@~ "~ ~ L ~a E~ c ® s ~x ~a s°8 e~a~ ~°=_g w ~ d 08 ~ e8 o E e 8 a°'s rc8 F aX e ~ : 5~ u8 „a 'a 'm m m ~ ~ ~ m °m m 'm 'm m 'm `m m 'm ~~ g; "` ~ ~ ~ '~ ~ z g 9 ' z z z z ~ z ¢ a d S u a F a ~ a " d a ~ ~ ~ a a a y V U ~ aFt V V U U U U U U ~ o z o z ~ y o z 0 z 0 z 0 z o z g o z 0 z 0 z 0 z 0 z 0 z e ~~r z u :6 s_ E e ~ s s ~ s a ~ 8 m ~ g ~ m R $ rv x 8 3 $ '° o ~ = S a ~ 8 Y m ~ o s rc N W ~ oz 0 Q gg e ° o e e e ° b~ ~ 8 8 8 8 8 = A m Y. S S $ o S ~ F O O O a z H J z O rc Y U m ~ m ° 8 8 8 8 8 $ e $ R 8 8 8 m ~ ~A i 1 ~ 8 9 $ 3 ~ S O a O 6 y W a S m m m n < - » ''S .~ °a z W ( 9 V ~ ~ z n ~ m 8 8 $ 8 B 8 8 88 ~ V p z ~ ~ 3 $ Q . » . 10 J O W 2 C m Z Q ~ R $ v 3 v 5 £ ~ _ ~ ` = ' ~ ~ ° O a Q W N N N N Q W Q W J J Q W Q W a W Q W Q W Q W a W Y U ~ a o ` B a ~ ~ - ~ s ~ ~ =o e E ~ 5 51 $ $ 3 8 S 3 wl ~ ' ~ " s ~ ~ a a ~ ~ S d v_ ~ _ ~ n b ~ ~ ~ E $ 6 8 8 $ g ~ g ~ E F s 2 s a x e m E 9si 8 ~ N 8 ~ s o ~ 3 5 $ E 51 w% 0 s k 8yy '~ E u u y 6 m yu~ ~ r C ~ 9 i W ~ $ W 8 a Ou ~ o n e'E ~E~ 88 E 8 ~ $ ° ~ g ug g aE a y y b E £ on ~a^ }}~ c ~° n°s S ° ° $ ' of ~` E8.° % .y E a~ ~__ 8 g x8 z n x8 n `8 F.~ ~ 8 UE ~'E SSE ~8 ~m E 4 ~ ~m ~ E ~$ B #p m @ _ U n$ m$ m$ tV3 ¢°°$ CW i w rvs w e• nE P n° V u u E tY Y u Y O 4 Y U U V U V