HomeMy WebLinkAboutC2008-466 - 12/16/2008 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 5 FUNDING SOURCE: CONTRACT TIME: 364 C.D. Operating Department: Bond 2004 DATE: November 4, 2008 Name of Project: Greenwood Drive Phase 1 from Gollihar to SPID -Project No. 6277 .Contractor: Salinas Construction Technologies Ltd. CHANGE AS FOLLOWS: ADD DEDUCT 1. Additional Sidewalks, Driveways, and Curb & Gutter for $186,166.42 Phases 1, 2, 3, 5, & 6. Why was this change necessary? (If left off the plans and specifications, explain why) Proiect was originally reviewed by TDLR and accepted before construction commenced. The City has implemented new ADA initiatives which exceed minimum ADA requirements and these changes provide improvements for all of the sidewalks and drivewavs which do not comply with current standards. How can similar changes be avoided in the future? N/A A. CONTRACT PRICE .............................................. $3,787,013.79 ~ B. TOTAL CHANGE ORDER (inc. current) .................... $281,138.11 ~ C. NEW CONTRACT PRICE ...................................... $4,068,151.90 / D. THIS CHANGE ORDER ........................................ $186,166.42 / ~.. ,E E. PERCENT TOTAL CHANGE (B/A) .......................... 7.42% / Project E near F. PREVIOUS ADDN'L TIME AUTHORIZED .................. 61 G. ADDN'L CONTRACT TIME THIS CHANGE ORDER .... 80 ~ ~~~' T EYG H. TOTAL ADDITIONAL TIME ..................................... 141 ~ CITY O~ PU CHRISTI, TEXAS By: ~os~a~" City Engi ear , APPROVED: CONTRACTOR By: ,~ Title: /~/ Operating Department Director of Management & Budget /~egal Department KiTE31? ANiIAANDOCHAPA ~{'° _. il:~r.hf;i 2008-466 12/16/08 M2008-332 Salinas Constr. Technologies dl~g ~:AUTHORIGt~ RT CatlRCIL....I..~~l~•'b~ SEC fTARY ~1~ 11/4/08 CHANGE ORDER Ifs COST BREAK DOWN (City Project No. 5277) GREENWOOD DRNE IMPROVEMENTS -PHASES 1, 2, 3, 5, 8 6 ADDITIONAL DRNEWAY, AND CURB AND GUTTER QUANTITIES Phase 1 (West side from NPID to Trojan) Addkional Bid Item Description Quantity Unit Price Subtotal H15 Unanticipated Concrete Driveway 4,020 SF $7.66 $30,793.20 C11 Unanticipated Concrete Driveway removal 4,020 SF $4.62 $18,572.40 H12 Unanticipated Concrete Sidewalk C8 Unanticipated Concrete Sidewalk removal 2,602 SF $4.94 $12,853.88 2,602 SF $2.09 $5,438.18 H13 Unanticipated Concrete Curb and Gutter 283 LF $16.08 $4,550.64 C9 Unanticipated Concrete Curb and Gutter removal 283 LF $6.94 $1,964.02 Total Cost for Phase 2 $74,172.32 Phase 2 (East side from NPID to Trojan) Addkional Bid Item Description Quantity Unk Price Subtotal H15 Unanticipated Concrete Driveway 0 SF $7.66 $0.00 C11 Unanticipated Concrete Driveway removal 0 SF $4.62 $0.00 H12 Unanticipated Concrete Sidewalk 2,178 SF $4.94 $10,759.32 C8 Unanticipated Concrete Sidewalk removal 2,178 SF $2.09 $4,552.02 H13 Unanticipated Concrete Curb and Gutter 0 LF $16.08 $0.00 C9 Unanticipated Concrete Curb and Gutter removal 0 LF $6.94 $0.00 Sidewalk Drain at (STA 15+75 approximately) $5,100.00 Shopping Center Driveway Storm Box Lid Rebuild $2,100.00 Total Cost for Phase 2 $22,511.34 Phase 3 (West side from Trojan to West Point) Additional Bid Item Description Quantity Unk Price Subtotal H15 Unanticipated Concrete Driveway 1,375 SF $7.66 $10,532.50 C11 Unanticipated Concrete Driveway removal 1,375 SF $4.62 $6,352.50 H12 Unanticipated Concrete Sidewalk 1,120 SF $4.94 $5,532.80 C8 Unanticipated Concrete Sidewalk removal 1,120 SF $2.09 $2,340.80 H13 Unanticipated Concrete Curb and Gutter 25 LF $16.08 $402.00 C9 Unanticipated Concrete Curb and Gutter removal 25 LF $6.94 $173.50 - - $25,334.10 Phase 5 (East side from Trojan to West Point) Addkional Bid Item Description Quantky Unit Price Subtotal H15 Unanticipated Concrete Driveway 0 SF $7.66 $0.00 C11 Unanticipated Concrete Driveway removal 0 SF $4.62 $0.00 H12 Unanticipated Concrete Sidewalk 2,092 SF $4.94 $10,334.48 C8 Unanticipated Concrete Sidewalk removal 2,092 SF $2.09 $4,372.28 H13 Unanticipated Concrete Curb and Gutter 300 LF $16.08 $4,824.00 C9 Unanticipated Concrete Curb and Gutter removal 300 LF $6.94 $2,082.00 $21,612.76 Phase 6 (East side from West Point to Gollihar) Addkional Bid Item Description Quantity Unk Price Subtotal H15 Unanticipated Concrete Driveway 0 SF $7.66 $0.00 C11 Unanticipated Concrete Driveway removal 0 SF $4.62 $0.00 H12 Unanticipated Concrete Sidewalk 1,512 SF $4.94 $7,469.28 C8 Unanticipated Concrete Sidewalk removal 1,512 SF $2.09 $3,160.08 H13 Unanticipated Concrete Curb and Gutter 300 LF $16.08 $4,824.00 C9 Unanticipated Concrete Curb and Gutter removal 300 LF $6.94 $2,082.00 $17,535.38 Allowance for Subgrade Treatment under Commercial Driveways $25,000.00 Total Cost of work for phases 1, 2, 3, 5, 8 8. 5186.165.88 Notes: 1. These additional improvements will complete accessible routes meeting ADA requirements along both sides of Greenwood Drive from NPID to Gollihar. 2. Fitty four cents was added to this Change Order to account for a math error in Change Order #4. DEPARTMENT OF ENGINEERING SERVICES CHANGE ORDER SUMMARY SHEET December 9, 2008 PROJECT: Greenwood Drive, Phase 1 - Gollihar to SPID Project No. 6277 APPROVED: City Council Motion No. M2008-054 on February 26, 2008 CONTRACTOR: Salinas Construction Technologies 3734 FM3006 Pleasanton, TX 78064 TOTAL CONTRACT AMOUNT .................... ........ $3,787,013.79 25°/G Limit Amount . .. .................................. ......... 946,753.45 Chan a Order No. 1 June 18, 2008 ............ ......... 21,757.11 Chan a Order No. 2 Au ust 12, 2008) ......... ......... 24,713.41 Chan a Order No. 3 Au ust 18, 2008 ......... ......... 24,500.00 Chan a Order No. 4 Se tember 22, 2008 ... ......... 24,001.17 Chan a Order No. 5 December 9, 2008 ...... ......... 186,166.42 TOTAL All Chan a Orders .......................... .......... $281,138.11 7.42% < 25°/D H:\USERS2\HOME\VELMAP\GEN\STREET\62]] GREENWOOD DRIVE\CONSTRUCTION\CHANGEQRDER NO. SCHANGE ORDER SUMMARY