Loading...
HomeMy WebLinkAboutC2009-018 - 1/27/2009 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 1 FUNDING SOURCE: CONTRACT TIME: 300 C. D. Operating Department: DATE: January 19, 2009 Name of Project: Wood River Lift Station Upgrade and Force Main Extension Part B - P R 7148 Contractor: Big Slate Excavation, Inc. CHANCE ADD DEDUCT SEE ATTACHED BREAKDOWN $88,180.25 Why was this change necessary? (If left offthe plans and specifications, explain why? I & 2.) Designed prior to property platting and development plan also to avoid ma'or public disruption and concrete/landscape repair 3 thru 7.) Traffic pattern changed during construction at Rrverwood & F.M. 624. B3 & B6) Ciry of Corpus Christi requested revised alignment of 16"PVC force main How can similar changes be avoided in the future? 1 & 2.) Unavoidable. B3 & B6) Unavoidable. 3 thru 7.) Unavoidable. A. CONTRACT PRICE $ 1,372,420.00 B. TOTAL CHANGE ORDERS (inc. current) $ 88,180.25 C. NEW CONTRACT PRICE $ 1,460,600.25 ~~ D. THIS CHANGE ORDER 88,180.25 Project anager E. PERCENT TOTAL CHANGE (B/A) 6.43% F. PREVIOUS TIME AUTHORIZED 0 C.D. G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 37 C.D. H. TOTAL ADDITIONAL TIME 37 C.D. CITY OF CORPUS CI ISTI, TEXAS CONTRACTOR By: ~~ ~ By: Director of Engineering Services Title: ~~tC~ /Yfgq,~~ Department 2009-018 M2009-023 01/27/09 nagement & Budget O AUTHUK12ED ~rtment nn /~ q BY COUNCII...ll.~ ~.1~~/~_(..._ ._ .....................lst. SECRETARY ~J}~• Big State Excavation Wood River Lift Station Upgrade and Force Main Extension Part B - P.R. 7148 Change Order No. 1 P.R. No. 7148 CHANGE ADD DEDUCT Add the followine items to the contract: 1 Provide material, equipment & labor for 320 L.F. of $106,086.06 directional drilling, installation of 16" HDPE Pipe, bore pits and support to fuse pipe (See Attached Breakdown) (1 L.S. @$106,086.06/L.S.) 2 Additional boring required to bore under the victory bank $5,000.00 driveway @ C.R. 69 - (1 L.S. @$5,000.00/L..S.) B3 16" PVC Sanitary sewer force main, complete in place $714.00 per linear foot (17 L.F. @$42.00/L.F.) B6 Installation of 30" steel casing beneath F.M. 624 by dry $3,500.00 boring method, complete in place, per linear foot (7 L.F. @$500.00/L.F. ) 3 Concrete Island @ Riverwood and F.M. 624 - (1 L.S. $5,860.00 4 2" HMAC 15 S.Y. - (1 L.S. @$1,910.00/L.SJ $1,910.00 5 Pavement Markings - (1 L.S. @$4,449.00/L.S.) $4,449.00 6 Traffic Control - (I L.S. @$2,407.25/L.S.) $2,407.25 7 Overhead & Profit - (15%) $2,193.94 Deduct the followine items from the contract: B3 16"PVC Sanitary Sewer Force Main complete in place, ($13,440.00) per L.F. (320 L.F. @$42.00/L.F.) Bl8 Misc. driveway repair and replacement, per squaze ($20,000.00) yard - (100 S.Y. @$200.00/S.Y.) B 19 Allowance for relocation of utilities, complete in place, per ($10,500.00) lump sum (.30 L.S. @$35,000.00/L.S.) SUB-TOTAL: $132,120.25 ($43,940.00) NET TOTAL: $88,180.25