HomeMy WebLinkAboutC2009-079 - 2/4/2009 - NA@]dtlbl~'OLOGY
80 George Street, Paterson, NJ 07503 (973) 523-0033, FAX (973) 523-3331
AMENDMENT NO. 1 TO THE
VOYAGE SOLAR SYSTEM AGREEMENT
1. Existing Agreement: Voyage Solar System Agreement ("Agreement")between Exhibitology,
LLC, and the City of Corpus Christi, a Texas home-rule municipal corporation, for the purchase of a
Voyage Scale Model Solar System.
2. Amendment Number: 1
3. Description of Modification:
To add an item to the deliverables list in Exhibit A, Section I, increasing the overall total value by
$10,000:
h. Modification of all 13 Voyage exhibition stanchions to include cover plates for installation using the
"Above Grade Option" as described in the NCESSE doclunent titled "Installation Options for the
Voyage Exhibition" (Exhibit D), though the cover plate will be sized appropriately to the twelve
inch dimension limitation of the selected seawall mounting site for placement of the stanchions.
To amend a portion of section 4 of the Agreement, titled `RICE, PAYMENT, METHOD OF
PAYMENT AND TAXES," to account for the $10,000 increase of the overall total cost for the Voyage
Solar System Exhibit, to read as follows:
4. PRICE, PAYMENT, METHOD OF PAYMENT AND TAXES. The total cost for the Voyage
Solar System Exhibit is One Hundred Eighty Nine Thousand and Six Hundred Dollars $189,600
("Total cost"). Client shall make payments as follows:
a. 40% ($ 75,8401 ($71,840 was due by Seutember 30, 2008 and has already been timely
paid b y the Cit v). Balance of $4,000 is due 30 days after receiut of invoice;
b. 25% ($ 47.4001 is due on reachina the 50% exhibit comaletion milestone:
c. 25% ($ 47.4001 is due on reachina the 95% exhibit comaletion milestone: and
d. 10% ($ 18.960) is due on delivery of the exhibit.
Except as provided herein, all terms and conditions of the Agreement identified in Item 1 above, as
heretofore modified, remain in full force and effect.
2009-079
02/04/09
Exhibitology
Exhibitology
By:
Name: Richard Rew
i
Title: President
Client ~
Name: -rr'~YL~•f ~ ~. ~~P~~.v
Title: ~ ~ ~Q !~ a ? v
Date: 10/30/08 Date: ~~_I~~
tot ~~-~
~~~-~.; late meY
r City AttomeY
ATTEST.
ARMANOp CHAPA ~-gam
carr sECRErnm~
Installation Options for the Voyage Exhibition
Revised: July 29, 2008 { { V 0 YA G E
Below Grade Option: The Voyage stanchions were originally designed ,,,~~.,,e,m,o~,~.o~„so:..ss,~.:~~
for installation in softscape areas with the base plate 3-inches below
grade, and the base plate covered with mulch. This is the case for the installation on the National
Mall in Washington, DC. The approach is detailed in Figure 1, which shows the surface of the
footings below grade. Note the base plate floats above the footing surface due to the action of
leveling nuts. The top of the concrete footing is located 3.5-inches below grade.
Above Grade Option: There are, however, community sites for Voyage where the stanchions are to
be placed in hardscape areas, which are surfaced with either pavers or concrete, and below grade
installation is not an option. This is the case for the Kansas City installation.
For above grade installation, the Voyage team had developed a workable solution which requires a
modification to the design, including: 1) footings poured at grade, 2) a round rather than square base
plate, 3) stanchions truncated by 3 inches at the bottom to ensure that the storyboards are
maintained at their correct height as per ADA requirements when the stanchion is mounted at grade,
and 4) an aesthetic round cover-plate that covers the base plate and the studs and nuts securing the
base plate to the footing. The adopted design is provided in Figure 2.
In the case of above grade installation, we strongly advise the Client NOT to install directly on top
of existing concrete slab. It is not clear that the existing slab will provide the structural integrity
required. Instead, the slab should be cut to allow pouring of the footing at grade, and the cover-
plate will hide the cut in the concrete. This, however, requires the cut in the slab to be smaller than
the cover-plate dimension.
The estimated added cost for the exhibition installed above ground is 5% more than that for
the below ground installation.
General Installation Notes:
• All installation specifications are provided in the attached drawings.
• Installation hardware (anchor bolts, nuts, and washers) is not provided with the stanchions.
Each stanchion requires the following hardware as specified on the attached drawings:
• 4 stainless steel L-hook anchor bolts 1/2" -13 Thread, ]2" Length
Thread length must be at least 2.5-inches for Below Grade option, and at least 2-inches
for Above Grade option, so that the appropriate length of thread extends to the top of
the concrete footing (see attached drawings.) An L-hook with these specifications is
McMaster-Can Part #91615A230 (http://www.mcmaster.com).
• 8 stainless steel I/2"-13 nuts, 3/4" width, 7/16" height
1
• 8 stainless steel 1/2" washers
• It is strongly recommended that the nuts are spot welded to the anchor bolts so that
someone with a wrench doesn't have the ability to walk off with a stanchion.
• We estimate that the weight for the 8.5-foot tall and 3.67-foot tall stanchions are 110 lbs and 85
lbs respectively.
• Receiving the shipment: for the 13 stanchion exhibition, the Client needs to be prepared to
receive (likely) 3 crates 4'x3'x10' @ 1,000 lbs each; 1 crate 4'x3'x5' @ 800 lbs.
Template for Bolt Holes and its Use:
For both modes of installation, the Client will be provided a Template for the base plate holes so
that the vendor constructing the footings can easily position the anchor bolts in the footing.
The Template will likely be a square piece of 'h-inch thick plywood with four holes in a square
pattern, with adjacent hales spaced 6.5-inches apart on center. This matches the bolt hole
configuration for the stanchion base plate, with hole configurations identical for Above and Below
Grade installations (see attached drawings.)
An approach:
• The contractor installing the concrete footings and stanchions can duplicate the Template to
have one for each footing to be poured.
• Attach the L-hooks with nuts and washers to each Template.
• At each footing, push. the L-hooks into the wet concrete, but make sure to shim the Template
so the specified amount of bolt length extends above the concrete. Also make sure that
bolt studs are plumb and level.
• After the concrete is dry, it is suggested that all Templates be left in place until the exhibition
arrives, but covered with, or mazked by, a safety cone to prevent accident.
Figure 1
Grade
m
Footing is
covered by
mulch or other
finish material
ty installation
.•f"~I VJldth; 7J7,6"1-leiphh..
Stainless Styd
,4 , 1/2' GYashers.
3 iY y <~'~'.. ~~..:..
~-
C
D
Stainless steel L-hook p
anchor bolt 1/2"-13 -
thread, 12" Length
\. p - p
w - ' D ~ Detail i
~ l
M D `• L-hook anchor bolts set
2-1/2" above the top of
D the footing
' D .. Concrete footing in 12" -
12 dia. Sonotube with top
surtace set 31/2"
below grade
. D
r•
., D • Stanchion
' .
D'
$ ~--
F2 :Scale: 8" =1•
61/2'..
m
..
• . --Outline of
D • interpretive panel
D.
1 ~ Below Grade Installadlon ElevaHan 2 .~ Grade Inetallatlan Plan
P2 'Scale: l" =1' `, F2 'Scab:1" =1'
__ _ Below Grade Installation _ - _ -
6xnbnaasy iteierw aia s~tmtta
eo oaxko sx.
Vrtasm tU O]643 Off Iy NMNN 6avm by'.
9]1s230o3d
9]36233]31 Mr. i Orte: -
3
t ,
Figure 2
Stainless Steel 1/2"-13 Nuts.
3/4" Width. 7/16" Heigh[,
-- welded to anchor
Stainless Steel Was
15"diameter cotter
plate with recessed n
Sta I feel - -
pockets Por 4 nuts. mess s
Cover plate Will be one Lhook enciwr
piece and attached to bolt 1/2"-13
stanchion prbr [o final Thread 12
assemby by LengUt
Fxhibftoloogy. I[ will
a D
have 1/8" clearance Anclwris set
around stanchion so R a min. 2" above
can be IffteU for grade and cut
attachmeirt. It will be flush with the top
flmlly secured With of the nut told then
silicon.. welded together
m
ro
Grade
a 'Grout Grade ~ a-,, ~BII
,, ,`
~ ~_ Fs, scale
' o ~- Detaa a
Stainless steel ~ ,
L-hook anchor Concrete
+,
insta~llatlon 12 footing in 12" ",
o • dia. Sonotube • ~ i
conVactor )~~~ 1~,_'.
°, D'
° ' Gralt underneath ~ ~ ~' ~~
° base pate N
D~
D.. , !~~)
s.
Stanchion ~~ ~ ~/~ ;
D•
D / - 12" Sbnotube
footing
~~
Nuts welded to '7" bolt ~, i - Outline of
' ~ '- irate retive
beneath the cover plate ~
wayside
/ 1 _ t Above Grade Ifretallatlon Devallon r _ 2 ~AboT~e Grade Inetallatlon Plan
Pl 'Scala: l" =1' '' Fi Scale: T' =1'
Above Grade Installation _ _ _
Exabttdog fa1lYiekW PnE SUbNM1a
p
g
B
Val
XI OIFOJ
m
. 6~.IT. 1![ePA
~ darn oy
~
Wb5R33J31 -. ~_
--.
4