HomeMy WebLinkAboutC2009-112 - 3/11/2009 - NAAMENDMENT NO. 3 GARWOOD WATER SUPPLY PIPELINE ROUTING PLAN CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, a Texas home rule municipal corporation, P.O. Box 9277, Corpus Christi, Nueces County, Texas 78469-9277 (City) acting through its duly authorized City Manager or Designee (Director of Engineering Services) and Freese and Nichols, Inc., a Texas corporation, 4055 International Drive, Suite 200, Fort Worth Texas 76109-4895, (Consultant Engineer), hereby agree to the amendment of the contract approved October 28, 2003 (M2003-394), and amended October 29, 2004 (M2004-387) as follows: Section 2. Scope of Services is amended by the addition of a paragraph to read: The Consultant Engineer hereby agrees, at its own expense, to perform services necessary to complete the Scope of Services set forth to complete a Garwood Right of Way Alignment as set fort by Exhibit A-3. Task 2A-0005 Task 5 -Permitting and Agency Coordination and Task 2A-0008 Task 8 - Phase 2A Report are deleted in their entirety. The Consultant Engineer will provide monthly status updates (project progress or delays, Gantt charts presented with monthly invoices) and provide contract administration services, as described in Exhibit A-3, to complete the Project. Section 5. FEE is amended by the revision of Fees to read: 1. FEE The City will pay the Consultant Engineer a fee, as described in Exhibit A-3, for providing services authorized. All other terms and conditions of the October 28, 2003 contract, as amended, between the City and Consultant will remain in full force and effect. CITY OF CORPUS CHRISTI By ~~ ~1~ ~//~109 Oscar Martinez, ate Assistant City Manager RECOMME ED BY: By 3~ 9 Pete Anaya, P.E. Date Interim Director -Engineering Services FREESE AND NICHOLS, INC. Joh Wolfhope, P.E Date 10814 Jollyville Road, Suite 100 Austin, TX 78759 (512) 451-7955 Office (512)451-7956 Fax ATTEST By ~ ii Armando Chapa, Dat City Secretary APPRO ED AS TO F M b~ By ~~"1\~~~'ty \ttorney Date 11 ~/ I _ 2009-112 03/11/09 Contract for Engineering (A/E) Services Page 1 or 7 ~d\Phase2A W EAmd 3. doc Freese and Nichols Exhibit A-3 CITY OF CORPUS CHRISTI Garvvood Water Supply Project Phase 2 Detailed Study of Delivery Options Phase 2A: Permitting and Partnering AgreementsAmendment No. 3 SCOPE OF SERVICES Additional Services 2. Scope Revision: Delete from the current scope of services: TASK 5: Permitting and Agency Coordination TASK 8: Meeting Requirements and Reporting of Findings Add to the scope of services: TASK 9: Garwood Alignment Study Scope of Work Task 9.1: Data Collection Gather the following maps to choose and evaluate route options: • Aerial maps Road maps • Contour maps Floodplain maps • Soils maps Landowner maps Zoning maps • Future Development maps • Thoroughfare plans • Utility maps • Meet with City of Corpus Christi to discuss preliminary options Task 9.2: Preliminary Hydraulic Study Conduct a preliminary hydraulic study to identify approximate pipeline and pump sizing. Task 9.3: Preliminary Environmental Review Use existing maps and other environmental data to outline required permitting and other environmental conflicts for the proposed routes. Task 9.4: Preliminary Route Analysis Conduct site visit to identify possible conflicts along selected routes. Evaluate routes based on: • Construction costs • Lifecycle costs • Real estate costs • Environmental conflicts • Schedule ramifications Exhibit A-3 Pa e1of16 H:\HOM EV(EV I NS\GEN\WATER\Garwood\P h ase2AW EAmd3ExhA3.doc Hydraulics Surveying and engineering costs Task 9.5: Final Route Analysis Meet with cities, counties, utility districts, and any other governmental or private entity that may have potential impacts based on the route. Narrow down multiple routes to a maximum of two final options and evaluate based on the following: • Facility requirements • Permitting • Conflicts with the public • Conflicts with future land use • O&M issues • Constructability • Easement acquisition schedule B. Fee: The authorized fee remains unchanged. The table Summary of Fees set forth on the following page will be used by the Consultant Engineer to determine the amount to be invoiced for each task. The fee shown for each task is inclusive of all expenses as set forth by the original contract. C. Schedule: Data Collection March 31, 2009 Preliminary Hydraulic Analysis March 31, 2009 Preliminary Environmental Review April 30, 2009 Preliminary Route Analysis April 30, 2009 Final Route Analysis June 15, 2009 TASK 1: Field Studies Purpose: The purpose of this task is to conduct field studies and gather background information related to easement, permitting, and regulatory requirements associated with the proposed water rights amendment. A.Ownership Mapping: Develop maps and spreadsheet of land ownership along West Mustang Creek from (a) the point of diversion to the Ganado USGS gauging station at Hwy 59 and (b) at proposed location of upstream flow monitoring device. This task will also include ownership mapping of the relevant Garwood Irrigation Company (GIC) canals. The maps developed in this task will be used to assist in determining potential permitting, easement acquisition, rights-of-entry, and mitigation requirements. It is assumed that rights-of-entry to support field studies will be obtained by others. If acquisition of rights-of-entry are required, scope and fee associated with this task will be authorized under a separate amendment. B.Risk Analysis: Develop risk analysis spreadsheet for opening of the water right and associated permit processes. Conduct a workshop in Corpus Christi with City staff to review risk analysis. Exhibit A-3 Pa e2of16 H:\HOMEU(EV I NS\GEN\WATER\Garwood\Phase2A V~EAmd3ExhA3.doc C.Field Survey of West Mustang Creek: Conduct field study and survey measurements of width of West Mustang Creek upstream from the mouth of the creek. The field survey information will be used in conjunction with the land ownership maps to determine public/private ownership of the bed and banks and to provide data for hydrologic modeling, if hydrologic evaluations are required for permit applications. It is assumed that survey data will be collected at no more than seven sub-reaches of the creek. D.West Mustang Creek Habitat Assessment: Conduct a habitat assessment of West Mustang Creek between the proposed point of diversion from the GIC canal to the mouth of Mustang Creek. The purpose of this task is to identify potential creek habitat impacts, investigate endangered species, and delineate flow regimes. As provided for in Task 4, meetings will be held with Texas Parks and Wildlife Department (TPWD), Texas Commission on Environmental Quality (TCEQ), U.S. Army Corps of Engineers (USAGE), and the Texas General Land. Office (TGLO) to determine requirements and needs for West Mustang Creek habitat impact assessments. For the purposes of establishing a budget, it is assumed that the assessment of potential habitat impacts will be based on representative field data collected at up to four sub-reaches of the study area. It is also assumed that the level of effort of characterizations of the physical habitat and biological community, if required, will be similar to that required for a TCEQ Receiving Water Assessment. E.Coordinate Re-Calibration of Ganado Gauging Station: Coordinate re-calibration of the Ganado Gauging Station with LNRA and the United States Geologic Survey (USGS). F.Task 1 Summary Findings: Prepare summary of Task 1 results for incorporation into final report. Conduct a workshop with City staff in Corpus Christi to review summary findings and receive comments. TASK 2: Agreement with Lower Colorado River Authority (LCRA) for use of Garwood Irrigation Company Facilities Puraose: The purpose of this task is to develop an agreement between the City of Corpus Christi (City) and LCRA for upgrades, operation, and maintenance of the Garwood Irrigation Company Facilities including the proposed West Mustang Creek Diversion. A.Agreement Framework: Develop framework of agreement for use of GIC facilities. The agreement will include the scope of maintenance upgrades for the existing Garwood Pump Station and Town Canal, design of the diversion structure at West Mustang Creek, and operations and maintenance plan. The operations and maintenance plan will consider coordination of river and irrigation diversions, in-stream flow needs for the Colorado Basin, diversion schedules, metering and gauging requirements, coordination with Lake Texana operations, flow regimes (erosion, flooding) in the canal and West Mustang Creek, and scheduled maintenance of the GIC facilities and proposed West Mustang Creek Diversion. B.Framework Meeting: Meet with LCRA to present framework and develop a detailed outline of the draft agreement. Discuss inclusion of Garwood Water Diversion in LCRA Water Management Plan. This task assumes one meeting in the Garwood area. Exhibit A-3 Pa e3of16 H:\HOMEV(EV INS\GEN\WATER\Garwood\Phase2AW EAmd3ExhA-3.doc C.Prepare Draft LCRA Agreement: Based on results of the meeting with LCRA, develop the draft agreement. Provide draft agreement to City and LCRA prior to scheduling the Draft LCRA Agreement Workshop. D.Draft LCRA Agreement Workshop: Meet with LCRA and City to review and edit draft agreement for use of GIC facilities. This task assumes one meeting in the Garwood area. E.Prepare Final Agreement: Finalize agreement based on input and comments from LCRA and Corpus Christi. F.Execute Agreement: Meet with the City and LCRA and obtain each entity's written approval of the Final Agreement. The executed agreement will be included as part of the Texas Commission on Environmental Quality (TCEQ) water right amendment application. This task assumes two (2) meetings, one in the Austin area (LCRA Board meeting), and one in Corpus Christi (City Council meeting). G.Task 2 Summary: Prepare a summary of Task 2 for incorporation in final report. TASK 3: Agreement with Lavaca-Navidad River Authority (LNRA) for conveyance through Lake Texana. Pur ose: The purpose of this task is to develop an agreement between the City and LNRA for upgrades, operation, and maintenance of LNRA facilities associated with the proposed Garwood Diversion. A.Aareement Framework: Develop framework of agreement for use of Lake Texana and other LNRA facilities. The agreement will include arrangements for capital improvements to LNRA facilities (as needed), and operations and maintenance arrangements. A Water Accounting Plan will be developed as part of the operations and maintenance portion of the agreement. The Water Accounting Plan will include withdrawal schedule for Colorado River diversions, content and availability estimates for Lake Texana, loss estimates in West Mustang Creek, flooding impacts and operational responses, spills from Lake Texana, meter and gauging requirements, bay and estuary releases, instream flow needs for the Lavaca/Navidad Basins, irrigation diversions, and system accounting and reporting for flows through Lake Texana. B.Framework Meeting: Meet with LNRA and City to present draft framework and prepare a detailed outline of the draft agreement. This task assumes one (1) meeting in the Edna area. C.Prepare Draft Agreement: Based on the results of the Framework Meeting, prepare a draft agreement. Provide draft agreement to City and LNRA prior to scheduling the Draft LNRA Agreement Review Workshop. D.Draft LNRA Agreement Review Workshop: Meet with LNRA to review and edit draft LNRA Agreement. This task assumes one (1) meeting in the Edna area. E.Regulatorv Coordination: Meet with TCEQ and TPWD to obtain their concurrence on the provisions of the LNRA agreement. This task assumes two (2) meetings in the Austin area. F.Prepare Final LNRA Agreement: Finalize agreement based on input and comments from LNRA, TCEQ, TPWD, and City. G.Execute Agreement: Meet with the City and LNRA and obtain each entity's written approval of the Final Agreement. The executed agreement will be included as part of the TCEQ water right amendment application This task Exhibit A-3 Pa e4of16 H:\HOM E\KE V I NS\GE N\WATE R\Garwood\Phase2A\AEAmd3ExhA3.doc assumes two (2) meetings, one in the Edna area (LNRA Board meeting), and one in Corpus Christi (City Council meeting). H.Task 3 Summary: Prepare summary of Task 3 results for incorporation in final report. TASK 4: Regulatory Agency Coordination Puraose: The purpose of this task is to coordinate with regulatory agencies and regional water planning groups regarding regulatory agency concerns, required permits, and consistency with current State of Texas water resources planning requirements. A.Coordinate with TPWD regardinq Gravel Sand and Marl (GSM) Permit: Meet and coordinate with TPWD regarding the need for a GSM Permit. This task assumes up to two (2) meetings with TPWD in Austin, Texas. B.Coordinate with TPWD regardinq LNRA Lake Texana Inflow and Release Agreement: Meet and coordinate with TPWD .the possible amendment of the existing agreement governing releases from Lake Texana between LNRA and TPWD. This task assumes up to three (3) meetings with TPWD in Austin. C.Coordinate with TCEQ regardinq Bed and Banks Authorization: Meet and coordinate with .TCEQ regarding the need for a Bed and Banks authorization. This task assumes up to three (3) meetings with TCEQ in Austin, Texas. D.Coordinate with TGLO regardinq Bed and BanksAuthorization: Meet and coordinate with TGLO regarding the need for a Bed and Banks authorization. This task assumes up to three (3) meetings with TGLO in Austin, Texas. E.Coordination with TCEQ and TWDB for Regional Water Planning: Meet with TCEQ and Texas Water Development Board (TWDB) to determine the status of diversion of the City's Garwood Right as a "consistent" strategy for Region N. This task assumes one (1) meeting each with TCEQ and TWDB in the Austin, Texas area. F.Regional Water Planning Groug Coordination: Meet with Region N and Region K representatives to determine the status of status of diversion of the City's Garwood Right as a "consistent" strategy for Region N. This task assumes one (1) meeting each with Region N and Region K planning groups, in the Corpus Christi and Austin areas, respectively. G.Monitor LCRA/SAWS Proiect: Continue discussions with LCRA and SAWS, as appropriate, to monitor status of the LCRA/SAWS Project and explore opportunities for the cooperative development of delivery options in conjunction with the LCRA-SAWS Water Supply Project. This task assumes up to two (2) meetings with LCRA in the Garwood, Texas area. H.U S Army Corps of Engineers (USAGE) Coordination: Meet with USAGE to begin coordination process for 404 permitting of the following facilities: .Proposed improvements to GIC canal .Proposed West Mustang Creek Diversion .Proposed gauging stations. This task will seek to identify the appropriate approach to permitting the facilities through the 404 system, and identify specific concerns of the USAGE and other participating regulatory agencies prior to preliminary design of each facility. This task assumes one (1) meeting with USAGE in the Galveston District Office. Exhibit A-3 Pa e5of16 H:\HOMEV(EV INS\GEN\WATER\Garwood\Phase2AViEAmd3ExhA3.doc I.TPDES Coordination: Maintain dialogue with TCEQ on potential need for a TPDES permit. This task assumes no meetings with TCEQ will be required. J.Landowner Issues and Communications: Assist LCRA in communicating with potentially affected landowners as requested by the City. This task assumes up to three (3) meetings in the Edna, Texas area. K.Meet with Environmental Grouas: Plan, schedule and attend up to three meetings with selected environmental groups that have interest in the proposed diversion. This task will include planning and scheduling of these meetings, and development of background information and exhibits. This task assumes up to three (3) meetings, including two (2) in the Austin area and one (1) in the Edna area. L.Task 4 Summary: Prepare summary of Task 4 results for incorporation in final report. TASK 5: Permitting Activities Purpose: The purpose of this task is to prepare and submit permit applications and other materials required for the delivery of Garwood Water to Corpus Christi. A.Bed and Banks Authorization: Prepare and process appropriate materials to support the request for a Bed and Banks authorization to transfer Garwood water via West Mustang Creek, where required. B.Prepare Amendment to TPWD/LNRA Inflow and Release Agreement: Purpose of this task is to amend the existing agreement governing Lake Texana environmental flow releases between TPWD and LNRA to accommodate City's diversion of the Garwood Right through Lake Texana. This task will include: 1.Development of amendment framework. The amendment framework will be a list of items, topics, and issues that must be addressed by the amendment. 2.Meet with LNRA and TPWD to present amendment framework and develop a detailed outline of the draft amendment. This task assumes one (1) meeting in the Edna area. 3.Based on the detailed outline, develop draft amendment. Provide draft amendment to LNRA and TPWD for review prior to scheduling Draft Amendment Workshop. 4.Meet with LNRA and TPWD to review and edit the draft amendment. This task assumes one (1) meeting in the Edna area. 5.Prepare final amendment based on input and comments from LNRA and TPWD. 6.Meet with LNRA and TPWD and obtain each entity's written approval of the Final Amendment. The final amendment will be included, as appropriate, as part of the TCEQ water right amendment application. This task assumes attendance at one (1) governing board meeting each with TPWD and LNRA in Austin and Edna, respectively. C.Water Rioht Amendment Application: Prepare application to TCEQ to amend the City's Garwood Water Right. The application is required to amend the current Exhibit A-3 Pa e6of16 H:\HOME\KEV I NS\GE N\WATER\Garwood\Phase2AVlEAmd3ExhA3. doc closed conduit conveyance recommendation to provide for use the Garwood Irrigation Company canals, West Mustang Creek, and Lake Texana for conveyance of Colorado River water to Corpus Christi. As part of the water right amendment application, it will be requested that the diversion eligibility of Segment C be preserved to allow for future downstream diversion options. D.Monitor Permit Applications Status: Submit and monitor processing of permit applications. Additional studies and information requests beyond Texas Water Code requirements for administratively complete permit applications are not included in this scope and will be covered as necessary under future amendments. E.Regulatory Agency Coordination during Permit Application Processing: Coordinate with TCEO, TPWD, LCRA, LNRA, COE, South Texas Nuclear Project (STNP), and GLO and respond to comments related to work performed in preparing the permit applications. F.Develop Supporting Information for Amendment of Region N Regional Water Plan: Develop supporting information of use by the Region N regional water planning group in amending the Coastal Bend Regional Water Plan to select Garwood diversion as a water management strategy to meet municipal and industrial needs. G.Coordinate Amendment of Reoion N Regional Water Plan: Meet with and coordinate approval of amendment to Region N Regional Water Plan. This task assumes up to two (2) meetings with the Regional Water Planning Group in the Corpus Christi area. H.Amend Water Conservation and Drought Management Plan: Amend existing Corpus Christi Water Conservation and Drought Management Plan to include specific quantitative goals to comply with Chapter 288 of the Texas Administrative Code and a provision that each wholesale water customer develop a water conservation plan. Conduct a workshop with City staff to review goals and objectives of the Water Conservation and Drought Management Plan. Prepare draft Amendment, then provide draft amendment to City for review. Conduct a workshop with City staff concurrent with delivery of the draft amendment. Incorporate City comments and prepare a final amendment for City approval. (.Easement Acouisitions: Acquisition of easements required for proposed diversions and facilities are not included in this scope. If easement acquisitions are required, scope and fee associated with this task will be authorized under a separate amendment. J.Gravel, Sand, and Marl Permit Application: Preparation of the GSM permit application is not included in this scope. If a GSM permit is needed, the scope and fee for preparation of this permit will be authorized under a separate amendment. K.Section 404 Permits: Preparation and processing of pre-construction notification for a Section 404 Nationwide Permit 7 for the construction of the ouffall structure. If additional 404 permit(s) are required, the scope and fee for preparation of these permits will be authorized under a separate amendment. Exhibit A-3 Pa e7of16 H:\HOM E\KE V IN S\GE N\WATER\Ga rwood\Ph ase2AW EAmd3ExhA3. doc L.TPDES Permit Application: Preparation of a TPDES permit for the Garwood Diversion is not included in this scope. If a TPDES permit is required, the scope and fee for preparation of the TPDES permit will be authorized under a separate amendment. M.TCEQ Public Hearings: Participation and assistance with TCEO Public Hearings is not included in this scope. If Public Hearings are required, the scope and fee for participation and assistance with the public hearing will be authorized under a separate amendment. N.In-Stream Flow Analyses: In-stream flow analyses in support of habitat evaluation of West Mustang Creek are not included in this scope. If in-stream flow analyses are required, the scope and fee for these analyses will be authorized under a separate amendment. O.Task 5 Summary: Prepare summary of Task 5 results for incorporation in final report. TASK 6: Conceptual Facilities Design Purpose: The purpose of this task is to develop conceptual diversion facilities designs to assist with development of agreements with LCRA and LNRA, and to assist in permit identification and coordination with regulatory agencies. A.GIC Facility Reauirements Workshop: Conduct workshop with LCRA to determine facility requirements for Garwood diversion, including Garwood Irrigation Company (GIC) Canal System improvements and West Mustang Creek diversion structure configuration. The workshop will be focused on identifying the facility requirements necessary to comply with the final agreements between the City and LCRA and LNRA. This task assumes one (1) workshop in the Garwood area. B.Conceptual Design of GIC Canal System Improvements:' Develop conceptual designs for improvements to GIC Canal System improvements based on input obtained during the GIC Facility Requirements Workshop. C.Conceptual Desion of West Mustano Creek Diversion Structure: Develop conceptual design of West Mustang Creek Diversion structure based on input obtained during the GIC Facility Requirements Workshop. D.GIC Facilities Conceptual Desion Review Workshop: Meet with LCRA and City to review conceptual designs for GIC Canal System Improvements and West Mustang Creek Diversion Structure. This task assumes one (1) workshop in the Garwood area. E.West Mustang Creek Gauging Stations Facilities Requirements Workshop: Conduct a workshop with City, LNRA, and USGS to identify specific requirements for proposed West Mustang Creek gauging stations. The workshop will be focused on identifying the facility requirements necessary to comply with the final agreements between the City and LCRA and LNRA. This task assumes one (1) workshop in the Edna area. F.Conceptual Design of West Mustang Creek Gauging Stations: Develop conceptual designs of gauging stations necessary to implement the final agreements with LCRA and LNRA. Meet with LCRA, LNRA, and the City to review conceptual design. Upon approval of conceptual design, proceed with Exhibit A-3 Pa e8of16 H:\HOME\KEV I NS\GE N\WATER\Garwood\Phase2AW EAmd3ExhA-3.doc preliminary design of gauging stations needed to provide accounting, management, and communication system for diversion. This task includes conceptual designs for up to three (3) stations. G.West Mustang Creek Gauging Stations Conceptual Design Workshop: Meet with LNRA and City to review conceptual designs for West Mustang Creek Gauging Stations. This task assumes one (1) workshop in the Edna area. H.Task 6 Summary: Prepare summary of Task 6 results for incorporation in final report. TASK 7: Mary Rhodes Pipeline Facilities Assessment Purpose: Diversion of the Garwood water will increase the City's reliance on the Mary Rhodes Pipeline (MRP). There is a need to identify alternatives for increasing the MRP's operational flexibility and reliability in order to best integrate the Garwood water into the City's existing treatment and distribution system operations. The purpose of this task is to evaluate the existing MRP system, identify and evaluate alternatives to enhance the MRP system's operational flexibility and reliability, and to develop a prioritized list of improvements to the MRP to enhance its operational flexibility and reliability. A.Data Collection and Review: Gather and review previous studies, construction plans, and operations and maintenance manuals (O&M's) for the MRP provided by Corpus Christi and Lavaca-Navidad River Authority (LNRA). B.Facilities Site Visit: Make site visits to each pump station, and other components of the MRP as required. Review existing equipment complements (pumps, piping, etc.) and SCADA. Meet with operations personnel and LNRA representatives to gather field information and identify potential alternatives. C.Task Kickoff Workshop: Conduct a Task Kickoff Workshop to provide an overview of the Task Scope to City personnel, discuss overall MRP overall flexibility and reliability objectives, and identify potential alternatives for evaluation, including project facilities, SCADA systems, and operations protocols. This task assumes attendance at one (1) workshop in Corpus Christi. D.Pump Station Assessment: Review plans, specifications, operating manuals, and the Lake Texana, Bloomington, and Woodsboro Pump Stations. Identify limitations of the existing pump stations considering the proposed Garwood Diversion and the City's overall MRP overall flexibility and reliability objectives. E.SCADA System Assessment: Review plans, specifications, and other information related to the MRP's SCADA system. Identify limitations of the MRP's SCADA system considering the proposed Garwood Diversion and the City's overall MRP overall flexibility and reliability objectives. Make recommendations for improved reliability, operations and maintenance, and including the need for additional backup and redundant systems to enhance the existing SCADA system. F.Operational Integration of Garwood Water: Identify impacts of use of Garwood water on raw water operations including requirements for blending and timing of releases from Choke Canyon and Lake Corpus Christi. Exhibit A-3 Pa e9of16 H:\HOMEU(E V I NS\GEN\WATE R\Garwood\Phase2AW EAmd3ExhA-3.doc G.Alternatives Identification and Screening: Review the MRP System and identify alternatives to improve operational flexibility and reliability Consider modifications to the project facilities, local control systems and instrumentation, storage, ways to maintain consistent water quality to aid in water treatment, better surge control, improved methods for start-up, shut-down, power failure recovery, and pump changes. Develop up to 10 alternatives, including conceptual capital cost estimates for each alternative. H.Alternative Control Strategies: For each alternative developed, identify the preferred control strategy and prepare schematic process and instrumentation diagrams for each alternative. Consider and include appropriate reliability and redundancy features consistent with the City's overall goals for the MRP. Prepare conceptual capital cost estimates for each control system and include in the overall alternative cost estimates. (.Recommended MRP Improvements: Screen the MRP alternatives and identify a recommended alternative. Develop an implementation plan for executing the recommended alternative. The implementation plan is expected to take the form of a prioritized list of improvements. J.Task 7 Summary: Prepare summary of Task 7 results for incorporation into final report. Conduct a workshop with City staff in Corpus Christi to review summary findings and receive comments. TASK 8: Phase 2A Report Purpose: The purpose of this task is to consolidate the Task Summaries into a final report. A.Prepare Draft Report: Prepare Develop Draft Report based on the previously prepared task summaries. Submit 10 hard copies and one electronic copy to the City for review and comment. B.Prepare Presentation summarizing Draft Report: Prepare a PowerPoint presentation summarizing the draft report and give the presentation at the Draft Report Workshop. Give the presentation at two additional meetings of the City's choice. C.Draft Report Workshop: Meet with City and review the findings of the Draft Report. D.Draft Report Comments Meeting: Meet with City and receive City's comments on Draft Report. E.Prepare Final Report: Incorporate comments into Draft Report. Submit 20 hard copies and one electronic copy to City. F.Final Report Presentation: Prepare a Power Point Presentation of the final report findings. Present findings to City Council and others as requested by the City (up to 3 presentations). Task 9: Project Management Purpose: The purpose of this task is to coordinate Engineer's efforts, monitor schedule and budget, and provide monthly status reports to City. A.Proiect Schedule: Develop and maintain project schedule in CPM format for all authorized project activities. B.Progress Reports and Invoices: Prepare monthly progress reports and invoices and submit to the City no later than the fifth day of the month. Exhibit A-3 Pa e10of16 H:\HOME\KEV INS\GEN\WATER\Garwood\Phase2AW EAmd3ExhA-3.doc C.Phase 3 Scoginq: Prepare scope, schedule and budget for Phase 3 Services. Schedule The tasks and subtasks will be completed according to the following timetable. Task Days to Com lete~ Com letion Datez, a Notice to Proceed Se tember 12, 2007 Task 1 -Field Studies 209 Aril 8, 2008 Task 2 - LCRA A reement 113 Janua 3, 2008 Task 3 - LNRA A reement 212 Aril 11, 2008 Task 4: Permittin and A enc Coordination 153 Februa 12, 2008 Task 5 -Permittin Activities 604 Ma 8, 2009 Task 6 - Conce tual Facilities Desi n 162 Februa 21, 2008 Task 7 - Ma Rhodes Pipeline Assessment 482 Janua 6, 2009 Task 8 -Phase 2A Re ort 733 Se tember 14, 2009 Task 9 - Pro'ect Management 761 October 12, 2009 Summary of Fees Schedule Notes: 1.Days to complete following Notice to Proceed. 2.Completion dates based on a Notice to Proceed Date of September 12, 2007. Actual completion dates will be adjusted to reflect actual Notice to Proceed date provided by the City. 3.Due to uncertainties in time with permit applications, the above schedule is an estimate as to when a task may be complete and may be adjusted based on input from permitting agencies. Schedule of Fees TASK Description Fee Original Contract- Phase 1 I.A.1 Screening Study of Delivery Options $116,100.00 I.A.2 Detailed Study of Delivery Options TBN I.A.3 Pipeline Route Study TBN I.A.4 Pipeline Surveying, Easement Acquisition, and Permitting TBN I.A.5 Pipeline Topographic Survey and Preliminary Design TBN I.A.6 Final Design Phase TBN I.A.7 Bid, Award, and Construction TBN Original Contract Fee $116,100.00 Amendment No. 1 -Phase 2 2.A Detailed Study of Delivery Option 5 $152,532 2.6 Detailed Study of Delivery Option 1 $64,328 2.C Detailed Study of Delivery Option 6 $68,630 Amendment No. 1 Fee $285,490 Exhibit A-3 Pa e11of16 H:\HOME\KEVf NS\GEN\WATER\Garnood\Phase2AWEAmd3ExhA3.doc Amendment No. 2 -Phase 2A Total Fee Task Description By Task 2A-0001 Field Studies 2A.1.AOH61 Task 1.A -Ownership Mapping $ 20,631 2A.1.BOH62 Task 1.B -Risk Analysis $ - Prepare Risk Analysis $ 5,853 Risk Analysis Workshop (in CC) $ 4,533 2A.1.COHB3 Task 1.C - Field survey of West Mustang Creek $ 46,922 2A.1.DOHB4 Task 1.D -West Mustang Creek Habitat Assessment $ 34,272 2A.1.EOH65 Task 1.E -Coordination Re-Calib. Of Gannado Gauging Station $ 6,168 2A.1.FOH66 Task 1.F -Task 1 Summary $ - Prepare Task Summary Task Summary Workshop (in CC) $ 11,650 $ 8,383 Total Fee by Classification $ 138,411 2A-0002 LCRA Agreement 2A.2.AOBD1 Task 2.A -Agreement Framework $ - Prepare Framework $ 12,695 Submit Framework $ 431 Schedule Framework Meeting $ 451 2A.2.BOBD2 Task 2.6 -Framework Meeting (Garwood) $ 7,235 2A.2.COBD3 Task 2.C -Prepare Draft LCRA Agreement $ 10,525 2A.2.DOBD4 Task 2.D -Draft LCRA Agreement Workshop (Garwood) $ 6,366 2A.2.EOBD5 Task 2.E - Prepare Final Agreement $ 8,740 2A.2.FOBD6 Task 2.F -Execute Agreement (1 meeting Austin, 1 meeting Corpus ChristiCC $ 8,151 2A.2.GOBD7 Task 2.G -Task 2 Summary $ 14,675 Total Fee by Classification $ 69,268 2A-0003 LNRA Agreement 2A.3.A1BD1 Task 3.A -Agreement Framework $ - Prepare Framework $ 13,025 Submit Framework $ 431 Schedule Framework Meeting $ 451 2A.3.61 BD2 Task 3.6 -Framework Meeting (Edna) $ 7,191 2A.3.C1 BD3 Task 3.C -Prepare Draft Agreement $ 10,525 2A.3.D1 BD4 Task 3.D -Draft LNRA Agreement Review Workshop (Edna) $ 7,191 2A.3.E1BD5 Task 3.E -Regulatory Coordination (2 meetings Austin) $ 10,137 2A.3.F1 BD6 Task 3.F -Prepare Final LNRA Agreement $ 6,815 Exhibit A-3 Pa e12of16 H:\HOME\KEVINS\GEN\WATER\Garwood\Phase2AW EAmd3ExhA-3.doc 2A.3.G1 BD7 Task 3.G -Execute Agreement (1 meeting Edna, 1 meeting Austin) $ 11,360 2A.3.H16D8 Task 3.H -Task 3 Summary $ 14,125 Total Fee by Classification $ 81,250 2A-0004 Permitting and Agency Coordination 2A.4.AOBS1 Task 4.A -Coord w/TPWD re: GSM Permit (2 meetings Austin) $ 3,737 2A.4.BOBS2 Task 4.B -Coord w/ TPWD re: LNRA Inflow/Release Agreement (3 meetin sAustin $ 5,156 2A.4.COBS3 Task 4.C -Coord w/ TCEQ re: Bed and Banks Permit (3 meetings Austin $ 7,104 2A.4.DOBS4 Task 4.D -Coord w/ TGLO re: Bed and Banks Permit (3 meetings Austin $ 7,104 2A.4.EOBSS Task 4.E -Coordination with TCEQ and TWDB re: Regional Water Plannin 2 meetin s Austin $ 1,437 2A.4.FOBS6 Task 4.F -Regional Water Planning Group Coordination (1 meeting Austin, 1 meetin Cor us ChristiCC $ 2,979 2A.4.GOBS7 Task 4.G -Monitor LCRA/SAWS Project (2 meetinggs Garwood) $ 6,437 2A.4.HOBS8 Task 4.H - USACE Coord (1 meeting Galveston) $ 8,253 2A.4.IOBS9 Task 4.1- TPDES Coordination (1 meeting Austin) $ 6,566 2A.4.J OBS10 Task 4.J -Landowner Issues and Communications (3 meetings Edna $ 20,785 2A.4.KOBS11 Task 4.K -Meet w/ Environmental Groups $ - Prepare Exhibits $ 13,093 Meeting 1 $ - Plan $ 501 Schedule $ 471 Prepare for Meeting $ 3,745 Attend Meeting (Austin) $ 2,376 Meeting 2 $ - Plan $ 501 Schedule $ 471 Prepare for Meeting $ 3,745 Attend Meeting (Austin) $ 2,376 Meeting 3 $ - Plan $ 501 Schedule $ 471 Prepare for Meeting $ 3,745 Attend Meeting (Edna) $ 3,591 2A.4.LOBS12 Task 4.L -Task 4 Summary $ 16,070 Total Fee by Classification $ 121,216 2A-0005 Permitting Activities 2A.5.AOCD1 Task 5.A -Bed and Banks Permit Application $ - Exhibit A-3 Pa e13of16 H: \HOME\KEV I NS\GEN\WATER\Ga rwood\Phase2AV\EAmd3ExhA-3. doc Prepare Permit $ 20,655 Submit Permit $ 6,360 Agency Review $ 8,115 Permit Approval $ 5,203 2A.5.BOCD2 Task 5.B -Prepare Amendment to TPWD/LNRA Inflow & Release A reement $ - Develop Amendment Framework $ 3,815 Meet with LNRA and TPWD to develop amendment outline (1 mt Edna $ 4,441 Develop Draft Amendment $ 4,075 Meet with LNRA and TPWD to review Draft Amendment (1 mtg Edna $ 4,441 Prepare Final Amendment $ 3,735 Obtain Written Approval (1 mtg Austin, 1 mtg Edna) $ 6,540 2A.5.000D3 Task 5.C -Water Right Amendment Application $ - Prepare Permit $ 10,815 Submit Permit $ 961 Agency Review $ 4,210 Permit Approval $ 1,023 2A.5.DOCD3 Task 5.D -Monitor Permit Application Status $ 2,045 2A.5.EOCD4 Task 5.E -Regulatory Agency Coord During Permit App Process $ 2,945 2A.5.F Task 5.F -Develop Supporting Info for Region N Amendment $ 5,130 2A.5.G Task 5.G -Coordinate Region N Amendment (2 meetings CC) $ 11,475 2A.5.HOCD5 Task 5.H -Amend Water Conservation/Drought Management Plan $ _ Prepare Draft Amendment $ 3,408 Plan Workshop (CC) $ 4,533 Submit Draft Amendment $ 1,120 City Review of Draft Amendment $ - Review Workshop (CC) $ 4,533 City Review Complete $ _ Incorporate City Comments/Prepare Final Amendment $ 3,535 City Council Approval of Final Amendment (CC) $ 4,533 2A.5.FOCD6 Task 5.F -Task 5 Summary $ 15,227 Total Fee b Classification $ 142,870 2A-0006 Conceptual Facility Design 2A.6.AOQF1 Task 6.A -GIC Facility Requirement Workshop $ 330 Schedule Workshop $ 681 Conduct Workshop (Garwood) $ 6,393 2A.6.BOQF2 Task 6.6 -Concept Design of GIC Canal System. Improvements $ 4,800 2A.6.COOF3 Task 6.C -Concept Design of West Mustang Creekk Div. Structure $ 4,800 2A.6.DOQF4 Task 6.D -Design Review Workshop $ _ Exhibit A-3 Pa a 74 of 16 H: \HOME\KEVI NS\GEN\WATER\Garwood\Phase2AV{EAmd3ExhA3. doc Schedule Workshop $ 681 Conduct Workshop (Garwood) $ 6,393 2A.6.EOQF5 Task 6.E - W. Mustang Creek Gauging Facility Workshop $ 6,900 Schedule Workshop $ 681 Conduct Workshop (Edna) $ 4,193 2A.6.FOOF6 Task 6.F -Concept Design, W. Mustang Creek Gauging Facility $ 3,960 2A.6.GOQF7 Task 6.G - W. Mustang Creek Gauging Facility Workshop $ - Schedule Workshop $ 681 Conduct Workshop (Edna) $ 6,393 2A.6.HOOF8 Task 6.H -Task Summary $ 10,275 Total Fee by Classification $ 57,164 2A-0007 Mary Rhodes Pipeline Assessment 2A.7.A0061 Task 7.A -Data Collection and Review $ 8,648 2A.7.60062 Task 7.6 -Facilities Site Visit $ 23,266 2A.7.COQ63 Task 7.C -Task Kickoff Workshop (Corpus ChristiCC) $ 8,605 2A.7.D0064 Task 7.D -Pump Station Assessment $ 17,008 2A.7.EOQ65 Task 7.E - SCADA System Assessment $ 11,840 2A.7.FOQ66 Task 7.F -Operational Integration of Garwood Water $ 6,200 2A.7.GOOB7 Task 7.G -Alternatives Identification and Screening $ 27,613 2A.7.H0068 Task 7.H -Alternative Control Strategies $ 11,335 2A.7.IOQ69 Task 7.1-Recommended Mary Rhodes Pipeline Improvements $ 6,205 2A.7.J1061 Task 7.J -Task 7 Summary $ - Prepare Summary $ 16,200 Attend Workshop $ 5,768 Total Fee by Classification $ 142,686 2A-0008 Task 8 -Phase 2A Report 2A.8.A0601 Task 8.A -Prepare Draft Report $ - Prepare Report $ 25,656 Submit Draft Report to City for Review $ 1,292 City Review of Draft Report $ - City Review Complete $ - 2A.S.BOBQ2 Task 8.B -Prepare Draft Report Presentation $ 7,112 2A.S.COBQ3 Task 8.C -Draft Report Workshop (Corpus Christi) $ 9,169 2A.8.DOBQ4 Task 8.D -Draft Report Comments Meeting (Corpus ChristiCC) $ 9,169 2A.8.E0605 Task 8.E -Prepare Final Report $ 10,321 2A.8.F0606 Task 8.F -Final Report Presentation (up to 3 meetings in Corpus ChristiCC $ 34,669 Total Fee by Classification $ 97,388 Exhibit A-3 Pa e15of15 H:\HOME\KEVI NS\GEN\WATER\Garwood\Phase2AVlEAmd3ExhA3.doc 2A-0009 Project Management 2A.9.AOBC1 Task 9.A-Project Schedule $ 10,060 2A.9.BOBC2 Task 9.6-Progress Reports and Invoices $ 23,342 2A.9.COBC3 Task 9.C-Phase 3 Scoping $ 28,343 Total Fee by Classification $ 61,744 Amendment No. 2 Fee $ 911,997 Amendment No. 3 2A-0005 Task 5 -Permitting Activities (Deleted in its Entirety) -142,870 2A-0008 Task 8 -Phase 2A Report (Deleted in its Entirety) -97,388 3-0009 Garwood Alignment Study Scope of Work 0 3-0009.1 Data Collection 49,709 3-0009.2 Preliminary Hydraulic Study 21,975 3-0009.3 Preliminary Environmental Review 60,294 3-0009.4 Preliminary Route Analysis 45,364 3-0009.5 Final Route Analysis 62,916 Amendment No. 3 Fee 0 Total Fee $1,313,587 Exhibit A-3 Pa e16of16 C:\Documents and Settings\amc\Local Settings\Temporary Internet Files\OLK1\AEAmd3ExhA-3.doc CITY OF CORPUS CHRISTI DISCLOSURE OF INTERESTS City of Corpus Christi Ordinance 17112, as amended, requires all persons or fines seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with'NA'. FlRM NAME: STREET: CITY: ZIP• FlRM is: 1. Corporation ^ 2. Partnership ^ 3. Sole Owner ^ 4. Assoaation ^ 5. Other ^ DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet 1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm". Name Job Title and City Department (~f known) Z. State the names of each °offictal" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm". Name Title 3. State the names of eaGr "board member" of the City of Corpus Christi having an "ownership interest" constituting 3°k or more of the ownership in the above named "firm". Name Board, Commission or Committee 4. State the names of each employee or officer of a "eonsultanY' for the City of Corpus~Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3% or more of the ownership in the above named "firm°. Name Consultant CERTIFlt:ATE I certify that ail information provided is true and correct as of the date of this statement, that i have not knowingy wdhheld dsdosure of any urfortnation requested; and that supplemental statements vm11 be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: Title: (type or Print) ~ ~ ~ >~_ .tom p Signature of Certifying. Person: ~~t/ ~ Date: ~~~ 7~C) /