HomeMy WebLinkAboutC2009-124 - 3/24/2009 - ApprovedDepartment of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 16 PROJECT NO: 6368 CONTRACT TIME: 570 C.D. Operating Department: Engineering Services DATE: Febmary 2, 2009 Name of Project: Neighborhood Streets Clusters 1, 2, 3, 5 & 7 Contractor: Haas-Anderson Construction, Ltd. CHANGE SEE ATTACHED: ADD DEDUCT Why was this change necessary? (If left off the plans and specifications, explain why) This is a reconciliation of estimated quantities versus actual quantities constructed on all street clusters. How can similar changes be avoided in the future? Unavoidable. During construction, additional driveway was removed and replaced to produce a project that is much more satisfying to the citizens.. A. CONTRACT PRICE ............................................................... $ 8.655.194.55 ~~ B. TOTAL CHANGE ORDER (inc. current) ............................ $ 521.723.67 ~~'~~'G,~'~" C. NEW CONTRACT PRICE .................................................... $ 9.176.918.22 D. THIS CHANGE ORDER ........................................................ $ 121.157.0 E. PERCENT TOTAL CHANGE (B/A) .................................... 6.03% Pro t Engineer F. PREVIOUS ADDN'L TIME AUTHORIZED ...................... 90 C.D. G. ADDN'L CONTRACT TIME THIS CHANGE ORDER.... -0- ~t~'Z H. TOTAL ADDTPIONAL TIME ............................................... 90 C.D. CITY OF CO`_ RPM U~S~QHRI TI, TEXAS By: ~ By: Tiu Operating Department Capital Budget Officer Legal Department ~ , „ - _ _O ~ ~ coaRCi~ 03/24/09 M2009-065 Haas-Anderson Construction AT'L•e'T. / I /Y ham. Yi YL~ ~ . _._. „r 2009-124 ~°'~-~'"~'~ ADD DEDUCT A. Add the following quantities to the bid items: A-1. Removal - 298 L.F. @ $45.00/L.F. $13,410.00 A-6. Remove and Replace Concrete Driveway - 1,766.25 S.Y. @ $160.00/L.F. 282,600.00 A-7. Remove and Replace Concrete Sidewalk - 844 S.F. @ 12.00/S.F 10,128.00 A10. Concrete Sidewalk- 31 S.F. @ $4.10/S.F. 127.10 A-14. Type 2 Rehab- Cement Treat 3%@8"- 19 S.Y. @ $4.80.S.Y. 91.20 A-21 Concrete Curb Ramp with Truncated Domes- 1,727 S.F. @ $15.00/S.F. 25,905.00 A-22 Reflective Pavement Mark (Yellow) (4") Solid - 72 L.F. @ $0.50/L.F. 36.00 A-23 Reflective Pavement Mark (White) (4") Solid - 120 L.F. @ $0.50/L.F. 60.00 A-25 Reflective Pavement Mark (White) (12") Solid - 1,201 L.F. @ $4.50/L.F. 5,404.50 A-34 Unanticipated Remove and Replace 4" Curb and Gutter 214 L.F. @ $41.00/L.F. 8,774.00 A-44. Reflective Pavement Mark (Type II - AA) - 32 Ea. @ $6.00/Ea. 192.00 B. Deduct the following quantities from the bid items: A-3 6" Curb and Gutter - 3 L.F. @ $16.70/L.F. $50.10 A-4 Remove and Replace 6" Concrete Curb and Gutter 629 L.F. @ $45.70/L.F. 28,745.30 A-5 Remove and Replace 4" Concrete Curb and Gutter 608 L.F. @ $43.75/L.F. 26,600.00 A-8 Remove and Replace Concrete Valley Gutter - 21 L.F. @ $19.25/L.F. ~ 404.25 A-I1 Concrete Driveway- 4 S.Y. @ $108.00/S.Y. 432.00 P:12007 GEM07002-00 (C) CITY OF CC - CONST INSP NEIGHBORHOOD STREET RECONS'I~OS-CONTRACTS & CHANGE ORDERS12009 02 02 Change Orcler N16 Attach.doc A-12 Concrete Header Curb - 92 L.F. @$17.50/ L.F. 1,610.00 A-13 Type 1 Rehab -Cement Treat 3%@10"- 448 S.Y. @ $5.15/S.Y. 2,307.20 A-15 Type 3 Rehab -Cement Treat 3%@6" 4,236 S.Y. @ $5.25/S.Y. 22,239.00 A-16 One Course Surface Treatment - 2,148 S.Y. @$1.90/S.Y. 4,081.20 A-17 8' Mill (0" -2") - 3,841 S.Y.@ $2.95/S.Y. 11,330.95 A-18 1.5" HMAC, Type D 1,625 S.Y. @ $7.75/S.Y. 12,593.75 A-19 2" HMAC, Type D - 135 S.Y. @ $9.80/S.Y. 1,323.00 A-20 2.5" HMAC, Type D 122 S.Y. @ $12.25/S.Y. 1,494.50 A-24 Reflective Pavement Mazk (White) (8") Solid - 3 L.F. @ $1.30/L.F. 3.90 A-26 Reflective Pavement Mazk (White) (24") Solid - 305 L.F. @ $9.00/L.F. 2,745.00 A-29 Reflective Pavement Mark (Type II - B) - 36 Ea. @ $7.60/Ea. 273.60 A-31 Adjust Valves - 11 Ea. @ $1,270.00/Ea. 13,970.00 A-32 Adjust Manhole - 15 Ea. @ $2,025.00/Ea. 30,375.00 A-33 Unanticipated Remove and Replace 6" Curb and Gutter 7 L.F. @ $44.50/ L.F. 311.50 A-35 Unanticipated Remove and Replace Concrete Driveway - 74 S.Y. @152.00/S.Y. 11,248.00 A-36 Unanticipated Remove and Replace Concrete Sidewalk - 670 S.F. @$11.25/S.F. 7,537.50 A-37 Unanticipated Sidewalk Drain - 1 Ea @ $1,500.00/Ea. 1,500.00 A-42 Ozone Day - 4 Ea @ $2,500.00/ Day 10,000.00 P:~2007 GEM07002-00 (C) Cn'Y OF CC - CONST QJSP NEIGHBORHOOD STREET RECONS'[~OS-CONTRACTS & CHANGE ORDERS~2009 02 02 Chaoge Order #16 Anach.doc C. Add the following bid items to the contract: A-47 Credit for Field Office - 18 Mo. @ $500.00/Mo. (9,000.00) A-48 Credit for Sodding - 6,772 S.Y. @ $3.75/S.Y. (25,395.00) Subtotal $312,332.80 $191,175.75 NET ADD 2 5 P:~2007 GEM07002-00 (C) CITY OF CC - CONST INSP NEIGHBORHOOD STREEC RECONST\OS-CONTRACTS & CHANGE ORDERS~2009 02 02 Change Ottler #16 Attach.doc