HomeMy WebLinkAboutC2009-224 - 6/23/2009 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: l FUNDING SOURCE: CONTRACT TIME 120A/360B C.D. Operating Department: Bond 2004 DATE: June 4, 2009 Name of Project: Laguna Shores Road Rehab. Graham Road to Hustlin Hornet Road P R #6278 Contractor: CHANGE G Contractors Add the following items to the contract: See attached breakdown: Location: Triple Crown/Citation Ditch ADD $117,064.40 TOTAL NET: $117,064.40 DEDUCT Why was this change necessary? (If left off the plans and specifications, explain why? The work on the attached breakdown is required to prevent flooding in the area. How can similar changes be avoided in the future? Unavoidable. A. CONTRACT PRICE $ 2,919,681.16 B. TOTAL CHANGE ORDERS (inc. current) $ 117,064.40 C. NEW CONTRACT PRICE $ 3,036,745.56 D. THIS CHANGE ORDER 117,064.40 E. PERCENT TOTAL CHANGE (B/A) 4.01% F. PREVIOUS TIME AUTHORIZED 0 C.D. G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 0 C.D. H. TOTAL ADDITIONAL TIME 0 C.D. CITY OF CORPUS By: Director of TEXAS ~~,,0..__perating Department wn~Dir. of Management & Budget ~t'i.~al Department CONTRACTOR H & By: Title: / V~V -~ Project Manager G t7oattra ~~ Vice Presit~stt BY COORCIL Gl n 2009-224 M2009-177 06/23/09 H&G Contractors Triple Crown Citation Drive Area Drainage Improvements Per Plans with Poured Concrete Bid Date: 5/]3/2009 H & G Contractors, Inc. Item # Description Quantity Unit Unit Price Total 1 Mobt~zatton/Demobilization 2 Traffic controls 3 Patch Pavement Inlet (3' to 5' depth)-south curb inlet with (2) 5' 4 extensions Inlet (3' to 5' depth)-north curb inlet with (1) 5' 5 extension 6 18" RCP 7 Remove and replace sidewalks 8 Remove and replace curbs 9 Open 72" double barrel, north and south ends Allowance for rehab of existing 72" headwall and 10 outfall 1 LS $ 1,500.00 $ 1,500.00 1 LS $ 1,250.00 $ 1,250.00 1 LS $ 1,161.70 $ 1,161.70 ,` 1 EA $ 3,680.70 $ 3,680.70 1 EA $ 3,045.70 $ 3,045.70 25 LF $ 46.40 $ 1,160.00 100 SF $ 10.00 $ 1,000.00 75 LF $ 25.00 $ 1,875.00 2 EA $ 2,750.00 $ 5,500.00 11 Allowance fox leaning and rehab double 72" RCP 12 Conaete slope protection and Iltune at headwall Concrete channel bottom and slope protection at 13 outfall Partially fill 72" pipe with bullxock, sand (72 LF 14 each) 15 Install bar grates on 72" RCP 16 Excavate, grade ditch to drain Sod 4' bottom of ditch and lowu 3' of ditch side 17 slopes 18 Hydroseed ditch slope and disturbed azeas 18 Trench Safety 19 Utility Allowance 20 Infall Stmctute 21 Outfall Structure 22 Cellulaz confinement system 23 Superintendence 24 Survey 25 SWPPP 121 SY $ 52.00 $ 6,292.00 327 SY $ 56.00 $ 18,312.00 89 CY $ 85.00 $ 7,565.00 2 EA $ 3,316.25 $ 6,632.50 2,327 BCY $ 8.50 $ 19,779.50 5.5 MSF $ 2,225.00 $ 12,237.50 31.35 MSF $ 200.00 $ 6,270.00 1 LS $ 300.00 $ 300.00 1 LS 1 EA $ 5,500.00 $ 5,500.00 1 EA $ 7,500.00 $ 7,500.00 240 SF $ 15.00 $ 3,600.00 1 LS $ 1,656.00 $ 1,656.00 1 LS $ 2,275.00 $ 2,275.00 1 LS $ 2,883.50 $ 2,883.50 Total -Drainage Improvements $ 117,064.40 Work will be done in accordance to undated Record Drawing No. STO-527, Sheets 1 & 3-6 and verbal instructions from Armando Gutierrez. Page 1 of 1 Printed on 5/13/2009at 11:11 AM DEPARTMENT OF ENGINEERING SERVICES CHANGE ORDER SUMMARY SHEET June 23, 2009 PROJECT: Laguna Shores Road Rehabilitation -Graham Road to Hustlin' Hornet Drive Project No. 6278 / CIP No. SW 18 BOND ISSUE 2004 APPROVED: City Council Motion No. 2008-275 on October 21, 2008 CONTRACTOR: H & G Contractors P. O. Box 10706 Corpus Christi, TX 78460 TOTAL CONTRACT AMOUNT $2,919,681.16 25°/D Limit Amount $729,920.29 Chan e Order No. 1 June 23, 2009 $117,064.40 TOTAL All Chan e Orders $117,064.40 4% < 25% LAGUNA SHORESICONSTRUCTION\CHANGE ORDER NO. 1\CHANGE ORDER SUMMARY