Loading...
HomeMy WebLinkAboutC2009-265 - 7/21/2009 - ApprovedCHANCE ORDER Department of Engineering Services City of Corpus Christi, Texas ~HANCE ORDER NO: 4 FUNDINC SOI~RCE: CONTRACT TIME: 27~ C.D. operating Deprtr~ent: Solid vVaste Services DATE: June O,~~Q9 lame of Project: J.O. Elliott Landfill-Final Cover Phase 4-fi and Landfill Cas Collection Pro'ect 2 ~ ~ contractor: Environmental Specialties Interr~atianal rrirlq.y-nnl.V.i~n•~~m•nn~~~~~nn~~~~~n.~~~n +.. - . i . - - \_ - n~~~i i i i i i i i ~ ~ ~ ~ ~ i i i ~ ni^ ~~ - - - - -__ - CHANCE AS FOLLOVIfS: Earthwork Oas System Surveying at South Toe Trench Hot 111~ire Cattle Fence Revetment Block ADD DEDUCT 8~,4fi.o0 8,?1 x.98 x,598.54 ~,74~.Oo ~~,484.88 1~3,8~4~.8~ Ihy was this change necessary? (If left off the plans and specifics#ions, explain why) he earthwork or addition of soil cover was r aired due to settlement and to rovide sil~ve drains e~ The as s stem work as required in order to locate a leak in the existing pas system. Surva~ing at the south toe trench was reg~ireci to lacate kilitie and revent convicts. The tem ra cattle fence was aired to secure cage north of the ro line while the new once way being installed. Additional revetment_blockwss repaired to prevent erosion at the drainage chutes. i ~ iw~n^~~~~ ~ nil i ~~i~ ~~ i ni~i~n~~r•rr~ i~ ow can similar changes be avoided in the future? Setter coordination Burin deli n between tM Ci Solid UVaste ~i~a,,rtent and #he,~ngineer. CONTRACT PRICE .. • • ............................ ~ ............. TOTAL CHANCE ORDER ~tnc. currents .... ................ NEVIS CONTRACT PRICE .. ~ ............... ... .. ~ .., ........... THIS CHANCE ORDER .., .~ .......... ......................... PERCENT TOTAL CHANCE ~B1A} .......................... PREVIODS ADDN'L TIME ADTHORI~ED .................. ADDN'#. CONTRACT TAME THIS CHANCE ORDER ,... TOTALADDIT'IONALTI~IIIE ...................~..,..,..,......,. ITY QF CORP CHRIfiI, TEAS ~~ C~t~f ~~t~inaar PPROIIEC ~1 n ~~o~-~o~ ~~~~1~~~ ~nvironme~t~ ~ec~arties ~~tnt~. B,7B9,418.19 ~93,~84.1 t ~G,9fi~,798.~ ~~3,8~4~.8G sc c . ~ , 2.8~°Io Projec# Engineer ~ CD 0 CD 0 C - ~ CONTRACTOR By: ~ G~ .. r~t~e: ~l2oJ~, • . Opera~ng Department Director of Management Budget Legal Department ~~ I~U~MD~i~~~ ~r ~I~c~t .. ~ ~~ ...r~...r.+~r. tal~!#fl~~IIH+~