HomeMy WebLinkAboutC2009-292 - 8/11/2009 - NACITY ~F CARPUS CHRISTI
AMENDMENT N~.
CONTRACT FAR PR~FESSI~NAL SERIIICEB
The City of Corpus Christi, Texas hereinafter called "City", and URBAN ENGINEERING INC., hereinafter
called "Engineer, agree to the following amendments to the Contract for Engineering Services far salt Flats
Dralna~e S~ste~r Irr~pravementsi Phase III. ~Pro~ect Igo. ~~ fi0 , as authorized and administratively amended
by:
Ori final Contract Februa 9,1999 Motion No. 99-038 18,000.00
Amendr~ent No.1 Aril 1, 2008 Administrative A royal 49,50000
Amendment No. ~ Februa ~5, X009 Administrative A royal 2~~OQ0~00
Ei~HIBIT "A", SECTION ~. SCGPE OF SER111CES, PART A. BASIC SERVICES, Item Na. ~ Design Phase
Services shall be amended to include additional Design Phase en-ices. Item Na. 3 Bid Phase Services shall
be amended to include additional Bid Phase Services. Item No. ~ Construction Phase Services shall be
amended to include additional Construction Phase Services. Bee Exhibit "A".
EXHIBIT "A", SECTIG~I ~. SCGPE GF SERVICES, PART B. ADDITi~NAL SER111CES, Item No. ~
Permitting Allowance} services shall be madi~ed to include additional Permitting ~Allowance~ Services Item
No. l vl~arranty Services shall be modified to include additional Vlvarranty Services. See Exhibit "A"
EJ~HIBIT "A", SECTION 3. FEES, PART C. SUMMARY GF FEES is amended tv include additional fees See
Exhibit "B" unnmary of Fees.
All other terms and conditions of the February 9, 1999 contract between the City and Engineer, and of any
amendments to that contract, which are not specifically addressed herein shall remain in full force and effect
CITY F CARPUS CHRISTI
By ` I ~
Oscar rtinez, Date
Assistant Cit~r Manager
APPROVED
By ~~
Pete Anaya, P. E~, ~ ate
Director of Engineering Services
ATTEST
By
Armando Chapa, City Secretary
URBANE INEERINC, INC.
~~
Janes L, Urban, P~E. Date
~T~5 Swarrtner
Corpus Christi, T~ 78404
X38 ~ ~ 854- ~ 0 ~ Office
~8fi9 } 854-~~~ Fax
Project Number:
Funding Source: 950-45~ -OOD00-1 fi0091
Encumbrance Number: E1 59AUR
APPRQ~I~ED AS~TO FORM
~ ~
By
i font ity Date
r
~~~1~~~~ ~ i/~
~~~~ ~~~~
~~'~ ~Il ~n~li~ ~~~lU gore Phasc 31AMENn~IE~1'I' Na. 3w~END1~NT rra. ~.~
AIIifEND. N~. 3
Pa e ~ of ~
Irl RBAN fob No. 37889.A9.OU
Firm No. 145
ENGINEERING
June ~4, ~~~~
fVfr. Pete Anaya, P.E.
f)irector of Engineering Services
City of Corpus Christi
P. 0. Box 977
Carpus Christi, Texas 7849
Suf~ject: daft„Flats Crainaae Ir~arov~ment~
Phas~ I I! -Sta. +~g~to Sta. ~ 7+~~
Dear Pete,
TRANIVIITTED VIA El~lAfi_
fVD ~f~IINAL I~lAff".ED
1e are please to eubrni# to you a proposal to provide engineering services for the
constriction of the Phase III Improvements to the halt Flats Drainage yten~. This is the third
and final phase of the Salt Flats Drainage improvements end will indude modiflcatians along the
existing channel from approx. Sta. ~+~~ dust south of discharge to ship channel} to Ste, ~ fi+54
~norkh side of Part Aver. Construckian plans for the entire Salt Flats project were developed and
originally completed in ~aaa. The subject portion of the project was never bid and, due to
hydraulic and construction issues with the existing railroad budges, a change in channel design
was proposed in 2aa~ . The proposed changes have never been incorporated into the Phase III
portion of the plans.
Phase Ill has recently .became significantly snare important far carnpl8tion due to the
recent move to tie the existing Broadway VVTP's 4~ inch die. eft~uent pipeline into the existing
Soft Plats Channel. The project involving the effluent pipeline is being lane by another firm in
conjunction with the planned improvements to the Broadway WTP. By moving the ef~uent
discharge to the nearest availaBle point into the Salt fiats drainage channel eliminates the
significant cost to rehaf~ifitate or replace the existing 4~ inch pipeline all the way to the ship
channel and eliminates having to lower the existing pipeline in two locations where it crosses
the Sa#t Flats Channel. The cast savings alone from net having to lager the pipe at the channel
crossings is approx. ~~2,aa. It is recommended that the Phase lil ir~praver~ents be
scheduled and completed as loan as possible so as no# to delay the rerouting of the 4 inch
effluent pipeline and sa that the proposed channel improvements construction would not have to
deal with the deify flaw of effluent from the plant, These services do not include the design and
cantructian of the proposed ~e-in of the existing 42 inch pipeline into the channel, It does
include same time far a~rending the existing IiSC~E permit for adding the 4~ inch ou~all to the
Salt Flats channel.
Vl~e propose to provide the fallowing services:
• Produce plans and specifications to bid the project for Phase III. Existing plans will fie
used as much as passible but mayor modifications are required to the channel
improvements due to the previously approved change in design.
• Assist the City in Bidding the project and providing the construeion administration.
Provide construction documents for the bridge culvert crossing at North Park and permit
requirements far TiCD~T
(3b1)854~3101 ~~~5 SINANTNER DR. • ~RPUS NRE~I.TE~CAS 7$404 F~ E~fF~~B~T "A}'
www,ur~ar~eng,om P~ a 10# 4
Mr! Pete Anaya, P.E.
June ~4, 200
~~~~
1~1~8 reque$t a~ olJr ~re~erft AE contract be a~811ded t0 add the eng~neenng serv~ceS ~0
acca~npfish Phase IIl of this pro~ec. Attached piease end the following:
1. Preliminary Estimate of Prababie Construction host
~. um~m2~ry of Fees ~inciuding proposed Amendment No. ~
~. Proposed Project Schedule
Vve proposed to perform the above services for a not to exceed fee of 43,~aa.~a. A
breakdown of proposed services is attached, If the above i acceptable, please prepare a small
AE Contract far signatures. Please review and let me know houfd you have any questions.
Sincerely,
MM
Enclosure
xc. Merry hoernaker, P.E. Engr. Irv. wlencl, v!a en~a~l
,tae Cavalier, P.~, - ~n~r. rv. wlenal. via email
Valerie Gray, P.E. ~ Storm Water ~e~t, lencl. via email
Edgar Leonard -Storm 1fVater l]ep#. wlenc~. via er~ail
SRN ENINEERIN
~L
Mark Maroney, P.E.
~~CH~BIT "A"
Pa e2of4
PHA~~ ~ ~ T~ ~TI~ 1BD
~ ~N~L T~ P'1' AVN~1~
U~arr ~~nee~in~
N#c N~aroney, ~..
May ~4, Z
PWA~ ~ C~ ~F VIII[
Cam` ~. ~. 0~
P1~D T
i ~, +~~ R ride ~11~ wl o ~ ~ E~. - ~.~
a. ~~+77 ~~0 CY ` ~ ~T~ SOD
~ ! ~a0
~ . ~~t~'1 ~ ' w Sian oraonc~.
~B Port Awe ~ ~a ~ ~+~ ~ 5~
5t~.1~ ~ 1~ ~ wed
4 ~ 4~" ~ ~
~. ~ end ~ ~~ed
R canc. ~ ~I, - 3.~ ~~~ ZED
"~"~TI~.
:r10 i~ I~IWh ~~ as-cost ~5-~.
EXHf~~T "A"
Pa e3of4
Salt Flats Drainage Improvements
Phase III -Sta. 5+20 to Sta. 16+50
PR~P~ED HEDUL~ -June 24, X009
Da Date Activit
Fride Juf 24, 2449 Be in Desi n
Monde Au usf 2~, 20Q9 7b°l~ ubrrMittal
Thufsda a tember 90, 2409 Cit Review
Monde a ter~ber ~~, 2009 100°l~ Bubr~iftal
Thursda ~#ober 1 , 2009 Cit Review
Tueda October 27, 2009 Final ubmi#tal
Monde November 2, 2049 Advertise for Bids
v~edneda November 18, 20D9 fare~Bid Conference
Mor~da December 7, 2009 f~eceive Bids
Tueda December 29, 2409 Contract Award
vVednesda Janua 27, 20~ 0 Be in Construction
iVlonde Ma 24, 20 ~ 0 Com fete Cortistruction
BXHIBtT "A„
pe e~af4
SALT FLATS DRAINAGE SYSTEM INtPROVEII~ENT, PHASE ill
Project Ho. ~1SD}
SUMMARY OF FEES
ORDINAL AMENDIVIENT ~o. ~ AI~EIa~M~I~T Igo. ~ AI~END~IE~iT Rio. ~
CONTRACT PHASE II PI•IASE II PHASE III TOTAL
BASIC ERIIIE
~ Prelimina Phase ~3~,a14.aa ~a.aa $4.04 $4,04 $33,914.04
~ Desi n Phase 83,GB0.00 ~3,~a~.aa ~2,004~0D 24,900Y04 15,60Y04
3 B
id Phase ~,~0.oa ~,aD~.aa D,O~ 2,~OaY4a 7,~5a,aa
4 a-
L
4..+.Istruct~Mn f Lase ~0,?80400 S,aaa.aa OrUa 8,~00.~~ 27,a8a.aa
~,~-Total ~as~c e~~~e~ ~~~,o~~.oo ~~,oao.oo ~~,ooo.aa ~,aao.oo ~~~,aao.ao
ADDIT
IO
N
AL
SERV
I
CE
~h,~M,
J
~y
Y
1
~
A
A.,,,fl `Y.14 ~~~.RR~~VV ~{~
~a,V Y~F~~ a n
A~~~~~V~
a.a~
~ ~Y~~ A
~ f l~~~r~~
~ ROW A uisition Surve 8,500.40 4r04 0.00 4.00 8,540.D4
3 To ra hic Surve 0.QD 0.40 0.40 0.00 4.04
a EnvironrrtentalAsessment 4.44 o.aa n.oo 4.00 4.44
5 Ins ' n Services 0.04 0.00 0.00 4,00 0.00
fi Start-u Services O.aa 0.00 0.40 4.00 4.44
7 yVrran 1,500.00 1,544.04 4.00 1,500.04 4,5~~.4a
B U ate Modeiin and Letter Re rt 0.00 x.44 0.00 D.~~ 0.40
Sub-Total Additional Services 34,440,00 18,540,44 a.04 8,000.D4 54,540.40
TOTAL AUTHORIZED FEE X141,044.44 $49,540.04 $2,000.40 $43,840.04 $27fi,30a.00
~a~~999
M1999-038 4l~~2448
Admin. Approval 21251049
Admin. Approval
Admin. A royal
E~HIBlT "~"
Pa e~af~
H:INQ~+IE1KeIly~1GEIVIDRAINAGE12~60~5a1t Rats D~i~g~ improvements Phase 31AM~N~MENT ~VO.3ISUMMARY ~F FEES AMD, NO 3
++ ~ l ~~
,_ ~ Ous CITY ~F C~RPtlS CHRISTI
h~~t~ QISCL~SURE ~F INTERESTS
City of Carpus Christi ordinance 171 ~ 2, as amended, requires all persons or firms seeking to da business with the City
to provide the fallowing information. Every question must be answered. If the question is not applicable, answer with
`NIA".
FIRM NAME: Urban En ineerin
STREET: ~7~5 Swantner Drive CITY: Car us Christi ZIP: 7S4a4
FIRM is: 1. Corparatian 2. Partnership ~ , Sole ~ner~ ~. Associations
5. ether
DISCLOSURE G~UESTI~NS
If additional space is necessary, please use the reverse side of this page ar attach separate sheet.
1. State the names of each employee of the City of Corpus Christi having an ownership interest constituting
3°lo ar more of the ownership in the above named firm.
Name Jab Yi~e antl ci~y Department ~#f known
NIA
~. State the names of each official of the City of Corpus Christi having an ownership interest constituting 3°l0
or more ~f the ownership in the above named firm.
Name Tide
NJA
. State the names of each beard member of the City of Corpus Christi having an ownership interest
constituting 3°1o ar mare of the ownership in the above named firm.
Name Board, commission or Gamr~ittee
NIA
4. State the names of each employee or officer of consultant for the City of Corpus Christi who worked on
any rnatter related to the subject of this contract and has an ownership interest car~stituting 3°l0 or more of
the ownership ire the above named firm.
Dame ons~itant
NIA
CERTIFICATE
I certify that all information provided is true and correct as of the date of this statement, that l have not knowingly
withheld disclosure of any information requested; end that supplemental statements will be promptly submitted to the
City of Carpus Christi, Texas as changes occur.
Certifying Person. James L~ Urban . E. Titles Authorized Repreentat#ve
Si nature of Corti in Person: Date: ~ ~~
fY 9
EXHIBIT "C"
Page 1 of ~
D~FtNITION
a. Board Member, A member of any board, commission ar car~mittee appointed by the City Council of the City of
Corpus Christi, Texas.
b. ~m~ioyee~ Any person employed by the City of Corpus Christi, Texas, either on a full ar part time basis, but not as
an independent contractor.
c. Firm. ~ Any entity operated for economic gain, whether professional, industrial or commercial and whether
estab~~hed t~ produce or deal uvith a product or service, including but not limited to, entities operated in the farm
of sale praprNetorship, as self-emplo ed person, partnersh~ ,,, corporation, Dint stack company, joint venture,
ti n are treat es non- rofit ar an~zetione.
receivership or trust and entities whit ,for purposes of taxa o , p g
d. official. The Mayo, members of the City Council, Ci Manager Depu, City Manager, Assistant City Managers,
Department and Division #~eads end Municipal Cou Judges o~ the C~ of Carpus Christ, Texas.
e. ~uvnership Interest. Legal or equitable interest, whether actually or constructively held, in a firm, includingg when
l r f t holdin ar
such interest ,~s held thraugt- an a ant, trust, estate or holding entity. Constructively he ~ e ers o g
control established through voting usts, proxies or special terms of venture or partnership agreements.
f~ Consultant. Any person or firm, such as engineers and architects, hired by the City of Carpus Christi far the
purpose of professional consultation end recarnmendation.
E.~CHIBIT "C"
Pale ~ of ~