HomeMy WebLinkAboutC2009-322 - 8/18/2009 - ApprovedCHANGE ORDER CHANGE ORDER N0: Department of Engineering Services City of Corpus Christi, Texas 1 CONTRACT TIME: 560 DATE: 31-Jul-09 Operating Department: Bond 2004 Name of Project: North Port Avenue from IH 37 to US 1 S 1 ~c Contractor; SLC Construction CHANGE ADD DEDUCT Add the following to the contract: See attached breakdown: Salt Flats Ditch under North Port Avenue $195,064.00 Why was this change necessary? ~If left off the plans and specifications, explain why? To minimize cost and disruption to transportation by coordinating the work during planned street reconstruction closure periods. The work could not be previously included in the North Port Project due to a pending U.S. Army Corps Of Engineers Permit approval which was not received until March 2009. How can similar changes be avoided in the future? Unavoidable A. CONTRACT PRICE $ 8,046,328.91 B. TOTAL CHANGE ORDER (inc. current} $ 195,060.00 C. NEW CONTRACT PRICE $ 5,241,388.91 ~~~ D. THIS CHANGE ORDER $ 195,060.Q0 Proj t Manager E. PERCENT TOTAL CHANGE (B1A) 2.42°/0 F. PREVIOUS TIME AUTHORIZED 0 G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 0 H. TOTAL ADDITIONAL TIME 0 CITY OF CORPUS C STI, TEXAS CONTRACTOR 1 By: By~ ~.~ ~ Direc of En ineer'n 5 ices R Title; ~~ ` ~ ~ 'f APPROVED: perating Department ~ - ~~ ~4UT~~R1~~ 2009-3~Z ~ ir. of Management ~ Budget MZUO9-2Z9 f ~ ~ ~, Q~ 0511~~0g legal Department ,~ 5LC Construction s~~~ ~ PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST PROPOSED ALTERNATIVE TO PORT AVENUE BOX CULVERT IMPROVEMENTS REPLACE THREE BOXES WITH LARGER AND DEEPER BOX CULVERTS SALT FLATS DRAINAGE SYSTEM IMPROVEMENTS P HAS E II -STA. 17+50 TO STA. 39+20 PORT AVENUE TO EXISTING BOX CULVERTS ITEM DESCRIPTION QUAN. UNIT UNIT TOTAL PRICE COST 1 Demo Existing Boxes 2 Excavation Channel} 3 Excavation ~Offsite} 4 Twin 8' x 8' Boxes 5 Reinstall Box End Curb fi Transition Concrete Platting ~3fi'x10'} 7 Channellsolation 8 Temporary Pavement Repair 48'x25'} 9 Traffic Control TOTAL 1 LS $5,OOO.DO $5,D00.00 156 CY $ ~ 0. DD $1,560.00 1 LS $10,000.00 $10,000.00 l8 LF $2,025.D0 $157,950.00 50 LF $20,00 $1,000.00 40 SY $l0.DD $2,800.00 1 LS $5,000.00 $5,D00.00 135 SY $50.OD $6,750.00 1 LS $5,ODD.00 $5,000.00 $195, 050.00 DEPARTMENT OF ENGINEERING SERVICES CHANGE ORDER SUMMARY SHEET August 18, 2449 PROJECT: North Porgy Avenue from IH 3l to US 181 Project No. 62641 CIP No. SI~I 24 BOND ISSUE 2004 APPROVED: City Council Motion No. 2009-131 on May 19, 2009 CONTRACTOR: SLC Construction, L. P. P. O. Box 639 Conroe, TX 71305 TOTAL CONTRACT AMOUNT $8,046,328.91 25°/° Limit Amount $2,011,582.23 Chan a Order No.1 Au ust 18, 2009 $195,060.00 TOTAL All Chan a Orders $195,060.00 2.42°/° ~ 25°/0 H:IHOME1VeIrr~aPIGEN157REETlfi264 NORTH PORT AVENUEICHANGE Of2DER N0.11CHANG~ ORDER SUMMARY.dac