CHANGE ORDER N0: 13 FUNDING SOURCE: CONTRACT TIME: 640 C.D.
Operating Department: Wastewater Department, Storm Water~artment, & Street Dept. DATE; 6-Aug-09
Name of Project: Everhart Road, Phase I Sarato a Boulevard to Cedar Pass Drive) P.R, 6263
Contractor: SLC Construction, L.P.
CHANGE ADD DEDUCT
Deduct the following quantities from the base bid line.items:
Part A -Street Sidewalk and Drivewa Im rovements
A-9 6" Header Curb ($4,063.50)
(3 50 LF @ $11.611LF}
Part B -Storm Water Improvements
B-3 15" RCP Storm Sewer, Class III ($307.10}
(5 LF @ $61.421LF}
B-7 27" RCP Storm Sewer, Class III ($372.08}
(4 LF @ $93.021LF}
8-11 54"' RCP Storm Sewer, Class III ($7,036.38)
(39 LF @ $180.421LF)
B-14 S idewalk Drain ($6,192.00)
(4 EA @ $1,548.OOIEA)
B-19 Silt Fence for SWPPP ($1,358.00}
(700 LF @ $1.941LF}
B-23 Cement Stabilized Sand (Storm) ($3,225.00}
(100 CY @ $32.251CY}
B-26 Hay Bales ($1,290.00)
(200 LF @ $6.451LF}
B-29 Trench Safety for Storm Water Structure ($4,128.00)
(32 EA @ $129.OOIEA)
B-31 Allowance: Storm Water ($30,000.00}
(1 LS ~a $30,000ILS}
Subtotal of Page: $0.00 ($57,972.06)
2009-334
M2009-238
08/25109
~~~~
SLC Construction
-~
' CHANGE ORDER N0. t3
Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drive) P.R. No. 6263
City of Corpus Christi, Tegas
CHANGE ADD DE
Deduct the following quantities from the base bid line items lcont.~:
Part C -Wastewater Improvements
C-21 24" PVC FM
(2,452 LF @ $124.95ILF)
C-24 5' Dia. Fiberglass MH and Air Relief Valve
(1 EA @ $ 5,160.OOIEA}
C-38 Trench Safety for SS and FM
(132 LF @ $6.451LF}
C~53 Allowance: Sanitary Sewer
(1 LS ~a $17,5001LS)
Part D -Water Improvements
D-b 6" Gate Valve with Box
(1 EA ~a $735.301EA)
D-25 Pavement Repair
(100 SY @ $38.701SY)
D-31 Allowance: Water
(1 LS ~a $20,00O.OOILS)
Part G -Additive Alternate 2
G-10 24"Plug
(2 EA @ $1,354.501EA)
Part H -Additive Alternate 3
H-5 Grout & Abandon 18" SS
(60 LF @ $14.191LF)
H-10 24"Plug
(1 EA ~a $1,032.OOIEA)
Change Order No. 5 Items
1 Pyramid Erosion Mat wl fixing slope voids
(1 EA @ $5,000.OOIEA)
5 RemovelReplace Existing Chain Link Fence
(200 LF @ $25.OOILF}
7 Allowance
(1 LS @ $4,00O.OOILS}
Subtotal of Page: $0.00
($5,160.00}
($851.40}
($17,500.00}
($735.30}
($3,870.00}
($20,000.00}
($2,709.00}
($851.40)
($1,032.00)
($5,000.00)
($5,000.00)
($4,000.00)
i s
' ~ ,
' CHANGE ORDER N0.13
Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drive} P.R. No. 6263
City of Corpus Christi, Texas
CHANGE ADD
Deduct the following quantities from the base bid line items (cont.l:
Changer No. 6 Items
17 4" Concrete Sidewalk
(375 LF @ $8.401LF)
Change Order No. S Items
5 Stabilized Sand
(100 CY ~a $45.OOICY}
Add the following items to the contract:
Part A -Street, Sidewalk and Drivewa~provements
A-1 Street Excavation
(2,722 SY @ $8.261SY)
A-3 Unanticipated Driveway Removal
(613 SF @ $2.061 SF}
A-4 12" Compacted Subgrade
(244 SY @ $2.061SY}
A-6 23" Flexible Base High Strength
(244 SY @ $30.531SY)
A-11 6" Concrete Driveways
(2,896 SF @ $6.131SF}
A-13 Cement Stabilized Sand (Gas}
(170 CY @ $32.251CY}
Part B- Storm Water Improvements
B-5 21"RCP Storm Sewer, Class III
(2 LF ~a $72.191LF}
B-8 36" RCP Storm Sewer, Class III
(403 LF @ $118.G31LF}
B-16 Type "B" Storm Water Manhole
(1 EA @ $4,257.OOIEA}
B-20 6" Concrete Curb and Gutter
(310 LF @ $15.481LF}
$22,483.72
$1,262.78
$502,64
$7,449.32
$17,752.4$
$5,482.50
$144.38
$47,807,89
$4,257.00
$4,798,80
DE
($3,150.00)
($4,500.00)
Subtotal of Page: $111,941.51 ~$7,G50.00)
.
< <
.
' CHANGE ORDER N0.13
~•
Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drive) P.R. No. 6263
City of Corpus Christi, Tegas
CHANGE ADD DEDUCT
Add the following items to the contract (cont.l:
Part C-wastewater Improvements
C-1 CCTV Inspection ($", l Q",12",15 "} S S
(41 b LF ~a $3.OOlLF}
C-2a Set Up Fee X75 LF (CIPP Install.}
(1 EA @ $S,OOO.OOIEA}
C-14 15" PVC S S 14'-16" Cut
(2 LF @ $117.071LF}
C-22 24" 45 Deg. D.I. Bend
(2 EA @ $2,515.50IEA}
C-23 24" Plug
(3 EA @ $1,354.501EA}
C-30 8" Manhole Drop Connection
C-46 30" Dia. Steel CasingBorel w121" SS
(14 LF ~7a $696.601LF}
C-47 36" Dia. Steel CasinglBorel wl 24" FM
(14 LF @ $825.601LF}
Part D- Water Im rovements
D-1 8" PVC Waterline
(35 LF @ $39.35ILF}
D-2 12" PVC Waterline
(130 LF @ $50.311LF}
D-4 12" Gate Valve with Box
(3 EA @ $2,064.OOIEA}
D-5 8" Gate Valve with Box
(4 EA @ $1,096.501EA}
D-7 12"x12"x12" Tee
D-8 12"x12"x8" Tee
(1 EA ~a $516.OOIEA}
$1,248.00
$5,000.00
$234.14
$5,031.00
$4,063.50
$5,031.00
$9,752,40
$11,558.40
$1,377,25
$6,54D.30
$6,192.00
$4,386.00
$516.00
$516,00
Subtotal of Page: $61,445,99 $0.00
i
•
` CHANGE ORDER N0.13
Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drive} P,R, No. 62b3
City of Corpus Christi, Tegas
CHANGE ADD
Add the following items to the contract !cont.):
Part D- Water Enprovements (cont.)
D-14 12" 45 Deg. Bend
(16 EA @ $419.251EA}
D-15 8" 45 Deg. Bend
(11 EA @ $258.OOIEA}
D-16 6" 45 Deg. Bend
(7 EA ~a $193.501EA)
D-17 12" Plug
(1 EA @ $258.OOIEA}
D-18 New Services wl Tie in, all sizes
D-21 8" Tie InlConnection
(5 EA ~a $741.751EA}
Part G -Additive Alternate 2
G-3 36" Dia. Steel CasingBorel w124" SS
(28 LF @ $612.751LF}
G-4 3G" Dia. Steel CasinglBorel w124" FM
(8 LF @ $645.OOILF)
Part H -Additive Alternate 3
H-7 24" Plug Valve and Box
(1 EA @ $14,448.OOIEA)
H-18 12" Gate Valve with Box
H-19 Pavement Repair
(2,b90 SY @ $38.701SY}
$b,708.00
$2,838.00
$1,354.50
$258.00
$10,946.55
$3,708.75
$17,157.00
$5,1 b0.00
$14,448.00
$4,128,00
$104,103.00
DEDUCT
Subtotal of Page: $170,809,80 $0.00
' CHANGE ORDER N0.13
Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drivel P.R. No. 6263
City of Corpus Christi, Texas
CHANGE
Add the following items to the contract, ,(cont.}:
~._..
Change Order No. 4 Items
1 4" PVC Waterline C900 DR18
(170 LF @ $21.141LF}
Change Order No. 7 Items
2 Tensar BX-1100 Geogrid (North of Saratoga}
(1,3b4 SY @ $2.221SY}
24" Forcemain Diversion Line and Schanen Ditch Im rovements
1 Schanen Ditch Improvements
(1 LS @ $708,OlbILS}
2 24" Forcemain Diversion Line
(1 LS @ $2b2,200.001LS}
Subtotal of Page:
TOTAL NET;
TOTAL NET;
ADD DE
$3,593.80
$3,028.08
$708,01 b.00
$2b2,200.00
$1,321,035.18 ($438,708.56)
$882,326.62
. ~
r
CHANGE ORDER NO.13
Everhart Road Phase I Saratoga Boulevard to Cedar Pass Drive} P.R, No. 62b3
City of Corpus Christi, Tegas "
Why was this change necessary? If left off the plans and specifications, explain why?
The items reflected in this chan a order re resent additional work associated with reroutin the 24" forcemain diversion line and
im rovements to the Schanen Draina e Ditch.
How can similar changes be avoided in the future?
All Unavoidable.
A, CONTRACT PRICE
B. .TOTAL CHANGE ORDER zinc. current}
C. NEW CONTRACT PRICE
D. THIS CHANGE ORDER
E, PERCENT TOTAL CHANGE ~BIA}
F. PREVIOUS TIME AUTHORIZED
G. ADDN'L CONTRACT TIME THIS CHANGE ORDER
H. TOTAL ADDITIONAL TIME
$ 7,454,229.87
$ 1,206,31b.98
$ 8,d60,54b.85 ~,
$ 882,32b.62 Proj Manager
1fi.18%
0 C.D.
0 C.D.
0 C.D. ~~ ~~
CITY OF CORPUS CH STI, TEXAS
By:
Director of Engineers g rvices
APPROVED: 1 ~ ~p rating Department
Dir. of Management & Budget
~/~'~ Legal Department
~~";
CITY SECRETAR"
CONTRACTOR
By;
Title: ~P C~
`~ ~IUTMnR~Z~D
~r ~o~~~~~ ~ n~
~ ^a arr as
^rwrrn
sr~~~Ni~ rr aL ~,
SEC~~T~RY ~•