Loading...
HomeMy WebLinkAboutC2009-334 - 8/25/2009 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Tegas CHANGE ORDER N0: 13 FUNDING SOURCE: CONTRACT TIME: 640 C.D. Operating Department: Wastewater Department, Storm Water~artment, & Street Dept. DATE; 6-Aug-09 Name of Project: Everhart Road, Phase I Sarato a Boulevard to Cedar Pass Drive) P.R, 6263 Contractor: SLC Construction, L.P. CHANGE ADD DEDUCT Deduct the following quantities from the base bid line.items: Part A -Street Sidewalk and Drivewa Im rovements A-9 6" Header Curb ($4,063.50) (3 50 LF @ $11.611LF} Part B -Storm Water Improvements B-3 15" RCP Storm Sewer, Class III ($307.10} (5 LF @ $61.421LF} B-7 27" RCP Storm Sewer, Class III ($372.08} (4 LF @ $93.021LF} 8-11 54"' RCP Storm Sewer, Class III ($7,036.38) (39 LF @ $180.421LF) B-14 S idewalk Drain ($6,192.00) (4 EA @ $1,548.OOIEA) B-19 Silt Fence for SWPPP ($1,358.00} (700 LF @ $1.941LF} B-23 Cement Stabilized Sand (Storm) ($3,225.00} (100 CY @ $32.251CY} B-26 Hay Bales ($1,290.00) (200 LF @ $6.451LF} B-29 Trench Safety for Storm Water Structure ($4,128.00) (32 EA @ $129.OOIEA) B-31 Allowance: Storm Water ($30,000.00} (1 LS ~a $30,000ILS} Subtotal of Page: $0.00 ($57,972.06) 2009-334 M2009-238 08/25109 ~~~~ SLC Construction -~ ' CHANGE ORDER N0. t3 Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drive) P.R. No. 6263 City of Corpus Christi, Tegas CHANGE ADD DE Deduct the following quantities from the base bid line items lcont.~: Part C -Wastewater Improvements C-21 24" PVC FM (2,452 LF @ $124.95ILF) C-24 5' Dia. Fiberglass MH and Air Relief Valve (1 EA @ $ 5,160.OOIEA} C-38 Trench Safety for SS and FM (132 LF @ $6.451LF} C~53 Allowance: Sanitary Sewer (1 LS ~a $17,5001LS) Part D -Water Improvements D-b 6" Gate Valve with Box (1 EA ~a $735.301EA) D-25 Pavement Repair (100 SY @ $38.701SY) D-31 Allowance: Water (1 LS ~a $20,00O.OOILS) Part G -Additive Alternate 2 G-10 24"Plug (2 EA @ $1,354.501EA) Part H -Additive Alternate 3 H-5 Grout & Abandon 18" SS (60 LF @ $14.191LF) H-10 24"Plug (1 EA ~a $1,032.OOIEA) Change Order No. 5 Items 1 Pyramid Erosion Mat wl fixing slope voids (1 EA @ $5,000.OOIEA) 5 RemovelReplace Existing Chain Link Fence (200 LF @ $25.OOILF} 7 Allowance (1 LS @ $4,00O.OOILS} Subtotal of Page: $0.00 ($5,160.00} ($851.40} ($17,500.00} ($735.30} ($3,870.00} ($20,000.00} ($2,709.00} ($851.40) ($1,032.00) ($5,000.00) ($5,000.00) ($4,000.00) i s ' ~ , ' CHANGE ORDER N0.13 Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drive} P.R. No. 6263 City of Corpus Christi, Texas CHANGE ADD Deduct the following quantities from the base bid line items (cont.l: Changer No. 6 Items 17 4" Concrete Sidewalk (375 LF @ $8.401LF) Change Order No. S Items 5 Stabilized Sand (100 CY ~a $45.OOICY} Add the following items to the contract: Part A -Street, Sidewalk and Drivewa~provements A-1 Street Excavation (2,722 SY @ $8.261SY) A-3 Unanticipated Driveway Removal (613 SF @ $2.061 SF} A-4 12" Compacted Subgrade (244 SY @ $2.061SY} A-6 23" Flexible Base High Strength (244 SY @ $30.531SY) A-11 6" Concrete Driveways (2,896 SF @ $6.131SF} A-13 Cement Stabilized Sand (Gas} (170 CY @ $32.251CY} Part B- Storm Water Improvements B-5 21"RCP Storm Sewer, Class III (2 LF ~a $72.191LF} B-8 36" RCP Storm Sewer, Class III (403 LF @ $118.G31LF} B-16 Type "B" Storm Water Manhole (1 EA @ $4,257.OOIEA} B-20 6" Concrete Curb and Gutter (310 LF @ $15.481LF} $22,483.72 $1,262.78 $502,64 $7,449.32 $17,752.4$ $5,482.50 $144.38 $47,807,89 $4,257.00 $4,798,80 DE ($3,150.00) ($4,500.00) Subtotal of Page: $111,941.51 ~$7,G50.00) . < < . ' CHANGE ORDER N0.13 ~• Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drive) P.R. No. 6263 City of Corpus Christi, Tegas CHANGE ADD DEDUCT Add the following items to the contract (cont.l: Part C-wastewater Improvements C-1 CCTV Inspection ($", l Q",12",15 "} S S (41 b LF ~a $3.OOlLF} C-2a Set Up Fee X75 LF (CIPP Install.} (1 EA @ $S,OOO.OOIEA} C-14 15" PVC S S 14'-16" Cut (2 LF @ $117.071LF} C-22 24" 45 Deg. D.I. Bend (2 EA @ $2,515.50IEA} C-23 24" Plug (3 EA @ $1,354.501EA} C-30 8" Manhole Drop Connection C-46 30" Dia. Steel CasingBorel w121" SS (14 LF ~7a $696.601LF} C-47 36" Dia. Steel CasinglBorel wl 24" FM (14 LF @ $825.601LF} Part D- Water Im rovements D-1 8" PVC Waterline (35 LF @ $39.35ILF} D-2 12" PVC Waterline (130 LF @ $50.311LF} D-4 12" Gate Valve with Box (3 EA @ $2,064.OOIEA} D-5 8" Gate Valve with Box (4 EA @ $1,096.501EA} D-7 12"x12"x12" Tee D-8 12"x12"x8" Tee (1 EA ~a $516.OOIEA} $1,248.00 $5,000.00 $234.14 $5,031.00 $4,063.50 $5,031.00 $9,752,40 $11,558.40 $1,377,25 $6,54D.30 $6,192.00 $4,386.00 $516.00 $516,00 Subtotal of Page: $61,445,99 $0.00 i • ` CHANGE ORDER N0.13 Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drive} P,R, No. 62b3 City of Corpus Christi, Tegas CHANGE ADD Add the following items to the contract !cont.): Part D- Water Enprovements (cont.) D-14 12" 45 Deg. Bend (16 EA @ $419.251EA} D-15 8" 45 Deg. Bend (11 EA @ $258.OOIEA} D-16 6" 45 Deg. Bend (7 EA ~a $193.501EA) D-17 12" Plug (1 EA @ $258.OOIEA} D-18 New Services wl Tie in, all sizes D-21 8" Tie InlConnection (5 EA ~a $741.751EA} Part G -Additive Alternate 2 G-3 36" Dia. Steel CasingBorel w124" SS (28 LF @ $612.751LF} G-4 3G" Dia. Steel CasinglBorel w124" FM (8 LF @ $645.OOILF) Part H -Additive Alternate 3 H-7 24" Plug Valve and Box (1 EA @ $14,448.OOIEA) H-18 12" Gate Valve with Box H-19 Pavement Repair (2,b90 SY @ $38.701SY} $b,708.00 $2,838.00 $1,354.50 $258.00 $10,946.55 $3,708.75 $17,157.00 $5,1 b0.00 $14,448.00 $4,128,00 $104,103.00 DEDUCT Subtotal of Page: $170,809,80 $0.00 ' CHANGE ORDER N0.13 Everhart Road Phase I (Saratoga Boulevard to Cedar Pass Drivel P.R. No. 6263 City of Corpus Christi, Texas CHANGE Add the following items to the contract, ,(cont.}: ~._.. Change Order No. 4 Items 1 4" PVC Waterline C900 DR18 (170 LF @ $21.141LF} Change Order No. 7 Items 2 Tensar BX-1100 Geogrid (North of Saratoga} (1,3b4 SY @ $2.221SY} 24" Forcemain Diversion Line and Schanen Ditch Im rovements 1 Schanen Ditch Improvements (1 LS @ $708,OlbILS} 2 24" Forcemain Diversion Line (1 LS @ $2b2,200.001LS} Subtotal of Page: TOTAL NET; TOTAL NET; ADD DE $3,593.80 $3,028.08 $708,01 b.00 $2b2,200.00 $1,321,035.18 ($438,708.56) $882,326.62 . ~ r CHANGE ORDER NO.13 Everhart Road Phase I Saratoga Boulevard to Cedar Pass Drive} P.R, No. 62b3 City of Corpus Christi, Tegas " Why was this change necessary? If left off the plans and specifications, explain why? The items reflected in this chan a order re resent additional work associated with reroutin the 24" forcemain diversion line and im rovements to the Schanen Draina e Ditch. How can similar changes be avoided in the future? All Unavoidable. A, CONTRACT PRICE B. .TOTAL CHANGE ORDER zinc. current} C. NEW CONTRACT PRICE D. THIS CHANGE ORDER E, PERCENT TOTAL CHANGE ~BIA} F. PREVIOUS TIME AUTHORIZED G. ADDN'L CONTRACT TIME THIS CHANGE ORDER H. TOTAL ADDITIONAL TIME $ 7,454,229.87 $ 1,206,31b.98 $ 8,d60,54b.85 ~, $ 882,32b.62 Proj Manager 1fi.18% 0 C.D. 0 C.D. 0 C.D. ~~ ~~ CITY OF CORPUS CH STI, TEXAS By: Director of Engineers g rvices APPROVED: 1 ~ ~p rating Department Dir. of Management & Budget ~/~'~ Legal Department ~~"; CITY SECRETAR" CONTRACTOR By; Title: ~P C~ `~ ~IUTMnR~Z~D ~r ~o~~~~~ ~ n~ ~ ^a arr as ^rwrrn sr~~~Ni~ rr aL ~, SEC~~T~RY ~•