HomeMy WebLinkAboutC2009-503 - 12/30/2009 - NACITY OF CORPUS CHRISTI AMENDMENT NO. 11 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City", and MAVERICK ENGINEERING, hereinafter called "Consultant", agree to the following amendments to the Contract for Engineering Services for Cimarron Boulevard Phase 1 from Saratoga to Yorktown (Project No. 6261),as authorized and administratively amended by: Ori final Contract Ma 10, 2005 Motion No. M2005-134 $1,359,999.00 Amendment No. 1 December 13, 2005 Motion No. M2005-411 $73,912.00 Amendment No. 2 Janua 24, 2006 Motion No. M2006-017 $412,603.00 Amendment No. 3 Au ust 18, 2006 Administrative A royal $20,020.00 Amendment No. 4 Se tember 21, 2006 Administrative A royal $19,161.00 Amendment No. 5 Se tember 26, 2006 Motion No. 2006-324 $1,143,024.00 Amendment No. 6 March 1, 2007 Administrative A royal $24,922.00 Amendment No. 7 March 30, 2007 Administrative A royal $24,950.00 Amendment No. 8 Au ust 30, 2007 Administrative A royal $0.00 Amendment No. 9 Aril 29, 2008 Administrative A royal $0.00 Amendment No. 10 June 30, 2008 Administrative A royal $13,714.00 EXHIBIT "A", SECTION 1. SCOPE OF SERVICES, PART A. BASIC SERVICES, ITEM NO. 4 CONSTRUCTION PHASE shall be amended to include the additional Construction Phase Services as shown on the attached Exhibit "A". EXHIBIT "A", SECTION 3. FEES shall be modified as shown on the attached Exhibit "A" for a revised fee not to exceed $14.910.00 (Fourteen Thousand Nine Hundred Ten Dollars and Zero Cents , for a total restated fee not to exceed $3.107.215.00 (Three Million One Hundred Seven Thousand Two Hundred Fifteen Dollars and Zero Centsl. All other terms and conditions of the Original Contract and Amendments between the City and Consultant shall remain in full force and effect. ATTEST Armando Chapa, City ecretary CITY F CO PUS CHRISTI ~ ~~3~~$ Johnny Perales, P.E. Date Assistant City Manager RECOMM DED i~ /~~ Pete Anaya, P.E. Date Director of Engineering MAVERICK ENGINEERING, INC. _ 1~~~~©r Dan Biles, P.E., PMP -TDate 400 Mann St., Suite 200 Corpus Christi, TX 78401 (361) 696-3711 Office; (361) 696-3599 Fax P VFW S TO FORM CIP # ST 04 - 7~ Project Number: 6261 "~ ~ ` ~~~ ~ Funding Source: 550950-3544-00000-170540 ~~ ' Encumbrance Number: L (7 ~ Assistant City Attorney Date 2009-503 12/30/09 AMD. NO. 11 Pa e1of1 Maverick Engineering vd. Phase 1 Saratoga to Yorktown\Co~ultant (Maverick)Wmendmrnt No 11\AMENDMENT NO. I l.doc 1Yl~Y L',~~~~~ November 11, 2009 Mr. Pete Anaya, P.E. Director, Engineering Services City of Corpus Christi P.O. Box 9277 Corpus Christi, 'fX 78469 Re: Contract Amendment No. 1 l Cimarron Blvd -Phase 1 (Saratoga to Yorktawn} Project No. 62b1 Dear Mr. Anaya: Maverick Engineering, Inc. (Maverick} is pleased to submit a revised. and consolidated fee proposal for providing additional services far the Cimarron Blvd-Phase 1, Sara.roga to Yorktawn (Project No. 6261) and also serves to close out the current engineering requirements on this project (a warranty inspection will be due next year and is part of our contract). "fhis memorandum serves to consolidate the five different amendments (formerly noted Nos. 1 I through 15} submitted in July anal August of this year as well as the time required to address any and all utility, road and storm drainage revisions to the design that were accomplished during the construction project. 'The revised scope of services and corresponding fees are shown by fine item below: Scope of Services and Fees (. Design Modifications a. Revision to the design location of approximately 2,425 lineal feet of the proposed 16" water line from Station 79+33 to Station l 03+59 from outside of the roadway template to the center turning lane (3 ft off the centerline of the roadway.) h. Add approximately 530 lineal feel of proposed 8" water main from Station $7+28 to Station 92+55. c. Miscellaneous Drainage Revisions d. iJtility Adjustments The total fee far this Amendment is $14,910. We appreciate the opportunity to provide these professional services to the City of Corpus Christi. If you have any questions regarding this proposal, please call me at (361)696-3711. Respectfully, Maverick Engineering, Lne. Daniel 13iles, P.F., PMP Infrastructure Business Stream Manager Attachments: Man Hour Estimate Project l=ee Breakdown. _ -. -- ~uCr ~4t~nn fit., tiu~i~ 'f1Q t'~~rpus f'tttisti, Ta~ys ~8~if1[ ~f7 i .t,~7(,- , i[}O e f'a~ ?fi l ,h'')C~- ; ~t)0 . 4~~ti4•G~..maverickcns,inc~.:rind.com EXHIBIT "A" Pa e 1 of 14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES INfTIAL CONTRACT Cim arron BNd Phase 1 Pro ect No. 6261 Street t rm Wa er W r Wa a er T Basi c Services 1 Prelknina Phase $24 040.29 $13 410.11 $7,791.90 $7,396.70 $52 638.00 2 Phase 210,963.00 117 679.00 68,377.00 64,909.00 461 928.00 3 Bid Phase 5,822.02 3 247.63 1687.03 1 791.32 12 748.00 4 Construriion Phase 19,208.85 10 715.04 6,225.94 5 910.17 42 060.00 Subt otal Basic Services Fees 260 034.16 145 051.78 84,281.87 80 007.19 569 375.00 Addi tional Services 1 Pertnilti Authorized 4,261.93 2,377.38 1,381.37 1311.31 9,332.00 2 ROW uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T is Surve Authorized 4 936.94 2,753.91 1600.15 1,518.99 10,810.00 4 Environnental issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 124,244.61 69 305.90 40,269.97 38 227.52 272,048.00 6 Warren Phase 3,385.07 1888.25 1,097.16 1041.52 7 412.00 7 H ro-Excavation Authorized 0.00 0.00 6,592.00 6 592.00 13 184.00 8 Televiskp Ex~tinp Sanitary Sewer Lines Autl~orized 0.00 0.00 0.00 31,250.00 31,250.00 9 Drains Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Interface of Cknarron wtih 's Pant Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 136,828.55 76 325.45 50,940.66 79,941.34 344,036.00 Total Aulharized Fee $396 862.70 $221,377.24 $135,222.53 $159,948.54 $913 411.00 Cim arron BNd Phase 2 Pro ect No. 6262 S rest form Water Wa r Wastew ter To 1 Basi c Services 1 Pretimina Phase $21,769.81 $9,004.82 $6 217.49 $5 500.88 $42,493.00 2 Phase 105,353.00 43 578.00 30 089.00 26,821.00 205,641.00 3 Bid Phase 5 395.19 2,231.66 1,540.88 1,363.28 10,531.00 4 Construction Phase 13 659.86 5,650.24 3,901.28 3 451.63 26,863.00 Subt otal Basic Services Fees 146 177.86 60,464.71 41 748.65 36 936.78 285 328.00 Addi tional Services 1 P Auhwrized 4652.85 1924.59 1,328.86 1,175.70 9,082.00 2 ROW A isition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Aulhrorized 4,723.55 1,953.84 1,349.05 1,193.56 9220.00 4 Environmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 48 669.94 20,131.73 13 900.22 12298.11 95,000.00 6 Wanan Phase 1805.40 746.78 515.62 456.20 3 524.00 7 H cavation Authorized 0.00 0.00 6 592.00 6 582.00 13,184.00 8 T ~ x~tinp Sanitary Sewer Lines 0.00 0.00 0.00 31,250.00 31,250.00 9 12-kith Waterline Re cement 0.00 0.00 0.00 0.00 0.00 10 R nt of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 vement8 to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Sub otal Addit~al Services Fees 59 851.73 24 756.95 23 685.76 52 965.56 161 260.00 Tota l Authorized Fee $206,029.59 $85,221.66 $65,434.41 $89,902.35 $446 588.00 Corr ~fned Total treat Storm W ter W t r Wa w T I Basi c Services 1 Pretintiria Phase $45,810.09 $22,414.93 $14 009.40 12 887.58 $95 132.00 2 Phase 316,316.00 161,257.00 98466.00 91,530.00 667,568.00 3 Bid Phase 11,217.22 5,479.29 3 427.90 3,154.60 23 278.00 4 CorisWction Phase 32 868.70 16 365.28 10,127.22 9,361.79 68,723.00 Sub bfal Basic Services Fees 406 212.01 205 516.50 126 030.52 116,943.97 854,703.00 Addi tional Servioss 1 P Authorized 8,914.78 4,301.98 2,710.23 2 487.01 18 414.00 2 ROW uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T 'Surve Authorized 9660.48 4 707.75 2949.21 2 712.56 20,030.00 4 Environmentallssues 0.00 0.00 0.00 0.00 0.00 5 Corrshudfon Observation Services 172,914.55 89,437.64 54,170.19 50,525.63 367,048.00 6 Warten Phase 5,190.47 2,635.03 1,612.78 1497.71 10,936.00 7 H cavation Autiwrized 0.00 0.00 13,184.00 13184.00 26,368.00 8 T ExistiripEwstinp Sanitary Sewer Lines 0.00 0.00 0.00 62,500.00 62,500.00 9 Drs Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12artch Waterline R cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R of Yoridawri Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 ernents to Bear Creek Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 Modfications for kiteiface of Cknarron with s Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt ohdl Additional Services Fees 196 680.28 101,082.40 74,626.41 132 906.91 505 286.00 Tota l Auharized Fee $602 892.29 $306,598.90 $200 656.93 $249 850.88 1 359 999.00 May 10, 2005 Motion No. M2005-134 EXHIBIT "A" Pa e2of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOW N TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES AM ENDMENT NO. 1 Cimarron Blvd Phase 1 Pro ect No. 8267 Street Storm Water W ter Wa taws r To 1 Basi c Servkxis 1 Prelimine Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt ohdl Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Services 1 Perm Authrorized 0.00 0.00 0.00 0.00 0.00 2 ROW A ' ition Surve 0.00 0.00 0.00 0.00 0.00 3 T k Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Emironmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wawa Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavatan Authorized 0.00 0.00 0.00 0.00 0.00 6 Televisirp Existing Sanihary Sewer Lines ' Authorized 0.00 0.00 0.00 0.00 0.00 9 Drains Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Interface of Cimarron with Kin s Pant Unk 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee $0.00 $0.00 $0.00 .00 .00 Cimarron Blvd Phase 2 Pro act No. 6262 r St rm Wat W ter Wa w r T I Basi c Services 1 PrNkrwna Phase $0.00 $0.00 $0.00 $0.00 .00 2 D Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Servk~s 1 Permi ' Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW ' ition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmentallssues 0.00 0.00 0.00 0.00 0.00 5 Consfncction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wanan Phase 0.00 0.00 0.00 0.00 0.00 7 H xcavation Authorized 0.00 0.00 0.00 0.00 0.00 6 T istirp Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 72-Inch Wateriine Re cement 0.00 0.00 14,149.00 0.00 14,149.00 10 R cement of Yoridown Ditch 0.00 19,337.00 15,753.00 0.00 35,090.00 11 vements to Bear Creek Ditch 0.00 24 673.00 0.00 0.00 24,673.00 Subt otal Additional Services Fees 0.00 44 010.00 29,902.00 0.00 73 912.00 Tota l Autwrized Fee $0.00 $44,010.00 $29 902.00 0.00 73 912.00 Com bined Total Street Storm Water W ter Wa taw r T I Basi c Services 1 PreA Phase .00 $0.00 $0.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Bask Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Service 1 P Autirorized 0.00 0.00 0.00 0.00 0.00 2 ROW Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environnrentallasues 0.00 0.00 0.00 0.00 0.00 5 Coraztruction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wana Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 8 T~ xis&p Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12~rrch Wateriine Re cement-Ph. 2 0.00 0.00 14 149.00 0.~ 14,149.00 10 R of Yorktown Ditch-Ph. 2 0.00 19 337.00 15,753.00 0.00 35 090.00 11 to Bear Creek Ditch-Ph. 2 0.00 24,673.00 0.00 0.00 24 673.00 12 Modifications for krterface of Cknarron with 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Servkes Fees 0.00 44 010.00 29 902.00 0.00 73 912.00 TWa I Authorized Fee $0.00 $44,010.00 $29 902.00 $0.00 73 912.00 December 13, 2005 Motion No. M2005~411 EXHIBIT "A" Pa e3of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOW N (PROJECT N0.6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.8262) SUMMARY OF FEES AM ENDMENT N0 .2 Cimarron BNd Phase 1 Pro act No. 6281 t Storm W ter Water Wastew T tat Basic Services 1 Pretimina Phase $0.00 $95,960.00 $0.00 $0.00 $95 980.00 2 Phase 11,372.00 0.00 0.00 117 289.00 128 661.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constnution Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees t 1,372.00 95 960.00 0.00 117,289.00 224 621.00 Additotal Services 1 Penn' ' Autiarized 0.00 0.00 0.00 4,124.00 4,124.00 2 ROW Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 173,704.00 0.00 10154.00 183,856.00 4 EnvKOnmenlallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 8 TAe ~ 6cislinp Sanitary Sewer Lines 000 0.00 0.00 0.00 0.00 9 Ora&ra Criteria Technipl Guide 0.00 0.00 0.00 0.00 0.00 1o Modifications t« Intertace of Cimarron with 's Pant Unit 7 Subd. o.oo o.ao o.oo o.oo o.oo Subtotal Additonal Services Fees 0.00 173 704.00 0.00 14,278.00 187 982.00 Total Authorized Fee $11,372.00 $269 664.00 $0.00 $131,567.00 $412603.00 Cimarron BNd Phase 2 Pro act No. 6262 Street form W r Water Wast wet T 1 Basic Services 1 Pretimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Consinictiori Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Additional Services 1 P Auhorized 0.00 0.00 0.00 0.00 0.00 2 ROW ition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Emtronmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 8 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-ExpvaOon Authorized 0.00 0.00 0.00 0.00 0.00 8 T~ istirp Sanitary Sewer lines 0.00 0.00 0.00 0.00 0.00 9 12~nCh Waterline Re cement 0.00 0.00 0.00 0.00 0.00 10 R cement of Yorktown Ditdt 0.00 0.00 0.00 0.00 0.00 11 vements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Addilbrial Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee $0.00 $0.00 $0.00 $0.00 .00 Combined Total S rest form W er Water Wastew r T 1 Basic Servir~s 1 Prelirtiina Phase $0.00 $95 960.00 $0.00 $0.00 $95,980.00 2 Phase 11,372.00 0.00 0.00 117 289.00 128,661.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constriction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services fees 11,372.00 95,960.00 0.00 117,289.00 224,621.00 Additional Services 1 P Autrrorized 0.00 0.00 0.00 4124.00 4124.00 2 ROW Surve 0.00 0.00 0.00 0.00 0.00 3 T 'Surve Authorized 0.00 173 704.00 0.00 10,154.00 183 858.00 4 Envirornnerttallssues 0.00 0.00 0.00 0.00 0.00 5 C«istrudiori Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 8 T Sanihary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Criteria TecFuiical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12~nch Waterline R lacement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 vements b Bear Creek Ditdt-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 ~~~ f« Interface of Cimarton with s Pant Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 173,704.00 0.00 14,278.00 187 982.00 Tobl Auhorized Fee $11,372.00 $269,664.00 $0.00 $131,567.00 $412603.00 January 24, 2006 Motion No. M2006-0t7 EXHIBIT "A" Pa e4of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOW N TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES AMENDMENT N0.3 Cimarron BNd Phase 1 Pro'eet No. 6261 Stre t form Water Water Wastewa er T 1 Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Services 1 P Autirorized 0.00 0.00 0.00 0.00 0.00 2 ROW isition Surve 0.00 0.00 0.00 0.00 0.00 3 T is Surve Autirorized 0.00 0.00 0.00 0.00 0.00 4 Emironmenfal issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H cavation Authorized 0.00 0.00 0.00 0.00 0.00 6 Autiwrrzg~ x~g Sanihdry Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Drakra Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 tNodfications for Interface of Cknarron with 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tofal Autiarized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Cimarron BNd Phase 2 Pro act No. 6262 Street S orm Water W ter Wast w er To 1 Basic Services 1 Pretimina Phase $0.00 $0.00 $0.00 .00 .00 2 Phase 5,005.00 5 005.00 5,005.00 5,005.00 20 020.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constvcton Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Servk:es Fees 5 005.00 5,005.00 5,005.00 5,005.00 20,020.00 Additional Services 1 Pennitti Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A u~ition Surve 0.00 0.00 0.00 0.00 0.00 3 T is Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmenhallssues 0.00 0.00 0.00 0.00 0.00 5 Construrion Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H xcavation Authorized 0.00 0.00 0.00 0.00 0.00 6 T frog Sanitary Sewer lines 0.00 0.00 0.00 0.00 0.00 9 12-ktch Waterline R lacement 0.00 0.00 0.00 0.00 0.00 10 R of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 vementa to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authwrized Fee $5,005.00 $5,005.00 $5,005.00 $5,005.00 $20 020.00 Combined Total Street Storm W Water Wastewa r T al Basic Services 1 P Phase $0.00 $0.00 $0.00 $0.00 .00 2 Phase 5,005.00 5,005.00 5 005.00 5,005.00 20,020.00 3 Bkl Phase 0.00 0.00 0.00 0.00 0.00 4 Corrstnrctiorr Phase 0.00 0.00 0.00 0.00 0.00 SubtWal Basic Services Fees 5,005.00 5,005.00 5 005.00 5,005.00 20 020.00 Additional Servkes 1 P Autlwrized 0.00 0.00 0.00 0.00 0.00 2 ROW uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 EnviroruneMallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavatiwi Authorized 0.00 0.00 0.00 0.00 0.00 6 T istirp SaniNdry Sewer Lirurs 0.00 0.00 0.00 0.00 0.00 9 Dre' Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12-inch Wade Re cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R cement of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 errrents to Bear Creek Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 i ~~ f~ ~f~ of Cimarron witir Kin s Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Servk~s Fees 0.00 0.00 0.00 0.00 0.00 Tohal Autiarized Fee $5,005.00 $5,005.00 5,005.00 $5 005.00 $20,020.00 August 18, 2006 Administrative Approval EXHIBIT "A" Pa e5of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES AMENDMENT N0.4 Cimarron BNd Phasa 1 Pro ect No. 8281 S ee form W t r W r Wa t w er T 1 Basic Services 1 PretimMa Phase 50.00 $0.00 50.00 50.00 ;0.00 2 Phase 1,872.25 1,872.25 1,872.25 1,872.25 7,489.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Bask Services Fees 1 672.25 1,872.25 1 872.25 1,872.25 7 489.00 Additional Services 1 Penn' ' Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisition Surve 2,918.00 2,918.00 2 918.00 2,918.00 11 672.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmentallasues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Servkes 0.00 0.00 0.00 0.00 0.00 8 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Expvation Auttorized 0.00 0.00 0.00 0.00 0.00 8 Auk ~Existinp Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Oraina Criteria Technipl Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Interface of Cimarron with Kin 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Servkes Fees 2,918.00 2,918.00 2,918.00 2 918.00 11 872.00 Total Autlxxized Fee 54,790.25 54,790.25 54,790.25 54,790.25 $19,161.00 Cimarron Blvd Phase 2 Pro ect No. 8282 Street Storm Water Water W few r T 1 Bask Services 1 Pretirtrina Phase .00 50.00 50.00 .00 50.00 2 Des' Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Bask Services Fees 0.00 0.00 0.00 0.00 0.00 Additional Services 1 PemMti Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmenhallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Ot~vation Services 0.00 0.00 0.00 0.00 0.00 8 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Exgvation Authorized 0.00 0.00 0.00 0.00 0.00 8 TAe Existing Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 12~ Waterline Re cement 0.00 0.00 0.00 0.00 0.00 10 R Of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 errlents to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee .00 50.00 50.00 50.00 0.00 Combined Total Street Storm W er Water W stewater Total Bask Services 1 Pretimina Phase 50.00 50.00 50.00 50.00 50.00 2 Phase 1,872.25 1872.25 1,872.25 1,872.25 7,489.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Corrstnrction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Bask Servkes Fees 1 872.25 1,872.25 1 872.25 1,872.25 7 489.00 Additional Services 1 P Audorized 0.00 0.00 0.00 0.00 0.00 2 ROW uisition Surve 2,918.00 2,918.00 2,918.00 2 918.00 11,872.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Servkes 0.00 0.00 0.00 0.00 0.00 8 Warra Phase 0.00 0.00 0.00 0.00 0.00 7 H cavation Authorized 0.00 0.00 0.00 0.00 0.00 8 TAe ExExisting Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 8 12-inch Waterlkre Re lacement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 to Bear Creek Dikh-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 f ~ for Interface of Cimamon wiMr s Pant Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Servkx•s Fees 2 918.00 2,918.00 2,918.00 2 918.00 11,672.00 Total Autiaraed Fee 54 790.25 54,790.25 $4 790.25 790.25 519 161.00 September 21,2008 Administrative Approval EXHIBIT "A" Pa e6of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES AMENDMENT NO. S • MASTER CHANNEL 27 No. 2263 Cim arron Blvd Phase 1 Pro ect No. 6261 tr Storm W W er Wa T cal Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Phase 0.00 662,986.00 0.00 0.00 662 986.00 3 Bid Phase 0.00 17,693.00 0.00 0.00 17 693.00 4 Construction Phase 0.00 53,962.00 0.00 0.00 53,962.00 Sutk ofal Basic Services Fees 0.00 734 641.00 0.00 0.00 734,641.00 Addi tional Servk~s 1 P Autwrized 0.00 48,510.00 0.00 0.00 48,510.00 2 ROW A Surve 0.00 13,529.00 0.00 0.00 13,529.00 3 T Surve Authorized 0.00 33,134.00 0.00 0.00 33134.00 4 Environmental Issues 0.00 17,807.00 0.00 0.00 17807.00 5 Construction Observation Services 0.00 214,826.00 0.00 0.00 214 826.00 6 Warta Phase 0.00 8,284.00 0.00 0.00 8284.00 7 H xpvation Autwrized 0.00 17,566.00 13,175.00 4,392.00 35,133.00 8 T isling Sanitary Sewer lines 0.00 0.00 0.00 0.00 0.00 9 Drains Criteria Technical Guide 0.00 37,160.00 0.00 0.00 37 160.00 10 ~~~ for Mterface of Cimarron with Ki 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 390,816.00 13,175.00 4,392.00 408,383.00 Tofa lAutiwrizsdFee $0.00 $1,125457.00 $13175.00 $4392.00 $1,143024.00 Cim arron Blvd Phase 2 Pro ect No. 6262 tr form W ter Water Wa taws er Total Basi c Servkxis 1 P Phase $0.00 .00 .00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Carstruction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Services 1 Permi ' Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW ' 'lion Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warran Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-ExCavatiwr Autrorized 0.00 0.00 0.00 0.00 0.00 8 Ted Existing Sarrihary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 12~ch Waterline Re cement 0.00 0.00 0.00 0.00 0.00 10 R of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 ements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tota l Authorized Fee $0.00 $0.00 $0.00 .00 $0.00 Cor M~ined Totat tree S orm W r W t r Wast w T t l Basi c Services 1 Pre' Phase $0.00 $0.00 $0.00 .~ $0.00 2 Phase 0.00 662 986.00 0.00 0.00 662,986.00 3 Bid Phase 0.00 17,693.00 0.00 0.00 17,693.00 4 Construction Phase 0.00 53,962.00 0.00 0.00 53,962.00 Subt Wal Basic Services Fees 0.00 734,641.00 0.00 0.00 734 641.00 Addi tional Services 1 P Autlwrized 0.00 48,510.00 0.00 0.00 48,510.00 2 ROW uisition Surve 0.00 13,529.00 0.00 0.00 13,529.00 3 T Surve Authorized 0.00 33,134.00 0.00 0.00 33,134.00 4 Emironmentallssues 0.00 17,807.00 0.00 0.00 17,807.00 5 Construction Observation Services 0.00 214 626.00 0.00 0.00 214 826.00 6 Wartan Phase 0.00 8,284.00 0.00 0.00 B 284.00 7 H cavation Authorized 0.00 17 566.00 13,175.00 4,392.00 35133.00 8 Televistrrg Existing Sanitary Sewer Lines Authorized 0.00 0.00 0.00 0.00 0.00 9 Drains Criteria Technical Guide-Ph. 1 0.00 37,160.00 0.00 0.00 37 180.00 9 12-inch Waterline R cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R cerrherht of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 to Bear Creek Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 t2 ~ for trhMrface of Cimamon with K' s Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Sh~t Wal Additional Services Fees 0.00 390 816.00 13175.00 4,382.00 408 383.00 Tota l Autihorized Fee $0.00 $1,125 457.00 $13,175.00 $4,392.00 $1 143,024.00 September 26, 2006 Motion No. M2006324 EXHIBIT "A" Pa e7of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6281) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.8262) SUMMARY OF FEES AMENDMENT N0.6 Cimarron BNd Phase 1 Pro act No. 6261 SVeet S orm Water W er Wastewater Total Basic Services 1 Prelimina Phase $0.00 $0.00 50.00 $0.00 $0.00 2 Phase 0.00 21,128.00 0.00 0.00 21128.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constnrction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 21 128.00 0.00 0.00 21,128.00 Additional Servkres 1 P Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 3,794.00 0.00 0.00 3 794.00 5 Corrstnrction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wartan Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 8 A'~&rp~ isfinp Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 D Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Interface of Cimarron with Ki 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 3,794.00 0.00 0.00 3 794.00 Total Authorized Fee $0.00 $24,922.00 .00 $0.00 $24,922.00 Cimarron BNd Phase 2 Pro act No. 6262 Street St rm W Wa er W w T I Basic Services 1 Prelknina Phase $0.00 $0.00 $0.00 $0.00 .00 2 Des Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Corrstnution Phase 0.00 0.00 0.00 0.00 0.00 Subtotal BaaiC Services Fees 0.00 0.00 0.00 0.00 0.00 Additional Services 1 Pertrri ' Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisitiar Surve 0.00 0.00 0.00 0.00 0.00 3 T is Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Envkonmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 Televising Existing Sanitary Sewer Lines 8 AtN~orized 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Re cement 0.00 0.00 0.00 0.00 0.00 10 R Ot Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 ements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee 50.00 $0.00 .00 $0.00 $0.00 Corr~irwd Total Street Storm W t Wa r Wastewa r Total Basic Services 1 PreAmina Phase .00 50.00 $0.00 $0.00 50.00 2 Phase 0.00 21128.00 0.00 0.00 21,128.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Servkes Fees 0.00 21 128.00 0.00 0.00 21 128.00 Additional Services 1 P Auhorized 0.00 0.00 0.00 0.00 0.00 2 ROW Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Envirorarrental issues 0.00 3,794.00 0.00 0.00 3 794.00 5 Carstruction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Werra Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavatiwr Authorized 0.00 0.00 0.00 0.00 0.00 8 T~ xisting Sani~ry Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Criteria Technicel Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterlkre Re cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 vements t0 Bear Creek Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 ModMCations for Interface of Cknarron with s Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 3 794.00 0.00 0.00 3 794.00 Total Authorized Fee $0.00 $24 922.00 $0.00 $0.00 $24 922.00 March 1,2007 Administrative Approval EXHIBIT "A" Pa e8of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOW N TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES AMENDMENT N0.7 Cimarron BNd Phase 1 Pro'ect No. 6261 Stre t Storm W r Water Wastew r T I Basic Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 24 950.00 24 950.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construdion Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 24,950.00 24 950.00 Additional Services 1 P Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisltion Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wanan Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 6 et v~'rek~q~Existinp Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Drama Criteria Technipl Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Interface of Cimarron with Ki s Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tohal Authorized Fee $0.00 $0.00 $0.00 $24 950.00 $24 950.00 Cimarron BNd Phase 2 Pro ect No. 6262 Street Storm Wa er Water W s ew To Basic Services 1 PreNmkra Phase .~ $0.00 50.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Additional Servk~s 1 Pertnitti Autltorized 0.00 0.00 0.00 0.00 0.00 2 ROW ' ition Surve 0.00 0.00 0.00 0.00 0.00 3 T is Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Envtronmentallssues 0.00 0.00 0.00 0.00 0.00 5 ConsWction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warren Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Expvation Authorized 0.00 0.00 0.00 0.00 0.00 6 e~ Existing Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 12-nch Waterline Re lacement 0.00 0.00 0.00 0.00 0.00 10 R cement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 vements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Sutdofal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tohdl Authorized Fee $0.00 $0.00 .00 $0.00 $0.00 Combirwd Total t torm Wa er W ter Wastew r Total Basic Services 1 Pretimina Phase $0.00 .00 50.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 24 950.00 24 950.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Cor~tnrdion Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 24,950.00 24,950.00 Additional Servk~s 1 P Auhorized 0.00 0.00 0.00 0.00 0.00 2 ROW Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Envkonmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Werra Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 Televlsirp Existing Sanitary Sewer Lines 8 Autl~orized 0.00 0.00 0.00 0.00 0.00 8 Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12-trrCh WaterNne Re cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 venrenfs to Bear Creek Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 Modifications for Interface of Cimarron wiUr s Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtaal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Auhorized Fee .00 $0.00 $0.00 $24 950.00 $24,950.00 March 30, 2007 Administrative Approval EXHIBIT "A" Pa e 9 of 14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES AMENDMENT NO. B Cimarron BNd Phase t Pro ect No. 8287 SVeet orm Wa er Water Wastew T I Basi c Services 1 Prelknina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 D Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constnution Phase 0.00 0.00 0.00 0.00 0.00 Sub otal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Servk~s 1 Permitii Auhorized 0.00 0.00 0.00 0.00 0.00 2 ROW A Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environrtrental issues 0.00 0.00 0.00 0.00 0.00 5 Corrslnx:tion Observation Services 24,859.00 0.00 0.00 0.00 24 859.00 s wawa Phase o.oo o.oo o.oo o.oo o.oo 7 H xcavation Authorized 0.00 0.00 0.00 0.00 0.00 8 Televising Existing Sanitary Sewer Lines Auhorized 0.00 0.00 0.00 0.00 0.00 9 Drains Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 to Modifications for Interface of Cimarron with Kin 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 SUbwtal Additional Services Fees 24 859.00 0.00 0.00 0.00 24,859.00 Total Authorized Fee 24 859.00 $0.00 $0.00 $0.00 24 859.00 Cimarron BNd Phase 2 Pro ect No. 6262 Street Storm W t Water Wa tew To 1 Basic Services 1 Prelimina Phase $0.00 .00 .00 $0.00 .00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constnrction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Additional Services 1 Perini ' Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmerdallssues 0.00 0.00 0.00 0.00 0.00 5 ConsWction Observation Services 24,859.00 0.00 0.00 0.00 24,859.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-F~ccavatiar Authorized 0.00 0.00 0.00 0.00 0.00 8 T iatinp Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 12-krch Waterline Re lacement 0.00 0.00 0.00 0.00 0.00 10 R Of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 t 1 vements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 24,859.00 0.00 0.00 0.00 24,859.00 Total Autiarized Fee $24,859.00 $0.00 $0.00 $0.00 $24 859.00 Combined Total Street Storm W r Water Wastew Total Basic Services t PreAmina Phase .00 $0.00 $0.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Consfnwfion Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Additional Services 1 P Autlwrized 0.00 0.00 0.00 0.00 0.00 2 ROW Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Emironmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 8 Wawa Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Expvation Authorized 0.00 0.00 0.00 0.00 0.00 Televising Existing Sanitary Sewer Lines 8 Autl~orized 0.00 0.00 0.00 0.00 0.00 8 Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline R cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 vements to Bear Creek Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 72 ~ ~ ~~~ ~ Cimarron with s Pant Unk 7 Subd. 0.00 0.00 0.00 0.00 0.00 SubWbl Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Autiarized Fee $0.00 $0.00 $0.00 $0.00 $0.00 August 30, 2007 Administrative Approval EXHIBIT "A" Pa e10of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOW N (PROJECT N0.6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES AMENDMENT N0.9 Cimarron BNd Phase 1 Pro eCt No. 6261 re Storm W Water Wastewa r To 1 Basi c Services 1 Prelimina Phase $0.00 E0.00 $0.00 $0.00 $0.00 2 De ' Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basle Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Services 1 Penh Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A Surve 0.00 0.00 0.00 0.00 0.00 3 T 'Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmentdllssues 0.00 0.00 0.00 0.00 0.00 5 Corrstmction Observation Services 3681.00 0.00 0.00 0.00 3681.00 8 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavatbn Authorized 0.00 0.00 0.00 0.00 0.00 8 Aele Existing Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Drama Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 ~~~ for Interface of Cimaron with Kin 's Point Unit 7 Subd. 3,681.00 0.00 0.00 0.00 3,681.00 Subt ohal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tota l Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Cim arron BNd Phase 2 Pro eGt No. 8282 Stree form Wat r W t Wastewater Total Basi c Servces 1 Prelimina Phase $0.00 $0.00 .00 .00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Servces 1 P Autwrized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisitior Surve 0.00 0.00 0.00 0.00 0.00 3 T 'c Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmental issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 8 Warran Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Expvation Authorized 0.00 0.00 0.00 0.00 0.00 8 T Existing Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 12-trrCh Waterline Re cement 0.00 0.00 0.00 0.00 0.00 10 R cement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 vemeMs to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tota l Autarized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Con fined Total Str et t rm W r Water Wastewat r Total Basi c Services 1 P Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constnx:tion Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Services 1 P Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW uisition Surv 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Envirorxnental sues 0.00 0.00 0.00 0.00 0.00 5 Carstrlrction Observation Services 3681.00 0.00 0.00 0.00 3,681.00 B Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Eupvation Authorized 0.00 0.00 0.00 0.00 0.00 8 T fisting Sanihary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12~ch Waterine R cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 is to Bear Creek Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 far Interface of Cknamon wMh K s Point Unit 7 Subd. 3,681.00 0.00 0.00 0.00 3,681.00 Sub mit Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tota l Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Aprti 29, 2008 Administrative Approval EXHIBIT "A" Pa a 11 of 14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOW N TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY ~ FEES AMENDMENT N0.10 -MASTER CHANNEL 27 No. 2263 Cim arron BNd Phase 1 Pro ect No. 8261 SVaet Storm W t r Water Wastewater T I Basi c Services 1 Pretimina Phase $0.00 $0.00 $0.00 0.00 $0.00 2 Phase 4 832.00 0.00 0.00 0.00 4 832.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 4,832.00 0.00 0.00 0.00 4,832.00 Addi tional Services 1 P Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW uisitiort Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 8,882.00 0.00 0.00 0.00 8,882.00 4 EnvirorxnenFallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 8 Warran Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 6 A~utliori~zed x~ting Sanitary Sewer lines 0.00 0.00 0.00 0.00 0.00 9 Drains Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modifications for Intertace of Cimarron with Ki 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 8,862.00 0.00 0.00 0.00 8,882.00 Total Autiprized Fee $13,714.00 $0.00 $0.00 $0.00 $13,714.00 Cim arron Blvd Phase 2 Pro ect No. 6262 Basi c Services 1 Pretimina Phase $0.00 $0.00 $0.00 $0.00 0.00 2 Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Cortatruction Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Services 1 P Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 EnvironmeMallssues 0.00 0.00 0.00 0.00 0.00 5 Cortstnrction O~ervation Services 0.00 0.00 0.00 0.00 0.00 6 Warta Phase 0.00 0.00 0.00 0.00 0.00 7 H pvation Authorized 0.00 0.00 0.00 0.00 0.00 8 Televising Existing Sanitary Sewer Lines Atdhorized 0.00 0.00 0.00 0.00 0.00 8 12~inch Waterline Re cement 0.00 0.00 0.00 0.00 0.00 10 R cement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 vements tD Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tota l Autitorized Fee $0.00 $0.00 $0.00 $0.00 .00 Com bined Total Basi c Services 1 Pretimina Phase $0.00 $0.00 $0.00 $0.00 .00 2 Phase 4,832.00 0.00 0.00 0.00 4,832.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Constnrctlon Phase 0.00 0.00 0.00 0.00 0.00 Subt otal Basic Services Fees 4,832.00 0.00 0.00 0.00 4,832.00 Addi tional Services 1 P Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW Surve 0.00 0.00 0.00 0.00 0.00 3 T 'Stave Autiarized 8,882.00 0.00 0.00 0.00 8,882.00 4 Environmental issues 0.00 0.00 0.00 0.00 0.00 5 ConsinultOn Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wanan Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Eucavation AuOwrized 0.00 0.00 0.00 0.00 0.00 8 T xfstirp Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline R cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R Dement of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 emenfs to Bear Creek Dkch-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 Modifications for kdeAace of Cimarron with s Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Addtifonal Services Fees 8,882.00 0.00 0.00 0.00 8,882.00 Tota l Authorized Fee $13,714.00 $0.00 $0.00 $0.00 $13,714.00 June 30,2008 Administrative Approval EXHIBIT "A" Pa e12of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TO YORKTOW N (PROJECT N0.6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES AMENDME NT N0.11 Cim arron Blvd Phase 1 Pro eCt No. 6261 Street Storm Water W ter Wastewater Total Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Des' Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 14,910.00 0.00 0.00 0.00 14 910.00 Subt ohai Basic Services Fees 14,910.00 0.00 0.00 0.00 14,910.00 Addi tional Services 1 Pertnittin Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A isition Surve 0.00 0.00 0.00 0.00 0.00 3 T re is Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warran Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 6 Aulhvorized xisting SaniNdry Sewer Lines 0.00 0.00 0.00 0.00 0 ~ 9 Draina Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 10 Modif'icafbns for Interface of Cimarron with Kin 's Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee $14,910.00 $0.00 $0.00 0.00 $14 910.00 Cim arron BNd Phase 2 Pro ect No. 6262 Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 .00 .00 2 Desi Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subt ohal Bask Services Fees 0.00 0.00 0.00 0.00 0.00 Addi tional Services 1 Pertnitiin Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Environmenfallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warran Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-Excavation Authorized 0.00 0.00 0.00 0.00 0.00 6 T ~ Existing Sanitary Sewer Liras 0.00 0.00 0.00 0.00 0 ~ 9 12-inch Waterline Re lacement 0.00 0.00 0.00 0.00 0.00 10 R cement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 Irrl vements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subt otal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Tota l Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 Com bined Total Basi c Services 1 Prelimina Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Des' Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 COnatN4liOn Phase 14,910.00 0.00 0.00 0.00 14,910.00 Subt otal Basic Services Fees 14,910.00 0.00 0.00 0.00 14,910.00 Addi tional Services 1 P Authorized 0.00 0.00 0.00 0.00 0.00 2 ROW A uisitiorr Surve 0.00 0.00 0.00 0.00 0.00 3 T Surve Authorized 0.00 0.00 0.00 0.00 0.00 4 Envirormrentallssues 0.00 0.00 0.00 0.00 0.00 5 Cer~truction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Wawa Phase 0.00 0.00 0.00 0.00 0.00 7 H ro-F~ccavation Authorized 0.00 0.00 0.00 0.00 0.00 6 Tele~v Existing Sanitary Sewer Lines 0.00 0.00 0.00 0.00 0.00 9 Drekra Criteria Technical Guide-Ph. 1 0.00 0.00 0.00 0.00 0.00 9 12-krdr Waterline Re cement-Ph. 2 0.00 0.00 0.00 0.00 0.00 10 R of Yorktown Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 11 emenis to Bear Creek Ditch-Ph. 2 0.00 0.00 0.00 0.00 0.00 12 Modifications far Interface of Cknarron with Ki s Point Unit 7 Subd. 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 Total Authorized Fee $14,910.00 $0.00 $0.00 .00 $14 910.00 Administrative A vat t;XMIBIT "A" Pa ~13of14 CIMARRON BOULEVARD PHASE 1 FROM SARATOGA TOYORKTOWN (PROJECT N0.6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT N0.6262) SUMMARY OF FEES TOTAL RESTATE D FEE Cimarron BNd Phase 7 Pro ect No. 6261 S S orm Water Water Wastewa r Total Basic Services 1 Prelimirw Phase $24,040.29 $109 370.11 $7,791.90 $7,396.70 $148,599.00 2 D Phase 229,039.25 803665.25 70,249.25 209,020.25 1,311,974.00 3 Bid Phase 5,822.02 20,940.63 1,887.03 1,791.32 30,441.00 4 Construction Phase 34,118.85 64 677.04 6,225.94 5,910.17 110,932.00 Subtotal Basic Services Fees 293020.41 998,653.03 86,154.12 224,118.44 1,601,946.00 Addi tional Servka3s 1 Pennitti Authorized 4,261.93 50,887.38 1,381.37 5,435.31 61,965.99 2 ROW A utsition Surve 2,918.00 16,447.00 2 918.00 2,916.00 25,201.00 3 To Surve Authorized 13,818.94 209,591.91 1,600.15 11,1172.99 236683.99 4 Environmenhallssues 0.00 21,601.00 0.00 0.00 21,601.00 5 Construction Observation Services 95,704.61 284,131.90 40,269.97 38,227.52 458,334.00 6 Wanan Phase 3,385.07 10,172.25 1,097.16 1041.52 15,696.00 7 H ro-Expvation Authorized 0.00 17,566.00 19,767.00 10,984.00 48,317.00 6 Te~vising Existing Sanitary Sewer Lines Autirorized 0.00 0.00 0.00 31,250.00 31'250'00 9 Drains Criteria Technical Guide 0.00 37,160.00 0.00 0.00 37,160.00 10 Modifications for Interface of Cimarron with K' 's Point Unit 7 Subd. 3,681.00 0.00 0.00 0.00 3,681.00 Subt otal Additional Services Fees 123,769.55 647,557.44 67,033.65 101,529.34 939,889.98 Tota l Authorized Fee $416 789.96 $1,646,210.47 $153,167.77 325,647.78 $2,541,835.98 Cim arron BNd Phase 2 Pro'ect No. 6262 Street Storm Water Water W tew er To I Basi c Services 1 Pretimina Phase $21,769.81 $9,004.82 $6,217.49 $5,500.86 $42,493.00 2 Des' Phase 110,358.00 48,583.00 35,094.00 31626.00 225,661.00 3 Bid Phase 5,395.19 2,231.66 1,540.88 1,363.28 10,531.01 4 Construction Phase 13,659.86 5,650.24 3,901.28 3,451.63 26,663.01 Subtotal Basic Services Fees 151,182.86 65,469.72 46,753.65 41,941.79 305 348.02 Additional Services 1 Perini ' Authorized 4,652.85 1,924.59 1,328.86 1,175.70 9082.00 2 ROW A uisition Surve 0.00 0.00 0.00 0.00 0.00 3 T icSurve Authorized 4723.55 1,953.84 1,349.05 1,193.56 9220.00 4 Environmentallssues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 73,528.94 20,131.73 13,900.22 12,298.11 119,859.00 6 Wartan Phase 1,805.40 746.78 515.62 456.20 3,524.00 7 H ro-Excavation Authorized 0.00 0.00 6,592.00 6 592.00 13,184.E 8 ~ ~Existin9 Sanitary Sewer Lines 0.00 0.00 0.00 31,250.00 31,250.00 9 12-inch Watedine Re lacement 0.00 0.00 14,149.00 0.00 14 149.00 10 Re cement of Yorktown Ditch 0.00 19,337.00 15,753.00 0.00 35 090.00 11 vemenLs to Bear Creek Ditch 0.00 24,673.00 0.00 0.00 24,673.00 Subtotal Additional Services Fees 84,710.74 68,766.94 53,587.75 52,965.57 260,031.00 Total Authorized Fee $235,893.60 $134 236.66 $100,341.40 $94,907.36 $565,379.02 Combined Total Street orm Wa r Water Wastewat r T I Basic Servk~s 1 Prelimina Phase $45,810.09 $118,374.93 $14009.40 $12,897.58 $191,092.00 2 D Phase 339,397.25 852,248.25 105,343.25 240,646.25 1,537635.00 3 Bid Phase 11,217.22 23,172.29 3,427.90 3,154.60 40 972.01 4 Construction Phase 32,868.70 70,327.28 10,127.22 9361.79 122,684.99 Subtotal Basic Services Fees $429,293.26 $1,064,122.75 $132,907.77 $266,060.22 $1,892,384.00 Additional Services 1 Pe Authorized 8,914.78 52,811.98 2710.23 6,611.01 71,048.00 2 ROW A uisition Surve 2 918.00 16,447.00 2,918.00 2,918.00 25,201.00 3 T Surve Authorized 16,542.48 211 545.75 2,949.21 12,866.56 245 904.00 4 Envtronmentallssues 0.00 21601.00 0.00 0.00 21,601.00 5 Construction Observation Services 169,233.55 304,263.64 54,170.19 50,525.63 578,193.01 B Wartan Phase 5190.47 10,919.03 1,612.78 1,497.71 19,219.99 7 H ro-Excavation Autlwrized 0.00 17 566.00 26 359.00 17 576.00 61 501.00 Televiskrg Existing Sanitary Sewer Lines 8 Autirwized 0.00 0.00 0.00 62,500.00 62,500.00 9 Drains Criteria Technical Guide-Ph. 1 0.00 37 160.00 0.00 0.00 37,160.00 8 12and1 Wafertine Re lacement-Ph. 2 0.00 0.00 14 149.00 0.00 14 149.00 10 R t of Yoridown Ditr:h-Ph. 2 0.00 19,337.00 15,753.00 0.00 35,090.00 11 1 vements to Bear Creek Ditch-Ph. 2 0.00 24,673.00 0.00 0.00 24,673.00 12 Modifications for Interface of Cknarron with Kin s Point Unit 7 Subd. 3,681.00 0.00 0.00 0.00 3,681.00 Sub~lal Additional Services Fees 208 480.28 716 324.40 120,621.41 154,494.91 1,199,921.00 Total Auttrorized Fee $637,773.54 $1,780 447.15 $253,529.18 $420 555.13 $3,107,215.00 EXHIBIT r~q„ Pa e14of14 SUPPLIER NUMBER TO BE ASSIGNED BYZTT~ PURCHASING DNISION vi~,ii City of CITY OF CORPUS CHRISTI corpus DISCLOSURE OF INTEREST Chrlsti City of Corpus Christi Ordinance 17112, as amended, reduires all persons or firms seeking to do business with the City to provide the following information. Every qquestion must be answered. If the question is not applicable, answer with `NA". See reverse slde for Filing Requirements, Certifications and definitions. COMPANY NAME: Maverick Engineering, Inc. P. O. BOX: STREET ADDRESS: 400 Mann Street, Suite 200 CITY: Corpus Christi ZIP: 78401 FIRM IS: 1. Corporation ® 2. Partnership ^ 3. Sole Owner ^ 4. Association 5. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this pa e or attach separate sheet. 1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm.' Name Job Title and City Department (if known) N/A 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title N/A 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee N/A 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant N/A EXHIBIT "B" Pa e 1 of 2 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public m general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349 (d)) CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: Daniel Biles, P.E. Title: Corpus Christi Area Manager (Type or Print) Signature of Certifying Date: ~ ~ %~~~~~ Person: / DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. EXHIBIT "B" Pa e2of2