Loading...
HomeMy WebLinkAboutC2009-508 - 12/14/2009 - NAAMENDMENT NO. 3 to the AIE AGREEMENT for Architect/Engineer Consultant Services The City of Corpus Christi, Texas, hereinafter called "CITY", and Urban Engineering, hereinafter called "CONSULTANT", agree to the following amendments to the Contract For Engineering Services for Oso Water Reclamation Plant Effluent Reuse Pump Station, as authorized and administratively amended by: Ori final Small A/E A reement Ma 15, 2002 Administrative A royal $23,850.00 Amendment No. 1 Au ust 19, 2003 Motion No. M2003-272 $198,780.00 Amendment No. 2 Aril 22, 2005 Administrative A royal $9,925.00 1. DECLARATIONS. CITY desires to engage CONSULTANT to provide services in connection with City's project, described as follows: Oso Water Reclamation Plant Effluent Reuse Pump Station (Project No. 7259 "PROJECT". 2. SCOPE OF WORK. CONSULTANT shall provide services for the PROJECT in accordance with the accompanying Letter, Scope of Services, and Fee attached as "Exhibit A." 3. FEE. The CITY agrees to pay the CON Exhibit "A", Scope of Services, and Fee under this A N (in figures), Fort Two Thousand One Hundred Fif F restated fee not to exceed $274,710.00 (in figures), Tw I• T_en Dollars and Zero Cents (in words). (See Summa CIT~ OFrCORPUS ~TI ,, // _~G% iz/y/~~ Juan Perales~Jr., P.E. (Date) Assistant City Manager APPROV S T FORM: 1/ .3~v of Pete Anaya, P. E., (Date) Director of Engineering Services / Legal Department (Dat `~-~~~~ ~~ 3 0~ Operating Department (Date for services provided in accordance with N0.3 a total fee not to exceed 42 155.00 ors and Zero Cents) (in words), for a total of Fee - Exh' it "B.") RB E I LNG ov ~o L n, P.E. (Date) 2725 S ter Corpus ~ i, TX 78404 (361) 854 1 1 Office (361) 854-6001 Fax ENTERED NOV 2 3 2009 CONTRACT MANAGERS ~P ATTE - ~r (~ ~'I ~w Project Number: 7259 City Secretary Funding Source: 550950-450 -00000-190125 Encumbrance Number: ~/ 2009-508 12/14/09 )SO WRP EFFLUENT RE-USE PUMP STATION~P.MENDMENT NO. 3WMENDMENT NO. 3.doc Urban Engineering ~1 RBAN Job No.: 37899.A9.02 Firm No. 145 ENGINEERING November 12, 2009 Mr. Pete Anaya, P.E. Dir. of Engineering. Services City of Corpus Christi P. O. Box 9277 Corpus Christi, Texas 78469 Subject: Oso WRP Effluent Reuse Puma Station ~16~~...,. ~~ ~~~\ Dear Pete: J Urban Engineering prepared plans in 2004 for the Oso WRP Effluent Pump Station (City Project No. 7259) and the project was bid but not awarded due to high bids and funds available. The project included a pump station with vertical turbine pumps, hydronuematic pressure tanks, flow metering and debris screening to supply the Oso WRP non-potable water system and off- site customers. The offsite customers include four golf courses, Texas A&M University, Memorial Park Cemetery and City Park. We have been requested to provide an engineering fee proposal to prepare this project for bidding again. Engineering services required to bid this project at this time are described in the following: 1. Preliminary: Determine whether the previously used design flows to the various customers are still valid. Meet with customers, discuss their requirements and update design flows. 2. DesigNBidding: The work required to revise, update and re-issue the previously completed contract documents are anticipated to be as follows: • Update the existing Contract Documents to present City standards including a new bid date. • Update the existing Plans to present City standards. • Add °REBID" to cover and each sheet. • Investigate existing conditions, including electrical, to verify what changes have been made since the project was originally designed. The existing plant road has shifted toward the proposed structure location, a new Electrical Control Room (ECR) has been constructed and a new perimeter fence has been constructed. • Update the electrical design. The original design was served by the AAGCs in Lift Station No. 2 building. In 2007 a new Electrical Control Room was constructed with new MCCs and the old MCCs were decommissioned and removed from Lift Station No. 2. Electrical engineer will have to redesign the new pump station power service, provide new One Line Diagram and update drawings. • Delete the proposed piping to the Oso Beach Golf Course. Modify the plans, specifications and bid proposal to reflect this change. (361)854-3101 2725 SWANTNER DR. • CORPUS CHRISTI,TEXAS 78404 FAX www.urbaneng.com AMEND. NO.3 EXHIBIT "A" Pa e1 of3 Mr. Pete Anaya, P.E. November 12, 2009 Page 2 • Delete the proposed circular perimeter brick fence from each sheet and show the new brick security fence recently constructed. • Modify civil drawings to show new ECR and new location of plant road. • Revise the route of the non-potable water pipe tie-in to go around the new ECR. • Review previously selected and designed off-site efflpent pumps for new system capacity. Revise pump selection, plans and specifications as necessary. • Update system modeling with new proposed effluent transmission piping routes and verify pump selection. • Furnish complete construction and bid documents including specifications for City staff review and approval. Provide 1 copy of 100% complete plans and bid documents to the City staff for review and approval purposes with estimates of probable costs. • Upon approval by the Director of Engineering Services, provide one (1) set (hard copy and electronic) of final plans and contract documents suitable for reproduction (In City Format). • Prepare addenda, attend bid gpening, review bids and provide recommendation to city. 3. Additional Services -Topographic Survey (Allowance) • Should it be necessary to resolve conflicts or verify existing conditions, provide survey work to locate existing utilities, structures, etc. in the area of the proposed effluent pump station. We request that our present AE contract be amended to add the engineering services to accomplish the additional work. This amendment includes additional fees for basic services and topographic survey to the original contract. The very preliminary estimate of probable construction cost of $1,300,000. 1. Manhour Breakdown for Preliminary and Design Phase additional work 2. Exhibit `B' Summary of Fees (including proposed amendment) 3. Project Schedule If the above is acceptable, please prepare a contract amendment for signatures. We are ready and available to start and move on this project immediately. Should you have any questions please let me know. Sincerely, MM/ Enclosure URBAN ENGINEERING ~VI..,C. Mark Maroney, P.E. xc: Jerry Shoemaker, P.E. -Engineering Services w/encl. via email Foster Crowell -Dir. of Wastewater via email Joe Trejo, P.E. -Wastewater via email AMEND. NO. 3 EXHIBIT "A" Pa e2of3 OSO WRP EFFLUENT REUSE PUMP STATION SCHEDULE Nov. 17, 2009 Da Date Activi Frida November 20, 2009 Be in Desi n Monda December 21, 2009 100% Submittal Monda Janua 4, 2010 Ci Review Thursda Janua 14, 2010 Final Submittal Monda Janua 18, 2010 Advertise for Bids Tuesda Februa 2, 2010 Pre-Bid Conference Wednesda Februa 17, 2010 Receive Bids Tuesda March 9, 2010 Contract Award Wednesda March 31, 2010 Be in Construction Wednesday December 1, 2010 Complete Construction S:\Projects\37500up\37899\A902WE ContractWE Schedule 11-17-09.x1s AMEND. NO. 3 EXHIBIT "A" Pa e3of3 OSO WATER RECLAMATION PLANT EFFLUENT REUSE PUMP STATION PROJECT NO. 7259 SUMMARY OF FEES Original Contract Amendment No. 1 Amendment No. 2 Amendment No. 3 TOTAL REVISED FEE Fee for Basic Services 1 Preliminar Phase $23,850.00 $0.00 $0.00 $3,400.00 $27,250.00 2 Desi n Phase 0.00 67,200.00 0.00 31,195.00 98,395.00 3 Bid Phase 0.00 4,800.00 0.00 3,070.00 7,870.00 4 Construction Phase 0.00 13,600.00 0.00 3,600.00 17,200.00 Sub-Total for Basic Services 23,850.00 85,600.00 0.00 41,265.00 150,715.00 Fee for Additional Services Allowance 1 To o ra hic Surve 0.00 2,140.00 0.00 890.00 3,030.00 2 Environmentallssues 0.00 4,600.00 0.00 0.00 4,600.00 3 Construction Observation 0.00 90,700.00 0.00 0.00 90,700.00 4 O&M Manual 0.00 5,980.00 0.00 0.00 5,980.00 5 Start-u Services 0.00 2,640.00 0.00 0.00 2,640.00 6 Warrant Phase 0.00 2,480.00 0.00 0.00 2,480.00 7 Non-Pot. Water S stem Modelin 0.00 4,640.00 0.00. 0.00 4,640.00 8 SCADA S stem Im rovements 0.00 0.00 9,925.00 0.00 9,925.00 Sub-Total for Additional Services 0.00 113,180.00 9,925.00 890.00 123,995.00 Total Authorized Fees $23,850.00 $198,780.00 $9,925.00 $42,155.00 $274,710.00 AMEND. NO. 3 EXHIBIT "B" Pa e1 of1 / .._._ ~~ SUPPLIER NUMBER TO BE ASSIGNED BY~- PURCHASING DIVISION ~~~ City of CITY OF CORPUS CHRISTI corpus DISCLOSURE OF INTEREST Christi City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA". See next page for Filing Requirements, Certifications and definitions. COMPANY NAME: Urban En~ineerin~ P. O. BOX: STREET ADDRESS: 2725 Swantner Drive CITY: Corpus Christi ZIP: 78404 FIRM IS: 1. Corporation ^ 2. Partnership X 3. Sole Owner ^ 4. Association 5. Other ^ DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this pa e or attach separate sheet. 1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Job Title and City Department (if known) N/A 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title N/A 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee N/A 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant N/A EXHIBIT "C" Pa e 1 of 2 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of` the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349 (d)] CERTIFICATION I certify that all informat have not knowingly withhf statements will be promptly Certifying Person: i pro ~ ed is true and correct as of the date of this statement, that I disclo re of any information requested; and that supplemental bmitted the City of Corpus Christi, Texas as changes occur. . E. ~ ~ Title: Authorized Representative (Type or Prin Signature of Certifying Date: Person: DE N IONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. £ "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. EXHIBIT "C" Pa e 2 of 2