HomeMy WebLinkAboutC2010-025 - 2/23/2010 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO:.S FUNDING SOURCE: CONTRACT TIl~IE: 300 Operating Department: Street Department DATE: 11-Feb-10 Name of Project: Street Overlays Bond 2008 Group 1 PR #6475 Contractor: Bay, LTD CHANGE ADD Add the following to the contract: Area: Tarlton St. (Crosstown to Churchill) and Horn Road See Attached Break Down TOTAL: $252,810.98 Why was this change necessary? (If left off the plans and specifications, explain why?) DEDUCT Items i-7: Sidewalks Driveways and Additional Curb Ramps Were Added To Improve Accessibility. Item 8: Unidentified Sanitary Forcemain found in pavement section will need to be encased in cement sand. How can similar changes be avoided in the future? Unavoidable A. CONTRACT PRICE 1Z~- $2,733,748.55 B. TOTAL CHANGE ORDER (inc. current) ~33/v,3(c7.35 , C. NEW CONTRACT PRICE $3,076,115.90 D. THIS CHANGE ORDER $252,810.98 Project Manager E. PERCENT TOTAL CHANGE (B/A) 12.52% F. PREVIOUS TIME AUTHORIZED 0 G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 0 H. TOTAL ADDITIONAL TIME 0 CITY OF CORPUS CH STI, TEXAS ~- By: hector of Engineering Services ~` APPROV~I . erating Department Dir. of Management & Budget !~ ~/~) ~. 2010-025 -Legal Department M2010-043 02/23/10 gay, Ltd. ~ `~' CONT TOR By: Title: ~ `` ' \ 1~T CAUNICIL...~~~..~._ ..~~--,° S~CRETA~Y ~N~ ~® Bond 2008 Street Overlays Group 1 Area: Tarlton St. (Crosstown to Churchill) and Horn Road Item 1 Remove and Replace Sidewalk 8600 SF @ $9.50 / SF $81,700.00 Item 2 Remove and Replace Driveways 6550 SF @ $10.38 / SF $67,989.00 Item 3 Traffic Control 1LS @ $4500.00 /LS $4,500.00 Item 4 F-22 Remove Existing Concrete 1000 SF @ $6.65 / SF $6,650.00 Item 5 F-23 Concrete Curb Ramp 1,000 SF @ $10.50 / SF $10,500.00 Item 6 Remove Alley Sidewalk 3,000 SF @ $5.23 /SF $15,690.00 Item 7 Replace Alley Sidewalk 3,000 SF @ $11.03 / SF $33,090.00 Area: Horn Road Item 8 Cement Sand Around 20" Sanitary Forcemain 1574 LF @ $20.77 /LF $32,691.98 TOTAL $252,810.98 Department of Engineering Services Change Order Summary Sheet February 23, 2010 PR07ECT: Street Overlays Group 1 (BOND ISSUE 2008) Project No. 6475 / CIP No: ST 31 APPROVED: City Council on 9/22/09 -Motion No. 2009-276 CONTRACTOR: Bay, Ltd. P.O. Box 9908 Corpus Christi, TX 78469 SUMMARY: This Change Order provides for the addition of sidewalks, driveways and additional curb ramps to improve accessibility on Tarlton Street (Crosstown to Churchill) and Horne Road and for an unidentified sanitary force main found in a pavement section to be encased in cement sand on Horne Road. TOTAL CONTRACT AMOUNT ............................ $2,733,748.55 25% Limit Amount ........................................ 683,437.14 Change Order No. 1 (1/21/10) ....................... 19,721.76 Change Order No. 2 (2/10/10) ............................... 24,128.30 Change Order No. 3 (2/10/10) ............................... 17,896.16 Change Order No. 4 (2/19/10) ............................... 21,810.15 Change Order No. 5 (Council 2/23/10) ................. 252.810.98 Total ........................................................... $336,367.35= 12.30% < 25% EXHIBIT "C" Pa e 1 of 1 H:WOME1KHIy0\GEN\STREETS\6475 and 8480• Slreet Overlays-Groups 1 & 2 BOND 2008\ConsWClion\Chanye Order No. 5• Group 1\5 SUMMARY.dx