HomeMy WebLinkAboutC2010-101 - 4/13/2010 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 1 FUNDING SOURCE: Contingency CONTRACT TIME: 270 CD Operating Department: Police DATE: March 29, 2010 Name of Project: Police Department Building Elevators (Project No. 524 Contractor: KJM Commercial, Inc. CHANGE AS FOLLOWS: ADD DEDUCT Provide various upgrades to elevators, per attached. $ 83,090.00 Total this Change Order: $ 83,090.00 Why was this change necessary? (If left off the plans and specifications, explain why) How can similar changes be avoided in the future? A. CONTRACT PRICE ..............................................$ 467,000.00 B. TOTAL CHANGE ORDERS (inc. current) ............$ 83,090.00 C. NEW CONTRACT PRICE ....................................$ 550,090.00 D. THIS CHANGE ORDER ........................................$ 83,090.00 E. PERCENT TOTAL CHANGE (B/A) ....................... 17.79% roject Manager F. PREVIOUS ADDN'L TIME AUTHORIZED............ 0 CD G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 77 CD H. TOTAL ADDITIONAL TIME .................................. 77 CD CITY OF CORP S CHRISTI, TEXAS CONTRACTOR By: w~ By: City Engine~~~, j ~~~ Title: pi»~~cE I~K...w-.~ APPROVED: OOperatmg Department l~h- Director of Management & Budget ~~, Legal Department ~waaarv~o c~aPa. ~I:cs~AS~ ~f ~Or ~ , AUl"t1UR1`"ED ~r c©tfHrll....~~~3 ~0 .~~' .M SECR~1'ARY' 2010-101 M2010-076 04/13/10 KJM Commercial INDEXED a .. o= ~ 0 ~ ~ F' ~ m ~r~** ~ ~i •~ ~ N • m C'1 k ~ =. r ~ m -' N ~ 1~ ~ ~ _ ~A N y P a CA N -~+ C ~O 00 V O~ t7~ ~P W N ~ a ,, 4 ~ ro m ~ ~ ~ ~ n ~ ~ ~ p N '~'` p ?P Q o ' ~ ~ ~ o m C ~~ c ~ ~ '~ ~ o ~ R p ' ,~ ~ ~ ' ~ ~y~+ o ° ~ r ~ oe F ~ rt ~° A ~ p ~ o 0 m ti rmF m a a O a ~ w o N W N p, G1 O W N o p ~ 0 `~ a N O ~TVH ~ O ~ y~ ~ N ~ ~ ~ ~ H ~ ~ EA sJ O O N p O ,Q "' Q "' ~ ~ .. 9 s. .°~ r ~. s n ~. a~ ~o 7 M w N tJi A c », o m ~" 0 n ~ ~ O® rt ~ A z W A~ r O N ~7 0 W th n n 3 n 4 n John R Dykema Jr. From: Matt Donnell [mdi~totalprotection.com] Sent: Wednesday, March 17, 2010 4:28 PM To: Jdykema cLDdykema-architects.com; Ipatterson c7ipateng.net; CBrzozowski~kjmcommercial.com Cc: mike@cctexas.com; mitchell.sumpter~us.schindler.com Subject: FW: CCPD Attachments: ElevatorUpgrade-TPSI-1.pdf John- Attached is a single line diagram for what I believe is the °project°. As for the questions below are my responses- I. What coordination from the electrician will you need to get the card reader to work? The only items that will require other contractors is the rough-in of a single gang box in between the elevators if there is will only be one call button used for both in the 1~` floor lobby. If there aze two call buttons then two rough- ins will be needed. That cable as shown will be routed to our existing hardware located on the first floor so conduit stubbed outside of the shaft to the accessible ceiling would be in order. We'll have a cazd reader that will need wire and mounting hardware holes provided by the elevator contractor. The travelling cable should have at 6 conductors for the reader available in the equipment penthouse for connection to our hazdwaze. The only item that appears to have changed since I first looked at the project is the apparent lack of a desk guazd who would select by input the floor that a visitor would be going to. Maybe Mike Walsh can comment on this item. From there it's all inputs/outputs and programming. 2. What will be the cost to install the card reader? I can finish a proposal as soon as everyone agrees on this SOW and Mike can comment on the desk guard. Thanks, Matt Donnell Vice President Total Protection Systems, Inc 361-289-2788 Ext. 105 361-289-1688 Fax 512-656-4802 Cell NOTICE: This transmission is strictly confidential and is intended ony for the indicated recipient. The information presented herein may be proprietary and may be subject to a confidentiality agreement that strictly prohibits its use and disclosure. If you are not the intended recipient of this message, you may not disclose, disseminate, print, copy or otherwise use this infonnation. ff you received this message in error, please reply to the sender and so advise him/her and then delete this message. Unauthorized interception of this email may be a violation of federal law. From: GREG MEDINA [mailto:gm@totalprotection.com] Sent: Wednesday, March 17, 2010 3:58 PM To: MATT DONNELL Subject: CCPD Greg Medina Total Protection Systems, Inc. 361-289-2788 Ext. 112 361-289-1688 Fax NOTICE: This transmission is strictly confidential and is intended only for the indicated recipient. The information presented herein may be proprietary and may be subject to a confidentiality agreement that strictly prohibts its use and disclosure. If you are not the intended recipient of this message, you may not disclose, ~~N ~Iz O r------i I I I m I x n I ~ Im~i ~ I In ~ I ~ Ir ~ I 10= ND o n I o ~ Imo ~ `" D I m cn ° Imp ~ ~ I ~ I ~ ~ I I m fA L.- --- J ~ D~~ m quo ~ ~~N (n ~o~ o mo G7 rl~ O ~ ~I°o~ I I I I I I I I I I I I I I I I I I I i I I 1 1 i i I -~ CO 00 ~IQ] CJt -P W N ~ ~ O) C.Jt ~ L.a N ~ O ~ nnnnnnnnc7r~1 D D D D D D D D D O I m m m m m m m m OJ n D ~ m~~ m D D D D D~ ~l TI TI TI TI TI TI TI ~ rrrrrrrrr, .D ~l :i7 :0 :0 TJ ~ ~ ~ "r1 C (Jt W N W ~~i v ~ ~ (n u v v ~--~ w ~ cn~~ 1 p 2 2 Z " ~'7 TI rl 2 10 p O OIL ~ ~ ~Im I - ---- I I i ~------ ---- -~ m ~ r I I i ~ ~ nl m I ~ I I I I I A n~ m~ ~ n~ m~ I I -t p D II ~ I DI I -+ I I I~ I~ o ao o D I~~o IZ~~ L----J nD I I I~ ~ m mm C I I I I IOC I~~m ~----, m z I I o~ I m~ z nl I n I I c~ I~~~ ~I n I I -'rn I D O I ~ I I I I oz~ ml I I L-- z] L----J 1 °~ I o=w I r r O I I DOS ~ a ~ I m~0 ~ I I are for the foie use et dotal Protecl:pi Syrtenn, ~ aM cannot be ueW by othero. ~ use wiW conabtub on ayraement to Purehow this traxing anE Eavgne roflectea. ~~ ~~ A ~ '" 3 ~ ° o m ~ ° > ~ ~ C m c m ~ m ~ ° z P ~ '~ ' s ~ ° O ~? m ~ cy ~ n ~ O o ~ ~ o H ~ ~y O~ z ~< ut ~ y'~'~j • m'•°• u s° em ' 1 m 1 zr i Sinn ~ ~ •. Y ~ ® Ta r~ J ~ O N y ~ V • ~ N Q m a a ~ Se N i O W \ ~ O y = m ° "~ ~ ~ x~ Z .~ z ~ ~ ^ ' ~. e ° ~ ~ °° `eW j °~° iR ' ~ J c G66 - ~ ~ n ~ ~ ° \ o ' - yo 3 N ~ ~`.~ ~~CA PERSOI~1 N/HAH N ASSOCIATES, INC. ELEVATOR CONSULTING, DESIGN 8 INSPECTION TO: John Dykema, AIA FROM: Mark Mendenhall REF: CC Police Buildiing DATE: 3-09-2010 John- Please request Schindler to include Card Reader interface in each elevator controller. A cutout in ~e car panel faceplate, as described in 2.44, A, may not be necessary depending on the type of card reader the CC Police Department purchases. The card reader provider [Security Contractor] usually mounts an interface box in the elevator machine room and provides contacts to the elevator contractor for interfacing to individual floor selection(s) in the elevator control panel. Schindler does not have to know the specific product yet, only to make preparations; at time of installation both trades will have to coordinate. bet me know if you have any questions. 2:44 .SECURITY INTERFACE F.OR ELEVATORS W1TH CARf~FtF.ADEl2S A Elevator contractor shall provide cut-out in one face plate with a tinted non-scratch glass window and space behind within each elevator that requires a security cardholder. Refer to the security drawings. The security contractor shall furnish the card reader to the elevator contractor for mounting. The elevator contractor shall provide all required mounting accessories and shall mount the card reader within the elevator cab. Brackets to hold the card reader in place shall be durable and non-metallic. B. The security contractor shall terminate the traveling cable provided by the elevator contractor within the elevator cab to the mounted card reader. The elevator contractor shall provide and mount glass panel to cover the mounted card reader. Mount the card reader so the glass panel is flush to the front of the mounted card reader. C. The security contractor shall terminate the traveling cable provided by the elevator contractor within the elevator machine room to the security remote field panel. D. The security contractor shall provide an intertace panel within the elevator machine room. This panel shall contain a minimum of 2 terminal strips. The security contractor shall label the terminal strips with the required connections from the elevator controller. The elevator contractor shall wire from the elevator controller to these terminal strips. Coordinate with the security contractor to provide all required connections and compatible low voltage contact closures from the elevator controller to this terminal strip to allow the following operations: 1. Signal from the security system to inkiate elevator control by the card reader. 494 SOUTH SEGUIN STREET SUITE 204 NEW BRAUNFELS, TEXAS 78130 830326 FAX830-6263982 PERSOHN/HAHN ASSOCIATES, INC. ELEVATOR CONSULTING, DESIGN d INSPECTION 1. On card reader mode: The security system shall indicate to the elevator controller which floors are selectable by the Cardholder within that elevator. The elevator controller shall enable those floor selection buttons only. When a floor is selected, the elevator controller should disable all other floors from being selected and signal the security system that a selection has been made. 3. Signal from the security system to remove the elevator from under card reader crontrol to normal operation. 494 SOUTH SEGUIN ST. SUITE204 NEW BRAUNFELS, TEXAS 78130 830826 X80 FAX834826-~82 ,~ Schindler Elevator Corporation - /,--, Schindler Confirmation Letter -Design and Finishes (D & F) ~,~, February 19, 2010 ~ Chris ~ KJM Commercial, Inc. ~ e 1814 Holly Rd. ~ c Corpus Christi, TX 78411 RE: Police Building t// Our G.O. No.F4751 Corpus Christi, TX Thanks for selecting Schindler to work with you on this project! EnGosed is submittal No.O for your review and approval. Please initial/indicate selections and return this form and two (2) complete sets of approved drawings by 3/15/10. Schindler shall not be subject to liquidated damages for delays to project schedule, which may occur as a result of our submittal package not being returned to us in a timely manner! Please confirm the following: ~ ~ E 1~ CO ~ F 1 ~ M 1. Power supply: ~08, ^ 480, or ^ volts, 3 ph, 60 Hz 2. Floor designations: 1, 2, 3, 4, 5 - A ~ E C.O U F~ 3. Main ingress/egress floor: 1 _ ~ ~ ~ eA N F ~ QM v~ t -D-1 /~ N S 4. Fireman's emergency return Primary floor: 1; Alternate floor: 2 pC ~ E Gp ~ F 11? M 5. Hoistway door panels -1 SCO, 42" wide x 84" high, ~/ r fi b~ 21;~ ~ . Y Finish: No.4 st.stl. at "1" only 5 W (p Z ~ 3 Baked enamel w/aluminum sill -- T ~ PtG/~L ~,~ ortt~ Stt,v~~ S 6. Surface mounted hall fixtures (drawings herewith) C.} ~~~E L~I~ ~CAC~-CSC NO Nb~?,E Confirmed Initial Confirmed Confirmed Confirmed Color Confirmed Ttt/~I~ ~" i~RO~EGTf01~ ~P_.DM VVF~LL ~E0.4U~,~r Tel. 800 847 5876 1 o L ^~ 12961 Park Central, Suite 1460 Fax 210 490 1338 ~ San Antonio, TX 78216-2073 www.us.schindler.com '~°° Police Department Corpus Christi, TX ~~~ `~ ~~~ ~~ ~~L~G~ 7. Cab (Existing) ~~E New vertical panels: Plastic laminate (from our sta. color chart) / Color _ New suspended ceiling: Aluminum frame with white '~ ~' Lexan°diffusers, 7'-5" AFF'~ ~~ ' Return(s), transom, and columns: Existing ~ Exposed interior steel shell: Existing / Handrail: Existing Illumination: Existing Sill: Existing / ..- G ~. ~/~ N PS S ~ ti/ U ~ 1~ ~ Wall protection: None ~~-~ To monitor your elevator's progress, from submittals to inspection, visit the Schindler Customer Clock on our website at www.us.schindler.com. Simply enter the project contract number (725836) and zip code (78401) on the Customer Clock screen. Please call me if you have any questions at (210) 301- 7183. Sincerely, ~~~ e~ ~~~ Mlitchetl Sumpter Sales Representative mitchell.sumpter@us.schindler.com FYI -PRODUCTION CANNOT NOT BEGIN UNTIL WE RECEIVE: a) ALL REQUIRED DESIGN DATA, b) AN EXECUTED CONTRACT, & c) 35% PAYMENT OF INITIAL INVOICE 2 John R Dykema Jr. From: John R Dykema Jr. [Jdykema~8idykema-architects.com] Sent: Monday, March 15, 2010 2:19 PM To: 'Chris Brzozowski' Gc: 'Kevin Stowers ; 'Mike Walsh' Subject: Police Elevators Chris, Please provide a proposed price as soon as passible to: 1. Replace the front cab panels (along with the other three sides of the cab as specified). The finish for the interior of the cab is to be: Schindler `Locarnd, with a 2"stainless steel rectangular handrail, Layer 4, 5 and 6 to bge Blackstar grainie laminate, layer 3 to be black laminate, layer 2 to be Windsor mahogany laminate and layer 1 to be stainless steel 2. Replace the interior cab doors with new stainless steel. 3. Install a frame ceiling with translucent diffuser/fluorescent ceiling. 4. Other previously mentioned required items. Let me know if you have questions Thanks, John John R. Dyfc~mS, Jr , AIA 1~1fi~1~M~ 1~HNTi`~T 1:~~. `~' 7'EY74.~epn~irnq ~(xpl;rt~taicii.TX?'~4'P+a [tr~r1 3frD-A~~~t~1 Cf,~t~ 36t~s84~-~5~t C~ s9Ykett~a-acel~st~,~ots~ 1