HomeMy WebLinkAboutC2010-102 - 4/13/2010 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 3 PROJECT NO: 8551 CONTRACT TIME: 510 Calendar Days Operating Department: Water DATE: March 24, 2010 Name of Project: Padre Island Elevated Water Storage Tank, Part A Project No. 8551 Contractor: Landmark Structures I, L.P. CHANGE ADD DEDUCT Add the following Bid Item to the Contract: A32. Credit for altitude valve ($ 16,922.00) A33. Credit for double swing gate ($ 2,000.00) A34. Credit for cathodic protection ($ 13,500.00) A35. Credit for providing 45' operating range in lieu of 40' operating range ($ 5,300.00) A36. Credit for 15 LF of 30" Ductile Iron Piping ($ 3,000.00) A37. Credit for 30" Ductile Iron 90° Bend ($ 3,000.00) A38. Electrical Modifications $ 93,725.00 A39. Sleeves in Pedestal Wall $ 4,500.00 A40. SCADA Modifications $ 38,206.16 A41. Waterline Modifications $228,600.00 A42. Landmark PM Travel and Engr. Support $ 11,500.00 A43. Bonds & Insurance Extension $ 7,000.00 A44. Site Temp Fencing Extension $ 1,300.00 A45. Toilet and Dumpster Extension $ 1,135.00 A46. Contractor Profit, Overhead, Superintendence, & Field Office Expense (15~ per Article B-8-4 of the Agreement). $ 57,894.92 Subtotal: $443,861.08 ($ 43,722.00) TOTAL CHANGE ORDER NO. 3: $400,139.08 Why was this change necessary? (If left off the plans and specifications, explain why) The deducted items to this change order include a credit for the diaphragm type altitude valve which was replaced with an electric operated butterfly valve, for the double swin gate which was replaced with an automatic gate and card reader, deleting the cathodic protection within the tank, and providing a 45' operating range in lieu of a 40' operating range. The additional items added to the scope of work are sleeves in the pedestal wall, Pipin Modifications required to accommodate future chemical boosting facilities, Electrical Modifications to provide MIS network equipment, police and fire communication, antennas, CCTV, and access control, and SCADA modifications to provide control and communication with Sand Dollar Pump Station. How can similar changes be avoided in the future? The additional work is performed as a request by the city. A. CONTRACT PRICE B. TOTAL CHANGE ORDER (inc. current) C. NEW CONTRACT PRICE D. THIS CHANGE ORDER E. PERCENT TOTAL CHANGE (B/A) F. PREVIOUS ADDN'L TIME AUTHORIZED G. ADDN'L CONTRACT TIME THIS CHANGE ORDER H. TOTAL ADDITIONAL TIME 2010-102 M2010-075 04/13/10 $ $3,379,000.00 $ $424,480.92 $ $3,803,480.92 p $ $400, 139. OS / ! '~. 12.6 Projec Engineer 47 DAYS 272 DAYS 319 DAYS ~v ~2 Landmark Structures I ~N~ v Lr CITY OF COF By : -,~ City CHRISTI, TEXAS CON By: ~ e 11 Title: C ~-©- 6'GR- Operating Department Director of Management & Budget Legal Department I' -'~,~~ f ~,~ ~uTMUK~ZE,~ ~' I a 4rrssr. sY CQUl~Cil..l~~. SECRETI~}'~ ~' Padre Island Elevated Water Storage Tank (1.5 MG), Part A Additional Work Required Prior to Completion 1. Piping Modifications -Inlet/Outlet piping modifications are required to accommodate future chemical boosting facilities to be installed at a later date. The modifications on this project consist of designing pipe above ground on pipe supports to accommodate tapping and flow meter work at a later date. A valve and fire hydrant were added to provide isolation and dewatering during installation of the taps and flow meter in the chemical boosting project. A 16" stub-out was also requested at Coral Vine for distribution looping. Extensive dewatering and cathodic protection are also included in the Waterline Modifications cost. 2. Electrical Modifications -Site lighting, MIS network equipment, Police & Fire communication and antennas, CCTV and Access Control improvements were incorporated into the electrical drawings for the tank project. The electrical modifications will also included furnishing and installing upgraded main safety switch, power panel, upgraded chlorine analyzer, new cable tray, as well as all associated conduit, wiring, duct banks, and grounding rods. 3. SCADA Modifications -Control and Communication at Sand Dollar Pump Station; will require changes to cycle the elevated tank. SCADA modifications will include a fully assembled control cabinet pre-wired and fully assembled for the City of Corpus Christi supplied Modicon M340 PLC. Modifications will also include the programming and testing of the unit along with demonstration and start-up services. 4. Sleeves in the Pedestal Wall -The electrical modifications included in the list of additional work required for completion will require additional conduit which will need to be cored through the existing pedestal wall. Padre Island Elevated Water Storage Tank (1.5 MG), Part A Deduction of Work 1. Altitude Valve - An electric operated butterfly valve was provided in lieu of the diaphragm type altitude valve. The cost associated with the additional butterfly valve was included in CO #2. This change order includes the credit for the diaphragm type altitude valve. 2. Double Swing Gate -Additive Alternative No. 1 includes an additional automatic gate and card reader. Additive Alternative No. 1 was included in lieu of the double swing gate bid item. 3. Cathodic Protection -The cathodic protection is no longer needed since the tank was constructed with a high performance coating and an additional 1/16 inch of steel thickness for corrosi9n_protection_. _ This method. of protecting the tank will _a_Iso reduce_ the maintenance costs associated with cathodic protection. 4. 45' Operating Range -The Contractor provides a standard 45' operating range. Any variation from this would provide for an additional cost. The tank will provide a 45' operating range in lieu of the 40' operating range specified in the plans. 5. Ductile Iron Pipe and Bend -The inlet/outlet piping bid items were included in the Waterline Modifications; therefore, these bid items were deducted. Department of Engineering Services Change Order Summary Sheet April 13, 2010 PR07ECT: Padre Island Elevated Storage Tank (1.5 MG) Part A Project No. 8551 / CIP No: WA 07 APPROVED: City Council on 3/11/08 -Motion No. 2008-071 CONTRACTOR: Landmark Structures I, L. P. 1665 Harmon Fort Worth, TX 76177 SUMMARY: This Change Order provides for additional sleeves in the pedestal wall, piping modifications required to accommodate future chemical boosting facilities, electrical modifications to provide MIS network equipment, police and fire communication, antennas, CCTV, and access control, and SCADA modifications to provide control and communication with Sand Dollar Pump Station. TOTAL CONTRACT AMOUNT ......................... $3,379,000.00 25% Limit Amount ...................................... 844,750.00 Change Order No. 1 (12/5/08) ...................... 5,250.00 Change Order No. 2 (4/14/09) ............................... 19,091.84 Change Order No. 3 (Council 4/13/09) ................ 400,139.08 Total .......................................................... $424,480.92= 12.56% < 25% H:\HOME\KellyO\GEN\WATER\Water System\8551-Padre Island Elevated Storage Tank (See 8487 for Amds)\Change Order No. 3\5 CO SUMMARY.doc