HomeMy WebLinkAboutC2010-134 - 4/27/2010 - ApprovedCWANGt= ORDER ND: 6 FUNDING SOURCE: Operating Department: 5glid Waste Services DATE: March 25, 2010 Name of Project: J.C. Elliott Landfill-Final Cover Phase 4-8 and Landfill Gas Collection Contractor: Environmental Speaafties International CHANGE A5 FOLLOWS: 1. Bid Item A-21 flare Station Repairs {12 weeksl8<t days) 2. Bid Item A-fi New fi" HOPE Pipe for the New Wells (Deduct) 3. Bid Item A-8 6"HOPE Pipe Existing Wells {Deduct} 4. Bid Item A~ 4" Pipe for the New Wells {Correction to Ct~i4k5} 5. Bid Item A-20 Horizontal Well {Correction to CO#5} fi. Earthwarlc Repair and Erosion Control Ma#trng {5 days} 7. Let Down Structure Repair {5 days) 8. Erosion Protection in the Existing Gully Draining the Ciay Liner Area {Deduct from CD#5} 9. Time Extension Due to Draught Conditions and Flare Issues {158 days} .... $fi,769,018.1$ --..- $252,719.88 ..... $7,(121,738.07 .... ~5a,93s.77 .... 3.73°Io Why was this change necessary? {If left off the plans and specifications, explain why] Additional a ui at the tiara station to make it o tional. Less 'r i wa Iced at th new and axis 'n wells. Erosion control matting and regair~ to an existing let down structure is required to avoid further ~n s How can similar changes lie avoided in the future? More comgiete maintenance records with regards to the flare station would have resulted in a more accurate estimate for repairs. Conduct periodic erosion maintenanre- A. CONTRACT PRICE .......................................... B- TOTAL CHANGE ORDER {inc. current] ............... C. NEW CONTRACT PRICE ................................. D. THIS CHANGE ORDER .................................... E. PERCENT TOTAL CHANGE {BIA} ...................... F. PREVIOUS ADDN'L TIME AUTHORIZED ............. G. ADDN'L CONTRACT TIME THIS Ci-IANGE ORDER W. TOTAL ADDITIONAL TIME ................................ CE MAR 2~ ~4~q ADD DEDUCT $50,415.29 $4,305.dD $10,711.50 $36.00 $229.98 $2fi,83D.tJ0 $4,570.00 $7,725.00 $(1.00 $58,939.77 t~ _ , Project Engineer 0 CD 252 CD 252 CD /~.~ ~ CITY DF COR CHRISTI, TE?(A5 CONTRACTOR By: By: ~~ City Engineer Ttle: ~~~ APPROVED: Operating Department ~Directar of Management ~ Budget p~.v~-i - Legal Department 4T>~`t. _ ~+Fil<~.41+ii?C) GI~fAPp Cm' Sf"::t'~?FTAP" 2010-134 M2010-092 0412711 ~D !0. 92 -~ur~lc~xIIED ~ ~~o~~~r~ .. ~~~ 1 D .~~. s~c~l:rrtr~r ~i• En-+iranmental Specialties Intel. ~N~~~~ CQ~b6 SummarylEl#iott Flare Station Re#~airs -4mount Description $191,251.1}Q Shaw Flare Proposal (Enclosed Flare Basis} {$1 D3,5DD.DD} t7edud to Switch to Candlestick Flare $4,909.1}D Flow Meter $5,818AQ Roof Structure $9,923AQ Vale Replacement $4,9fi0.Q0 Air Compressor Install $0,541 Afl Air Compressor $S,OOfl.Of] Shipping $3,50Q.00 Blower Maintenance $4,t3043.iH1 4nsta44atiac- Clew tVtntaJDemab $25,700.Oa Candlestick Flare [nstall w151ab {$S,DDD.DD} Deduct 5#ah $fi,OdQ_QQ Laydawn C!d Flare $174,1 Q2.1]Q Suttotal $Z6,115.3t] 159b Marku $240,217.3Q Tata1 {$132,559.5D} Flare Allowance Remaining in Contract {$4D,38~1.D1} Ne# Credit in Contrad Due to Quantit Chan es $27,273.T9 Total Change order Cost for Flare Repairs - ~~SQECtiA~~i~s~y~~ ~ ~y z ca ~~ ~`~ ,~~ 7943 Pecue Lane, Suite R. Baton Rouge, LA 70809 March 9, 2D 1 D Td: don Reinhard, P. E. HDR Shiner Mosley and Associates, Inc. FRGM: Tom Aberly Environmental Specialties International, Inc. RE: Pricing to Supply and Install Erosion Control Mat d. C. Elliot Landfill Final Cover System Installation & Landfill Gas Management System CC Project No. 5125 don, As per your request I am submitting pricing to supply and instal] erosion control matting in the galley where the drainage runoff from the lay down area is concentrated causing erosion. Two product options are given below: Landlok 454 and Pyramat HPTRM. Product data sheets are attached far your reference. Pyramat is the option recommended by our erasion contra] subcontractor for this application. Landlok 45D is a lower cost alternate and it will not last as long as the Pyramat. We estimated the total length to be protected at 32D feet. Far the top 150 feet where the erosion pattern is narrow we estimate 2 rolls wide would be sufficient. For the next 17D feet where the erosion pattern fans out to the chute, we estimated 3 rolls wide. The Landlok rolls are 5.5 feet wide and the Pyramat rolls are 8.5 feet wide. Both products will be installed per manufacture's specifications. Both products will be trenched in an the sides but the Pyramat will be trenched in lengthwise every 3D feet. In addition the Pyramat will include seeding with %x" topsoil placement and sprayed with F1exTerra FGM and topped with single net Erosion Control Blanket. The estimated useful lire of the Landlok is 5 years whereas the Pyramat is 50 years. Costs are presented below: Mobilization: [LS} Earthwork Repair: (LS} TRM-450 Mat: (Estimated 585 SY} Pyramat HPTRM (Estimated 75S SY} If you have any questions, please call. ~, $~SD.Do $1,5DD.DD $2D.9415Y $ l 2,270.84 $32.DDISY $24,480.04----5E+~~"'~~ s.~.~. TEL: (225} 291-270Q FA}C: (225) 291-2788 tJRt_: www.ESILiners.eam ~~ ~ v .- . - ., ~~ ... ~ ~" ~:.:,.. •' .c~~` 7943 Pecue Lane, Suite A. Baton Rouge, LA 70809 March 18, 2Q10 T4: ron Reinhard, P. E. HDR Shiner Mosley and Associates, Inc. FROM: Tam Aberly Environmental Specialties International, Inc. RE: Pricing to Supply and Install Let Down Pipe far Repair 7. C. Elliot Landfill Final Cover System Installation ~ Landfill Gas Management System CC Project No. 5 i26 Jon, As per your request we am submitting pricing to supply and install 18 inch corrugated HDPE pipe at the let doom structure at the asphalt entxance road. We have already made a repair to the existing pipe about 104 feet upslope from the bottom as part of our work that included installing RCP pipe under the main road. Subsequent to completing this work another water piping hole opened up down slope about 16 feet up from the bottom of the existing let down pipe. We uncovered this section and discovered that a piece of the existing pipe had a $ap in it and rainwater had eroded a hole in the cover above this gap. We also noticed that the existing upslope pipe is now oval and has some rents in it. We can't tell how far up the slope the damage continues so the scope of work assumes that we will have to replace the pipe up to the previously made repair, a distance of about 12U feet. We will uncover and remove the existing pipe and replace it with the one joint that is already on site and supply four more joirrts for a total repair of 12Q feet. The pipe factory attachment is a snap fit. We will also install some screws in each joint to strengthen the connection. We will perform this scope of work for $4,570.00. The pipe is in stock and readily available_ As you know we're close to completing our work with the heavy equipment and I will be fuming it in within the next few days. So a quick decision is essential as we have not included any mobldemvbiliTation charges. If it is decided to make this repair after we have returned the equipment, we will have to add a mob charge to this estimate. Please let me know as quickly as passible if you want to make this repair. r-° ~. ~"'~ ~ ~F TEL: X225} 291-2700 FEU(: [225} 291-2788 l1RL: www.ESILiners.cvm