WATERGARDEN ELECTRICAL UPGRADES
PROJECT NO. E10202
(Revised 6/27/99)
Table of Contents
NOTICE TO CONTRACTORS - A (Revised March 2009)
Insurance Requirements
NOTICE TO CONTRACTORS - B
Worker's Compensation Coverage for Building, or Construction'Projects for
Government Entities
PART A - SPECIAL PROVISIONS
A I Time and Plaee of . Reeeiving Prepesals�Pre Bid meeting
A -2 Definitions and Abbreviations
A -3 Description of Project
A -4 Method of Award /Explanation of Bid Items
A -5 Items to be Submitted with Proposal
A -6 Time of Completion /Liquidated Damages
A -7 Workers Compensation Insurance Coverage
71_8 __Faa ed Pr.-peree l - e
A -9 Acknowledgment of Addenda
A -10 Wage Rates
A -11 Cooperation with Public Agencies
A -12 Maintenance of Services
A -13 Area Access and Traffic Control
A 714 Construction Equipment Spillage and Tracking
A -15 Excavation and Removals
A-16 Disposal /Salvage of Materials
A I;E Fiel eff (NOT USED)
A -18 Schedule and Sequence of Construction
A -19 Construction Project Layout and Control
A -20 Testing and.Certification
A 21 PEej eet Signs (NOT USED)
A -22 Minority /Minority Business Enterprise Participation Policy
A -23 Inspection Required
A -24 Surety Bonds
A 25 S a l es __ Tax E..e,....tie (NO LONGER APPLICABLE) (6/11/98)
A-26 Supplemental Insurance Requirements
(NOT USED)
A - 28 Considerations for Contract Award and Execution
A -29 Contractor's Field Administration Staff
A -30 Amended "Consideration of Contract" Requirements
A -31 Amended Policy on Extra Work and Change Orders
A -32 Amended "Execution of Contract" Requirements
A -33 Conditions of Work
A -34 Precedence of Contract Documents
A 3S City Water Faeilities Speeial Requirements (NOT USED)
A -36 Other Submittals
A 37 .. e , ArrwV meat and Charge fer -Water PurpAshed by Git-y'
A -38 Worker's Compensation Coverage for Building or Construction
Government Entities
A 39 Gerti €ieate of Geeupaney and Final Aeeeptanee (NOT USED)
A -40 Amendment to Section B -8 -6: Partial Estimates
A -41 Ozone Advisory
A -42 OSHA Rules & Regulations
A -43 Amended Indemnification & Hold Harmless (9/98)
A -44 Change Orders (4/26/99)
A -45 As -Built Dimensions and Drawings
A 46 D isposa l of Highly c l ..te.7 a te_,._��_ /_c /nn�
A 47 Pre n. . a .. F Ep . „t H , tl ( 7 1 5 1 nn
A -48 Overhead Electrical Wires
A- 49 Amended "Maintenance Guaranty" (8/24/00)
(Revised 10198)
(NOT USED)
Projects for
A -50 Amended Prosecution and Progress
FQ
A 53 Dust Gemm
PART B - GENERAL PROVISIONS
PART C - FEDERAL WAGE RATES AND REQUIREMENTS
PART 8 STANDARD SPECIFIG&TIGNs
PART.T - TECHNICAL SPECIFICATIONS
Section 16000 - Electrical
PART W DRAWINGS
AFFIDAVIT & WAIVER OF LIEN
AGREEMENT
PROPOSAL /DISCLOSURE STATEMENT
PERFORMANCE BOND
PAYMENT BONA
Table of Contents
Page 2 of 2
NOTICE TO CONTRACTORS -,A
NOTICE TO CONTRACTORS - A
(Revised June 2010)
INSURANCE REQUIREMENTS
I. CONTRACTOR'S LIABILITY INSURANCE
w . A. The Contractor shall not commence work under this Agreement until he /she
has obtained all insurance required herein and such insurance has been
approved by the City. Nor shall the Contractor allow any subcontractor to
commence work until all similar insurance required of the subcontractor has
been so obtained.
B. The Contractor shall furnish two (2) copies of certificates, with the City named
as an additional insured, showing the following minimum coverage in an
insurance company acceptable to the City.
TYPE OF INSURANCE
MINIMUM INSURANCE COVERAGE
30 -Day Notice of Cancellation required on all certificates
Bodily Injury and Property Damage
PER OCCURRENCE AGGREGATE
Commercial General Liability, including:
$2,000,000 COMBINED SINGLE LIMIT
1. Commercial f=orm
2. Premises - Operations
3.. Explosion and Collapse Hazard
4. Underground Hazard
5. Products /Completed Operations Hazard
6. Contractual Liability
7. Broad Form Property Damage
8. Independent Contractors
9. Personal Inju
AUTOMOBILE LIABILITY - OWNED NON -OWNED
$1,000,000 COMBINED SINGLE LIMIT
OR RENTED
WHICH COMPLIES WITH THE TEXAS WORKERS'
WORKERS' COMPENSATION
COMPENSATION ACT AND PARAGRAPH II OF
THIS EXHIBIT
EMPLOYERS' LIABILITY
$100,000
EXCESS LIABILITY
$1,000,000 COMBINED SINGLE LIMIT
PROFESSIONAL POLLUTION LIABILITY/
$2,000,000 COMBINED SINGLE LIMIT
ENVIRONMENTAL IMPAIRMENT COVERAGE
Not limited to sudden & accidental. discharge; to
include long -term environmental impact for the
❑ REQUIRED
disposal of contaminants
X NOT REQUIRED
See Section B -6 -11 & Supplemental
BUILDERS' RISK
Insurance Requirements
❑ REQUIRED X NOT REQUIRED
$100,000 COMBINED SINGLE LIMIT
INSTALLATION FLOATER
See Section B -6 -11 & Supplemental
Insurance Requirements
❑ REQUIRED X NOT REQUIRED.
Exhibit B - Insurance Requirements
Page 1 of 3
C. In the event of accidents of any kind, the CONTRACTOR shall furnish the CITY
with copies of all reports of such accidents at the same time that the reports
are forwarded to any other interested parties.
II. INDEMNIFICATION AND HOLD HARMLESS
A. CONTRACTOR shall indemnify, save harmless and defend the City of
Corpus Christi, and its agents, servants, and employees, and each of
them against and hold it and them harmless from any and all
lawsuits, claims, demands, liabilities, losses and expenses, including
court costs and attorneys' fees, for or on account of any injury to any
person, or any death at any time resulting from such injury, or any
damage to any property, which may arise or which may be alleged to
have arisen out of or in connection with the work covered by this
contract. The foregoing indemnity shall apply except if such injury,
death or damage is caused solely by the negligence or other fault of
the City of Corpus Christi, its agents, servants, or employees or any
other person indemniffed hereunder.
B. The CONTRACTOR shall obtain workers' compensation insurance coverage
through a licensed insurance company or through self - insurance obtained in
accordance with Texas law. If such coverage is obtained through a licensed
insurance company, then the contract for coverage shall be written on a
policy and endorsements approved by the Texas State Board of Insurance.
If such coverage is provided through, self - insurance, then within ten (10)
calendar days after the City requests that the Contractor sign the contract
documents, the Contractor shall provide the City with a copy of its certificate
of authority to self- insure its workers' compensation coverage, as well as a
letter, signed by the Contractor, stating that the certificate of authority to
self- insure remains in effect and is not the subject of any revocation
proceeding then pending before the Texas Workers' Compensation
Commission. Further, if at any time before final acceptance of the Work by
the City, such certificate of authority to self - insure is revoked or is made the
subject of any proceeding which could result in revocation of the certificate,
then the Contractor shall immediately provide written notice of such facts to
the City, by certified mail, return receipt requested, directed to: City of w
Corpus Christi, Department of Engineering Services, P. O. Box.9277, Corpus
Christi, Texas 78469, Attention: Contract Administrator.
Whether workers' compensation insurance coverage is provided through a
licensed insurance company or through self- insurance, the coverage provided
must be in an amount sufficient to assure that all workers' compensation
obligations incurred by the Contractor will be promptly met.
Exhibit B - Insurance Requirements .
Page 2 of 3
rl-
r_
C. Builder's Risk Coverage CONTRACTOR will be responsible for providing
builder's risk insurance coverage for the term of the contract up to and
including the date the CITY finally accepts the project or work. Builder's risk
coverage shall be an "All Risk" form. The policy shall be a completed value
form. The CONTRACTOR shall provide such builder's risk coverage at least in
the amount of $ N A ( N/A Dollars ), which is estimated to be the
value at completion of the real or personal property to be constructed,
repaired or otherwise improved under the contract.
CONTRACTOR shall be responsible for paying all costs necessary to procure
such builder's risk insurance coverage, including any deductible. The CITY
shall be named an additional insured on any policy providing such
insurance coverage.
III. ON THE CERTIFICATE OF INSURANCE:
• The CITY OF CORPUS CHRISTI is to be named as an additional insured
on the certificate and by endorsement on the liability coverage, except
for workers' compensation coverage.
• For each insurance coverage, the Contractor shall obtain an .endorsement to
the applicable insurance policy, signed by the insurer, providing the city with
thirty (30) days prior written notice of cancellation of or material change on.
any coverage.
• The NAME OF THE PROJECT should also be listed under "description of
operations
Exhibit B - Insurance Requirements
Page 3 of 3
NOTICE TO CONTRACTORS B
NOTICE TO CONTRACTORS - B
WORKER'S COMPENSATION INSURANCE
REQUIREMENTS
Texas Administrative Code
TITLE 28 INSURANCE
PART 2 TEXAS DEPARTMENT OF INSURANCE, DIVISION OF
WORKERS' COMPENSATION
CHAPTER 110 REQUIRED NOTICES OF COVERAGE
SUBCHAPTER B EMPLOYER NOTICES
RULE §110.110 Reporting Requirements for Building or Construction
Projects for Governmental Entities
(a) The following words and terms, when used in this rule, shall have the following meanings, W
unless the context clearly indicates otherwise. Terms not defined in this rule shall have the
meaning defined in the Texas Labor Code, if so defined.
(1). Certificate of coverage (certificate) - -A copy of a certificate of insurance, a certificate of
authority to self-insure issued by the commission, or a workers' compensation coverage
agreement (TWCC -81, TWCC-82, TWCC -83, or TWCC -84), showing statutory workers' ti
compensation insurance coverage for the person's or entity's employees (including those subject
to a coverage agreement) providing services on a project, for the duration of the project.
(2) Building or construction- -Has the meaning defined in the Texas Labor Code,
§406.096(e)(1).
(3) Contractor - -A person bidding for or awarded a building or construction project by a
governmental entity.
(4) Coverage -- Workers' compensation insurance meeting the statutory requirements of the
Texas Labor Code, §401.0.11(44).
(5) Coverage agreement - -A written agreement on form TWCC -81, form TWCC -82, form
TWCC -83, or form TWCC -84, filed with the Texas Workers' Compensation Commission which
establishes a relationship between the parties for purposes of the Texas Workers' Compensation
Act pursuant to the Texas Labor Code, Chapter 406, Subchapters F and G, as one of
employer /employee and establishes who will be responsible for providing workers'
compensation coverage for persons providing services on the project.
(6) Duration of the project -- Includes the time from the beginning of work on the project until
the work on the project has been completed and accepted by the governmental entity.
(7) Persons providing services on the project ( "subcontractor" in §406.096 of the Act) - -With the
exception of persons excluded under subsections (h) and (i) of this section, includes all persons
or entities performing all or part of the services the contractor has undertaken to perform on the
project, regardless of whether that person contracted directly with the contractor and regardless
of whether that person has employees. This includes but is not limited to independent
contractors, subcontractors, leasing companies, motor carriers, owner - operators, employees of
any such entity, or employees of any entity furnishing persons to perform services on the project.
Page 2 of 11
"Services" includes but is not limited to providing, hauling, or delivering equipment or materials,
or providing labor, transportation, or other service related to a project. "Services" does not
include activities unrelated to the project, such as food/beverage vendors, office supply
deliveries, and delivery of portable toilets.
(S) Project -- Includes the provision of all services related to a building or construction contract
for a governmental entity.
(b) Providing or causing to be provided a certificate of coverage pursuant to this rule is a
representation by the insured that all employees of the insured who are providing services on the
project are covered by workers' compensation coverage, that the coverage is based on proper
reporting of classification codes and payroll amounts, and that all coverage agreements have
been filed with the appropriate insurance carrier or, in the case of a self - insured, with the
commission's Division of Self-Insurance Regulation. Providing false or misleading certificates of
coverage, or failing to provide or maintain required coverage, or failing to report any change that
materially affects the provision of coverage may subject the contractor or other person providing
services on the project to administrative penalties, criminal penalties, civil penalties, or other
civil actions.
(c) A governmental entity that enters into a building or construction contract on a project shall:
(1) include in the bid specifications, all the provisions of paragraph (7) of this subsection, using
the language required by paragraph (7) of this subsection;
(2) as part of the contract, using the language required by paragraph (7) of this subsection,
require the contractor to perform as required in subsection (d) of this section;
(3) obtain from the contractor a certificate of coverage for each person providing services on
the project, prior to that person beginning work on the project;
(4) obtain from the contractor a new certificate of coverage showing extension of coverage:
(A) before the end of the current coverage period, if the contractor's current certificate of
coverage shows that the coverage period ends during the duration of the project; and
(B) no later than seven days after the expiration of the coverage for each other person
providing services on the project whose current certificate shows that the coverage period ends
during the duration of the project;
(5) retain certificates of coverage on file for the duration of the project and for three years
thereafter;
(6) provide a copy of the certificates of coverage to the commission upon request and to any
person entitled to them by law; and
(7) use the language contained in the following Figure 1 for bid specifications and contracts,
without any additional words or changes, except those required to accommodate the specific
document in which they are contained or to impose stricter standards of documentation: Attached
Graphic
Page,3 of 11
(d) A contractor shall:
(1) provide coverage for its employees providing services on a project, for the duration of the w
project based on proper reporting of classification codes and payroll amounts and filing of any
coverage agreements;
(2) provide a certificate of coverage showing workers' compensation coverage to the
governmental entity prior to beginning work on the project;
(3) provide the governmental entity, prior to the end of the coverage period, a new certificate. of
coverage showing extension of coverage, if the coverage period shown on the contractor's
current certificate of coverage ends during the duration of the project;
(4) obtain from each person providing services on a project, and provide to the governmental
entity:
(A) a certificate of coverage, prior to that person beginning work on the project, so the
governmental entity will have on file certificates of coverage showing coverage for all persons
providing services on the project; and
(B) no later than seven days after receipt by the contractor, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of L
coverage ends during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project and for one
year thereafter;
(6) notify the governmental entity in writing by certified mail or personal delivery, within ten
days after the contractor knew or should have known, of any change that materially affects the
provision of coverage of any person providing services on the project; -
(7) post a notice on each project site informing all persons providing services on the project that
they are required to be covered, and stating how a person may verify current coverage and report w
failure to provide coverage. This notice does not satisfy other posting requirements imposed by
the Act or other commission rules. This notice must be printed with a title in at least 30 point
bold type and text in at least 19 point normal type, and shall be in both English and Spanish and
any other language common to the worker population. The text for the notices shall be the
following text provided by the commission on the sample notice, without any additional words
or changes: Attached graphic
(8) contractually require each person with whom it contracts to provide services on a project to:
(A) provide coverage.based.on proper reporting of classification codes and payroll amounts 4
and filing of any coverage agreements for all of its employees providing services on the project,
for the duration of the project;
(B) provide a certificate of coverage to the contractor prior to that person beginning work on W
the project;
(C) include in all contracts to provide services on the project the language in subsection (e)(3)
of this section;
Page 4 of 11
(D) provide the contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the current certificate
of coverage ends during the duration of the project;
(E) obtain from each other person with whom it contracts, and provide to the contractor:
(i) a certificate of coverage, prior to the other person beginning work on the project; and
(ii) prior to the end of the coverage period, a new certificate of coverage showing extension
of the coverage period, if the coverage period shown on the current certificate of coverage ends
during the duration of the project;
(F) retain all required certificates of coverage on file for the duration of the project and for one
year thereafter;
(G) notify the governmental entity in writing by certified mail or personal delivery, within ten
days after the person knew or should have known, of any change that materially affects the
provision of coverage of any person providing services on the project; and
(M contractually require each other person with whom it contracts, to perform as required by
subparagraphs (A) -(H) of this paragraph, with the certificate of coverage to be provided to the
person for whom they are providing services.
(e) A person providing services on a project, other than a contractor, shall:
(1) provide coverage for its employees providing services on a project, for the duration of the
project based on proper reporting of classification codes and payroll amounts and filing of any
coverage agreements;
(2) provide a certificate of coverage as required by its contract to provide services on the
project, prior to beginning work on the project;
(3) have the following language in its contract to provide services on the project: 'By signing.
this contract or providing or causing to be provided a certificate of coverage, the person signing
this contract is representing to the governmental entity that all employees of the person signing
this contract who will provide services on the project will be covered by workers' compensation
coverage for the duration of the. project, that the coverage will be based on proper reporting of
classification codes and payroll amounts, and that all coverage agreements will be filed with the
appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of
Self - insurance Regulation. Providing false or misleading information may subject the contractor
to administrative penalties, criminal penalties, civil penalties, or other civil actions."
(4) provide the person for whom it is providing services on the project, prior to the end of the
coverage period shown on its current certificate of coverage, a new certificate showing extension
of coverage, if the coverage period shown on the certificate of coverage ends during the duration
of the project;
(5) obtain from each person providing services on a project under contract to it, and provide as
required by its contract:
(A) a certificate of coverage, prior to the other person beginning work on the project; and
(B) prior to the end of the coverage period, a new certificate of coverage showing extension of
the coverage period, if the coverage period shown on the current certificate of coverage ends
during the duration of the project;
Page 5 of 11
(6) retain all required certificates of coverage on file for the duration of the project and for one
year thereafter;
(7) notify the governmental entity in writing by certified mail or personal delivery, of any
change that materially affects the provision of coverage of any person providing services on the
project and send the notice within ten days after the person knew or should have known of the
change; and
(S) contractually require each other person with whom it contracts to: u�
(A) provide coverage based on proper reporting of classification codes and payroll amounts
and filing of any coverage agreements for all of its employees providing services on the project,
for the duration of the project;
(B) provide a certificate of coverage to it prior to that other person beginning work on the
project;
(C) include in all contracts to provide services on the project the language in paragraph (3) of
this subsection;
(D) provide, prior to the end of the coverage period, a new certificate of coverage showing
extension of the coverage period, if the coverage period shown on the current certificate of
coverage ends during the duration of the project;
(E) obtain from each other person under contract to it to provide services on the project, and
provide as required by its contract:
(i) a certificate of coverage, prior to the other person beginning work on the project; and
(ii) prior to the end of the coverage period, a new certificate of coverage showing extension
of the coverage period, if the coverage period shown on the current certificate of coverage ends
during the duration of the contract;
(F) retain all required certificates of coverage on file for the duration of the project and for one
year thereafter;
(G) notify the governmental entity in writing by certified mail or personal delivery, within ten
days after the person knew or should have known, of any change that materially affects the
provision of coverage of any person providing services on the project; and
(H) contractually require each person with whom it contracts, to perform as required by this
subparagraph and subparagraphs (A) -(G) of this paragraph, with the certificate of coverage to be
provided to the person for whom they are providing services.
(f) If any provision of this rule or its application to any person or circumstance is held invalid,
the invalidity does not affect other provisions or applications of this rule that can be given effect
without the invalid provision or application, and to this end the provisions of this rule are
declared to be severable.
(g) This rule is applicable for building or construction contracts advertised for bid by a
governmental entity on or after September 1, 1994. This rule is also applicable for those building
or construction contracts entered into on or after September 1, 1994, which are not required by
law to be advertised for bid.
Page 6 of 11
(h) The coverage requirement in this rule does not apply to motor carriers who are required
pursuant to Texas Civil Statutes, Article 6675c, to register with the Texas Department of
Transportation and who provide accidental insurance coverage pursuant to Texas Civil Statutes,
Article 6675c, §40).
(i) The coverage requirement in this rule does not apply to sole proprietors, partners, and
corporate officers who meet the requirements of the Act, §406.097(c), and who are explicitly
excluded from coverage in accordance with the Act, §406.097(a) (as added by House Bill 1089,
74th Legislature, 1995, § 1.20). This subsection applies only to sole proprietors, partners, and
corporate executive officers who are excluded from coverage in an insurance policy or certificate
of authority to self-insure that is delivered, issued for delivery, or renewed on oz after January 1,
1996.
Source Note: The provisions of this § 110.110 adopted to be effective September 1, 1994, 19
TexReg 5715; amended to be effective November 6, 1995, 20 TexReg 8609
Page 7 of 11
T28S 110.110(d)(7)
"REQUIRED WORKERS' COMPENSATION COVERAGE"
"The law requires that each person working on this site or providing services related to this
construction project must be covered by workers' compensation insurance. This includes persons
providing, hauling, or delivering equipment or materials, or providing labor or transportation or
other service related to the project, regardless of the identity of their employer or status as an
employee. "
"Call the Texas Workers' Compensation Commission at 512 -440 -3789 to receive information on
the legal requirement for coverage, to verify whether your employer has provided the required
coverage, or to report an employer's failure to provide coverage. "
Page 8 of 11
T28S 114.110(c)(7)
Article . Workers' Compensation Insurance Coverage.
A_ Definitions:
Certificate of coverage ( 'certificate')- A copy of a certificate of insurance, a certificate of
authority to self- insure issued by the commission, or a coverage agreement (TWCC -81; TWCC
82, TWCC83, or TWCC -84), showing statutory workers' compensation insurance coverage for'
the person's or entity's employees providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the project until the
contractor's /person's work on the project has been completed and accepted by the governmental
entity.
Persons providing services on the project ("subcontractor" in §406.096) - includes all persons
or entities performing all or part of the services the contractor has undertaken to perform on the
project, regardless of whether that person contracted directly with the contractor and regardless
of whether that person has employees. This includes, without limitation, independent
contractors, subcontractors, leasing companies, motor carriers, owner - operators, employees of
any such entity, or employees of arty entity which furnishes persons to provide services on the
project. "Services" include, without limitation, providing, hauling, or delivering equipment or
materials, or providing labor, transportation, or other service related to a project. "Services"
does not include activities unrelated to the project, such as food/beverage vendors, office supply
deliveries, and delivery ofportable toilets.
B. The contractor shall provide coverage, based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements, which meets the statutory requirements
of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services
on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior to
being awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends during
-` the duration of the project, the contractor must, prior to the end of the coverage period, file a
new certificate of coverage with the governmental entity showing that coverage has been
extended.
E. The contractor shall obtain from each person providing services on a project, and provide to
the governmental entity:
(1) a certificate of coverage, prior to that person beginning work on the project, so the
governmental entity will have on file certificates of coverage showing coverage for all persons
providing services on the project; and
(2) no later than seven days after receipt by the contractor, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project.
Page 9 of 11
F. The. contractor shall retain all required certificates of coverage for the duration of the project
and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or personal
delivery, within 10 days after the contractor knew or should have known, of any change that
materially affects the provision of coverage of anyperson providing services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Workers' Compensation Commission, informing all persons providing
services on the project that they are required to be covered, and stating how a person ma y. verify
coverage and report lack of coverage.
L The contractor shall contractually require each person with whom it contracts to provide
services on a project, to:
(1) provide coverage, based on proper reporting of classification codes and payroll amounts and
filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code,
Section 401.011(44) for all of its employees providing services on the project, for the duration of
the project;
(2) provide to the contractor, prior to that person beginning work on the project, a certificate of
coverage showing that coverage is being provided for all employees of the person providing
services on the project, for the duration of the project,
(3) provide the contractor, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project,
(4) obtain from each other person with whom it contracts, and provide to the contractor:
(a) a certificate of coverage, prior to the other person beginning work on the project; and
(b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage
period if the coverage period shown on the current certificate of coverage ends during the
duration of the project,
(5) retain all required certificates of coverage on fi le for the duration of the project and for one
year thereafter;
(6) notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the person knew or should have known, of any change that materially affects the
provision of coverage of any person providing services on the project; and
(7) contractually require each person with whom it contracts, to perform as required by
paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they
are providing services.
J. By signing this contract or providing or causing to be provided a certificate of coverage, the
contractor is representing to the governmental entity that all employees of the contractor who
will provide services on the project will be covered by workers' compensation coverage for the
duration of the project, that the coverage will be based on proper reporting of classification
codes and payroll amounts, and that all coverage agreements will be filed with the appropriate
insurance carrier or, in the case of a self - insured with the commission's Division of Self-
Page 10 of 11
Insurance Regulation. Providing false or misleading information may subject the contractor to
administrative penalties, criminal penalties, civil penalties, or other civil actions.
K The contractor's failure to comply with any of these provisions is a breach of contract by the
contractor which entitles the governmental entity to declare the contract void if the contractor
does not remedy the breach within ten days after receipt of notice of breach from the
governmental entity.
Page 11 of 11
PART A - SPECIAL PROVISIONS
NSW FIRE DEPARTMENT MAINTAINENCE
FACILITY LANDSCAPE IMPROVEMENT
PROJECT NO. 5244
SECTION A - SPECIAL PROVISIONS
rM
A -2 Definitions and Abbreviations
Section S -1 of the General Provisions will govern.
A -3 Description of Project
Watergrarden Electrical Upgrades -
Project No. E10202;
The project for the Water Garden located at 1900 N. Chaparral St.; consists of
replacing several electrical components to restore operation. The following
provides a more detailed description of the work:
• Removal and replacement of the Main Distribution Center and all related
components.
• Removal and replacement of the F'LA Panel and all related components..
• Removal and replacement of the LP Panel and all related components.
• Removal and replacement of the 112.5 KVA Transformer and all related
components.
• Removal and replacement of the Control Cabinet and components.
Section A - SP
- (Revised 12/15/D4)
Page 1 of 25
OFF
-W
A -2 Definitions and Abbreviations
Section S -1 of the General Provisions will govern.
A -3 Description of Project
Watergrarden Electrical Upgrades -
Project No. E10202;
The project for the Water Garden located at 1900 N. Chaparral St.; consists of
replacing several electrical components to restore operation. The following
provides a more detailed description of the work:
• Removal and replacement of the Main Distribution Center and all related
components.
• Removal and replacement of the F'LA Panel and all related components..
• Removal and replacement of the LP Panel and all related components.
• Removal and replacement of the 112.5 KVA Transformer and all related
components.
• Removal and replacement of the Control Cabinet and components.
Section A - SP
- (Revised 12/15/D4)
Page 1 of 25
A -4 Method of Award
The Contract is awarded as a Job Order Contract (JOC) and prices established
through the use of RSmeans cost pricing
A -5 Items to be Submitted with Proposal
The following items are required to be submitted with the proposal:
5% Bid Bead (Must refer-enee PAUL JONES AvMTUE � HOLT=Y RQAD RXMB . NSMG
2. Disclosure of Interests Statement
3. Submittal of Materials
A -6 Time of COmPletion/Liquidated.Damages
The working time for completion of the Project will be 75 calendar days The
Contractor shall. commence work within ten (10) calendar days after receipt of
written notice from the Director of Engineering services or designee ( "City
Engineer ") to proceed.
For each calendar day that any work remains incomplete after the time specified
in the Contract for completion of the work or after such time period as extended
pursuant to other provisions of this Contract, FIVE HUNDRED DOLLARS ($500.00)
per calendar day will be assessed against the Contractor as liquidated damages.
Said liquidated damages are not imposed as a penalty but as an estimate of the
damages that the City will sustain from delay in completion of the work, which
damages by their nature are not capable of precise proof. The Director of
Engineering Services (City Engineer) may withhold and deduct from monies
otherwise due the Contractor the amount of liquidated damages due the City.
A -7 Workers Compensation Insurance Coverage
I€ the Contractor's workers' compensation insurance coverage for its employees
working on the Project is terminated or canceled for any reason, and replacement
workers' compensation insurance coverage meeting the requirements of this
Contract is not in effect on the effective date of cancellation of the workers'
compensation insurance coverage to be replaced, then any Contractor employee not
covered by the required workers' compensation insurance coverage must not
perform any work on the Project.
Furthermore, for each calendar day including and after the effective date of
termination or cancellation of the Contractor's workers' compensation insurance
coverage for its employees working on the Project until the date replacement
workers' compensation insurance coverage, meeting the requirements of this
Contract, is in effect for those Contractor employees, liquidated damages will
be assessed against ad paid by the Contractor at the highest daily rate
elsewhere specified in this Contract. Such liquidated damages will accumulate
without notice from the City Engineer to the. Contractor and will be assessed and
paid even if the permitted time to complete the Project has not expired.
In accordance with other requirements
permit subcontractors or others to
individuals working on the Project
of this Contract, the Contractor shall not
work on the Project unless all such
are covered by workers' compensation
Section A - SP
(Revised 12 /15/04)
Page 2 of 25
insurance and unless the required documentation of such coverage has been
provided to the Contractor and the City Engineer.
A 8 Famed Prep als
Prepesals— feed— direetly to the - --city will be— eenside:-r-ed een respenei�
u.e.eer- dane.e ➢�� of the General Previeiens.
' tY :�eetiex�
,
A -10 Wage Rates (Revised. 7/5/00)
Labor preference and wage rates for BUILDING CONSTRUCTION in ease of eenfliet,
Minimum Prevailing Wage Scales
The Corpus Christi City Council has determined the general prevailing minimum
hourly wage rates for Nueces County, Texas as set out in Part C. The Contractor
and any subcontractor must not pay less than the specified wage rates to all
laborers, workmen, and mechanics employed by them in the execution of the
Contract. The Contractor or subcontractor shall forfeit sixty dollars ($60.00)
per calendar day, or portion thereof, for each laborer, workman, or mechanic
employed, if such person is paid less than the specified rates for the
classification of work performed. The Contractor and each subcontractor must
keep an accurate record showing the names and classifications of all laborers,
workmen, and mechanics employed by them in connection with the Project and
showing the actual wages paid to each worker.
The Contractor will make bi- weekly certified payroll submittals to the City
Engineer. The Contractor will also obtain copies of such certified payrolls from
all subcontractors and others working on the Project. These documents will also
be submitted to the City Engineer bi- weekly. (See section for Minority /Minority
Business Enterprise Participation Policy for additional requirements concerning
the proper form and content of.the payroll submittals.)
One and one - half (1%) times the specified hourly wage must be paid for all hours
worked in excess of 40 hours in any one week and for all hours worked on Sundays
or holidays. (See Section B -1 -1, Definition of Terms, and Section B -7 -6,
Working Hours.)
A -11 Cooperation with Public Agencies (Revised 7/5/00)
The Contractor shall cooperate with all public and private agencies with
facilities operating within the limits of the Project. The. Contractor shall
provide a forty -eight (48) hour notice to any applicable agency when work is
anticipated to proceed in the vicinity of any facility by using the Dig Tess at
1- 800 - 344 -8377, the Lone Star Notification Company at 1- 800 - 669 - 8344, and the
Verizon Dig Alert at 1- 800 -483 -6279. For the Contractor's convenience, the
following telephone numbers are listed.
Section A - SP
(Revised 12/15104)
Page 3 of 25
City Engineer
Traffic Engineering
Police Department
Water Department
Wastewater Department
Gas Department
Storm Water Department
Parks & Recreation Department
Streets & Solid Waste Services
A E P
S B C /At &T
City Street Diva for Traffic
Signal /Fiber Optic Locate
Cablevision
ACSI (Fiber Optic)
KMC (Fiber Optic)
ChoiceCom (Fiber Optic)
CAPROCK (Fiber Optic)
Brooks Fiber Optic (MAN)
A -12 Maintenance of Services
826 -3500
826 -3540
882 -2600
826 -1881 (826 -1888 after hours)
826 --1800 (826 -1888 after hours)
885 -6900 (885 -6900 after hours)
826 -1875 (826 -1888 after hours)
826 -3461
826 -1970
1- 877 - 373 -4058
881 -2511 (1 -800- 824 -4424, after hours)
826 -1946 826 -3547
857 -5000 (857 -5060, after hours)
887 --9200 (pager 800- 724 -3624)
813 -1124 (Pager 888- 204 - 1679)
881 -5767 (pager 850 -2981)
512/935 -0958 (Mobile)
972 - 753 -4355
The Contractor shall take all precautions in protecting existing utilities, both
above and below ground. The Drawings show as much information as can be
reasonably obtained from existing as -built drawings, base maps, utility records,
etc. and from as much field work. as normally deemed necessary for the
construction of this type of project with regard to the location and nature of
underground utilities, etc. However, the accuracy and completeness of such
information is not guaranteed It is the Contractor's sole and complete
responsibility to locate such underground features sufficiently in advance of
his operations to preclude damaging the existing facilities. If the Contractor
encounters utility services along the line of this work, it is his
responsibility to maintain the services in continuous operation at his own
expense.
In the event of damage to underground utilities, whether shown in the drawings,
the Contractor shall make the necessary repairs to place the utilities back in
service to construct the work as intended at no increase in the Contract price.
All such repairs must conform to the - requirements of the company or agency that
owns the utilities. 4
Where existing sewers are encountered and are interfered with U..e. broken, cut,
etc.) , flow must be maintained. Sewage or other liquid must be handled by the
Contractor either by connection into other sewers or by temporary pumping to a
satisfactory outlet, all with the approval of the City Engineer. Sewage or
other liquid must not be pumped, bailed or flumed over the streets or ground
surface and Contractor must pay for all fines and remediation that may result if
sewage or other liquid contacts the streets or ground surface. It is also the
Contractor's responsibility to make all necessary repairs, relocations and
adjustments to the - satisfaction of the City Engineer at no' increase in the
Contract price. Materials for repairs, adjustments or relocations of sewer
service lines must be provided.by the Contractor.
A -13 Area Access and Traffic Control
Sufficient traffic control measures must be used to assure a safe condition and
to provide a minimum of inconvenience to motorists and the public.
The Contractor will be required to schedule his operations so as to cause
minimum adverse impact on the accessibility of the public. This may include, but
is not limited to, working driveways in half widths, construction of temporary
Section A - SP - -
(Revised 12/15/04)
Page 4 of 25
ramps, etc.
The Contractor shall comply with the City. of Corpus Christi's Uniform
Barricading Standards and Practices as adopted by the City. Copies of this
document are available through the City's Traffic Engineering Department. The
Contractor shall secure the necessary permit from the City's Traffic Engineering
Department.
All costs for traffic control shall be as shown in the proposal.
A -14 .Construction Equipment Spillage and Trackin
The Contractor shall keep the adjoining streets free of tracked and /or spilled
materials going to or from the construction area. Hand labor and /or mechanical
equipment must be used where necessary to keep these roadways clear of job -
related materials. Such work must be completed without any increase in the
Contract price.
Streets and curb line must be cleaned at the end of the work day or more
frequently, if necessary, to prevent material from washing into the storm sewer
system. No visible material that could be washed into storm sewer is allowed to
remain on the Project site or adjoining streets.
A -15 Excavation and Removals
The excavated areas behind curbs and adjacent to sidewalks and driveways must be
filled with "clean" dirt. "Clean" dirt is defined as dirt that is capable of
providing a good growth of grass when applied with seed /sod and fertilizer. The
dirt must be free of debris, caliche, asphalt, concrete and any other material
that detracts from its appearance or hampers the growth of grass.
,All existing concrete and asphalt within the limits of the Project must be
removed unless otherwise noted.
All necessary removals including but not limited to pipe, driveways, sidewalks,
etc, are shown in the removal summary and paid for as shown in the proposal.
A -16 Disposal/ Salvage of Materials
Excess excavated material, broken asphalt, concrete, broken culverts and other
unwanted material becomes the property of the Contractor and must be removed
from the site by the Contractor. The cost of all hauling is considered
subsidiary; therefore, no direct payment will be made to Contractor.
A 17 Field Of-fiiee (NOT USED)
The Gentraeter- must furnish the Gity EngineeE.gr his r-epEesentati-ve with a field
effiee at the eenst:3.= site. The -field effiee must eentain at. least 9:20
heated and must be Parnished with an ilnleli-ned- table that measuEes at least 30 x-
60 and twe (2) shairs. The Gentraeter shall ineve the field effiee en the site
as r-e ir-ed by the City Ba 56neer er- his representative. The field effiee must be
furnished with a teiephqne (with 24 heuL- per- dW answer-Ing sea--vlee4 and FAY.
maehiRe paid fer by.the Gent:eaeter. TheEe is no separate pay item fer the fie!
effiee. This item shall be eensidered siabsidiaray to the appr-epriate bid items.
A -18 Schedule and_Semence of Construction.
The Contractor shall submit to the City Engineer a work plan based only on
t+ L =DAR days. This plan must detail the schedule of work and .must be submitted
Section A - SP
(Revised 12/15/04)
Page 5 of 25
to the City Engineer at least three (3) working days prior to the pre -
construction meeting.
The plan must indicate the schedule of the following work items:
1. Initial Schedule Submit to the City Engineer three (3) days prior to the
Pre - Constructions Meeting an initial Construction Progress Schedule for
review.
2. Items to Include Show complete sequence of construction by activity,
identifying Work of separate stages and other logically grouped activities.
Identify the first work day of each week.
3. Submittal Dates Indicate submittal dates required for all submittals.
4. Re- Submission Revise and resubmit as required by the City Engineer.
5. Periodic Update Submit Updated Construction Progress .Schedule to show
actual progress of each stage by percentage against initial Schedule= The
detailed updated construction progress schedule shall be submitted with the
monthly pay request.
For each calendar day that any work remains incomplete after the time specified
in the Contract for completion of the work or after such time period as extended
pursuant to other provisions of this Contract, $500.00 per calendar day will be
assessed against the Contractor as liquidated damages. Said liquidated damages r
are not imposed as a penalty but as an estimate of the damages that the City
will sustain from delay in completion of the work, which damages by their nature
are not capable of precise proof. The Director of Engineering Services (City
Engineer) may withhold and deduct from monies otherwise due to the Contractor
the amount of liquidated damages due to the City from the monthly pay estimate.
Days Allocation for Rain '
The contractor shall anticipate the following number of work days lost due to
rain in determining the contract schedule for each part of the contract. A rain
day is defined as any day in which the amount of rain measured by the National
Weather Service at the nearest location is 0.50 inch or greater. No extension
of time will be considered until the expected number of rain days has. been
exceeded and the Engineer has agreed that the status of construction was such
that there was an impact detrimental to the construction schedule.
January
3 Days
May
4 Days
September
7 Days
February
3 Days
June
4 Days
October
4 Days
March
2 Days
July
3 Days
November
3 Days
April
3 Days
August
4 Days
December
3 Days
Completion shall be based on satisfactory work, completed, tested, in accordance
with the plan, specifications, and contract documents and connected. to the
existing system, and accepted by the City for the entire project.
Certificate of Completion
The requirements to 'issue the Contractor a Certificate of Completion are the
following (Project Acceptance Procedures Check List):
(1) Final inspection (Contractor shall have red lined set ready to
submit to City with all corrections /notes - Engineering Services to
coordinate As- Built plan preparation with A/E Consultant).
(2) Inspector prepares final quantities, contractor evaluation form, and
project summary.
(3) Inspector /Engineer verifies that all submittals, payrolls,
Inspection Reports, As- Builts, O&M manuals (in electronic format as
Section A - SP
(Revised 12/15/04)
Page 6 of 25
required), SCADA documentation, and other Field Information are
complete.
(4) Contractor reviews and agrees to final quantities or differences
agreed upon by Contractor and Inspector.
(5) Final estimate reviewed by City Construction Engineer.
(5) City Construction Engineer submits to Engineering Administrative
Asst., the final estimate and Contractor evaluation form and Project
Acceptance Procedures Check List.
(7) Final payment checklist:
(a) Affidavit that all bills have been paid, "waiver of
Lien"
(b) Submittal of all remaining payrolls
(c) Submittal of MBE letter on what Contractor has actually
subcontracted through end of project
(d) if GBBG-- piaejeet, all federal €erm8 eempleted —and
wed
(8) Final Acceptance Memorandum prepared by Administrative Assistant.
(9) Administrative Asst. reviews for completeness, funding availability,
prepares financial paperwork.
(14) Administrative Asst. submits to director of Engineering
Services /operating Department Head for approval and forwarding to
Asst. City Manager.
(11) Final Acceptance memo returned from Asst. City Manager.
(12) Authorization for payment (AFP) prepared and submitted to Accounting
Department.
(13) Contractor receives final payment after City Council (if required or
Asst. City Manager accepts project.
(14) Administrative Asst. sends letter to Contractor informing him or her
when one -year warranty date begins (Acceptance Memorandum).
City acceptance of the project will be described in an Acceptance Memorandum to
the Contractor.
The warranty will begin on the date that the Acceptance Memorandum is issued to
the Contractor.
ME
Section A - SP
(Revised 12/15/04)
. Page 7 of 25
eentFel of the werk -.
Engineer at the - eRse- ef- the - Ge�r��aeter.
Section A - SP
(Revised 12/15/04)
. Page 7 of 25
L� l
J the Gentraeter shall pr-evide
The Gentraeter shall tie in er- refeL-enee all —1-o:es and , both exjs-t-i�
and f
assisting the measuring ef the eempleted werls.
Werle. Any diser-epaneies shall be neted by the Third Party or in house SurmveyeE
Streets
•— All -eur -b rettiras cat -p eint of ta cif- e" mfer-eaee
Gu�-b and 9:utter flew line beth sides ef street en a 200 Interval;
Street awewns- -en a 298' interval and at al! inter
Wastewater:
,,4 xver-t elevatiens at rrtaiiheles,
• All interseeti l ines
• 0--a-s-ing eie-e:atiens (top ef pipe and flew line) (T-XDGEP and RR permit6).
Water:
• —All tep- ef- valves b 93 _
Valves . .. l- t s '
- TMf
Stormwater:
All rirtt invert ele- vatiens -at manholee;-
• A!! interseeting lines in manheles J
•— CasiRq elevat }ens --- Step --e-f- nine -a*td flew ( u line. GEP a nd Pa perm its)
J L + +i
A -20 Testina and Certification
All tests required under this item must be done by a recognized testing
laboratory selected by the City Engineer. The cost of the laboratory testing
will be borne by the City. In the event that any test fails, that test must be
done over after corrective measures have been taken, and the cost of retesting
will be borne by the Contractor and deducted from the payment to the Contractor.
The Contractor must provide all applicable certifications to the City Engineer.
A -21 Project Signs (NOT USED)
1 P1111
Section A - SP
(Revised 12/15/04)
Page 8 of 25
A -22 Minority/Minority Minority/Minority Business Enterprise Participation Policy (Revised 10/96)
1. Policy
it is the policy of the City of Corpus Christi that maximum opportunity is
afforded minorities, women and Minority Business Enterprises to participate
in the performance of contracts awarded by the City of Corpus Christi in
support of Equal Employment Opportunity goals and objectives of the
Affirmative Action Policy Statement of the City dated October, 1989, and
any amendments thereto. In accordance with such policy, the City has
established goals, as stated herein, both for minority and female
participation by trade and for Minority Business Enterprise.
2. Definitions
a. Prime Contractor Any person, firm, partnership, corporation,
association or joint venture as herein provided which has been awarded.
a City contract.
b. Subcontractor Any named person, firm, partnership, corporation,
association, or joint venture as herein identified as providing work,
labor, services, supplies, equipment, materials or any combination of
the foregoing under contract with a prime contractor on a City
contract.
C. Minority Business Enterprise A business enterprise that is owned and
controlled by one or more minority person(s) . Minority persons
include Blacks, Mexican - Americans and other persons of Hispanic
origin, American Indians, Alaskan Natives, and Asians or Pacific
Islanders. For the purposes of this section, women are also
considered as minorities. Minority person(s) must collectively own,
operate and /or actively manage, and share in payments from such an
enterprise in the manner hereinafter set forth:
1. owned
(a) For a sole proprietorship to be deemed a minority
business enterprise, it must be owned by a minority
person.
(b) For an enterprise doing business as a partnership, at
least 51.0% of the assets or interest in the partnership
property must be owned by one or.more minority person(s).
(c) For an enterprise doing business as a corporation, at
least 51.0% of the assets or interest in the corporate
shares must be owned by one or more minority person(s).
2. Controlled
The primary power, direct or indirect, to manage a business
enterprise rests with a minority person(s)-
3. Share in Payments
Minority partners, proprietor or stockholders, of the
�- enterprise, as the case may be, must be entitled to receive
51.0 °s or more of the total profits, bonuses, dividends,
interest payments, commissions, consulting fees, rents,
procurement, and subcontract payments, and any other monetary
distribution paid by the business enterprise.
Section A - SP
(Revised 12/15/04)
Page 9 of 25
i.
d.. Minority See definition under Minority Business Enterprise.
e. Female Owned Business Enterprise: A sole proprietorship that is owned
and controlled by a woman, a partnership at least 51.0% of whose
assets or partnership interests are owned by one or more women, or a
corporation at least 51.0% of whose assets or interests in the
corporate shares are owned by one or more women.
3.
4
f. Joint Venture A joint venture means an association of two or more
persons, partnerships, corporations, or any combination thereof,
founded to carry on a single business activity which is limited in
scope and direction. The degree to which a joint venture may satisfy
the stated MBE goal cannot exceed the proportionate interest of the
MBE as a member of the joint venture in the work to be performed by
the joint venture. For example, a joint venture which is to perform
50.0 of the contract work itself and in which a minority joint
venture partner has a 50.0% interest, shall be deemed equivalent to
having minority participation in 25.00 of the work. Minority members
of the joint venture must have either financial, managerial, or
technical skills in the work to be performed by the j.oint venture.
Goals
a. The goals for participation by minorities and Minority Business
Enterprises expressed in percentage terms for the Contractor's
t,J
aggregate work force on all construction work for the Contract award
are as follows:
Minority Participation. Minority Business Enterprise
(Percent) Participation. (Percent)
45 1s %
b. These goals are applicable to all the construction work (regardless of
federal participation) performed in the Contract, including approved
change orders. The hours of minority employment must be substantially
uniform throughout the length of the Contract,and in each trade. The
transfer of minority employees from Contractor to Contractor or from
project to project for the sole purpose of meeting the Contractor's
percentage is prohibited.
Compliance
a. upon completion. of. the Project, a final breakdown of MBE
participation, substantiated by copies of paid invoices, shall be
submitted by the Contractor to the City Engineer.
b. The Contractor shall make bi- weekly payroll submittals to the City
Engineer. The Contractor is to indicate the percent of minority and
female participation, by trade, which has been utilized on the
Project. Along with the request for final payment on the Project, the
Contractor will indicate, in writing, the overall participation in
these areas which have been achieved. The City Engineer may withhold.
monthly or final payments to the Contractor for failure to submit bi-
weekly.payrolls in a timely fashion or to submit overall participation
information as required.
Section, A - SP
(Revised 12/15/04)
Page 10 of 25
A -23 Inspection Required (Revised 7/5/00)
The Contractor shall assure the appropriate build inspections by the Building
inspection Division at the various intervals of work for which a permit is
required and to assure a final inspection a fter the building 4:9 eempleted a
applieable. Section B -6 -2 of the General Provisions is hereby amended in that
the Contractor must pay all fees and charges levied by the City's Building
inspection Department, and all other City fees, including water /wastewater meter
fees and tap fees as required by City.
A -24 Surety Bonds
Paragraph two (2) of Section B -3 -4 of the General Provisions is changed to read
as follows-.
"No surety will be accepted by the City from any Surety Company who is
now in default or delinquent on any bonds or who has an interest in
any litigation against the City. All bonds must be issued by an
approved Surety Company authorized to do business in the State of
Texas. if performance and payment bonds are in an amount in excess of
ten percent (10s) of the Surety Company's capital and surplus, the
Surety Company shall provide certification satisfactory to the City
Attorney that the Surety Company has reinsured the portion of the bond
amount that exceeds ten percent (10a) of the Surety Company's capital
and surplus with rei-nsurer(s) authorized to do business in the State
of Texas. The amount of the bond reinsured by any reinsures may not
exceed ten percent (10'6) of the reinsurer's capital and surplus. For
purposes of this section, the amount of allowed capital and surplus
will be verified through the State Board of Insurance as of the date
of the last annual statutory financial statement of the Surety Company
or reinsurer authorized and admitted to do business in the State of
Texas. The Surety shall designate an agent who is a resident of
Nueces County, Texas. Each bond must be.executed by the Contractor and
the Surety. For contracts in excess of $100,000 the bond must be
executed by a Surety company that is certified by the United States
Secretary of the Treasury or must obtain reinsurance for any liability
in excess of $100,000 from a reinsures that is certified by the United
States Secretary of the Treasury and that meets all the above
requirements. The insurer or reinsurer must be listed in the . Federal
Register as holding certificates of authority on the date the bond was
issued."
A - 25 Sales Tax Exemption (NO LONGER APPLICABLE)
fellewing substitrated - in lieu thereef.
Ghristi 12::� qualify for- e�Eemptiens ef sales, Baceise, and Use - Tames unless the
3.291 ef Ghapter- 3, E-9-am of Title 34, Publie Finanee of the Temae
19 the Gqntraeter- eleets to epei=ate under a separated eentr-aet he shall:
Section A - SP
(Revised 12/i5/04)
Page 11 of 25
inte the Pro j eet
.
prapesal value of
materi
, he Hl
eerti €ieate to his supp=se=
A -26 Supplemental Insurance Requirements
For each insurance coverage provided in accordance with Section B -6 -11 of the
Contract, the Contractor shall obtain an endorsement to the applicable insurance
policy, signed by the insurer, stating:
In the event of cancellation or material change that reduces or restricts
the insurance afforded by this coverage part, each insurer covenants to
mail prior written notice of cancellation or material change to:
1. Name: City of Corpus Christi
Engineering Services Department
Attn: Contract Administrator'
2. Address: P.O. Box 9277
Corpus Christi, 'Texas 78469 -9277
3. Number of days advance notice: 30
The Contractor shall provide to the City Engineer-the signed endorsements, or
copies thereof. certified by the insurer, within thirty (30) calendar days after
the date the City Engineer requests that the Contractor sign the Contract
documents.
Within thirty (30) calendar days after the date the City Engineer requests that
the Contractor sign the Contract documents, the Contractor shall provide the
City Engineer with a certificate of insurance certifying that the Contractor
provides worker's compensation insurance coverage for all employees of the
Contractor employed on the Project described in the Contract.
For each insurance coverage provided in accordance with Section B -6 -11 of the
Contract, the Contractor shall obtain an endorsement to the applicable insurance
policy, signed by the insurer,. stating that the City is an additional insured
under the insurance policy. The City need not be named as additional insured on
Worker's Compensation coverage.
For contractual liability insurance coverage obtained in accordance with Section
B -6 -11 (a) of the Contract, the Contractor shall obtain an endorsement to this
coverage stating:
Contractor agrees to indemnify, save harmless and defend the City, its
agents, servants, and employees, and each of them against and hold it
and them harmless from any and all lawsuits, claims, demands,
liabilities, losses and expenses, including court costs and attorneys'
fees, for or on account of any injury to any person, or any death at
Section A - SP
(Revised 12/15/04)
Page 12 of 25
` any time resulting from such injury, or any damage to any property,
which may arise or which may be alleged to have arisen out of or in
connection with the work covered by this Contract. The foregoing
_ indemnity shall apply except if such injury, death or damage is caused
directly by the negligence or other fault of the City, its agents,
servants, or employees or any person indemnified hereunder.
A -27 Responsibility for Damage Claims (NOT USED)
A -2$ Considerations for Contract Award and Execution
To allow the City Engineer to determine that the bidder is able to perform its
obligations under the proposed contract, then prior to award, the City Engineer
may require a bidder to provide documentation concerning:
1. Whether any liens have been .filed against bidder for either failure to pay
for services or materials supplied against any of its projects begun within
the preceding two (2) years. The bidder shall specify the name and address
of the party holding the lien, the amount of the lien, .the basis for the
lien claim, and the date of the release of the lien. If any such lien has
not been released, the bidder shall state why the claim has not been paid;
and
2'. Whether there are any outstanding unpaid claims against bidder for services
or materials supplied which relate to any of its projects begun within the
preceding two (2) years. The bidder shall specify the name and address of
the claimant, the amount of the claim, the basis for the claim, and an
explanation why the claim has not been paid.
A bidder may also be required to supply construction references and a financial
statement, prepared no later than ninety (94) days prior to the City Engineer's
request, signed and dated by the bidder's owner, president or other authorized
party, specifying all current assets and liabilities..
A -29 Contractor's Field Administration Staff
The Contractor shall employ for this Project, as its field administration staff,
superintendents and foremen who are careful and competent and acceptable to the
City Engineer.
The criteria upon which the City Engineer .makes this determination may include
the following:
1. The Superintendent must have at least . five (5) years recent experience in
field management and oversight of projects of a similar size and complexity
to this Project. This experience must include, but not necessarily limited
to, scheduling of manpower and materials, safety, coordination of
subcontractors, and familiarity with the submittal process, federal and
state wage rate requirements, and City contract close -out procedures..
Section A - SP
(Revised 12/15/04)
Page 13 of 25
be "All Perm.
Centr-aeter
eeverage Est -Ri-sk"
must pay all east_
a ;d
� _rrage-
p eli e i es e
A -2$ Considerations for Contract Award and Execution
To allow the City Engineer to determine that the bidder is able to perform its
obligations under the proposed contract, then prior to award, the City Engineer
may require a bidder to provide documentation concerning:
1. Whether any liens have been .filed against bidder for either failure to pay
for services or materials supplied against any of its projects begun within
the preceding two (2) years. The bidder shall specify the name and address
of the party holding the lien, the amount of the lien, .the basis for the
lien claim, and the date of the release of the lien. If any such lien has
not been released, the bidder shall state why the claim has not been paid;
and
2'. Whether there are any outstanding unpaid claims against bidder for services
or materials supplied which relate to any of its projects begun within the
preceding two (2) years. The bidder shall specify the name and address of
the claimant, the amount of the claim, the basis for the claim, and an
explanation why the claim has not been paid.
A bidder may also be required to supply construction references and a financial
statement, prepared no later than ninety (94) days prior to the City Engineer's
request, signed and dated by the bidder's owner, president or other authorized
party, specifying all current assets and liabilities..
A -29 Contractor's Field Administration Staff
The Contractor shall employ for this Project, as its field administration staff,
superintendents and foremen who are careful and competent and acceptable to the
City Engineer.
The criteria upon which the City Engineer .makes this determination may include
the following:
1. The Superintendent must have at least . five (5) years recent experience in
field management and oversight of projects of a similar size and complexity
to this Project. This experience must include, but not necessarily limited
to, scheduling of manpower and materials, safety, coordination of
subcontractors, and familiarity with the submittal process, federal and
state wage rate requirements, and City contract close -out procedures..
Section A - SP
(Revised 12/15/04)
Page 13 of 25
The superintendent shall be present, on the job site, at all times that work
is being performed.
2. Foremen, if utilized, shall have at least five (5) years recent experience .
iri similar work and be subordinate to the superintendent.
Foremen cannot act as superintendent without prior written approval from
the City.
Documentation concerning these requirements will be reviewed by the City
Engineer. The Contractor's field administration staff, and any' subsequent
substitutions or replacements thereto, must be approved by the City Engineer in
writing prior to such superintendent assuming responsibilities on the Project.
Such written approval of field administration staff is a prerequisite to the
City Engineers obligation to execute a contract for this Project. If such
approval is not obtained, the award may be rescinded. Further, such written
approval is also necessary prior to a change in field administration staff
during the term of this Contract. It the Contractor fails to obtain prior
written approval of the City Engineer concerning any substitutions or
replacements in its field administration staff for this Project during the term
of the Contract,. such a failure constitutes a basis to annul the Contract
pursuant to section B -7 -13.
All bidders (See Speeial Previsiait A 5 items to be Submitted
3 ). must submit te the City Engineer the foliewing
with-preposai, .
infeiematien, witTl it-M
Frepesal Form (Bid)--
?_ A list e€ the k.
eempenents of the we
eeitpe-nent —e€ the wer-,
Section ,A - SP
(.Revised 12/15/04)
Page 14 of 25
in the event that -- s4—;hPPP#:r-aE!ter- pr-evieusiy listed and appreved is seught
City Engineer r-etaies the right te approve any skib A-�-r- :-replaeement
will net be given if the rnepiaeement eff the subeentraeter will Eesult in an
this previsien eenstitutes a basis upon whieh te annul the GeRtraet
Pursuant to sectlen B 7 13
8. Deeumen:tatien reefaired 19ursuant to the Speelal Previsions A 28 and A 29
10. Withim five (5) days feliewing bid epea-ing, With Bid) oubmit in letter-
form, infemation identifying type ef e3atity and state,. i.e., Teacas (or-
ether state) Ger-per-abien ar- Partnership, and name(o) and Titie(s) e E
.
A -31 Amended Policy on Extra Work and Change Orders
Under "General Provisions and Requirements for Municipal Construction Contracts"
B -8 -5 Policy on Extra Work and Change Orders the present text is deleted and
replaced with the following:
Contractor acknowledges that the City has no obligation to pay for any
extra work for which a change order has not been signed by the Director of
Engineering Services or his designee. The Contractor also acknowledges
that the City Engineer may authorize change orders which do not exceed
$25,000.00. The Contractor acknowledges that any change orders in an
amount in excess of $25,000.00 must also be approved by the City Council.
A -32 Amended "Execution of Contract" Requirements
Under "General Provisions and Requirements for Municipal Construction Contracts"
B -3 -5 Execution of Contract add the following:
The award of the Contract may be rescinded at any time prior to the date
the City Engineer delivers a contract to the Contractor which bears the
signatures of the City Manager, City Secretary, and City Attorney, or their
authorized designees. Contractor has no cause of action of any kind,
including for breach of contract, against the City, nor is the City
obligated to perform under the Contract, until the date the City Engineer
delivers the signed Contracts to the Contractor.
A -33 Conditions of Work
Section A - SP
(Revised 12 /15/04)
Page 15 of 25
Each bidder must familiarize himself fully with the conditions relating to the
completion of the Project. Failure to do so will not excuse a bidder of his
obligation to carry out the provisions of this Contract. Contractor is reminded
to attend the
A -34 Precedence of Contract Documents
In case of conflict in the Contract documents, first precedence will be given to
addenda issued during the bidding phase of the Project, second precedence will
be given to the Special Provisions, third precedence will. be given to the
construction plans, fourth precedence will be given to the Standard
Specifications and the General Provisions will be given last precedence. In the
event of a conflict between any of the standard Specifications with any other
referenced specifications, such as the Texas Department of Public Transportation
Standard Specif ications for Highways, Streets and Bridges, ASTM specifications,
etc., the precedence will be given to addenda, Special Provisions and
Supplemental Special Provisions (if applicable), construction plans, referenced
specifications, Standard Specifications,.and General Provisions, in that order.
A -35 City Water Facilities: Special Requirements (NOT USED)
All xaater-lals and
:used in the
ether
n spe tat }e� reinstallation,
equipment repair-, 3Feassembl
inspeetien
and efts, err az'y-
ien �ANSMMGF)
Standard 6! -as deser-4bed in the Stand
�J
Section A - SP
(Revised 12/15/04)
Page 16 of 25
All trash generated by the P=entaFaeter-
er his r agen er
su-beentraeters mast be eentained at
site $iewiny trash —
all tifaes at the water faeilit
The stall keep
will net —be - allewed.
weds times
trash daily.
areas clean at all and refoavall
I. He is in the based
engaged eemputer menitering
business €era-bly
an
to the
eontrei systefa ,pre as applied
mun ieipal water a.-.d tewater industr
2. lie hasper €ermed # �
type,
d
wer en systems -ef e _ab e size,
Mr--Y �1
required is this- Gentraet least
r -. an
three
eempiemit as -en at; --
l
I. He is in the based
engaged eemputer menitering
business €era-bly
an
to the
eontrei systefa ,pre as applied
mun ieipal water a.-.d tewater industr
2. lie hasper €ermed # �
type,
d
wer en systems -ef e _ab e size,
Mr--Y �1
required is this- Gentraet least
r -. an
three
eempiemit as -en at; --
Section A - SP
w (Revised 12/15/04)
Page 17 of 25
Plant shall he perfer-med using a baekhee er- ha"Id digging di3� to the
shall be allewed an the prejeet.
A -36 Other Submittals
1:. Shop Drawing Submittal The Contractor shall follow the procedure outlined
below when processing Shop Drawing submittals:
C.. Submittal Transmittal Forms: Contractor shall use the Submittal.
Transmittal Form attached at the end of this Section; and sequentially
number each transmittal form. Resubmittals must have the original
submittal number with an alphabetic suffix. Contractor must identify
the Contractor, the Subcontractor or supplier; pertinent Drawing sheet
and detail number(s), and specification Section number, as
appropriate, on each submittal form.
d. Contractor's Stamp: Contractor must apply Contractor's stamp,
appropriately signed or initialed, which certifies that review,
verification of Products required, field dimensions, adjacent
construction work, and. coordination of information, is all in
Section A - SP
(Revised 12/15/04
Page 18 of 25
accordance . with the requirements of the Project . and Contract
documents.
e. Scheduling: Contractor must schedule the submittals to expedite the
Project, and deliver to the City Engineer for approval., and coordinate
the submission of related items.
f. Marking: Contractor must mark each copy to identify applicable
products, models, options, and other data. Supplement manufacturers'
standard data to provide information unique to this Project.
g. Variations: Contractor must identify.any proposed variations from the
Contract documents and any Product or system limitations which may be
detrimental to successful performance of the completed work.
h. Space Requirements: Contractor must provide adequate space for.
Contractor and Engineer review stamps on all submittal forms.
I Resubmittals: Contractor must revise and resubmit submittals as
required by City Engineer and clearly identify all changes made since
previous submittal.
j. Distribution: Contractor must distribute copies of reviewed submittals
to subcontractors and suppliers and instruct subcontractors and
suppliers to promptly report, thru Contractor, any inability to comply
with provisions.
2. Samples The Contractor must submit samples of finishes from the full
range of manufacturers' standard colors, textures, and patterns for City
Engineer's selection.
3. Test and Repair Report
When specified in the Technical Specifications Section, Contractor must
submit three (3) copies of all shop test data, and repair report, and all
on -site test data within the specified time to the City Engineer for
approval. Otherwise, the related equipment will not be approved for use on
the project. T
A-38 Worker's Compensation Coverage for Building or Construction Pro for
Government Entities
The requirements of "Notice to Contractors - B 311 are incorporated by reference in
this Special Provision.
A -39 Certificate of Occupancy and Final Accqptance NOT USED
Section A - SP
(Revised 12/15/04)
Page 19 of 25
A -40 Amendment to Section B -8 -6: Partial Estimates
General Provisions and Requirements for Municipal Construction Contracts Section
B -8 -6: Partial Estimates is amended to provide that approximate estimates from
which partial payments will.be calculated will not include the net invoice value
of acceptable, non - perishable materials delivered to the Project worksite unless
the Contractor provides the City Engineer with documents, satisfactory to the
City Engineer, that show that the material supplier has been paid for the
materials delivered to the Project worksite.
A -41 Ozone Advisory
Priming and hot -mix paving operations must not be conducted on days for which an
ozone advisory has been issued, except for repairs. The City Engineer will
notify Contractor about ozone alert. If a delay such as this is experienced, the
day will not be counted as a work day and the.Contractor will be compensated at
the unit price indicated in the proposal.
A -42 OSHA Rules & Recrulations
It is the responsibility of the Contractor(s) to adhere to all applicable oSHA
rules and regulations while performing any and all City- related projects and or
jobs.
A -43 Amended Indemnification & Hold Harmless
Linder "General Provisions and Requirements for Municipal Construction Contracts" l
B -6 -21 Indemnification & Hold Harmless text is deleted in its entirety and the
following is substituted in lieu thereof:
The Contractor shall hold the City, its officials, employees, attorneys,
and agents harmless and shall indemnify the City, its officials,.employees,
attorneys, and agents from any and all damages, injury or liability
whatsoever from an act or omission of the contractor, or any subcontractor,
supplier., materialman, or their officials, employees, agents, or
consultants, or any work done under the contract or in connection therewith
by the contractor, or any subcontractor, supplier, materialman, or their
officials, employees, agents, or consultants.
The contractor shall hold the City, its officials, employees, attorneys,
and agents harmless and shall indemnify the City, its officials, employees,
attorneys, and agents from any and all damages, injury, or liability
whatsoever from a negligent act or omission of the city, its officials,
employees, attorneys, and agents that directly or indirectly causes injury
to an employee of the contractor, or any subcontractor, supplier or
materialman.
A -44 Change orders
Should a change order(s) be required by the engineer, Contractor shall furnish
the engineer a complete breakdown as to all prices charged for work of the
change order (unit prices, hourly rates, sub- contractor's costs and breakdowns,
cost of materials and equipment, - wage rates, etc.) . This breakdown information
shall be .submitted by contractor as a basis for the price of the change order.
A -45 As -Built Dimensions and Drawings (7/5/00)
(a) Contractor shall make appropriate daily measurements of facilities
constructed and keep accurate records of location (horizontal and
vertical) of all facilities.
Section A - SP
(Revised 12/15/04)
Page 20 of 25
(b) Upon completion of each facility, the Contractor shall furnish Owner
with one set of direct prints, marked with red pencil, to show -as-
built dimensions and locations of all work constructed. As a minimum,
the final drawings shall include the following:
(1) Horizontal and vertical dimensions due to substitutions/field
changes.
(2) Changes in equipment and dimensions due to substitutions.
(3) "Nameplate" data on all installed equipment.
(4) Deletions, additions, and changes to scope of work.
(5) Any other changes made.
water The Gentraeter shall be r-espens4:ble feE the di=5pesal ef water used fer testing,
partieularly high levels ef ehlerine, will be used fer
e3ceeed the peEraissible limits for- diseharge !Rte wetlands or- e1wirenment
sensitive areas. These are regulated by numere;as ageneies sueh as T.G.E.Q., r and may
,
ef all regulatery 4n the Elisigesal ef all water used in 4-4;P
metheds of dispesal shall be submitted to the Gity fer appreval. There shall be-
ne separate pay fer dispesal ef highly ehlerinated water. Gentraeter shall net
use the City's sanitar=y sewer system fer dispesal ef eentaiainated water.
y Gentraet=er
;;;;Fl - it it t-e the
Gity fer appre�,Fal
shall then prepare a r-epert
W WON WIN W NO
indieating
as well the
the eviner ef pipelines exeavated and surveyed,
r
!
r
the tep-ef
r
emisting pilaelines, and their- di
y Gentraet=er
;;;;Fl - it it t-e the
Gity fer appre�,Fal
shall then prepare a r-epert
indieating
as well the
the eviner ef pipelines exeavated and surveyed,
r
!
r
the tep-ef
r
emisting pilaelines, and their- di
Section A - SP
(Revised 12/15/04)
Page 21 of 25
A -48 overhead Electrical Wires (7/5/00)
Contractor shall comply with all OSHA safety requirements with regard to
proximity of construction equipment beneath overhead electrical wires. There are
many overhead wires crossing the construction route and along the construction
route. Contractor shall use all due diligence, precautions, etc., to ensure that
adequate safety is provided for all of his employees and operators of equipment
and with regard to ensuring that no damage to existing overhead electrical wires
or facilities occurs.
Contractor shall coordinate his work with ,AEP /CP &L and inform AEP /CP &L of his
construction schedule with regard to said overhead lines.
Some overhead lines are shown in the construction plans, while others are not.
It shall be the Contractor's sole responsibility to provide for adequate safety
with regard to overhead lines whether shown in the plans or not.
A -49 Amended "Maintenance Guaranty}' (8/24/00)
Under "General Provisions and Requirements for Municipal Construction
Contracts", B -8 -11 Maintenance Guaranty, add the following:
"The Contractor's guarantee is a separate, additional remedy available to
benefit the City of Corpus Christi. Neither the guarantee nor expiration of
the guarantee period will operate to reduce, release, or relinquish any
rights or remedies available to the City of Corpus Christi for any claims
or causes of action against the Contractor or any other individual or
entity."
A -50 Amended Prosecution and Progress
under "General Provisions and Requirements for Municipal Construction
Contracts ", B -7 Prosecution and Progress, add the following: "
"Funds are appropriated by the City, on a yearly basis. If funds, for any
reason, are not appropriated in any given year, the City may direct
suspension or termination of the contract. If the Contractor is terminated
or suspended and the City requests remobilization at a later date, the
Contractor may request payment for demobilization /remobilization costs.
Such costs shall be addressed a change order to the contract." -
the General P-re-, islensr
in ' fellewin statement an s
after the last -bid -item:
eertifies that the unit priees shewn en this print eut--f-e item (ilaeludiRg
Section ,A - SP
(Revised 12/15/04)
Page 22 of 25
all
bid items
(ineluding
any
dedueti-ve
g�-epesa"1-
Sheets
- (3 -THRU 10
additive
GF 19)
er alt=er-nates)
if the Centraeter
en.
elut
th e
out shall
.
be aeeempanied
eheeses- to
by
- su bm i t -a print
-- r
pr
11, 12 , an
13 . A ll sampl e -
p =int
preperly eempleted j93Fepesai
eu is 5h in Attachment i.
pages r f
.
in ' fellewin statement an s
after the last -bid -item:
eertifies that the unit priees shewn en this print eut--f-e item (ilaeludiRg
Section ,A - SP
(Revised 12/15/04)
Page 22 of 25
r
■ r
dF
up w it
A 94 Tw wat wr i w a nd TiwwM- l -
dewatering is needed te keep the emeavatien I !
Storm water that enters an eme-4atlen ean be pamped eut as leng
ed te a 1 eatien that allows fer sheet flew przier te enter-ing a steim
pump steLcm water te an area where pending eeeiars natiar-ally witheut leaving the
designated werle area or by manmade bems pr-�r to entering the sterm water-
system. Sheet flew and pending is to allew selids semeening and er sett=14-ng
prier to emiter -ing a- tee =meter eendult eEinlet.
i-b- the eigioting Storm water 19ye Ided that the quality of- gremadwater
Section A - SP
Y' (Revised 12/15/04)
Page 23 of 25
io equa! tB 82 better than the r-eeeiving stream (0me Bay)
n p
per-mit.–grem the Wastewater
will pay fer any. water efaality testing
Eliseharge and Shall be aFetested by the City, at the C-:�ty-
,
9 expen-S
anaiy5iq e9st aFegu4:r-ed. The
Greund-water- flew ean he
mifilmum ef enee a week. The Gentr-aeteL� shall eeer-Elii4ate with the
testiag. Test will alse be perfeEmed as eaeh new area Of eenstr-Retien
star
City,
en all
-is
f-
pumping tie the n
ide
the
by ease
system er wastewater
alter-natives E)r- selutiens may be appreved by the RngiReeL- en a
b asis.
l9lant,
ease
SUBMITTAL TRANSMITTAL FORM
PROJECT: NEW FIRE DEPARTMENT MAINTAINENCE FACILITY LANDSCAPE IMPROVEMENT
PROJECT No. 5244
DRAWING No. STR 842
OWNER: CITY OF CORPUS CHRISTI
ENGINEER: JERRY SHOEMAKER, PE, CITY OF CORPUS CHRISTI
CONTRACTOR:
SUBMITTAL DATE: SUBMITTAL NUMBER:
Section A _ SP
(Revised 12/15/04)
Page 24 of 25
n p
per-mit.–grem the Wastewater
will pay fer any. water efaality testing
,
Department. —The--Gi-ty
eiF water
permit will reEfa44ce an estimate ef 9L-euadwatei5 flew
anaiy5iq e9st aFegu4:r-ed. The
Greund-water- flew ean he
night
it takes te fill te eriffinal level and ever-night level.
,
SUBMITTAL TRANSMITTAL FORM
PROJECT: NEW FIRE DEPARTMENT MAINTAINENCE FACILITY LANDSCAPE IMPROVEMENT
PROJECT No. 5244
DRAWING No. STR 842
OWNER: CITY OF CORPUS CHRISTI
ENGINEER: JERRY SHOEMAKER, PE, CITY OF CORPUS CHRISTI
CONTRACTOR:
SUBMITTAL DATE: SUBMITTAL NUMBER:
Section A _ SP
(Revised 12/15/04)
Page 24 of 25
APPLICABLE SPECIFICATION
OR DRAWING SUBMITTAL
Section .A - SP
(Revised 12/15/04)
Page 25 of 25
A G R E E M E N T
THE STATE OF TEXAS §
COUNTY 'OF NUECES §
THIS AGREEMENT is entered into this 14TH day of DECEMBER 20
by and between the CITY OF CORPUS CHRISTI of the County of Nueces,
State of Texas, acting through its duly authorized City Manager,
termed in the Contract Documents as "City," and Alpha Building
Corporation termed in the Contract Documents as "Contractor," upon
these terms, performable in Nueces County, Texas:
In consideration of the payment of $72,480.02 by City and other
obligations of City as set out herein, Contractor will construct and
- complete certain improvements.described as follows:
WATERGARDEN ELECTRICAL UPGRADES
JOB ORDER CONTRACT (RFP 2009 -04)
PROJECT NO.E10202
(TOTAL AMOUNT: $72,480.02)
according to the attached Plans and Specifications in a good and
workmanlike manner for the prices and conditions set out in their
- attached bid proposal supplying at their expense such materials,
services, labor and insurance as required by the attached Contract
Documents, including overseeing the entire job. The Contract
Documents include this Agreement, the bid proposal and instructions,
The General and Special Provisions and Requirements for Municipal
Construction Contracts of the City of Corpus Christi, plans and
specifications, including all maps, plats, blueprints, and other
drawings, the Performance and Payment bonds, addenda, and related
documents all of which constitute the contract for this project and
are made a part hereof.
Page 1 of 3
Rev. Jun -2010
Contractor shall .indemnify, save harmless and defend
the City of Corpus Christi in accordance with General
Provision B- -6--11 and Special Provision A -26 of the General
and Special Provisions and Requirements for Municipal
Construction Contracts of the City of Corpus Christi,
Texas.
The Contractor will commence work within ten (10) calendar days
from date they receive written work order and will complete same
within 75 rALMMAR.DAYS after construction is begun. Should
Contractor default, Contractor may be liable for liquidated damages
as set forth in the Contract Documents.
City will pay Contractor in current funds for performance of the
contract in accordance with the Contract Documents as the work
progresses.
Signed in 4 parts. at Corpus Christi, Texas on the date shown
above.
Page 2 of 3
Rev. Jun -2010
ATTEST:
City Secretary
APPRO 7AS TO LEGAL FORM:
By:
Asst. City Attorney
ATTE ( Co p ation)
(Sea7"Below}
Andrew E. Wicks, C0 rate 87ret"
(Note. If Pe xson $.I ng or
corporation is riot. President,
attach.cogy of authorization
to sign)
CITY Vt7s CHR ST By :
Juan Perales, r.,P.E.
Assistant City Manager
Engineering /Development Services
Pete Anaya, P.E.
Director of Engineering Services
CONTRACTOR
Al ha Bui oration
By:
Title: Richard Booher, Fnm&e Vice 'resident
5541 BEAR LANE #201
(Address)
CORPUS CHRISTI, TX 78405
(City) (State) (ZIP)
361/299 -6292 * 361/299 -6374
( Phone) (Fax)
Ik9VIC-303 AUTO
FY COUNCIL.. Z ! !Q
Page 3 of 3
Rev, Jun -2010
Alpha Building Corporation
Corporate Resolution
May 17, 2010
I, undersigned Secretary of Alpha Build in Cor oration a corporation, organized and existing
under the laws of the State of Texas, do herby certify that at a meeting of the Board of
Directors of said Corporation held on May 17, 2010, a quorum being present, the following
resolution was adopted and the said resolution having been entered upon the regular minute
book of said Corporation and in accordance with the bylaws are now in full force and effect to-
wit:
That, Kathleen K. Acocic President and Richard H. Booher, Vice President have
unrestricted authorization, and are individually empowered and directed for and on
behalf of this Corporation, and in its name, to execute any and all Agreements or
Contracts or other instruments necessary for the company.
I, Andrew E. Hicks, Secretary of Alpha Building Corporation, a corporation, do hereby certify
that the resolution appearing above is a full true and correct copy of a resolution of the Board
of Directors of said corporation duly and regularly passed and adopted at a meeting of the
Board of Directors of said corporation which was duly and regularly called and held in all
respects as required by the law and by the bylaws of said corporation on the 17 day of May.
2010, and that the signatures appearing on the above mentioned copy of said resolution and
authorized to act on behalf of said corporation as set forth in said resolution
I further certify that said resolution has not been amended or revoked and is still in full force
and effect.
IN WITNESS WHEREOF, I have hereunto set my hand as such Secretary and affix the Corporate
Sea] of said Corporation this 17 day of May, 2010.
Corporate Seal
Secretary's Signature
Mr. Billy Delgado
City of C.C. Engineering Services
1317 Mestina
Corpus Christi, TX 78401
August 16, 2010
We are pleased to present our proposal for repairs and replacement of major electrical
gear and components for the Water Garden Facility as outlined below:
Scope of Work
Provide labor and material to:
1. Remove and replace Main Distribution Center materials only.
2. Remove and replace Panel FLA materials only.
3. Remove and replace Panel LP materials only.
4. Remove and replace 112.5 KVA Transformer materials only.
5. Remove and replace Control Cabinet Partial Components materials only.
Total Project Cost: $72,480.02
(project total based on standard 6 -8 week delivery)
Exclusions:. Anything not listed above. Bid price is for the replacement of electrical
equipment and all related components only. Electrical equipment will be installed in
same /existing areas. All other work needed at facility based on Engineer's
recommendations not included in bid price. Unforeseen conditions not included in bid
price. Bid price valid for (60) days.
Corpus Christi Area Office
5541 Bear Lane, Suite 201
Corpus Christi, Texas 78405
P 361- 299 -6292 F 361 -299 -6374 www.alphabuilciing.com
CREATING ENVIRONMENTS WHERE GREAT THINGS CAN HAPPEN
BUILDING CORPORATION
First Choice For Facilities Renovation & Construction
Schedule. Mobilization within. (10) days of NTP and or issue of permit. (65) days to
complete based on standard shipping of material totaling (75) days.
Sincerely,
e
Cruz E Aguilar
Asst. Project Manager/Estimator
Alpha Building Corporation
Corpus Christi Area Office
5541 Bear lane, Suite 201
Corpus Christi, Texas 78405
P 361- 299 -6292 F 361- 299 -6374 www.alphabuilding.com
CREATING ENVIRONMEN.T5 WHERE GREAT THINGS CAN HAPPEN
P E R F O R M A N C E BOND
u STATE OF TEXAS §
COUNTY OF NUECES §
KNOW ALL BY THESE PRESENTS:
THAT Alpha Bulldinq Corporation _ of BEXAR County, Texas,
hereinafter called "Principal ", and r4
corporation organized under the laws of the State ofAJF
ey
and duly authorized to do business in the State of Texas,
hereinafter called "Surety ", are held and firmly bound unto the
City of Corpus Christi, a municipal corporation of Nueces County,
Texas, hereinafter called "City ", in the penal sum of SEVENTY -TWO
THOUSAND FOUR HUNDRED EIGHTY AND 02/100 ($ 72,180.02 ) DOLLARS,
lawful money of the United States, to be paid in Nueces County,
Texas, for the payment of which sum well and truly to be made we
bind ourselves our heirs, executors, administrators and
successors, jointly and severally, firmly by these presents:
THE CONDITION OF THIS OBLIGATION IS SUCH THAT: Whereas, the
principal entered into a certain contract with the City of Corpus
Christi, dated the 14TH of DECEMBER , 20 10 , a copy of which is
hereto attached and made a part hereof, for the construction of:
WATERGARDEN ELECTRICAL UPGRADES
JOB ORDER CONTRACT (RFP 2009 -04)
PROJECT NO.E10202.
(TOTAL AMOUNT: $72,480.42)
NOW, THEREFORE, if the principal shall faithfully perform said
work in accordance with the plans, specifications and contract
documents, including any changes, extensions, or guaranties, and if
the principal shall repair and /or replace all defects due to faulty
materials and /or workmanship that appear within a period of one (1)
year from the date of completion and acceptance of improvements by
the City, then this obligation shall be void; otherwise to remain
in full force and effect.
PROVIDED FURTHER, that if any legal action be filed on this
bond, venue shall lie in Nueces County, Texas.
And that said surety for value received hereby stipulates that
no change, extension of time, alteration or addition to the terms
of the contract, or to the work performed thereunder, or the plans,
specifications, drawings, etc., accompanying the same shall in
anywise affect its obligation on this bond, and it does hereby
waive notice of any such change, extension of time, alteration or
addition to the terms of the contract, or to the work to be
performed thereunder.
This bond is given to meet the requirements of Article 5.160,
Vernon's Civil Statutes of Texas, and other applicable statutes of
the State of Texas.
Performance Bond
Wage 1 of 2
The undersigned agent is hereby designated by the Surety
herein as the Agent Resident in Nueces County to whom any requisite
notices may be delivered and on whom service of process may be had
in matters arising out of such suretyship, as provided by Art.
7.19 -1, Vernon's Texas Insurance Code.
IN WITNESS WHEREOF, this instrument is executed in 4 copies,
each one of which shall be deemed an original, this the TA
day of b 20
PRINCIPAL
SURETY
The Resident Agent of the Surety in Nueces Counter, Texas for
delivery of notice and servsce of process is:
Agency:
Contact Person: oil
Address:1
Phone Nuwber:
(NOTE: Hate of Performance Bond must not be prior to date of contract) (Revised 3108)
Performance Bond
Page 2 of 2
Andrew E. Hicks, Corporate Secretary
(Print Name & Title)
(Print Name)
PAYMENT B O N D
STATE OF TEXAS §
KNOW ALL BY THESE PRESENTS:
COUNTY OF NUECES §
THAT ' — Alpha Building Corporation of BEXAR County, Texas,
hereinafter called "Principal ", and � _ erg dutf (4mi 03v�1.
a corporation organized under the laws of the State of
and duly authorized to do business in. the State of Texas,
- hereinafter called "Surety ", are held and firmly bound unto the
City of Corpus Christi, a municipal corporation of Nueces County,
Texas, hereinafter called "City ", and unto all persons, firms and
corporations supplying labor and materials in prosecution of the
work referred to in the attached contract, in the penal sum
of SEVENTY -TWO THOUSAND, FOUR HUNDRED EIGHTY AND 02/100
DOLLARS, lawful money of the United States, to be paid in Nueces
County, Texas, for the payment of which sum well and truly to be
made we bind ourselves, our heirs, executors, administrators and
successors, jointly and severally, firmly by these presents:
THE CONDITION OF THIS OBLIGATION IS SUCH THAT: Whereas, the
principal entered into a certain contract with the City of Corpus
Christi, dated the 14TH day DECEMBER , 20 10 , a copy of which
is hereto attached and made a part hereof, for the construction of:
WATERGARDEN ELECTRICAL UPGRADES
JOB ORDER CONTRACT (RFP 2009 - 04)
PROJECT NO.E10202
(TOTAL AMOUNT: $72,480.02)
NOW, THEREFORE, if the principal shall faithfully perform its
duties and make prompt payment to all persons, firms,'
subcontractors, corporations and claimants supplying labor and
material in the prosecution of the work provided for in said
contract and any and all duly uthorized modification f
Y o sand.
contract that may hereinafter be made, notice of which modification
to the surety is hereby expressly waived, then this obligation
shall be void; otherwise to remain in full force and effect.
PROVIDED FURTHER, that if any legal action be filed upon this
bond, venue shall lie in Nueces County, Texas.
And that said surety for value received hereby stipulates that
no change, extension of time, alteration or addition to the terms
of the contract, or to the work performed thereunder, or the plans,
specifications, drawings, etc., accompanying the same shall in
anywise affect its obligation on this bond, and it does hereby
waive notice of any such change, extension of time, alteration or
addition to the terms of the contract, or to the work to be
performed thereunder.
Payment Bond
Page 1 of 2
This bond is given to meet the requirements of Article 5160,
Vernon's Civil Statutes of Texas, and other applicable statutes of
the State of Texas. The terms "Claimant ", "Labor" and "Material"
as used herein are in accordance with and as defined in said
Article.
The undersigned agent is hereby designated by the Surety
herein as the. Agent Resident in Nueces County to whom any requisite
notices may be delivered and on whom service of process may be had
in matters arising out of such suretyship, as provided by Art.
7.19 -1, Vernon's Texas Insurance Code.
IN WITNESS WHEREOF, this instrument is executed in 4 copies,
each one of which shall be deemed an original, this the
day of Dacp 20 ) p
PRINCIPAL
Print Name
ATTEST
e
Andrew E. Hicks, Corporate Secretary
(Print name & Title)
SURETY
The Resident Agent of. the Surety in . Nueces County, Texas for
delivery of notice and service of process is:
Agency:
Contact Person:
Address:
Phone Number:
(NOTE: Date of Payment Bond must not be prior to date of contract)
Payment Bond
Page 2 of 2
(Revised 3/08)
-Ric hard Booher, EXCC dve Vice Preddemt
n k- - - ,. - 1 u --- l a 4,: 1.
L 2f4t
(Print Name
CITY OF CORPUS CHRISTI
DEPARTMENT OF ENGINEERING SERVICES
P.O. BOX 9277
CORPUS CHRISTI, TEXAS 78469 -9277
RE: Certification of Power of Attorney for Performance and Payment Bonds
Project Name /No.: Various. Projects _
Surety Company: North American Specialty Insurance Co.
Ladies /Gentlemen:
I, Paul A.Yasilli Jr. hereby certify that the facsimile power of attorney submitted
by Lawrence L. Rhodes for Alpha Building Corporation a copy of
which is attached to this certificate, is a true and correct copy of the original power of
attorney on file in the records of the surety company in its home office, has not been
amended or abridged, is still in full force and effect, and said designated agent is
currently in good standing with the surety. In the event of cancellation of this power of
attorney, the City of Corpus Christi shall be notified in writing by certified mail within
seven (7) days thereof at the following address:
City of Corpus Christi
Department of Engineering Services
Attn: Contract Administrator
P.O. Box 9277
Corpus Christi, TX 78469 -9277
Signed this 4 day of 2008.
I
Name. � - i+'glCk-t
Ck-
Title v e
Sworn and subscribed to before me on this day of r nA- a ' S '`' '
41111:3
"RYPO'�w SHARON GRANT Notary Public
° •yam Notary Public, State of Texas
- My Co Expires State of J*
h'�auiait +`', March 30, 2011 My Commission Expires: (
(Revised 9103) ATTACHMENT 1
1 OF 1
NAS SURETY GROUP
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under
laws of the State of New Hampshire, and having its principal office in the City of Manchester, New Hampshire, and Washington International
Insurance Company, a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of
Schaumburg, Illinois, each does hereby make, constitute and appoint:
LAWRENCE L. RHODES, BRADLEY D. JOHNSON,
MARILYN CALHOUN and S TEVE N I✓ _ WHITE
JOINTLY OR SEVERALLY
Its true and lawful Attorney(s) -in -Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by
law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of TWENTY -FIVE MILLION (525.000.000.00) DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held
on the 24'" of March, 2000:
"RESOLVED, that any two of the Presidents, any Managing Director, any Senior Vice President, any Vice President, any Assistant Vice President,
the Secretary or any Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named
in the given Power of Attorney to execute on behalf of the Company bonds, undertakings and all contracts of surety, and that each or any of them
hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is
FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached."
` llpllillflry�,
A1JrYy,!� /i
pF1P01�'•
- -
unwuvw
By
.GpRPOgRrtr
SI4E n
Steven P. Anderson, President & Chief Executive Officer of Washington International Insurance Company
SEAL 'y
z p �� 7x79 Q GQ `
&Senior Nice President of North American Specialty Insurance Company
I F ME
• :�
hn . .l��S� a\a fir?
�
��
David M. Layman, Senior Vice President of Wasbington International Insurance Company
- - - -
- & Vice President of North American Specialty Insurance Company
IN WITNESS WHEREOF, North American Specialty Insurance Company and Washington International Insurance Company have caused their
official seals to be hereunto affixed, and these presents to be signed by their authorized officers this 18 th day of April 20
North American Specialty Insurance Company
Washington International Insurance Company
State of Illinois
County of Cook SS:
On this 18th day of April , 20 10 , before me, a Notary Public personally appeared Steven P. Anderson , President and CEO of
Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and David M. Layman ,
Senior Vice President of Washington International Insurance Company and Vice President of North American Specialty Insurance Company,
personally known to me, who being by me duly sworn, acknowledged that they signed the above Power of Attorney as officers of and
acknowledged said instrument to be the voluntary act and deed of their respective companies.
E IAL. SEAL D. SKLEENSS abLc, State oI Iy IN6 Donna D. Sklens, Notary Public
mission Expires ItllUC�12011
I, James A. Carpenter , the duly elected Assistant Secretary of North American Specialty Insurance Company and Washington
International Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North
American Specialty Insurance Company and Washington International Insurance Company, which is still in full force and effect.
IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this 28th day of December .120 10
' V)4
James A. Carpenter, Vice President & Assistant Secretary of Washington International Insurance Company &
North American Specialty Insurance Company
IMPORTANT NOTICE
In order to obtain information or make a complaint:
You may contact Jim Carpenter, Vice President -
Claims, at 1- 800 -338 -0753.
You may call Washington International Insurance
Company and/or North American Specialty
Insurance Company's toll -free number for
information or to make a complaint at:
1 -800- 338 -0753
You may also write to Washington International
Insurance Company and/or North American
Specialty Insurance Company at the following
address:
475 North Martingale Road, Suite 850
Schaumburg, IL 60173
You may contact the Texas Department of Insurance
to obtain information on companies, coverages, rights
or complaints at:
1- 800 -252 -3439
You may write the Texas Department of Insurance:
P.O. Box 149104
Austin, TX 78714 -9104
Fag: (512) 475 -1771
Web: http:llwww.tdi.state.tx.us
E -mail:
ConsumerProtection(a,tdi. state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or
about a claim you should first contact the Washington
International Insurance Company andlor.North
American Specialty Insurance Company. If the.
dispute is not resolved, you may contact the Texas
Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not become
a part or condition of the attached document_
AVISO IMPORTANTE
Para obtener informacion o para someter un queja:
Puede comunicarse con Jim Carpenter, Vice
President - Claims, al 1- 800 -338 -0753.
Usted puede llamr al numero de telefono gratis de
Washington International Insurance Company
and /or North American Specialty Insurance
Company's para informaciono pars someter una queja
al:
1 -800- 338 -0753
Usted tambien puede escribir a Washington
International Insurance Company and/or North
American Specialty Insurance Company al:
475 North Martingale Road,.Suite 850
Schaumburg, IL 60173
Puede escribir at Departmento de Seguros de Texas
para obtener informacion acerea de companias,
coberturas, derechos o quejas al:
1- 800- 252 -3439
Puede escribir at Departmento de Seguros de Texas:
P.O. Box 149104
Austin, TX 78714 -9104
Fax: (512) 475 -1771
Web: httpalwww.tdi.state.tx.us
E -mail:
ConsumerProtection a@tdi.state.tx.us
DISPUTES SOBRE PRIMAS O RECLAMOS:
Si tiene una disputa concemiente a su prima o a un
reclamo, debe comunicarse con el Washington
International Insurance Company and/or North
American Specialty Insurance Company primero. Si
no se resuelve la disputa, puede entonces comunicarse
con el Departmento de Seguros de Texas.
UNA ESTE AVISO A SU POLIZA:
Este aviso es solo para. proposito de infoomacion y no se
converte en parte o condicion del documento adjunto.
SUPPLIER NUMBER
TO BE ASSIGNED BY CITY
PURCHASING DIVISION
City of CITY OF CORPUS CHRISTI
Corpus
Christi DISCLOSURE OF INTEREST
City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business
with the City to provide the following information. Every question must be answered. If the question is
not applicable, answer with "NA ". See reverse side for Filing Requirements, Certifications and
definitions.
COMPANY NAME: Al pha Building Corporation
P. O. BOX:
STREET ADDRESS: 24850 $1 anco Road CITY: San Antonio, TX ZIP:7 _
FIRM IS:. 1. Corporation ® 2. Partnership ❑ 3. Sole Owner ❑
4. Association 5. Other
DISCLOSURE QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet.
1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Job Title and City Department (if known)
2. State the names of each "official" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "fine."
Name Title
N/A
3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest".
constituting 3% or more of the ownership in the above named "firm."
Name Board, Commission or Committee
4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who
worked on any matter related to the subject of this contract and has an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Consultant
_ - N/A
FILING REQUHtEMENTS
If a person who requests official action on a matter knows that the requested action will confer an
economic benefit on any City official or employee that is distinguishable from the effect that the action
will have on members of the public in general or a substantial segment thereof, you shall disclose that fact
in a signed writing to the City official, employee or body that has been requested to act in the matter,
unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be
made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -349 (d)]
CERTIFICATION
I certify that all infonnation provided is true and correct as of the date of this statement, that I have not
knowingly withheld disclosure of any information requested; and that supplemental statements will be
promptly submitted to the City of Corpus Christi, Texas as changes occur.
Certify Person: -- Kathleen Acock Title: President
(Type or Print)
Signature of Certifying
Person: �L[.�s'���.�
DEFINITIONS
September 15, 2009
a. "Board member." A member of any board, commission, or committee appointed by the City
Council of the City of Corpus Christi, Texas.
b. "Economic benefit ". An action that. is likely to affect an economic interest if it is likely to have an
effect on that interest that is distinguishable from its effect on members of the public in general or a
substantial segment thereof.
c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-
time basis, but not as an independent contractor.
d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and
whether established to produce or deal with a product or service, including but not limited to, entities
operated in the form of sole proprietorship, as self- employed person, partnership, corporation, joint
stock company, joint venture, receivership or trust, and entities which for purposes of taxation are
treated as non -profit organizations.
e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager,
Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of
Corpus Christi, Texas.
f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a
firm, including when such interest is held through an agent, trust, estate, or holding entity.
"Constructively held" refers to holdings or control established through voting trusts, proxies, or
special terms of venture or partnership agreements."
g. "Consultant." Any person or farm, such as. engineers and architects, hired by the City of Corpus
Christi for the purpose of professional consultation and recommendation.
A GORA CERTIFIC/ - E OF LIABILITY INSURANr
P1i40tl� phone, 713-978 -666a -
T HIS CERTIFICATE IS 1 UH AS
RUB 3:nternatianal Rigg ONLY AND CONFERS NO RIGH
7 ilaetheimer HOLDER. THIS CERTIFICATE 00'
X077' 300 ALTER THE COVERAGE AFFORD
Suites
XI011E3t;011 TX 77042 -3954
INSURERS AFFORDING COVERAGE
RVBVREY— I
A1pYa- Building Corporation J
248 O Blanco Rd.
San Antonio TX 78260 -6656
bATk (MWM,,"
pOIACIRS OF INSURANCE LAMP BELOW HAVE B93N ISSUED TO THE INSUREID NAMED ABOVE FOR THE POLICY PERIOD INDICATED.
:1:1X1iSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO VRIQH THIS
r- 31 ICATE MAY HE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE
Ig . MMU8IonS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWII MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
suithuru POLICYNUMSER
PO1. PFBCT E
P P TIOk
u1tAITS
A
RtRALLULSILITY V C00324L158
3/6/2010
3/6/2011
EACH OCCURRENCE
S 0
;
S
COMMERCIAL GENERAL LIABILITY I
CLAIMS MADE El OCCUR
/
Y
MEDENP(An ono
X1 000. 060
PERSONAL&ADVINJURY
'
DENERALAflflREOATE
$
1 000. 000
OENLAGOR£GATEL[MITAPPLIBBPER:
PRODUCTS-COMP10PAW
POLICY LOC
AOTOMOBLUIL UADILl1Y EkA 5994111512
ANYAUTO /
3/6/203.0
3 / 6 / 2 011
/ ��Q
COMBINEDSINCILE LIMIT
s 1 r Q0Qi aQQ
s
ALLOWNEDAU705 �Yf
SGHEOULEDAVIGS
YY
J
RODS INJURY
HIt6D AUT08
NON-0WNEDAUIDS
BOV ILYINµ
S
PROPERTYDAMAOE
Igor icekNnl}
GARAGE LIABILITY ..
AUTO ONLY -EA ACCIDENT
;
ANYAUTO
I..'
OTHERT"AN BAACC
AUTO ONLY: AGO
S
C
EX C E SSIU MokELLALIA61L" I CUP546IP36
OCCUR � CLA IAS MADE J
3/6/2010
3/6/2011
/
EACHOCCUR
AGORE GATE
A 00 i
$
�!
$
DEDUCTIBLE
RETENYION ;
WORKERSCDMPBNIA M9834C 72
EMPLOYERS LIABILITY
ANYPROPRIEIORIPARTNERIEKEOUTNE
OFFICEWMEMBERE%CLUDEpt
3/6/2010
3/6/2011
_
X wceTA T 0TH•
E- L•EAOMACCIDHNT
E.L. D48EJ1$Ei • 6h EMPlOYFE
"'-'-
;
;
]FYse duorbsundtrN b law
P
E.L.OiBlABE- POLICYLIMIT
; 0 (100
A oTI+BA J T6604543L912
Builders Risk
Equipment Floater
3/6/2010
3/6/2011
!
Y
y One Project
aced & Rented
3
100,000
DESCRIPTION OP OPERATIONS I LOCATIONS I V8H1CL8SI P.KCLVIR]NI ADVEV BY ENDORSEMENT I SPECIAL PROVISIONS
-
ISC PROJRCTS AS REQUIRED. The City of Corpus Chrl.sti to named Additional Insured on all General Lia4ility and Auto
lability policies where required by by written contract.
, qP ' 0 'P . T �GJ
City of Corpus Christi
Engineering services
PO Box 9277
Corpus Christi TX 78469 -9277
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCBLI.xU
13EFORB THE EXPIRATION DATE THEREOF, THE ISSUING INSURER
WILL BNDEAVOR TO NhIL c30 +> DAYS WRITTBBNOTICE TO THE
CERTIFICATE HOLDER NAMED TO THU LEFT, BBT FAILURE To DO SO
SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON i
THE INSURER ITS AGENTS OR REPRESENTATIVES.
(200!108)
IMPORTANT
if the certificate holder is an ADDITIONAL INSURED, the pollcy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder In Ileu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the pollay, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certifioate
holder in lieu of such endorsernent(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the cartiflcate holder, nor does It
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
23