Loading...
HomeMy WebLinkAboutC2011-134 - 5/10/2011 - Approvedt C :IIANGr ORDER Department of Ungineering Services City of Corpus Christi, "I'esas CHANGE ORDER NO: 1 FUNDING SOURCE: Operating Department: Waste Water A QD Nance of Project: Lift Station' Rehabilitation 2009 - Pea Place, Clarkwood So., Wilts., Wooldrirlgc, Coquina Bay L Laguna Shores Lift Stations - P.R. E09040 Contractor: I.S. Haren Co. C14ANG E Add the following to the-contract: Sec Attulied: S 119,942.26 CONTRACT TIME: ISO CD DATE: hmmary 28, 2011 TOTAL NET: $119,942.26 wity Wi s this change necessary? (If left off the Mans and SperMca0ous,,etpinin why? ante the lift stations were ta[cen.out of sen ice,.various components were identified in poor condition and needing repiacing or reltiorl:iiat•. _ flow can simil changes be a oiled in the future? Unavoidable. . A. CONTRACT PRICE` $ 1 181,000.00 W:: a. TOTAL CHANGE ORDERS (hk. current) $ 1 1.9,942•:?6 i' C. NEW CON'TRACTPItI;CE $ 1,100,94. � D. THIS tt IS CHANGE ORD $ 119,942 6✓ Proje ct.M tgat*er P PERCENT TOTAL CHANGE (B /x1) 12.23% t t1.ti? E.. P TIME ; AUTHORIZED 0CD: 0. ADDN'L CON'I'ILACT TIME THIS CHANGE ORDER 176 C. O.- I L 1'O'I'AL ADDITIONAL. TIi1 E 17G>C,b:.. CITY OF CORPUS CIIRK $y1 I C \AS By: APPROVED- Operating Department ` l-) r, of J'Valla 1fient & Budget: Legal Department ` AUTHORIZED SY COUNCIL.. � b .SECRETARY ?#�. of Etig CONTRACTOR By: . 'title: ,., •. ATTEST: - - L 22 - - 2011 -134 M2011 -106 05/10/11 J. S. Haren INDEXED= ; Additional. Items for the Lift Station Project:,, Previously Authorized Clarkomod Plpe in Vault 3 "9.00 Coquina Gate.\(,a in- Vaulf' $4100 0:00 AuthoiWed Coquin*.;CheckValve in'Vauit $5,000.00 .: Peary 13l5ctiar9e P1ping irrDrywall $20,750:00 Peary Hori¢ontel S, uction'Pipes $2,80fI;00. Woaldddge Chal l Operators (for four plug valves) .$1,976:00 Williams Chairnruheel' Operators.'( #or four. plug :valves) $7,978,00 Agreed to Dec, 18, 2410 Coquina. Bypass for valve.replacement and °r''i ' "'Adlay $4,20 :40 Lagune'Removal of pipe $1,429.00 Clarkwood Main Breaker-Enclosure, 22KATC to 65KAIC $471.26 Total: $43,442.26 To be Negotiated andfor Finalized Pi e' ry '®rick'MH•Corbel : $2,000 ;00 Coquina Access Driveway. $5,570.00 Pending ClarMWod 'COFW5 --Pump Control Parcel . $9,776,00 Laguna CDF#16- Additional Raven Liner $7,50Q 00' Laguna CO . S- Bypass,.PumOhg at Laguna Shores $10 Peary-COR#:77- Cancr61eRepair Material $7,000.00 Peary COR#1,3 ».Bypass"06nipin9 Wooldrid ge C R#a- Flaw control. $13,738.50_ ' Williams COWW Flow Control .$13 ; j3g 5p. Total: $76;500.00 Grand Total: $119;942:26 • .I 7 J. S. HAREN COMPA February 3, 2011 City of Corpus Christi Attn: Ken Kaper 1317 Mestina Corpus Christi, TX 76408 P: 361 - 826 -3555 RE: Lift Station Rehab 2009 Project # E09040 Corpus Christi, TX Please find enclosed five (5) original copies of the Change Order issued from the City of Corpus Christi on the above referenced project. Thank you, J. S. HAREN COMPANY J. S. Haren JSH/bh RO. BOX 450, ATHENS, TN 37371 -0450 / 1175 HIGHWAY 11 NORTH, ATHENS, TN 37303 PHONE (423) 745 -5000 / FAX (423) 745 -5252