HomeMy WebLinkAboutC2011-135 - 5/10/2011 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 2 I00_131M 1 1918J. 1 004 CONTRACT TIIVlE: 150 days Operating Departments: DATE: April 15, 2011 Name of Project: Police Vehicle Impound Facility - Phase 1(5249) Contractor: Bay LTD. CHANGE ADD 1 Add Storm Water Maintenance Ramp including saw cut and $205,520.801/ removal of existing concrete, excavation, concrete barrier wall, TOTAL CHANGE ORDER (inc. current) fill material, 8" concrete ramp, 6" concrete rip -rap, and NEW CONTRACT PRICE bollards with cable wire THIS CHANGE ORDER Additional Lump Sum @ $205,520.80 PERCENT TOTAL CHANGE (B./A.1 2 Bid Item B10 6" Concrete Curb $1,050.00 Additional 50 LF (total of 107 LF) @ $21.00/LF ADDN'L CONTRACT TIME THIS CHANGE ORDER 3 Bid Item E13 6" Concrete Curb Ramp $1,848.00 Additional 132 LF (total of 291 LF) @ $14.001LF 4 Add erosion control matting for ditches $10,800.88' 3,418 SY @ $3.161SY TOTAL (NET): $219,219.68 DEDUCT Why was this change necessary? (If left off the plans and specifications, explain why ?) - 1.) City Storm Water Department requested addition of Maintenance Ramp Wku 2. and 3.) Actual paving quantities changed in the field to match site conditions. , �, t�/� �FQJ� 4,) Matting required due to steepness of ditch side slopes. How can similar changes be avoided in the future? 1.) No changes. 2. and 3.) Field adjustments expected, no changes. 4.) Verify existing conditions prior to commencement of construction. A. CONTRACT PRICE B. TOTAL CHANGE ORDER (inc. current) C. NEW CONTRACT PRICE D. THIS CHANGE ORDER E. PERCENT TOTAL CHANGE (B./A.1 F. PREVIOUS TIME AUTHORIZED G. ADDN'L CONTRACT TIME THIS CHANGE ORDER H. TOTAL ADDITIONAL TIME 2011 -135 M2011 -105 05/10/11 $ 2,107,855.57" $243,962.88 $ 2,351,818.45 j a1r�,il $ 219,219.68 11.57 % I C.D. 146 C.D. 147 C.D. Project Ma alter i = APR 1 9 2011 ':l 6 f i'= Bay, Ltd. CITY OF CORPUS C 7 By: 4 . r Directur of Fn�giin- APPROVED: )1 Ao t [ 1 TEXAS j ating Department Dir of Management &Budget Legal Department AnM ARMAWO CHAPA C17Y SECRETAR" CONTRACTOR By: Title: 1I Vl ~ 1� All�'NDR� BY C011WCIL..�� •C. SECRETARY M� Department of Engineering Services Change Order Summary Sheet May 10, 2011 SUBJECT: Police Vehicle Impound Facility, Phase 1 (BOND ISSUE 2008) (Project No. 52491CIP No. PF 06) CHANGE ORDER NO.2 APPROVED: City Council on July 20, 2010 - Motion No. 2010 -183 CONTRACTOR: Bay, Ltd. P.O. Box 9908 Corpus Christi, TX 78469 SUMMARY: This Change Order provides for: 1. Storm water maintenance ramp including saw cut and removal of existing concrete, excavation, concrete barrier wall, fill material, 8 -inch concrete ramp, 6 -inch concrete rip -rap, and bollards with cable wire. 6 3 4. Additional 50- linear feet of 6 -inch concrete curb Additional 132- linear feet of 6 -inch concrete curb ramp Addition of 3,418 square yards erosion control matting for ditches TOTAL CONTRACT AMOUNT ...................... $2,107,855.57 25% Limit Amount ........... ............................... 526,963.89 Change Order No. 1 (4120111) ....................... $24,743.20 Change Order No. 2 (5110111) ....................... $219,219.68 Total .............. ............................... .................. $243,962.88 = 11.57% < 25% HAHOMBVeImaP1GENTOLICB5249 VEHICLE IMPOUND FACILITY4CONSTRUCTION1CHANGE ORr)ER NO. 11CHANGE ORDER SUMMARY.doo