AMENDMENT NO. 2
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "City ", and CHUCK ANASTOS ASSOCIATES. LLC
hereinafter called "Engineer", agree to the following amendments to the Contract for Professional Services for
O. N. Stevens Water Treatment Plant Facility Alterations (Project No. 8657) as authorized and
administratively amended by: -
Original Contract
June 9, 2009
=Motion No. M2009 -161
$165,700.00
Amendment No. 1
December 4, 2010
1 Administrative Approval
$46,903.00
From the original contract, Exhibit "A ", Basic Services, Item No. 2 Design Phase is amended to include
additional Design Phase Services for the building plan re- design; revised site access, lay down area(s) and
parking area(s); and additional scope required for the building permit application submission requirements not
in original scope.
From the original contract, Exhibit "A ", Summary of Fees is amended as specified in Exhibit "B" Summary of
Fees.
All other terms and conditions of the June 9, 2009 contract between the City and Consultant, and of any
amendments to that contract, which are not specifically addressed herein shall remfuli force and effect.
CITY OF ORP7t;z? //
By /f d(
Juan Perale , Jr., P. E. b6te
Assistant City Manager
CHUCK ANASTOS
, LLC
RECOMMEND
By
Pete Anaya, P. E., Date
Director of Engineering Services
ATTEST
By
Armando Chapa, City Secrefgry
APPROVED AS TO FORM
By W - : - H
Assistant City Attorney Date
By 23 'k-We C
Chuck Anastos, AIA Date
P. O. Box 3883
Corpus Christi, TX 78463 -3883
(361) 884 -4422 Office
(361) 884 -4419 Fax
Project Number: 8657
Funding Source: 550950-447
2011 -260' ,
07/18/11
Chuck Anasto5 ASSociate5 _TERATIONSIAMENDMENT NO. 2. CHUCK ANASTOSAAMENDMENT NO, 2.DOC
Page 1 of 1
INDEXED
CHUCK flHflSTOS
A550C IAT E5, L LC
02 June 2/27
Mr. Pete +¢,�ti�
Director o Services
City Of C
PO Box 9
Corpus C 469 -9277
Re: Request for Amendment #02 to the AE fee for the ON STeVENs FACILITY ALTERATIONS— FY 08109 CIP
PROJECT #WA 12, City of Corpus Christi Project #8657
Dear Mr. Anaya:
This is a Request for Amendment #02 to Contract Fee for the above referenced City Project, as required by latest
scope modifications. The additional fees are for the following scope revisions (refer to attached Exhibit A -1):
1. The additional AE services for the building plan redesign;
2. The additional AE services for the revised site access, lay down area(s) and parking area(s); and
3. Additional scope required for the building permit application submission requirements not in original scope.
Basis of Revised Compensation Request:
r
Existing Fee for Basic Services: Requested Additional Fee for Basic Services:
1. Master Plan Phase $15,930.00
2. Preliminary Phase $15,930.00
3. Design Phase $58,410.00 _ Add: $32,555.00
ARCHITECTURE 4. Bid Phase $31 ,779.00
INTERIOR DESIGN
Fee for Additional Services Requested Additional Fee for Additional Services:
1. Warranty Inspection(s) $ 3,000.00
2. Preparation of Record
Drawing Set $ 2,000.00
3. Topographic Survey $ 8,500.00
4. Submission to TDLR $ 3,500.00
5. Supplemental
Engineeri
. _ ....___ ...... .... ...$55,054.00 Add 00
6. Furniture Design
and Documents $ 3,500.00
7. Landscape Plan $15,000.00
P O BOX 3883 otal Requested Increase in AE Fee Add: $48,755.00
CORPUS C H R I S T I Total Original Fee and Amendment #01 $212,603.00 ($2,362,260 x 9 %)
TEXAS 7846 3 Total R Ise Fee with Amendment #02 $261,358.00 ($2,362,260 x 11 %)
901 S STAPLES
CORPUS CHRISTI Sincere ,
TEXAS 78404
TEL 3611884 -4422
FAX 361 1884.4419 Chuc a os, AIA, NCARB
Amendment #02
ON STEVENS FACILITY ALTERATIONS- FY 08109 CIP PROJECT #WA 12 City of Corpus Christi Project #8657
EXHIBIT "A"
Pa e 1 of 4
SCHEDULE
DAY
DATE
ACTIVITY
Wednesday
10 June 2009
Begin Master Plan Phase
Wednesday
01 July 2009
Begin Preliminary Phase
Wednesday
15 July 2009
Begin Design Phase
Friday
14 August 2009
Interim Submittal (60 %)
Friday
21 August 2009
City Review
Monday
27 June 2011
Pre -Final Submittal (100 %)
Friday
08 July 2011
City Review Meeting (100 %)
Friday
29 July 2011
Final Submittal (100 %)
Monday (2)
Submission to TDLR
Advertise for Bids
Tue/Wed/Thu
Supplemental Construction Observation
Pre -Bid Conference
Wednesday
Furniture Design and Documents
Receive Bids
Monday
Landscape Plan (By Licensed Landscape Designer)
Begin Construction
Weekday
106,754
Construction Completion
Summary of Amended Fees (Amendment #01 & Amendment #02
Fee for Basic Services
1.
Master Plan Phase
$15,930
2.
Preliminary Phase
15,930
3.
Design Phase
90,965
4.
Bid Phase
31,779
Subtotal Basic Services Fees
154,604
Fee for Additional Services (Allowance)
1.
Warranty Inspection(s)
3,000
2.
Preparation of Record Drawing Set
2,000
3.
Topographic Survey (Authorized)
8,500
4.
Submission to TDLR
3,500
5.
Supplemental Construction Observation
71,254
6.
Furniture Design and Documents
3,500
7.
Landscape Plan (By Licensed Landscape Designer)
15,000
Sub -Total Additional Services Fees Authorized
106,754
Total Authorized Fee
$261,358
EXHIBIT "A"
Page 2of4
(hU(K fin USTOS
A S S O C I A T E 5, L L C
EXHIBIT A -1
FEE AMENDMENT #02 FOR THE ON STEVENS FACILITY
ALTERATIONS — FY 08109 CIP PROJECT #WA 12
CITY OF CORPUS CHRISTI PROJECT #8697
TASK LIST
1. Architecture:
F BIT "A"
e3of4
A.
Attend meetings, prepare forms, drawings and specifications and
resubmit drawings and specifications to Development Services for final
review;
B.
Revise drawings for staging, phasing and alternates;
C.
Revise drawings for modifications of areas uncovered after asbestos
abatement;
D.
Review revised civil notes, SWPPP, detail(s), site demolition and
staging, rough grading and paving plans, detail(s), and specifications;
E.
Revise architectural site plan and detail(s);
F.
Revise site means of egress and ADA parking 1 access into building;
G.
Revise demolition plan;
H.
Revise floor plan(s);
I.
Revise roof plan and roof detail(s);
A R C H I T E C T U R E
J.
Revise floor finish plan(s);
INTERIOR DESIGN
K.
Revise ceiling plan(s);
L.
Revise furniture plan and schedule;
M.
Modify exterior elevation(s), building section(s) and wall sections;
N.
Modify interior elevation(s);
O.
Modify detail(s) and schedule(s);
P.
Review structural notes, foundation plan(s), structural detail(s) and
specifications,
Q.
Review mechanical 1 electrical I plumbing notes, plan(s), detail(s),
specifications, and coordinate with work in other engineering project
(Bath);
R.
Review modifications made to landscaping notes, plan(s), irrigation
plan(s), detail(s) and specifications;
S.
Attend meetings, prepare Building Permit forms, drawings and
P o BOX 3 88 3
specifications and submit drawings and specifications to Development
CORPUS CHRISTI
Services to commence Building Permit Application process.
TEXAS 78 46 3
9 0 1 S STAPLES
2. Civil Engineering:
CORPUS CHRISTI
TEXAS 78404
A.
Resurvey the site;
TEL 3611884 -4422
FAX 361 1 884 -441 9
Amendment #02, Page 1 - 2
ON STEVENs FACILITY ALTERATIONS— FY 08109 CIP PROJECT #WA 12, City of Corpus Christi Project #8657
F BIT "A"
e3of4
B. Coordinate with Bath (engineering) project;
C. Redesign parking from asphalt to concrete paving;
D. Identify additive bid alternates; and
E. Orient design drawings to Owner requested phasing plan.
3. Structural Engineering:
A. Survey exposed structure not visible prior to asbestos abatement;
B. Infill large holes in slab and roof uncovered in asbestos abatement;
and
C. Redefine additive bid alternates.
4. Mechanical, Electrical and Plumbing Engineering:
A. Survey exposed building elements not visible prior to asbestos
abatement;
B. Coordinate with additional engineering (Bath) project;
C. Redesign elements of server room; and
D. Redefine additive bid alternates.
6. Cost Estimating Services:
A. Survey exposed building elements not visible prior to asbestos
abatement; and
B. Re- estimate projected construction costs.
6. Landscape Architecture:
A. Resurvey the site work; and
B. Modify landscaping as required.
Amendment #02, Page 2 - 2
ON STEVENS FACILITY ALTERATIONS — FY 08109 C1P PROJECT #WA 12, City of Corpus Christi Project #8857
F EXHI , BIT "A"
4 of 4
O.N. STEVENS WATER TREATMENT PLANT FACILITY ALTERATIONS
(Project No. 8657)
SUMMARY OF FEES
M2009 -161 I Admin Approval I Admin Approval I
06/09/09 12/04/10
EXHIBIT "B"
H:( HOME %VelmaP1GENIWATERSONSWTP18657 FACILITY ALTERATiONS4AMENOMENT NO. 2. chuck anastoMSUMMARY OF FEES Page 1 of 1
ORIGINAL
CONTRACT
AMENDMENT
NO.
AMENDMENT
NO.2
TOTAL
BASIC SERVICES
1
Preliminary Phase
$15,930.00
$0.00
$0.00
$15,930.00
2
Design Phase
48,889.00
26,469.00
48,755.00
124,113.00
3
Bid Phase
5,310.00
0.00
0.00
5,310.00
4
Construction Phase
9,620.00
0.00
0.00
9,620.00
Subtotal Basic Services
79,749.00
26 469.00
48,755.00
154,973.00
ADDITIONAL SERVICES
1
Permit Preparation (TDLR & Windstorm)
(AUTHORIZED)
5,000.00
0.00
0.00
5,000.00
2
To o ra hic Survey (AUTHORIZED)
18,021.00
0.00
0.00
18,021.00
3
Facility Master Plan AUTHORIZED
15,930.00
0.00
0.00
15 930.00
4
Construction Observation Services
22 500.00
20,434.00
0.00
42,934.00
5
Furniture Design and Documents
(AUTHORIZED)
3,500.00
0.00
0.00
3,500.00
6,
Landscape Plan (By Licensed Landscape
Designer) (AUTHORIZED)
15,000.00
0.00
0.00
15,000.00
7
Warrant Phase & As- Builts
6,000.00
0.00
0.00
6,000.00
Subtotal Additional Services
85,951.00
20,434.00
0.00
106,385.00
TOTAL. AUTHORIZED FEE
$165
$46,903.00
$48,75 ' .00
$261,358.00
M2009 -161 I Admin Approval I Admin Approval I
06/09/09 12/04/10
EXHIBIT "B"
H:( HOME %VelmaP1GENIWATERSONSWTP18657 FACILITY ALTERATiONS4AMENOMENT NO. 2. chuck anastoMSUMMARY OF FEES Page 1 of 1
h � y�,� SUPPLIER NUMBER
�� TO BE ASSIGNED BYE
PURCHASING DIVISION
City of CITY OF CORPUS CHRISTI
ti DISCLOSURE OF INTEREST
City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business
with the City to provide the following information. Every question must be answered. If the question is
not applicable, answer with "NA ". See reverse side for Filing Requirements, Certifications and
definitions.
COMPANY NAME: Chuck Anastos Associates, LLC
P. O. BOX: 3883
STREET ADDRESS: 901 South Staples Street
FIRM IS: 1. Corporation B 2.
4. Association 5.
CITY: Corpus Christi
Partnership X
Other
ZIP: 78463 -3883
3. Sole Owner ❑
DISCLOSURE (QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet.
1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Job Title and City Department (if known)
NIA
2. State the names of each "official" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Title
NIA
3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Board, Commission or Committee
NIA
4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who
worked on any matter related to the subject of this contract and has an "ownership interest"
constituting 3 % or more of the ownership in the above named "firm."
Name Consultant
NIA
EXHIBIT "C"
Pa e 1 of 2
FILING REQUIREMENTS
If a person who requests official action on a matter knows that the requested action will confer an
economic benefit on any City official or employee that is distinguishable from the effect that the action
will have on members of the public in general or a substantial segment thereof, you shall disclose that fact
in a signed writing to the City official, employee or body that has been requested to act in the matter,
unless the interest of the City official or em loyee in the matter is apparent. The disclosure shall also be
made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -349 (d)]
CERTIFICATION
I certify that all information provided is true and correct as of the date of this statement, that I have not
knowingly withheld disclosure of any information requested; and that supplemental statements will be
promptly submitted to the City of Corpus Christi, Texas changes occur.
Certifying Person: Chuck Anastos, A. I. A. itle: President
(Type or Print)
Signature of Certifying Date: �,�
Person: -J C It
DEFINITIONS
a. "Board member." A member of any board, commission, or committee appointed by the City
Council of the City of Corpus Christi, Texas.
b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an
effect on that interest that is distinguishable from its effect on members of the public in general or a
substantial segment thereof.
C. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-
time basis, but not as an independent contractor.
d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and
whether established to produce or deal with a product or service, including but not limited to, entities
operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint
stock company, joint venture, receivership or trust, and entities which for purposes of taxation are
treated as non -profit organizations.
e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager,
Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of
Corpus Christi, Texas.
f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a
firm, including when such interest is held through an agent, trust, estate, or holding entity.
"Constructively held" refers to holdings or control established through voting trusts, proxies, or
special terms of venture or partnership agreements."
g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus
Christi for the purpose of professional consultation and recommendation.
= IT "C"