Loading...
HomeMy WebLinkAboutC2011-260 - 7/11/2011 - NACITY OF CORPUS CHRISTI AMENDMENT NO. 2 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City ", and CHUCK ANASTOS ASSOCIATES. LLC hereinafter called "Engineer", agree to the following amendments to the Contract for Professional Services for O. N. Stevens Water Treatment Plant Facility Alterations (Project No. 8657) as authorized and administratively amended by: - Original Contract June 9, 2009 =Motion No. M2009 -161 $165,700.00 Amendment No. 1 December 4, 2010 1 Administrative Approval $46,903.00 From the original contract, Exhibit "A ", Basic Services, Item No. 2 Design Phase is amended to include additional Design Phase Services for the building plan re- design; revised site access, lay down area(s) and parking area(s); and additional scope required for the building permit application submission requirements not in original scope. From the original contract, Exhibit "A ", Summary of Fees is amended as specified in Exhibit "B" Summary of Fees. All other terms and conditions of the June 9, 2009 contract between the City and Consultant, and of any amendments to that contract, which are not specifically addressed herein shall remfuli force and effect. CITY OF ORP7t;z? // By /f d( Juan Perale , Jr., P. E. b6te Assistant City Manager CHUCK ANASTOS , LLC RECOMMEND By Pete Anaya, P. E., Date Director of Engineering Services ATTEST By Armando Chapa, City Secrefgry APPROVED AS TO FORM By W - : - H Assistant City Attorney Date By 23 'k-We C Chuck Anastos, AIA Date P. O. Box 3883 Corpus Christi, TX 78463 -3883 (361) 884 -4422 Office (361) 884 -4419 Fax Project Number: 8657 Funding Source: 550950-447 2011 -260' , 07/18/11 Chuck Anasto5 ASSociate5 _TERATIONSIAMENDMENT NO. 2. CHUCK ANASTOSAAMENDMENT NO, 2.DOC Page 1 of 1 INDEXED CHUCK flHflSTOS A550C IAT E5, L LC 02 June 2/27 Mr. Pete +¢,�ti� Director o Services City Of C PO Box 9 Corpus C 469 -9277 Re: Request for Amendment #02 to the AE fee for the ON STeVENs FACILITY ALTERATIONS— FY 08109 CIP PROJECT #WA 12, City of Corpus Christi Project #8657 Dear Mr. Anaya: This is a Request for Amendment #02 to Contract Fee for the above referenced City Project, as required by latest scope modifications. The additional fees are for the following scope revisions (refer to attached Exhibit A -1): 1. The additional AE services for the building plan redesign; 2. The additional AE services for the revised site access, lay down area(s) and parking area(s); and 3. Additional scope required for the building permit application submission requirements not in original scope. Basis of Revised Compensation Request: r Existing Fee for Basic Services: Requested Additional Fee for Basic Services: 1. Master Plan Phase $15,930.00 2. Preliminary Phase $15,930.00 3. Design Phase $58,410.00 _ Add: $32,555.00 ARCHITECTURE 4. Bid Phase $31 ,779.00 INTERIOR DESIGN Fee for Additional Services Requested Additional Fee for Additional Services: 1. Warranty Inspection(s) $ 3,000.00 2. Preparation of Record Drawing Set $ 2,000.00 3. Topographic Survey $ 8,500.00 4. Submission to TDLR $ 3,500.00 5. Supplemental Engineeri . _ ....___ ...... .... ...$55,054.00 Add 00 6. Furniture Design and Documents $ 3,500.00 7. Landscape Plan $15,000.00 P O BOX 3883 otal Requested Increase in AE Fee Add: $48,755.00 CORPUS C H R I S T I Total Original Fee and Amendment #01 $212,603.00 ($2,362,260 x 9 %) TEXAS 7846 3 Total R Ise Fee with Amendment #02 $261,358.00 ($2,362,260 x 11 %) 901 S STAPLES CORPUS CHRISTI Sincere , TEXAS 78404 TEL 3611884 -4422 FAX 361 1884.4419 Chuc a os, AIA, NCARB Amendment #02 ON STEVENS FACILITY ALTERATIONS- FY 08109 CIP PROJECT #WA 12 City of Corpus Christi Project #8657 EXHIBIT "A" Pa e 1 of 4 SCHEDULE DAY DATE ACTIVITY Wednesday 10 June 2009 Begin Master Plan Phase Wednesday 01 July 2009 Begin Preliminary Phase Wednesday 15 July 2009 Begin Design Phase Friday 14 August 2009 Interim Submittal (60 %) Friday 21 August 2009 City Review Monday 27 June 2011 Pre -Final Submittal (100 %) Friday 08 July 2011 City Review Meeting (100 %) Friday 29 July 2011 Final Submittal (100 %) Monday (2) Submission to TDLR Advertise for Bids Tue/Wed/Thu Supplemental Construction Observation Pre -Bid Conference Wednesday Furniture Design and Documents Receive Bids Monday Landscape Plan (By Licensed Landscape Designer) Begin Construction Weekday 106,754 Construction Completion Summary of Amended Fees (Amendment #01 & Amendment #02 Fee for Basic Services 1. Master Plan Phase $15,930 2. Preliminary Phase 15,930 3. Design Phase 90,965 4. Bid Phase 31,779 Subtotal Basic Services Fees 154,604 Fee for Additional Services (Allowance) 1. Warranty Inspection(s) 3,000 2. Preparation of Record Drawing Set 2,000 3. Topographic Survey (Authorized) 8,500 4. Submission to TDLR 3,500 5. Supplemental Construction Observation 71,254 6. Furniture Design and Documents 3,500 7. Landscape Plan (By Licensed Landscape Designer) 15,000 Sub -Total Additional Services Fees Authorized 106,754 Total Authorized Fee $261,358 EXHIBIT "A" Page 2of4 (hU(K fin USTOS A S S O C I A T E 5, L L C EXHIBIT A -1 FEE AMENDMENT #02 FOR THE ON STEVENS FACILITY ALTERATIONS — FY 08109 CIP PROJECT #WA 12 CITY OF CORPUS CHRISTI PROJECT #8697 TASK LIST 1. Architecture: F BIT "A" e3of4 A. Attend meetings, prepare forms, drawings and specifications and resubmit drawings and specifications to Development Services for final review; B. Revise drawings for staging, phasing and alternates; C. Revise drawings for modifications of areas uncovered after asbestos abatement; D. Review revised civil notes, SWPPP, detail(s), site demolition and staging, rough grading and paving plans, detail(s), and specifications; E. Revise architectural site plan and detail(s); F. Revise site means of egress and ADA parking 1 access into building; G. Revise demolition plan; H. Revise floor plan(s); I. Revise roof plan and roof detail(s); A R C H I T E C T U R E J. Revise floor finish plan(s); INTERIOR DESIGN K. Revise ceiling plan(s); L. Revise furniture plan and schedule; M. Modify exterior elevation(s), building section(s) and wall sections; N. Modify interior elevation(s); O. Modify detail(s) and schedule(s); P. Review structural notes, foundation plan(s), structural detail(s) and specifications, Q. Review mechanical 1 electrical I plumbing notes, plan(s), detail(s), specifications, and coordinate with work in other engineering project (Bath); R. Review modifications made to landscaping notes, plan(s), irrigation plan(s), detail(s) and specifications; S. Attend meetings, prepare Building Permit forms, drawings and P o BOX 3 88 3 specifications and submit drawings and specifications to Development CORPUS CHRISTI Services to commence Building Permit Application process. TEXAS 78 46 3 9 0 1 S STAPLES 2. Civil Engineering: CORPUS CHRISTI TEXAS 78404 A. Resurvey the site; TEL 3611884 -4422 FAX 361 1 884 -441 9 Amendment #02, Page 1 - 2 ON STEVENs FACILITY ALTERATIONS— FY 08109 CIP PROJECT #WA 12, City of Corpus Christi Project #8657 F BIT "A" e3of4 B. Coordinate with Bath (engineering) project; C. Redesign parking from asphalt to concrete paving; D. Identify additive bid alternates; and E. Orient design drawings to Owner requested phasing plan. 3. Structural Engineering: A. Survey exposed structure not visible prior to asbestos abatement; B. Infill large holes in slab and roof uncovered in asbestos abatement; and C. Redefine additive bid alternates. 4. Mechanical, Electrical and Plumbing Engineering: A. Survey exposed building elements not visible prior to asbestos abatement; B. Coordinate with additional engineering (Bath) project; C. Redesign elements of server room; and D. Redefine additive bid alternates. 6. Cost Estimating Services: A. Survey exposed building elements not visible prior to asbestos abatement; and B. Re- estimate projected construction costs. 6. Landscape Architecture: A. Resurvey the site work; and B. Modify landscaping as required. Amendment #02, Page 2 - 2 ON STEVENS FACILITY ALTERATIONS — FY 08109 C1P PROJECT #WA 12, City of Corpus Christi Project #8857 F EXHI , BIT "A" 4 of 4 O.N. STEVENS WATER TREATMENT PLANT FACILITY ALTERATIONS (Project No. 8657) SUMMARY OF FEES M2009 -161 I Admin Approval I Admin Approval I 06/09/09 12/04/10 EXHIBIT "B" H:( HOME %VelmaP1GENIWATERSONSWTP18657 FACILITY ALTERATiONS4AMENOMENT NO. 2. chuck anastoMSUMMARY OF FEES Page 1 of 1 ORIGINAL CONTRACT AMENDMENT NO. AMENDMENT NO.2 TOTAL BASIC SERVICES 1 Preliminary Phase $15,930.00 $0.00 $0.00 $15,930.00 2 Design Phase 48,889.00 26,469.00 48,755.00 124,113.00 3 Bid Phase 5,310.00 0.00 0.00 5,310.00 4 Construction Phase 9,620.00 0.00 0.00 9,620.00 Subtotal Basic Services 79,749.00 26 469.00 48,755.00 154,973.00 ADDITIONAL SERVICES 1 Permit Preparation (TDLR & Windstorm) (AUTHORIZED) 5,000.00 0.00 0.00 5,000.00 2 To o ra hic Survey (AUTHORIZED) 18,021.00 0.00 0.00 18,021.00 3 Facility Master Plan AUTHORIZED 15,930.00 0.00 0.00 15 930.00 4 Construction Observation Services 22 500.00 20,434.00 0.00 42,934.00 5 Furniture Design and Documents (AUTHORIZED) 3,500.00 0.00 0.00 3,500.00 6, Landscape Plan (By Licensed Landscape Designer) (AUTHORIZED) 15,000.00 0.00 0.00 15,000.00 7 Warrant Phase & As- Builts 6,000.00 0.00 0.00 6,000.00 Subtotal Additional Services 85,951.00 20,434.00 0.00 106,385.00 TOTAL. AUTHORIZED FEE $165 $46,903.00 $48,75 ' .00 $261,358.00 M2009 -161 I Admin Approval I Admin Approval I 06/09/09 12/04/10 EXHIBIT "B" H:( HOME %VelmaP1GENIWATERSONSWTP18657 FACILITY ALTERATiONS4AMENOMENT NO. 2. chuck anastoMSUMMARY OF FEES Page 1 of 1 h � y�,� SUPPLIER NUMBER �� TO BE ASSIGNED BYE PURCHASING DIVISION City of CITY OF CORPUS CHRISTI ti DISCLOSURE OF INTEREST City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: Chuck Anastos Associates, LLC P. O. BOX: 3883 STREET ADDRESS: 901 South Staples Street FIRM IS: 1. Corporation B 2. 4. Association 5. CITY: Corpus Christi Partnership X Other ZIP: 78463 -3883 3. Sole Owner ❑ DISCLOSURE (QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Job Title and City Department (if known) NIA 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title NIA 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee NIA 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3 % or more of the ownership in the above named "firm." Name Consultant NIA EXHIBIT "C" Pa e 1 of 2 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or em loyee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -349 (d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas changes occur. Certifying Person: Chuck Anastos, A. I. A. itle: President (Type or Print) Signature of Certifying Date: �,� Person: -J C It DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. C. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part- time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non -profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. = IT "C" 2of2