Loading...
HomeMy WebLinkAboutC2011-271 - 8/8/2011 - NAAMENDMENT NO.3 TO CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City ", and Freese and Nichols Inc. hereinafter called "CONSULTANT ", agree to the following amendments to the Contract for Professional Services for Staples Street (Bond Issue 2008) — Phase 1 from Saratoga to Holly (Project No. 6494) and Phase 2 from Holly to Williams (Protect No. 6495) as authorized by: Original Contract June 9, 2009 Motion No. M2009 -162 $1,665,349.00 Amendment No. 1 Aril 27, 2010 Motion No. M2010 -093 $67,968.00 Amendment No. 2 August 17, 2010 Motion No. M2010 -186 $71,625.00 • In the original contract, Exhibit "A ", Section 1. SCOPE OF SERVICES, Section B. Additional Services, 2. Right-of-Way--(ROW) Acquisition Survey shall be amended as follows: ➢ For revising the right -of -way description and area on Parcels 3, 4, 413, 11, 13 and 14 along the corridor of Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494). In the original contract, Exhibit "A ", Section 1. SCOPE OF SERVICES, Section B. Additional Services, 3. Topographic Survey shall be amended as follows: ➢ For conducting additional topographic survey in Mary Carroll Channel to extend the proposed box culvert adjacent to the corridor of Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494). In the original contract, Exhibit "A ", Section 1. SCOPE OF SERVICES, Section B. Additional Services shall be amended to add the following task: ➢ 11. Roadway Re- alignment Revise and realign the roadway, remove the raised median, narrow the traffic lane widths and sidewalk/bike path width in specified locations, and make associated revisions to the contract documents for Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494). • In the original contract, Exhibit "A ", Section 3. FEES shall be modified for a total fee not to exceed $47.978.00 (Forty Seven Thousand Nine Hundr Seventv Eiaht Dollars and Zero Cents) for a total restated fee not to exceed $1,852,920.00 One Million Eight Hundred Fifty Two Thousand Nine Hundred Twenty Dollar and Zero Cents) as shown in the attached Amendment No. 3, Exhibit "B." All other terms and conditions of the June 9, 2009 contract between the City and Consultant will remain in full force and effect. CITY O CORPUS HRISTI Juan Perales, h., P.E. D to Assistant City Manager 2011 -271 08/08/11 F EESE ND NICHOLS, INC. 1 - 2 -1k Rdh Guzman, P.E. Date Principal 800 N. Shoreline Blvd., Suite 160ON Corpus Christi, TX 78401 361 - 561 -6500 Office; 361 - 561 -6501 Fax Freese and Nichols RIHOMEWelmaRGEMSTREET16494 STAPLES FREESEIAMENDMENT NO. 364MENDMENT NO. Moc AMD. NO.3 Page 1 of 2 INDEXED RECOMME DED Pete Anaya, P.E. Date Director of Engineering Services ATTEST Armando Chapa, City Secre ry APPROVED AS TO FORM Assistant City Attorney Date Project Number: 649 Funding Source: 550950- 3546 - 00000- 17021i Encumbrance Number: E q 6 1- ENTERED RXHOMBVelmaP5GEN%STREET%6494 STAPLES FREEMAMENDMENT NO. MMENDMENT NO. 3.doc AMD. NO. 3 Page 2 of July 5, 2011 IG . Pete Anaya, P.E. Director of Engineering Services City of Corpus Christi, TX P.O. Box 9277 Corpus Christi, TX 78469 RE: Staples Street (Bond Issue 2008) Phase 1— Saratoga to Holly (Project No. 6494) Contract Amendment Request No. 3 (REVISED) Dear Mr. Anaya: The Corpus Christi City Council authorized a Contract for Professional Services with Freese and Nichols, Inc. on June 9, 2009 (by M2009 -162) for the above referenced project. FNI delivered the final signed and sealed design drawings and contract documents for Staples Street Phase 1 from Saratoga to Holly to the City on August 16, 2010. Per our meeting with City Engineering staff on March 21, 2011, FNI was directed to remove the raised median and shift the alignment for this street on the north side of Saratoga Boulevard, in order to avoid the need to acquire a 5.42 ft. strip ROW parcel from Saratoga Plaza, LLC. Subsequently, FNI was also directed to revise the traffic lane widths and sidewalk /bike path width and eliminate or reduce the ROW takings from three other parcels. This realignment and other changes will necessitate revising the metes and bounds descriptions for six parcels; revising 98 sheets of the drawings; and revising quantities, opinion of probable construction costs and the bid proposal form. The scope of services for these Additional Services will be in accordance with Exhibit 'A' and Exhibit 'A-I' of our Contract for Professional Services. Our proposed fee for these additional services is $47,978. We request approval of Amendment No. 3 (attached) and authorization to proceed with these Additional Services. AMD. No. 3 EXHIBIT "A" Pape 9 of 2 800 N. Shoreline Blvd., Suite 160ON a Corpus Christi, Texas 78401 ® 361 - 561 -6500 o fax 361 -561 -6501 o www.frease.eom 1" wwl Pete'Anayg, P.E. July 5, 2011 Page 2 If you have any questions, please call me at (361) 561 -6500. Sincerely, FREESE AND NICHOLS, INC. r Ron Guzman, P.E. Principal Attachment: Amendment No. 3 Exhibit B — Indemnification Clause Exhibit C - Disclosure of Interest AMD. No. 3 EXHIBIT "A" Page 2 of 2 Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494) Staples Street, Phase 2 from Holly to Williams (Project No. 6495) SUMMARY OF FEES Staples Street. Phase 1 from Saratoaa to Holiv IProiect No. 64941 X x O -w wW HAHOME1Ve1maRGEMSTREET;5494 STAPLES FREESESAMENDMENT NO. 31SUMMARY OF FEESSUMMARY OF FEES Original Contract Amd. No. 1 Amd. No. 2 Amd. No. 3 Street Stone Water Water Wastewater Total Street Street Street Basic Services 1 Preliminary Phase $51,297-00 $34,248.00 $20,592.00 $1,561.00 $107,698.00 $0.00 $0.00 $0.00 2 Design Phase 248,096.00 165,641.00 99,593.00 7,553.00 520,883.00 0.00 0.00 0.00 3 Bid Phase 7,876.00 5,259.00 3,162.00 240.00 16,537.00 0.00 0.00 0.00 4 Construction Phase 40,015.00 26,716.00 16,063.00 1,218.00 84,012.00 0.00 0.00 0.00 Subtotal Basic Services 347,284.00 231,864.00 139,410.00 10,572.00 729,130.00 0.00 0.00 0,00 Additional Services (Allowance) 1 Pemit Preparation TXDOT TCEQ -TPDES Notice of Intent/Termination TDLR- ADAlTAS Compliance Subtotal Permit Preparation 4,670.00 0.00 3,193.00 7,863.00 0.00 546.00 0.00 546.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 -00 4,670.00 546.00 3,193.00 8,409.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 67,968.00 0.00 8,252.00 3 Topographic Survey 54,775.00 36,570.00 21,988.00 1,667.00 115,000.00 0.00 0.00 1,121.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 Median/Traffic Impact Assessment 113,139-00 0.00 0.00 0.00 913,139.00 0.00 0.00 0.00 7 Public Involvement Phase 7,068.00 4,799.00 2,837.00 215.00 14,839.00 0.00 0.00 0.00 8 Warranty Phase 5,716.00 3,816.00 2,294.00 174.00 12,000.00 0.00 0.00 0.00 9 Subsurface Utility Exploration 0.00 21,253.00 12,778.00 969.00 35,000.00 0.00 0.00 0.00 10 Roadway Re-alignment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38,605.00 Subtotal Additional Services 1 188,561.00 1 66,904,001 39,897.00 3,025.00 298,387.00 67,968.00 a -0a 47,97800 Total Phase 1 1 535,845.001 298,768.001 179,307.001 13,597.001 1,027,517.001 67,968.001 0,001 47 978.00 X x O -w wW HAHOME1Ve1maRGEMSTREET;5494 STAPLES FREESESAMENDMENT NO. 31SUMMARY OF FEESSUMMARY OF FEES Staples Street. Phase 2 from Holm to Williams Wrniect No_ 6495f X m � O w W HAH0ME%VeImaPXGENISTREETXE494 STAPLES FRLESBAMENNMENT NO. 31SUMMARY OF FEESSUMMARY OF FEES Original Contract Amd. No. 7 Amd. No. 2 Amd. No. 3 Street Storm Water Water Wastewater Total Street Street Street Basic Services 1 Preliminary Phase 47,092.00 13,576.00 4,123.00 9,230.00 74,021.00 0.00 0.00 0.00 2 Design 223,608.00 64,460.00 19,577.00 43,829.00 351,474.00 0.00 0.00 0.00 3 Bid Phase 7,482.00 2,1 57.00 655.00 1,467.00 11 ,761.00 0.00 0.00 0.00 4 Construction Phase 32,179.00 9,276.00 2,817.00 6,307.00 50,579.00 0.00 0.00 0.00 Subtotal Basic Services 310,361.00 89,469.00 27,172.00 60,833.00 487,835.00 0.00 0.00 0.00 Additional Services (Allowance) 1 Pemit Preparation TXDOT TCEQ -TPDES Notice of Intent/Termination TDLR- ADA/TAS Compliance Subtotal Permit Preparation 0.00 0.00 4,772.00 4,772.00 0.00 544.00 0.00 544.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 544.00 4,772.00 5,316.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 71,625.00 0.00 3 Topographic Survey 66,145.00 19,068.00 5,791.00 12,965.00 103,969.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 Median/Traffic Impact Assessment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 Public Involvement Phase 10,257.00 2,957.00 898.00 2,011.00 16,123.00 0.00 0.00 0.00 8 Warranty Phase 4,669.00 1,346.00 409.00 915.00 7,339.00 0.00 0.00 0.00 9 Subsurface Utility Exploration 0.00 8,696.00 2,641.00 5,913.00 17,250.00 0.00 0.00 0.00 10 Roadway Re 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 1 85,843.00 32,611.00 9,739.00 21,804.00 949,997.00 0.00 71,625.00 0.00 1 Total Phase 2 396,204.00 122,080.00 36,911.00 82,637.00 637832.001 0.001 71,625.00 0.00 X m � O w W HAH0ME%VeImaPXGENISTREETXE494 STAPLES FRLESBAMENNMENT NO. 31SUMMARY OF FEESSUMMARY OF FEES Staples Street, Phases 1 & 2 (6494 & 6495) Combined Total 'fl X m = A W W � O w W HAHOMEWelmaRGEMSTREM6494 STAPLES FREESEWMENDMENT NO. =UMMARY OF FEESSUMMARY OF FEES Original Contract Amd. No. 1 Amd. No. 2 Amd. No. 3 Street Storm Water Water Wastewater Total Street Street Street Total Basic Services 1 Preliminary Phase 98,389.00 47,824.00 24,715.00 10,791.00 181,719.00 0.00 0.00 0.00 181;719.00 2 Design Phase 471,704.00 230,101.00 119,170A0 51,382.00 872,357.00 0.00 0.00 0.00 872,357.00 3 Bid Phase 15,358.00 7,416.00 3,817.00 1,707.00 28,298.00 0.00 0.00 0.0a 28,298.00 4 Construction Phase 72,194.00 35,992.00 18,880.00 7,525.00 134,591.00 0.00 0.00 0.00 134,591.00 Subtotal Basic Services 657,645.00 321,333.00 166,582.00 71,405.00 1,216,965.00 0.00 0.00 0.00 1,216,965.00 Additional Services (Allowance) 1 Pemit Preparation TXDOT TCEQ -TPDES Notice of IntentlTermination TDLR- ADA/TAS Compliance Subtotal Permit Preparation 4,670.00 0.00 7,965.00 12,635.00 0.00 1,090.00 OM 1,090.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,670.00 1,090.00 7,965.00 13,725.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,670.00 1,090.00 7,965.00 13,725.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 67,968.00 71,625.00 8,252.00 147,845.00 3 Topographic Survey 120,920.00 55,638.00 27,779.00 14,632.00 218,969.00 0.00 0.00 9,121.00 220,090.00 4 Environmental issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 Median/Traffic Impact Assessment 113,139.00 0.00 0.00 0.00 113,139.00 0.00 0.00 0.00 113,139.00 7 Public Involvement Phase 17,325.00 7,676.00 3,735.00 2,226.00 30,962.00 0.00 0.00 0.00 30,962.00 8 Warranty Phase 10,385.00 5,162.00 2,703.00 1,089.00 19,339A0 0.00 0.00 0.00 19,339.00 9 Subsurface Utility Exploration 0.00 29,949.00 15,419.00 6,882.00 52,250.00 0.00 0.00 0.00 52,250.00 10 Roadway Re- alignment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38,605.00 38,605.00 Subtotal Additional Services 274,404.00 99,515.001 49,636.001 24,829.00 448,384.00 67,968.00 71,625.00 47,978.00 635,955.0C Total Authorized Fee for Phases 1 & 2 $932,049.001 $420,848.00 $98,234.001 $1,665,349.00 $67,968.00 $71,625.00 $47,978.00 $1,852,920.00 __ $216,218.001 06/09/09 M2009 -162 04/27/10 M2010 -093 08/17/10 M2010 -186 AdminApprval 'fl X m = A W W � O w W HAHOMEWelmaRGEMSTREM6494 STAPLES FREESEWMENDMENT NO. =UMMARY OF FEESSUMMARY OF FEES 4 SUPPLIER NUMBER TO BE ASSIGNED BY ITT PURCHASING DIVISION City of CITY OF CORPUS CHRISTI �ti DISCLOSURE OF INTEREST City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with `NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: Freese and Nichols, Inc. P. O. BOX: STREET ADDRESS: 800 N. Shoreline, Suite 160ON CITY: Corpus Christi ZIP: 78401 FIRM IS: 1. Corporation X 2, Partnership ❑ 3. Sole Owner E] 4. Association ❑ 5. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1, State the names of each `employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm.' Name Job Title and City Department (if known) NIA 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title NIA 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership In the above named "firm." Name Board, Commission or Committee NIA 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant NIA EXHIBIT "C" Pa e I of 2 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -349 (d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: Ron Guzman, P. E. (Type or Print) Title: Principal gnature:of Certifying` -'.,;] Person 1 • � Z • 1 � ..,. DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. o, "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non - profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. EXHIBIT "C" Pa e2 of2