HomeMy WebLinkAboutC2011-372 - 9/20/2011 - NACITY OF CORPUS CHRISTI AMENDMENT NO. 1 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "CITY ", and LNV Inc., hereinafter called "ENGINEER," agree to the following amendment to the Contract for Professional Services for Elevated Water Storage Tanks City -Wide (Project No. 8651) as authorized and amended by: Original AIE Ag reement I February 10, 2009 Motion M2009 -032 $ 705,242.00 Exhibit "A " SECTION 1. SCOPE OF SERVICES, PART A. BASIC SERVICES, ITEM NO, 1 PRELIMINARY PHASE shall be amended to include additional Preliminary Design Phase services. Exhibit "A " SECTION 1. SCOPE OF SERVICES, PART B. ADDITIONAL SERVICES shall be amended to include additional services as follows: • ITEM NO. 1 PERMIT PREPARATION • ITEM NO.2 ROW ACQUISITION SURVEY • ITEM NO. 4 ENVIRONMENTAL ISSUES • ITEM NO. 9 SITING EVALUATION AND RECOMMENDATION • ITEM NO. 10 PRESSURE AND WATER AGE EVALUATION • ITEM NO. 11 PROPOSED SYSTEM ANALYSIS — ACR FOR ELEVATED STORAGE Exhibit "A " SECTION 1. S_ COPE OF_SERVICES, PART B. ADDITIONAL_ SE_ RVICES shall be amended to deduct services as follows: • ITEM NO. 5 CONSTRUCTION OBSERVATION SERVICES • ITEM NO. 6 START -UP SERVICES In the original contract, EXHIBIT "A ", SUMMARY OF FEES shall be modified and is attached as Amendment No. 1 Exhibit "A" for a revised fee not to exceed $0.00 Zero Dollars and zero cents), for a total restated fee not to exceed $705,242.00 (Seven Hundred Five Thousand Two Hundred Fortv Two Dollars and zero cents). -. All other terms and conditions of February 10, 2009 contract between the City and Consultant will remain in full force and effect. r, CITY OF CO% S CHRISTI �� 1 2 V Zcj Juan Perales Jr., P.E. Date Assistant City Manager LNV. I Dan S. Leffecker, P.L Date 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361) 883 -1984 Office (361) 883 -1986 Fax LNV Inc. 2011 -372 09/20/11 51 ELEVATED WATER STORAGE TANKSIAMENDMENT NO. 1LAMENDMENT N0, 1.DOCX AMEND. NO. 1 Page 1 of 2 INDEXED RECOMME ED �f Pete Anaya, P.E. Date Director of Engineering Services ATTEST Armando Chapa, City SecretaHJ APPROVED AS TO FORM N J &P 4 4-1/ G"(� 1 --r - Assistant City Attorney Date Project Number: 8651 Funding Source: 550950- 4477 - 00000 - 180203 Encumbrance Number: ≪ k, J EN" FQED AMEND. NO. 1 Page 2 of 2 K:IENGINEERING DATAEXCHANGEWELMAMWATER18651 ELEVATED WATER STORAGE TANKMAMENDMENT NO. MMENDMENT NO. 1.DOCX LNV engineers I architects I contractors Solutions Today with a Vision for Tomorrow August 22, 2011 Mr. Pete Anaya, P. E. Director of Engineering Services City of Corpus Christi Engineering Services P.O. Box 9277 Corpus Christi, TX 78469 -9277 Re: AMENDMENT NO. 1 TO PROFESSIONAL SjERVICES CONTRACT ELEVATED WATER STORAGE TANKS CITY -WIDE (PROJECT NO. 8651) Dear Mr. Anaya: In response to City request, we are proposing the following small A/E contract for additional services associated with the Elevated Water Storage Tanks — City Wide (City Project No. 8651). Project Description: The City of Corpus Christi, Texas, hereinafter called "City ", and LNV, Inc. hereinafter called "Engineer ", agree to the following Contract for Additional Services associated with the above referenced task. This effort includes providing the City and Texas Commission on Environmental Quality (TCEQ) with the additional water system analysis and modeling methodology and assumptions as a result of the July 8, 2011 meeting with TCEQ in an Engineering Letter Report with the purpose of determining proper elevated storage tank locations and providing a plan for implementation of the proposed elevated storage. The configuration of elevated storage determined in this project will also be used to defend the City's request for Alternative Capacity Requirement (ACR) for the City's Elevated Storage operating system. These services were requested by the Operating Department. Scope of Services: The Scope of Services for this contract is comprised of the following tasks: A. Basic Services 1, Preliminary Phase Integration of the TCEQ approved ACR Variance Request Letter Report (detailed in Section 11.8) including Implementation Plan for four (4) new elevated storage tanks into the Elevated Storage Tanks City -Wide Engineering Letter Report. 2. Design Phase — No Changes under this Amendment 3. Bid Phase -- No Changes under this Amendment 4. Construction Phase — No Changes under this Amendment AMEND. NO. 1 EXHIBIT ` "A" Pa e 1 of 7 B. Additional Services 1. Permitting Provide Permitting services as detailed in Exhibit "A" of the original contract for one (1) additional tank site from ACR Implementation Plan. 2. Right -of -Way (ROW) Acquisition Survey Provide Permitting services as detailed in Exhibit "A" of the original contract for one (1) additional tank site from ACR Implementation Plan. 3. Topographic Survey — No Changes under this Amendment 4. Environmental Issues Provide Permitting services as detailed in Exhibit "A" of the original contract for one (1) additional tank site from ACR Implementation Plan. 5. Construction Observation — No Changes under this Amendment 6. Start -up Services — No Changes under this Amendment 7. Warranty Phase — No Changes under this Amendment 8. Provide SCADA Documentation — No Changes under this Amendment 9. Siting Evaluation and Recommendations Provide Permitting services as detailed in Exhibit "A" of the original contract for one (1) additional tank site from ACR Implementation Plan. 10. Pressure and Water Age Evaluation Perform Water Age Evaluations only as detailed in Exhibit "A" of the original contract for modified tank siting from the TCEQ approved ACR Implementation Plan (detailed in 11.6). A water age Evaluation will be performed for each of the four (4) phases identified in the ACR Implementation Plan. 11. Proposed System Analysis — ACR for Elevated Storage Provide the additional modeling effort to include the Year 2025 scenario. This scenario will include all Proposed Elevated Storage. ii) Provide 2025 demand projections and include the results of the four (4) conditions requested by TCEQ and described in further detail in Sections 11.1 -11.4 below for the scenario described above. 11.1 Modeling Requirements i) Apply growth projection analysis to identify the Average Annual Demand (AAD) for each customer by projecting the current demands to the year 2025. This will be determined by analyzing the estimated projections obtained from the Texas Water Development Board's Regional Water Planning Data. Allocate the additional demands to the forecasted growth areas indicated by the 1995 -2008 platting data in the City's Draft Water Transmission Master Plan. ii) Calculate the projected maximum daily demand (MDD) and peak hourly demand (PHD) based upon the trend found above by applying factors historically determined from water department records and TCEQ Rules and Regulations to the demands allocated in the existing model. For the purpose of this ACR, TCEQ has allowed the City to exclude the demands associated with STWA, NCWCID#4, and SPMWD since the system does not rovide pressure maintenance for theses stems. E O. 1 "A °b f7 11.2 Proposed System Simulation at Peak Hour Demand (PHD) during Normal Operating Conditions This task addresses the following comment in the April 6, 2009 letter from TCEQ. "The design under normal operating conditions must be sized, designed and capable of providing at least 35 psi at all points in the distribution at flow rates of at least 1.5 gpm per connection. (if a public water system's peak hour demand is greater than 1.5 gpm per connection, then the system must be sized, designed and capable of meeting the actual peak hour demand.)" • 1.5 gpm 1 connection = TBD • ONSWTP System Actual PHD = TBD i) Based on the projection analysis described in Section 1.1 above, allocate both demands to the model in two separate scenarios to satisfy 1.5 gpm /connection from TCEQ Rules and Regulations §290.45 (g)(5)(A)(i) as well as ONSWTP system actual PHD to provide consistency in comparing each modeled scenario. ii) Perform the steady -state hydraulic simulation to confirm that under normal operating conditions, at least 35 psi is maintained at all points in the distribution system at the PHD determined above. All booster pump stations will be in service. This simulation will be performed for the 2025 scenario for both demand scenarios (2 model runs) iii) Provide a defense for reasons the ONSWTP's actual Peak Hour Demand should be used. iv) Create a color coded exhibit identifying the pressure at every node in the distribution system for this simulation. 11.3 Proposed System Emergency Power Hydraulic Simulation at Average Daily Demand (ADD) This task addresses the following comment in the April 6, 2009 letter from TCEQ. "Hydraulic simulation with emergency onsite generated power with automatic switchover simulated. This should demonstrate that the system can provide 0.35 gpm per connection or average daily demand, whichever is greater and provide 0.35 gpm per connection to storage with operation of only facilities powered by onsite emergency generators. The onsite emergency power facilities must power sufficient production, pumping and treatment facilities to provide 0.35 gpm per connection to storage." `in addition, the emergency hydraulic simulation should include a surge analysis to determine the high and low transient pressures that occur during an emergency pump shutdown." • 0.35 gpm 1 connection = TBD • 0.35 gpm 1 connection to storage = TBD demand at storage facilities will be applied to the steady -state model • ONSWTP System ADD = TBD • No booster pump stations will be in service. i) Perform the steady -state hydraulic simulation to confirm that under emergency power conditions, at least 35 psi is maintained at all points in the distribution system at the AAD determined for each scenario along with providing an additional 0.35 gpm per connection to the System's storage facilities. No booster pump E D. NO. 1 BIT "A" 3of7 stations will be in service. This simulation will be performed for the year 2025 scenario ii) Create a color coded exhibit identifying the pressure at every node in the distribution system for this simulation. 11.4 Proposed System Power Loss at Peak Hour Demand (PHD) This task addresses the following comment in the April 6, 2009 letter from TCEQ. "A hydraulic analysis for each pressure plane must be conducted under peak hour customer demands and include the recorded lag time between loss of normal power and the commencement of emergency power. The analysis must demonstrate that pressures in each pressure plane will not be less than 20 psi. Please note whether the emergency power facilities have automatic switchover controls or are manually started, and note the corresponding time for System staff to power up the onsite emergency power equipment and bring necessary equipment online after the loss of normal power." • The existing onsite emergency power generators at ONSWTP have automatic start -up controls and capabilities. The High Service pumps must be manually re- started once the generators have ramped up to full speed. i) Coordinate with Water Department personnel to accurately determine the maximum realistic duration (lag time) between a power outage and placing the High Service pumps back in service. Obtain the Standard Operating Procedure from Water Department Staff and implement the current procedure into the controls within this scenario of the water model and provide as an attachment to the report. ii) Perform the necessary extended period hydraulic simulation to show that under a power loss condition, at least 20 psi is maintained at all points in the existing distribution system at the PHD determined for each scenario and for the duration required to place the necessary pumps back in service. The pumps at O.N. Stevens WTP are assumed to be without power until backup generators are put into place and pumps are strategically turned back on. This simulation will be performed for the year 2025 scenario iii) Provide calculations and assumptions in an organized format within a report. If possible, create a color coded exhibit identifying the minimum pressure at every node in the distribution system during the outage duration. 11.5 Surge Analysis (Existing and Proposed System) This task addresses the following comment in the April 6, 2009 letter from TCEQ "In addition, the emergency hydraulic simulation should include a surge analysis to determine the high and low transient pressures that occur during an emergency pump shutdown." i) Transfer the existing water model into the recommended surge software and verify that all controls and attributes have been accurately carried over into the new software. E O. . N 1 T "A" of7 Research and implement industry standard internal diameters and wall thicknesses of each pipe in the model by pipe material and M 1 nominal diameter. iii) Calculate the wave speed for each pipe using the wave speed calculator in the surge analysis software. iv) Perform surge analysis where transient events are usually most severe (at pumps stations and control valves, in high elevated areas, at locations of low static pressure, and in remote locations that are distanced from elevated storage). Conduct Analysis and setup profiles to determine the routes which will encompass the critical points in the distribution system. This simulation will be performed for existing and year 2025 scenarios V) Perform the analysis and review results for each profile of typical events that require transient considerations: (1) Pump startup and shutdown (i.e. power outage) (2) Valve opening and closing at tanks and in large transmission mains (3) Rapid changes. in demand conditions (i.e. hydrant flushing or LVU) (4) Changes in transmission conditions (i.e. main break) vi) Review previously prepared engineering report on system surge by others. vii) Provide field verification study including recommendation for gauge placement, data collection, compiling and organizing data, and verifying data with modeled results (including any iterations to refine the model parameters). viii) Provide calculations and assumptions in an organized format within the report. If possible, create a color coded exhibit identifying the critical locations in the distribution system. 11.6 Proposed System Implementation Plan i) Develop and select available alternatives for phasing the implementation plan. ii) Analyze modeling results to determine the hierarchy of alternatives selected in Section 11.6 (i) based on hydraulically critical locations and provide a maximum of 4 phases for implementation of the elevated storage and associated boundary modifications. iii) Coordinate with City Water and Engineering Departments to provide a probable construction plan and schedule which includes milestone dates of the City's plan for increased elevated storage capacity and pressures. iv) Provide plan and schedule in an organized format within the report. 11.7 Meetings i) Prepare for and conduct three (3) project status meetings not to exceed two (2) hours each with City Water and Engineering Staff approximately every two weeks after specific project milestones. ii) Conduct two (2) meetings with TCEQ's oversight and development team not to exceed eight (8) hours (including travel time) each to present model results and submit final revision of the AC R. M 1 11.8 Engineering Letter Report i) Update the variance request letter report, as appropriate for submission to the TCEQ concerning city -wide Alternative Capacity Requirements (ACR) for the elevated storage tank volume component of the ONSWTP system, in response and compliance with TCEQ letter dated April 6, 2010. The variance letter with supporting report will include, but not necessarily be limited to, the following information and sections. Executive Summary • Modeling methodology including pump controls, assumptions, etc. • Demand discussion on customer types & demand factors • Model Calibration data • Modeling scenario descriptions • Surge protection analysis • Modeling Results in exhibit and tabular summary format + Implementation Plan ASSUMPTIONS: As requested by TCEQ, Padre Island pressure zone will be removed from all modeling scenarios. Holly Pump Station and associated separation valves will be removed from the distribution system and all modeling scenarios. Schedule: • All work associated with the TCEQ variance request and implementation plan shall be completed by the Engineer by December 12, 2011. All work associated with the Preliminary Design, Permitting, Environmental Issues, Site Evaluations, and Water Age Evaluation for the Elevated Storage Tanks City -Wide Project (8651) shall be completed by the Engineer 120 calendar days following TCEQ's approval of the ACR Variance Request. ROW Acquisition Survey shall be concurrent with the Modified Design Schedule. Fees: A. Fee for Additional Services Authorized. The City will pay the Engineer a lump sum fee not to exceed $ 0.00 for provided services specified in this contract. The fee will be full and total compensation for services and for all expenses incurred in performing these services. Engineer will submit monthly statements for basic services rendered. Each statement will be based on the project percent completion at the time of billing. City will make prompt monthly payments in response to Engineer's monthly statements. AMEND. NO. 1 EXHIBIT "A" Page 6 of 7 B. Summary of fees. See below. M2009-032 Admin_ Approval Please feel free to contact me, should you have any questions. Sincerely, LNV, INCPE F.jm No. F -366 Dan S.i ndecker, P.E. E O. 1 "A" f7 ORIGINAL CONTRACT AMEND. NO.1 TOTAL BASIC SERVICES 1 Preliminary Phase $55,000.00 $18,808.00 $73,808.00 2 Design Phase 160,000.00 0.00 160,000.00 3 Bid Phase 5,000.00 0.00 5,000.00 Construction Phase 4 Tank 1 39,000.00 0.00 39,000.00 Tank 2 39,000.00 0.00 39,000.00 Tank 3 39,000.00 0.00 39,000.00 Subtotal Basic Services 337,000.00 18,808.00 355,808.00 ADDITIONAL SERVICES 1 Permit Preparation 29,998.00 9,904.00 39,902.00 2 ROW Acquisition Survey 18,038.00 6,332.00 24,370.00 3 Topographic Survey 21,024.00 0.00 21,024.00 4 Environmental Issues 23,996.00 8,442.00 32,438.00 Construction Observation Services 5 Tank 1 47,000.00 47,000.00 0.00 Tank 2 47,000.00 47,000.00 0.00 Tank 3 47,000.00 47,000.00 0.00 Start-Up Services 6 Tank 1 5,978.00 3,868.00 2,110.00 Tank 2 5,806.00 3,868.00 1,938.00 Tank 3 5,806.00 3,868.00 1,938.00 Warranty Phase 7 Tank 1 3,147.00 0.00 3,147.00 Tank 2 2,972.00 0.00 2,972.00 Tank 3 2,904.00 0.00 2,904.00 Provide SCADA Documentation 8 Tank 1 2,521.00 0.00 2,521.00 Tank 2 2,521.00 0.00 2,521.00 Tank 3 2,521.00 0.00 2,521.00 9 Siting Evaluation and Recommendation 59,970.00 19,080.00 79,050.00 10 Pressure and Water A e Evaluation 40,040.00 6,016.00 46,056.00 11 Proposed System Analysis - ACR for Elevated Storage 0.00 84,022.00 84,022,00 Subtotal Additional Services 368,242.00 18,808.00 349,434.00 TOTAL FEE $705,242.00 $0.00 $705,242.00 M2009-032 Admin_ Approval Please feel free to contact me, should you have any questions. Sincerely, LNV, INCPE F.jm No. F -366 Dan S.i ndecker, P.E. E O. 1 "A" f7 6 ' yi,� SUPPLIER NUMBER �1 TO BE ASSIGNED BY PURCHASING DIVISION %W0%WW#M" City of CITY OF CORPUS CHRISTI Corpus DISCLOSURE OF INTEREST Christi City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with `NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: LNV Engineering P. O. BOX: STREET ADDRESS: 801 Navigation, Suite 300 CITY: FIRM IS: 1. Corporation X 2. Partnership ❑ 4. Association ❑ 5. Other Corpus Christi ZIP: 78408 3. Sole Owner ❑ DISCLOSURE QUESTIONS If additional space is necessar please use the reverse side of this page or attach separate shcet. 1. State the names of each `employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm.' Name Job Title and City Department {if known} NIA 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title NIA 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee Dan S. Leyendecker Marina Advisory Board 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant NIA EXHIBIT "B" Page 1 of 2 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the . public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -349 (d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: Dan S. Leyendecker, E.,E. Title: President (Type or Print) S>tgnatureof Certifying:: Date;_ DEFINITIONS a. `Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part -time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non - profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. EXHIBIT `B" Page 2 of 2