Loading...
HomeMy WebLinkAboutC2011-451 - 11/20/2011 - NACITY OF CORPUS CHRISTI AMENDMENT NO. 4 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City ", and ARCADIS U. S., INC. hereinafter called "Engineer", agree to the following amendments to the Contract for Engineering Services for McBride Lift Station and Force Main Project No. 7287), as authorized and administratively amended by: Original Contract November 11, 2003 Motion No. M2003 -400 $308,620.00 Amendment No. 1 July 9, 2004 Administrative Approval $0.00 Amendment No. 2 March 4, 2009 Administrative Approval $12,065.00 Amendment No. 3 - September 10, 2010 Administrative Approval $15,795.00 EXHIBIT "A" OF THE ORIGINAL CONTRACT, SECTION 1. SCOPE OF SERVICES, PART A. BASIC SERVICES, shall be modified as follows and as shown on the attached Amendment No. 4 Exhibit "A ": 2. DESIGN PHASE 1. Prepare the 100% Plans and Specifications and Estimate package for rebid. Changes to design of the system are not included in this amendment. Non - significant changes to address City Staff comments will be addressed and included in this Scope of Work. 2. Obtain utility crossing TXDOT permit (Notice of Proposed Installation) 3. Revise and submit the Construction Cost Estimate. The deliverable for this amendment will consist of one set of updated full size (24" X 36 ") force main plans sheets. Only sheets that were revised will be submitted. One set of bid documents with specifications and the revised construction estimate for the force main work only. City will provide bid dates to update the bid documents before the signed and sealed PS &E package is submitted. EXHIBIT "A" OF THE ORIGINAL CONTRACT, SECTION 2. SCHEDULE, shall be modified as follows and as shown on the attached Amendment No. 4 Exhibit "K. 3. BID PHASE 1. Assist the City in solicitation of bids by identification of prospective bidders, and review of bids by solicited interests. 2. Attend pre -bid conference and review all pre -bid questions and submissions concerning the bid documents and prepare, in the City's format, for the Engineering Services approval, any addenda or other revisions necessary to inform contractors of approved changes prior to bidding. 3. Attend bid opening, analyze bids, evaluate, prepare bid tabulation, and make recommendation concerning award of the contract. 4. In the event the lowest responsible bidder bid exceeds the project budget phase estimate require above as revised by the Engineering Services in accordance with the A/E's design phase estimate required above, the Engineer will, at its expense, confer with City staff and make such revisions to the bid documents as the City staff deems necessary to re- advertise that particular portion of the Project for bids. 2011 -451 11/20/11 ectN0. 7287McartdeLittStationandForeeMainU .mendment No. 4.doc AMD. NO.4 Page 1 of 2 Arcades U.S., Inc. INDEXED Final plans will be submitted within 30 days from the Notice to Proceed date and the execution of this amendment by the City. EXHIBIT "A" OF THE ORIGINAL CONTRACT, SECTION 3. FEES, PART C. SUMMARY OF FEES, shall be modified as specified in Amendment No. 4 Exhibit "A" for a revised fee not to exceed $26,146.00 (Twenty -Five Thousand One Hundred Forty-Six Dollars and Zero Cents) for a total restated fee not to exceed 1361,626.00 (Three Hundred Sixty -One Thousand _Six Hundred Twenty -Six Dallars and Zero Cents). _ --� All other terms and conditions of the November 11, 2003 contract between the City and Engineer, and of any amendments to that contract, which are not specifically addressed herein shall remain in full force and effect. CITY F CORPU CHRISTI �. 'u-- �C•� /l Zo /zoz i Juan Perales Jr., P.E. Date Assistant City Manager RECOMME, ED Pete Anaya, P. E., Date Director of Engineering Services C 1S U, IN ruce McNiff Date Sr. Vice President, South Region Transportation 2849 Paces Ferry Road, Suite 400 Atlanta, GA 30339 (770) 384 -6739; Office ATTES Armando Chapa, City Secret ry APPROVED AS TO FORM Assl Ci Attor Date Project Number: 7287 Funding Source: 550950 -4502- 00000 - 200452 Encumbrance Number: EI-987 M - L O CT Yw P 20 11 F CONTRACT MANAGERS KAEngineering DataExchangelRohertQ% WASTEWATER% ProjectNo. 128iMcBrideLiftSlationandForceMaiz )AMendment No. 4.doc =of2 O.4 0 Mr, Pete Anaya, P,.l . Director of Engineering Services City of Corpus Christi 1201 Leopard ,Street Corpus Christi,. TX 78401 Subject: McBride Lift Station Force Main Replacement, Project No. 7257 Amendment No. 4 Dear Mn Annya: Please find enclosed, for your review, ARCADIS's A/E scope of work and fee proposal to rebid. the subject prUject. If you have any questions, Please do not hesitate to contact this office. Sincerely, ARCADIS �y Ricardo Ramos, P.E. Project Maiiager ARCADIS -US, Inc, TX Engineering Lic. No, F -533 70 NE Loop 410 Suite 11.50 San-Antonio Texas 74216 Tel 210 375 1500 Fax 2 10 375 1550 BUSINESS PRACTICE INFRASTRUCTURE OCTOBER 25.2017 AMD. NO. EXHIBIT "A" Page 1 of 7 CITY OF CORPUS CHRISTI AMENDMENT N0.4 TO CONTRACT FOR PROFESSIONAL SERVICES FOR MCBRIDE LIFT STATION AND FORCE MAIN PROJECT NO. 7287 ADDITIONAL SERVICES Project Description The Force Main PS &E package was submitted and bids were received and rejected by the City of Corpus Christi. The purpose of this Amendment No. 4 is to provide a scope of work and tasks for ARCADIS to develop 100% Plans, Specifications, and Estimate package to rebid the Force Main work only. The completion of the 100% Plans, Specifications, and Estimate for the McBride Lift Station is not part of this amendment. A separate amendment will be developed at a later date upon notice by the City of Corpus Christi. Scope of Work and tasks: Consultant will perform the following BASIC SERVICES tasks. A. PRELIMINARY PHASE: NOT APPLICABLE, 100% COMPLETED B. DESIGN PHASE 1. Prepare the 100% Plans and Specifications and Estimate package for rebid. Changes to design of the system are not included in this amendment. Non - significant changes to address City Staff comments will be addressed and included in this Scope of Work. 2. Obtain utility crossing TXDOT permit (Notice of Proposed Installation) 3. Revise and submit the Construction Cost Estimate. The deliverable for this amendment will consist of one set of updated full size (24" X 36 ") force main plans sheets. Only sheets that were revised will be submitted. One set of bid documents with specifications and the revised construction estimate for the force main work only. City will provide bid dates to update the bid documents before the signed and sealed PS &E package is submitted. C. BID PHASE I. Assist the City in solicitation of bids by identification of prospective bidders, and review of bids by solicited interests. 2. Attend pre -bid conference and review all pre -bid questions and submissions concerning the bid documents and prepare, in the City's format, for the Engineering Services approval, any addenda or other revisions necessary to inform contractors of approved changes prior to bidding. 3. Attend bid opening, analyze bids, evaluate, prepare bid tabulation, and make recommendation concerning award of the contract. 4. In the event the lowest responsible bidder bid exceeds the project budget phase estimate require above as revised by the Engineering Services in accordance with the AMD. NO, 4 EXHIBIT "A" PAGE 2 of 7 0 A/E's design phase estimate required above, the Engineer will, at its expen as the City staff deems se, confer with City staff and make such revisions to the bid documents necessary to re-advertise th at particular portion of the Project for bids. CONSTRUCTION PHASE: refer to original contract Scope of Work. Consultant will perform the following ADDITIONAL SERVICES tasks E. PERMIT PREPARATION. refer to original contract Scope of Work. F. ROW ACQUISITION SURVEY: refer to original contract Scope of Work. G. TOPOGRAPHIC SURVEY: refer to original contract Scope of Work. H. ENVIORNMENTAL ASSESSMENTS: refer to original contract Scope of Work, T. GEOTECH REPORT: refer to original contract Scope of Work. J. CONSTRUCTION OBSERVATION SERVICES: refer to original contract Scope e of p K. START UP SERVICES: refer to original contract Scope of Work L. WARRANTY PHASE: refer to original contract Scope of Work. M. SCADA: refer to original contract Scope of Work. N. FEASIBILITY/ROUTE STUDIES: refer to original contract Scope of Work. SCHEDULE: Final plans will be submitted within 30 days from Notice to Proceed date and the execution of this amendment by the City. M Page 3 of 7 E � v z 0 McBride LM Station and Faroe Main (Project No. 7257) Summanr of Fawc SUMMARY OF FEES ARCADIS MCBRIDE LIFT STATION & FORCE MAIN ( PROJECT NO. 7287) AMENDMENT NO. 4 RCADIS PS &E FEE RCADIS DIRECT COSTS TOTAL X21 82 AL FEE AMD. NO.4 EXHIBIT "A" Page 5 of 7 Summary of hours by Classification & Major Task Analysis ARCADIS MCBRIDE LIFT STATION & FORCE MAIN ( PROJECT NO. 7287) Amendment No. 4, for' City Corpus Christi �Xa m f c a : o V Item Description production & Printing Copies of Schematic Plans Copies of PS &E Mylar of PS &E Total Reproduction & Printin =rnight Deliveries Overnight Deliveries I . Service to City 2. Service to Sub - Consultants Total Overnight Deliveries r ) Travel b) Lodging c) Per Diem al Travel raphs Long Distance T aneous Supplies cellaneous Present omputer Time penses x ic x (D z o Summary of Expenses ARCADIS MCBRIDE LIFT STATION & FORCE MAIN (PROJECT NO. 7287) Amendment No. 4, for City Corpus Christi 1st Measure Qnty 'Unit 2nd Measure 3rd Measure Total Units Cost Per Qnty Unit Qnty Unit Qnty Unit Unit Sets Lngth 4 Sets 10 Shts Ht 0 SF $0.10 40 Sets Shts Shts Shts Sh #s $2.00 $s.00 Supplies Total Cost $0 $2,700 $0 $108 $2,808 $0 $0 $0 $616 $3,564 WICMM®+ ~ ® Total Cost $0 $2,700 $0 $108 $2,808 $0 $0 $0 $616 $3,564 !�1 SUPPLIER NUMBER ►1 TO BE ASSIGNED BY-CITY- - = PURCHASING DIVISION City of CITY OF CORPUS CHRISTI Ch DISCLOSURE OF INTEREST C hris t i City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to _ provide the following information. Every question must be answered. If the question is not applicable, answer with `NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: P. O. BOX: Arcadis U. S., Inc. STREET ADDRESS: 2849 Paces Ferry Road CITY: Atlanta, GA — ZIP: 30339 FIRM IS: 1. Corporation X 2. Partnership e 3. Sole Owner 11 ❑ 4. Association 5. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each `employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm.' Name Job Title and City Department (if known) NIA 2, State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3 % or more of the ownership in the above named "firm." Name Title NIA 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest constituting 3 /o or more of the ownership in the above named "firm." Name Board, Commission or Committee NIA 4. State the names of each employee or officer of a "consultant" for the City of Co r�us Christi who worked on any matter related to the subject of this contract and has an ` ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant NIA EXHIBIT �'B» Pa e 1 of 2 , 1 I ' I I I I , I ,. FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the rrzatter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -349 (d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: Bruce McNitt Title: Sr. Vice President. S Region Transa. (Type or P inY Signature of Certifying Date: 1 0 Person: Ww' 1.f DEFINITIONS a. `Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self- employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non - profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. EXHIBIT "B" Pa e 2 of 2