HomeMy WebLinkAboutC2011-461 - 11/30/2011 - NACITY OF CORPUS CHRISTI
AMENDMENT NO. 5
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "City ", and Freese and Nichols Inc., hereinafter called
"CONSULTANT", agree to the following amendments to the Contract for Professional Services for Garwood
Water Supply Project Project No. 8424), as authorized and administratively amended by:
— Ori g inal
Contract
October 28, 2003
Motion No. M2003 -394
$116,100.00
Amendment No. 1
Amendment No. 2
October 19, 2004
December 18, 2007
Motion No. M2004 -387
Motion No. M2007 -334
$285,490.00
$944,997.00
Amendment No. 3
March 11, 2009
Administrative Approval
$0.00
Amendment No. 4
March 9, 2010
Motion No. M2010 -051
$9,676,590.00
Amendment No. 5 is a zero dollar amount amendment that revises project scope for Mary Rhodes Pipeline
Phase 2 Project No. E10008 to the Garwood Water Supply Project as follows:
• In the original contract, EXHIBIT "A ", PART 1. SCOPE OF SERVICES, SECTION A. BASIC
SERVICES, shall be amended to include supplemental Basic Services as described in the attached
Amendment No. 5 Exhibit "A ":
➢ ITEM NO. 3 Design Phase in the amount of $183,179.00
➢ ITEM NO. 4 Bid Phase in the amount of $82,814.00
In the Amendment No. 4, EXHIBIT "A ", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL
SERVICES, shall be amended to include supplemental Additional Services as described in the
attached Amendment No. 5 Exhibit "A":
➢ ITEM NO. 1 Permitting in the amount of $53,696.00
ITEM NO. 3 Topographic Survey in the amount of $37,035.00
➢ ITEM NO. 8 Geotechnical Investiqation in the amount of $18,749.00
➢ ITEM NO. 10 Hydraulic Modeling in the amount of $36,102.00
• In the Amendment No. 4, EXHIBIT "A ", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL
SERVICES, shall be amended to downsize Additional Services as described in the attached
Amendment No. 5 Exhibit "A °:
➢ ITEM NO. 4 Subsurface Utility Exploration in the amount of $(121,045.00)
➢ ITEM NO. 9 Archeological Investigation in the amount of $(87,808.00)
➢ ITEM NO. 11 ROW Acquisition in the amount of $(202,722.00)
In the Amendment No. 4, EXHIBIT "A ", PART 3. FEES, SUMMARY OF FEES shall be modified and i;
attached as Amendment No. 5 Exhibit "B" for a revised fee not to exceed $0.00 (Zero Dollars and zer(
cents), for a total restated fee not to exceed X10,990,177.00 (Ten Million Nine Hundred Ninety Thousam
One Hundred Seventy Seven Dollars and zero cents).
All other terms and conditions of the October 28, 2003 contract and amendments between the City ar
Consultant shall remain in full force and effect.
2011 -461
11/30/11 AMEND. NO.
7 Page 1 of 2
Freese and Nichols, Inc. 108 MARY RHODES PIPELINE PHASE 2AMENDMENT NO. S4AMENDMENT NO. 5.130C
INUI
CITY OF CORPUS CHRISTI
-+ ///? 201
Juan Perale , Jr., P.E. Date
Assistant City Manager
RECOMMENDED
Pete Anaya, P. E. Date
Director of Engineering Services
ATTEST
Armando Chapa, City Secretary
APPROVED AS TO FORM
Ass'Istant4ty Attorney Date
Project Number: E10008
Funding Source: 550950- 4477 - 00000- E10408
Encumbrance Number: E10008AFR
FREESE AND NICHOLS, INC.
1 2 L - to-Y-1
Non G zman, P.E. Date
Vice President/Group Manager
800 North Shoreline Blvd., Suite 160ON
Corpus Christi, TX 78401
361 - 561 -6500 Office; 361 - 561 -6501 Fax
E Yff E ED i
AMEND. NO.
Paae 2 of 2
K ;IENGINEERING DATAEXCHANGEIVELMAPIWATER\E1 OD08 MARY RHODES PIPELINE PHASE 21AMENDMENT NO. 51AIWENDMENT NO. 5.DOC
Exhibit "A"
CITY OF CORPUS CHRISTI
Mary Rhodes Pipeline Phase 2 (Project No. E10008)
Parent Project: Garwood Water Supply Project (Project No. 8424)
Amendment No. 5
SCOPE OF SERVICES
Additional Services
2. Scope Revision
Revise the following tasks as shown below:
Final Design Phase:
Remove the following activities from the Final
scope:
• Produce design drawings and specification �as.-described -..below far "the facilities:
• Addition of one (1) pump and VFD, includia . I dtr cal and instrurrrentation equipment,
piping, and valves to supportbe unrt at the Lake Texana Intake Pump Station;
• Additional pipeline, ground storageaapks, con trolsystems and flow monitoring at the
Bloomington and Woodsboro Pump Satins,
• Addition of one and VD, including electrical a:nd instrumentation equipment,
piping, and vales to support the pornpin unit afi the Bloomington and Woodsboro
Pump Stations,;;:.:.,;,,
• Colorado River Pump`Si t ion avid,intake Electrical Drawings
Add the fol
the
Des
pe:
• Produce dibsig
• Sedie
• Booster
Bid and Construction
drawings ""a
ration basin
.':.` i nR Static
)edifications as described below for the following facilities:
cent "t the Colorado River;
5ed on a peak flow of 46 MGD and a typical flow of 31 MGD.
Add the following activities to the Bid and Construction Phase scope:
• Re- packaging effort prior to bid and construction of the Mary Rhodes Pipeline Phase 2 Project
including SCADA activities.
AMEND. NO. 5
EXHIBIT "A"
Paue 1 of 9
Additional Services
A. Geotechnical Services
Remove the following activities from the Geotechnical Services scope:
• Field exploration, laboratory testing, engineering analysis and report and final design p
consultation for improvements to the Mary Rhodes Phase 'I system.
Add the following to the Geotechnical Services scope:
• Field exploration, laboratory testing, engineering „aryi and report and final design
consultation for sedimentation basin and Booster >;ut'np'S;taton.
B. Surveying Services
Remove the following activities from the Surveying rvices
No scope will be added or rem' -died from this task. Fee will be reduced from this task due to
number of archeological sites determined to require investigation is lower than anticipated.
G. Environmental Investigation
Add the following activities to the Environmental Investigation scope:
• Conduct site visits for sedimentation basin and Booster Pump Station;
• Prepare Draft and Final EA including sedimentation basin and Booster Pump Station;
AMEND.
EXHIBIT
Paae 2 of 9
• Respond to request by Texas Water Development Board (TWDB) for information
the Guidelines for Preparation of Environmental Assessments.
H. Physical Modeling of Colorado River Pump Station and Intake
Add the following activities to the Physical Modeling scope:
• Create a scalable physical model of the Booster Pump Station and the existing Lake T
Intake and provide resulting design recommendations.
I. Easement Acquisition Services
Change the following activities related to Easement
+ Complete deed research, conduct land c
the City's agent for the acquisition of app
ces:
arch, discuss {:co,mpensation offers, and act as
ly 150 propertieon the southern alignment.
B. Fee: The total authorized fee for all services will remain th same. Fees for:.some individual tasks
will be increased or decreased as son the Sum
ummary bf� Fees table The table Summary of
Fees set forth on the following page be used bye Consultant Engineer to determine the
amount to be invoiced for each task. The fee shown for Balch task is inclusive of all expenses as
set forth by the original contract.
C. Schedule:
September 1, 2011
August 1, 2012
TASK
Qescription
Fee
Original Contract ., _�P:4aase 1
1.A.1
Screer fr ;;.Study of. Q livery Options
$116,100.00
I.A.2
Detailed Siu;, aflivery Options
TBN
i.A.3
Pipeline Route:z5fu'dy
TBN
I.A.4
Pipeline Surveying, Easement Acquisition, and Permitting
TBN
I.A.5
Pipeline Topographic Survey and Preliminary Design
TBN
I.A.6
Final Design Phase
TBN
LAY
Bid, Award, and Construction
TBN
Original Contract Fee
$116,100.00
AMEND. NO. 5
EXHIBIT "A"
Paqe 3 of 9
Amendment No. 1 — Phase 2
2.A
Detailed Study of Delivery Option 5
$152,532
2.B
Detailed Study of Delivery Option 1
$64,328
2.0
Detailed Study of Delivery Option 6
$68,630
Amendment No. 1 Fee
$285,490
Amendment No. 2 — Phase 2A
2A -0001
Field Studies
2A. 1.A
-- Ownership Mapping
$ 20,631
2A.1.B
—Risk Analysis
_
Prepare Risk Analysis
$ 5,853
Risk Analysis Workshop (in CC)
$ 4
2A.1.0
Field survey of West Mustang
46,922
2A.1.D
—West Mustang Creek Habitat Assessment
$ 34,272
2A.1.E
— Coordination Re- Calib. Of Gannado Gauging Station
$ 6,168
2A.1.F
— Summary
$ _
Prepare Task Summ. any , ;,
Task Summary Worksj �p
11,650
$ 8,383
Total Fee by Classification
$ 138,411
2A -0002
LCRA Agreement
2A.2.A
— Agree mle4"F" ramewo
Prepa Framework:;
$ 12,695
Submit FriCl;kewerl
$ 431
Schedule Franeu�iork M& 611
451
2A.2.B
"- Framework Meeting (Garwood)
$ 7
2A.2.0
Prepare Draft LCRA Areemment
$ 10,525
2A.2.D
graft LCRA Agreement Workshop (Garwood)
$ 6,366
2A.2.E
P* a)'e Final AweeOpent
$ 8,740
2A.2.F
Task' , , xecute Agreement (1 meeting Austin, 1 meeting Corpus
Christi )
$ 8,151
2A.2.G
--Task 2 Su'rr;a:`
$ 14,675
Total Fee by Classification
$ 69,288
2A -0003
LNRA Agreement
2A.3.A
— Agreement Framework
$ _
Prepare Framework
$ 13,025
Submit Framework
$ 431
Schedule Framework Meeting
$ 451
2A.3.13
— Framework Meeting (Edna)
$ 7,191
2A.3.0
— Prepare Draft Agreement
$ 10,525
AMEND. NO. 5
EXHIBIT
Pa
qe 4 of 9
2A.3.D
—Draft LNRA Agreement Review Workshop (Edna)
$ 7,191
2A.3.E
— Regulatory Coordination (2 meetings Austin)
$ 10,137
2A.3.F
— Prepare Final LNRA Agreement
$ 6,815
2A.3.G
— Execute Agreement (1 meeting Edna, 1 meeting Austin)
$ 11,360
2A.3.H
—Task 3 Summary
$ 14,125
Total Fee by Classification
$ 81,250
2A -0004
Permitting and Agency Coordination
2A.4.A
—Coord w1 TPWD re: GSM Permit (2 meetings Austin)
$ 3,737
2A 4 B
—Coord w1 TPWD re: LNRA Inflow /Release Agreerr;erit (3 meetings
Austin)
$ 5,156
2A.4.0
—Coord w/ TCEQ re: Bed and Banks Permit (3 meetings Austin)
$ 7,104
2A.4.D
— Coord wl TGLO re: Bed and Banks Per i1: 3 meeEm Austin}
$ 7,104
2A 4 E
— Coordination with TCEQ and TWDB re. Regional Wafter Planning (2
meetings Austin)
$ 1,437
2A.4.F
— Regional Water Planning Group Coordination (1 meeting Austin, 1
meeting Corpus Christi)
$ 2,979
2A.4.G
-- Monitor LCRAISAWS Project (2 meeting Garvuaod)
6,437
2A.4.H
—USACE Coord (1 meetng alyeston)
$ 8,253
2A.4.1
—TPDES Coordination (1 meeting Austin)
$ 6,566
2A.4.J
— Landowner Issues and Communibg iorrs..(3 meeti(Jgs, Edna)
$ 20,785
2A.4.K
—Meet w1 Enwraar�mental Grou o� ,,
Prep
P • e, •xh�brfs .. •
$ 13,093
Meeting 1
$ _
Plan
$ 501
: :..., hedule `�, ....: ���
$ 471
Prepare for Meting
$ 3,745
Attend IU)i?eting (Austin)
$ 2,376
Meeting 2 .: -:
$
lan
$ 501
hedule
$ 471
Prepare for:Nieeting
$ 3,745
Atterid >Cing (Austin)
$ 2,376
Meeting 3 '
$ _
Plan
$ 501
Schedule
$ 471
Prepare for Meeting
$ 3,745
Attend Meeting (Edna)
$ 3,591
2A.41
Task 4 Summary
$ 16,070
Total Fee by Classification
1 $ 121,216
AMEND. NO. 5
EXHIBIT "A"
Paae 5 of 9
2A -0005
Permitting Activities
2A.5.A
—Bed and Banks Permit Application
$ _
Prepare Permit
$ 20
Submit Permit
$ 6,360
Agency Review
$ 8
Permit Approval
$ 5,203
2A.5.B
— Prepare Amendment to TPWD /LNRA Inflow & Release Agreement
$ _
Develop Amendment Framework
$ 3,815
Meet with LNRA and TPWD to develop amens ent outline (1
mtg Edna)
$ 4,441
Develop Draft Amendment
$ 4,075
Meet with LNRA and TPWD to reviewlraft Amel''dment (1 mtg
Edna )
$ 4,441
Prepare Final Amendment
$ 3,735
Obtain Written Approval (1 mtg.Austin, 1 mtg Edna)
$ 6,540
2A.5.0
—Water Right Amendment Application
$ _
Prepare Permit
$ 10
Submit Permit
$ 961
Agency Review
$ 4,210
Permit Approval
$ 1,023
2A.5.D
— Monitor Permit Application St4top
$ 2,045
2A.5.E
—Reg ulg Agency oord During Permit App P
, s
$ 2,945
2A.55
— Develop Supporting Info for Regioih;N Amendment
$ 5,130
2A.5.G
7 Coordinate Rin N Amendment ( meetings CC)
$ 11,475
2A.5.H ',
Rrtaernd Ulfater Canser�atiorrQrQught 1�Ilanagement Plan
$ _
Prep& Daft Amendment
$ 3,408
Plan Workshop (CCj
$ 4,533
Submit Draff`;Amendrrier', >
$ 1,120
:ty Review of t% aft Amendment
$ _
Review Works;r (CC)
$ 4,533
City R'e ew „C; %<rplete
$ _
{
Incorporaefty Comments /Prepare Final Amendment
$ 3,535
City Council' Approval of Final Amendment (CC)
$ 4,533
2A.5.F
—Task 5 Summary
$ 15,227
Total Fee by Classification
$ 142,870
2A -0006
Conceptual Facility Design
2A.6.A
—GIC Facility Requirement Workshop
$ 330
Schedule Workshop
$ 681
Conduct Workshop (Garwood)
$ 6,393
2A.6.B
— Concept Design of GIC Canal System Improvements
$ 4,800
AMEND. NO. 5
EXHIBIT "A”
Pane 6 of 9
2A.6.0
— Concept Design of West Mustang Creek Div. Structure
$ 4,800
2A.6.D
— Design Review Workshop
$ _
Schedule Workshop
$ 681
Conduct Workshop (Garwood)
$ 6,393
2A.6.E
—W. Mustang Creek Gauging Facility Workshop
$ 6,900
Schedule Workshop
$ 681
Conduct Workshop (Edna)
$ 4,193
2A.6.F
— Concept Design, W. Mustang Creek Gauging Facility
$ 3,960
2A.6.G
W. Mustang Creek Gauging Facility Workshop::.."
Schedule Workshop
$ 681
Conduct Workshop (Edna)
$ 6,393
2A.6.H
—Task Summary
$ 10,275
Total Fee bS6
$ 57
2A -0007
Mary Rhodes Pipeline Assessment
2A.7.A
—Data Collection and Review
$ 8,648
2A.7.13
— Facilities Site Visit
$ 23
2A.7.0
—Task Kickoff Workshop; (C;ofi' p Christi) `�
$ 9,605
2A.7.D
—Pump Station Assessment'
$ 17
2A.7.E
—SCADA System Assessment;
$ 11,840
2A.7.F
— Operationai Erteg;ration of Gar+"ood Water;
$ 6,200
2A.7.G
— Alterna- ve's ldentificati ; on and Scree`nIng
$ 27,613
2A.7.H
-- Alternative, Control Strategies
$ 11,335
2A.7.1
— Recommended ,Mary Rhkpo, s Pipeiri�eImprovements
$ 6 205
2A.7.J
PreO Summary :;:;..
$ 16,200
Attend Worlrshop
5,768
Total Fee by Classification
$ 142,686
2A -0008
Task 8 — Phase 2A Report
2A.8.A
— Prepara'i:praft Re po#
$ _
Prepare ReP0
$ 25,656
Submit Draeport to City for Review
$ 1,292
City Review of Draft Report
$ _
City Review Complete
$ _
2A.8. B
— Prepare Draft Report Presentation
$ 7,112
2A.8.0
—Draft Report Workshop (Corpus Christi)
$ 9,169
2A.8.D
—Draft Report Comments Meeting (Corpus Christi)
$ 9,169
2A.8.E
— Prepare Final Report
$ 10,321
AMEND. NO. S
EXHIBIT "A"
Paae 7 of 9
2A.8.F
—Final Report Presentation (up to 3 meetings in Corpus Christi)
$ 34,669
$ 97,388
2A-0009
Project Management
2A.9.A0BC1
Task 9,A—Project Schedule
$ 10,060
2A.9.BOBC2
Task 9.13—Progress Reports and Invoices
23,342
2A.9,COBC3
Task 9.C—Phase 3 Scoping
28,343
by Classification
$ 61,744
Amendment No. 2 Fee
911,997
Amendment No.
3
2A-0005
Task 5 - Permitting Activities (Deleted in its Entirety)
$ -142,870
2A-0008
Task 8 — Phase 2A Report (Deleted in its Entirety)
$ -97,388
3-00010
Task 10 - Garwood Alignment Study Scope of Work
3-0010.1
Data Collection
$ 49,709
3-0010.2
Preliminary Hydraulic Study
$ 21,975
3-0010.3
Preliminary Environmental Review
$ 60,294
3-0010.4
Preliminary Route Analysis
$ 45,364
3-0010.5
Final Route Analysis
$ 62,916
Amendment No. 3 Fee
$ 0
Amendment No.
4
1
Study Phase
$ 0
2
Preliminary Phase
$ 1,514,814
3
Design Phase
$ 3,068,522
4
Bid Phase
$ 102,000
5
Construction Phase
$ 1,200,000
A - 1
Permitting
$ 267,414
A-2
ROW Acquisition Survey
$ 350,000
A-3
Topographic Survey
$ 891,165
A-4
Subsurface Utility Exploration
$ 286,000
A-5
Aerial Photography
$ 23,750
A-6
Corrosion Engineering
$ 122,768
A-7
Surge Analysis
$ 104,181
A-8
Geotechnical Investigation
$ 312,737
A-9
Archeological Investigation
$ 184,650
A-10
Hydraulic Modeling
$ 37,398
A-11
ROW Acquisition
$ 1,060
AMEND. NO. 5
EXHIBIT AAA'g
8 of 9
A— 12
Construction Observation Services
$ TBD
A— 13
Start -Up Services
$ TBD
A — 14
O &M Services
$ 150,590
A — 15
Warranty Phase
$ TBD
A— 16
Provide SCADA Documentation
$ TBD
Amendment No. 4 Fee
$ 9,676,590
Amendment No.
5
2
Preliminary Phase
$ 0
3
Design Phase
$ 183,179
4 1
Bid Phase
$ 82
A - 1
Permitting
$ 53,696
A-3
Topographic Survey
$ 37
A-4
Subsurface Utility Exploration
$ - 121,045
A-8
Geotechnical Investigation
$ 18,749
A-9
Archeological Investigation
$ - 57
A-10
Hydraulic Modeling
$ 36,102
A —11
ROW Acquisition
$ -202,722
Amendment No. 4 Fee
$ 0
Total Fee
$90,990,177
AMEND. NO. 5
EXHIBIT "A"
Page 9 of 9
Mary Rhodes Pipeline Phase 2 (Project No. E10008)
Parent Project: Garwood Water Supply Project (Project No. 8424)
SUMMARY OF FEES
x�
a
= m
W Z
_v
o Z
NC6 o
ORIGINAL
CONTRACT
8424
AMEND. NO. 1
8424
AMEND. NO.2
8424
AMEND. NO.3
8424
AMEND. NO.4
E10008
BASIC SERVICES
1
Study Phase
$116,100.00
$285,490.00
$911,997.00
$0.00
$0.00
2
Preliminary Phase (Authorized)
0.00
0.00
0.00
0.00
1,514,814.00
3
Design Phase Not Authorized)
0.00
0.00
0.00
0.00
3,068,522.00
4
Bid Phase (Not Authorized )
0.00
0.00
0.00
0.00
102,000.00
5
Construction Phase (Not Authorized )
0.00
0.00
0.00
0.00
1,200,000.00
Subtotal Basic Services
116,100.00
285,490.00
911,997.00
0.00
5,885,336.00
ADDITIONAL SERVICES
1
Permitting (Authorized)
0.00
0.00
0.00
0.00
267,414.00
2
ROW Acquisition Survey (Authorized)
0.00
0.00
0.00
0.00
350,000.00
3
To o ra hic Surge (Authorized)
0.00
0.00
0.00
0.00
891,165.00
4
Subsurface Utility Exploration Authorized
0.00
0.00
0.00
0.00
286,000.00
5
Aerial Photogra Authorized
0.00
0.00
0.00
0.00
23,750.00
6
Corrosion Engineering Authorized)
0.00
0.00
0.00
0.00
122,768.00
7
Surge Analysis (Authorized)
0.00
0.00
0.00
0.00
104,181.00
8
Geotechnical Investigation (Authorized)
0.00
0.00
0.00
0.00
312,737.00
9
Archeological Investigation (Authorized)
0.00
0.00
0.00
0.00
184,650.00
10
Hydraulic Modeling (Authorized)
0.00
0.00
0.00
0.00
37,398.00
11
ROW Acquisition Authorized
0.00
0.00
0.00
0.00
1,060,601.00
12
Construction Observation Services
0.00
0.00
0.00
0.00
0.00
13
Start-Up Services
0.00
0.00
0.00
0.00
0.00
14
0 & M Services (Authorized)
0.00
0.00
0.00
0.00
150,590.00
15 lWarranty
Phase
0.00
0.00
0.00
0.00
0.00
16 1
Provide SCADA Documentation
0.00
0.00
0.00
0.00
0.00
Subtotal Additional Services
0.00
0.00
0.00
0.00
3,791,254.00
TOTAL FEE
$116,100.00
$285,490.00
$911,997.00
$0.00
$9,676,590.00
1
10/28/03
M2003 -394
10/19/04
M2004 -387
12/18/07
M2007 -334
03/11/09
Admin AnDroval
03/09/10
M2010 -051
o Z
NC6 o
Mary Rhodes Pipeline Phase 2 (Project No. E10008)
Parent Project: Garwood Water Supply Project (Project No. 8424)
SUMMARY OF FEES
Admin Approval
M Mic
=a
n ,Wv
o . z
N P
AMEND. NO. 5
E10008
TOTAL
BASIC
SERVICES
1
Study Phase
$0.00
$1,313,587.00
2
Preliminary Phase (Authorized)
0.00
1,514,814.00
3
Design Phase (Not Authorized)
183,179.00
3,251,701.00
4
Bid Phase (Not Authorized )
82,814.00
184,814.00
5
Construction Phase (Not Authorized)
0.00
1,200,000.00
Subtotal Basic Services
265,993.00
7,464,916.00
ADDITIONAL SERVICES
1
Permitting (Authorized)
53,696.00
321,110.00
2
ROW Acquisition Surge Authorized
0.00
350,000.00
3
Topographic Survey (Authorized)
37,035.00
928,200.00
4
Subsurface Utility Exploration (Authorized)
121,045.00)
164,955.00
5
Aerial Photogra Authorized
0.00
23,750.00
6 lCorrosion
Engineering (Authorized)
0.00
122,768.00
7
Surge Analysis (Authorized)
0.00
104,181.00
8
Geotechnical Investigation Authorized
18,749.00
331,486.00
9
Archeological Investigation (Authorized)
87,808.00
96,842.00
10
Hydraulic Modeling Authorized
36,102.00
73,500.00
11
ROW Acquisition (Authorized)
(202,722.00)
857,879.00
12
Construction Observation Services
0.00
0.00
13
Start -Up Services
0.00
0.00
14
O & M Services Authorized
0.00
150,590.00
15
Warrant Phase
0.00
0.00
16
Provide SCADA Documentation
0.00
0.00
Subtotal Additional Services
265,993.00
3,525,261.00
TOTAL FEE
$0.00
$10,990,177.00
Admin Approval
M Mic
=a
n ,Wv
o . z
N P