HomeMy WebLinkAboutC2012-006 - 1/17/2012 - ApprovedCHANGE ORDER
Department of Engineering Services
City of Corpus Christi, Texas
CHANGE ORDER NO: 3 FUNDING SOURCE:
Operating Department: Bond 2008
Name of Project:
Contractor:
CONTRACT TIME: 250 CD
DATE: November 15, 201 I
PR E09050 - ADA Improvements Group I
Ti -Zack Concrete
CHANGE
Add the following to the contract:
See attached:
I LS @ $277,159.23
ADD
S 277,159.23
TOTAL NET: $ 277,159.23
Why was this change necessary? {If left off the plans and specifications, explain why?
Reconcile final bid uantities - additional work, time and bid quantities were utilized as necessa
How can similar changes be avoided in the future?
Unavoidable.
A. CONTRACT PRICE $ 1,448,396.50
B. TOTAL CHANGE ORDERS (Inc. current) $ 348,295.39
C. NEW CONTRACT PRICE S 1,796,691.89
D. THIS CHANGE ORDER $ 277,159.23 Project Manager
E. PERCENT TOTAL CHANGE (BIA) 24.05%
F. PREVIOUS TIME AUTHORIZED 20 C.D.
G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 30 C.D.
H. TOTAL ADDITIONAL TIME 50 C.D.
CITY OF CORPUS CHRISTI, TEXAS + I Z CONTRACTQ
-
By: By:
Directoro gi eerin ervices .."- - -° °°"" " " "'" r �
�� r� � Title:
Operating Department APPROVED: P g P �A$
2012 -006
Project #.E09050
I M2012 -012 f 550910- 3546- 00000- EO905
01/17/12 PO #: E09050G7 I I
01-if-IRA - Ti -Zach Concrete
C3 SECREiAPw
CITY OF CORPUS CHRISTI
DEPARTMENT OF ENGINEERING SERVICES
CHANGE ORDER No. 3
PROJECT; ADA Improvements, Group 1
Band Issue 2008 - PR E09050
Contractor: Ti -Zack Concrete, Inc-
Contract Amount 51,519,532.66
PAGE; 1
DATE.: 1- Aug -11
QTY Over/ Under
ITEM #
ITEM DESCRIPTION
UNIT
EST.
QUANT.
WORK DONE
CONTRACT
UNIT PRICE
AMOUNT
Over /Under
AMOUNT
Part A - ADA Compliance Streets
#5.
A -1
Reripve c4rcrete :,
SF
23,454
23439.00
$ 2.00
878 t}(1
0 00'
-2015
A -2
concrete curb ramp
SF
12,849
14864.39
$ 9.00
$133;779.511
$
X21'
A -3
Remove and replace curb and gutter
LF
3,833
4254.20
$ 40.00
$170;168:00
$ (16,848 -00)
ff
A-4
'6
SF
13,723
13640.95
$ 900
. -2184
A -5
Asphalt pavement repair:.
SF
8,647
10811.00
$ 4.00
$.43;244.00
$ (8,656:00)
-11
A -6
Remove and relocate traffic sign
EA
16
27.00
$ 275,00
$7,425;00
$ (3,025.00)
0
A -7
Remave relocate business sign
EA
0
0.00
$ 10,000.00
$0.00
$
-6
A -8
Adjust watedgas valve
EA
16
22.00
$ 55.00
$1;210:00
. S (330.00)
A -9
Adjust eleckcal #unefron box :
EA
17
9.00
5 150 00
-1
A -10
Relocate electrical 'junction :box
EA
2
3.00
S 825.00.
$2,425:00
$ (825.00)
0
A. -11
Tactile panel warning surface (stand alone
SF
0
0.00
$ 1,000.00
$ 0.00
$
A - 12
Gamcrate dnvewayk,bnorete ar�ng lot
• . P -
SF
565
0.00
S. 10 00
-
-1159
A - 13
Concrete Type A Header curb
LF
71
1230.20
$ 100.00
S123;020.00
$(115,920..00)
0
A -14
Remove and replace valley gutter
LF
32
32.00
$ 45.00
$1,440.00
$ -
0
A -15
Remove and replace concrete median
SF
178
178.00
$ 20.00
$3,560.00
$ -
island
-$
A -16
12" white crosswalk striping
LF
2,916
2924.00
$ 5.00
$14,620.00
$ (40.00)
-494
A -17
24': white crosswalk striping
LF
2,918
3412.00
S 8 -00
. $27,296.00
$ (3
0
A -18
Concrete pedestrian bus pad
SF
0
0.00
S 25.00
$0.00
$ -
#
A- 19
t ii►lanslfQ
EA
1
0.00
$ 825.00
0
A -20
Remove and replace curb and inlet top.
EA
0
0.00
$ 750.00
$0.00
S -
(Including ring and cover)
2
A -21
�terrieve and replace parkEttg bollards :
EA
2
0 -00
500-00
$0 Dbxl1Q;
0
A -22
Sidewalk drain including steel plate cover
SF
0
0.00
S 75.00
$0.00
$ -
0%
A -23
Traffce control
LS
1
100%
$ 52,000.00
$52,000.00
S -
CITY OF CORPUS CHRISTI PAGE: 2
DEPARTMENT OF ENGINEERING SERVICES DATE: 7 - Aug -11
CHANGE ORDER No. 3
PROJECT: ADA Improvements, Group 1
Bond Issue 2008 - PR 1=09050
Contractor. Ti -Zack Concrete, Inc.
Contract Amount: $1,519,532.66
CITY Over/ EST. CONTRACT Over /Under
ITEM # ITEM DESCRIPTION UNIT WORK DONE I AMOUNT
Under QUANT: I UNIT PRICE AMOUNT
0 % A -24 Miscellaneaous demolition and LS 1 1 100% $ 10,000.00 1 $10,000.00 $ -
1
1
1
100%
0.00%
100%
$ 30,000.00
$30,000.00
site preparation
$ 8,000.00
0%
A -25
SWPPP
LS
$
A -26
Mrsllar�rsxs &Alfunce _ _..
LS
0%
A -27
Mobilization /Bondsllnsurance
LS
9.00
$1 53;39528 .S
Part 13 - ADA Improvements
14134.42
$
4.00
Group 1 - Streets
(13,.861.68)
=227
B -1
Remove. concrete;
SF
;531
B -2
Concrete curb ramp
SF
-454
B -3
Remove and replace.curb and gutter
LF
2607
B
6 c oncrete.sidewalk
SF
-3465
B -5
Asphalt. pavement repair
SF
9
B- 6
2,600.00
EA
0
B -7
Remove and relocate business sign
EA
'$
B -8
Adjust v�ratarigas Piave
EA
T.
B -9
Adjust electripalOctlon box
lwA
0
B -10
Relocate electrical function box
EA
` 2
8 -11
$1,395.00 $
5F
1274
8 - 12
Coe,ete d1Crr7gwa3rlcoricrfe parking lot
SF
-1009
B -13
Concrete Type A Header curb .
LF
0
B -14
Remove.and replace valley gutter
LF
.-7.1
B -15
Remove and replace concrete median
SF
$
13.00
island
(572.00)
=136
B -16
12" white crosswalk striping
LF
-285
B - 17
24" white crosswalk striping
LF
-44
B -18
Concrete pedestrian bus pad
SF
B -19
jusl Marrhdle
EA
1
1
1
100%
0.00%
100%
$ 30,000.00
$30,000.00
$
$ 8,000.00
15793.49
5
S 56,000.00
$56,000.00
$
1
4.600
1
30
1
16
15
1,274
30
31
6C
1,48E
1,48-e
6E
26029.00 $
2.00
$52;()58. $
( 454. 6 0)
15793.49
5
9.00 `'
$142;141.41, 1
(4,783.41)
5053.62
$
40.00
$202;144,80 $
(18,144.80)
17043.92
$
9.00
$1 53;39528 .S
{23
14134.42
$
4.00
$55;537.68 $
(13,.861.68)
11.00
$
275.00 ..
__..: _. 3,0 5_(]4
1.00
S
605.00
$605.00 $
-
8.00
$
55.00
2.00
S
495.00
0.00
$
2,600.00
$0,00
-
0.00
S
495.000
0.00
$
10.00
1039.30
$
100.00.
$103;930.00 $(100,930.00)
31.00
$
45.00
$1,395.00 $
-
130.50
$
15.00
$1;957;50 $
(3,057.50)
1624 -00
S
5.00 ..
$8,120.00. $
1769.00
$
8.00
$14,152.00 $
(2,280.00)
110.00
$
13.00
$1,430.00 $
(572.00)
0.001$
1,32000
3(7.
# 0{1,
Ove r'runs only
$ 333,960.18
CITY OF CORPUS CHRIST] PAGE: 3
DEPARTMENT OF ENGINEERING SERVICES DATE. 1- Aug -11
CHANGE ORDER No. 3
PROJECT: ADA.Improvements, Group 1
Bond Issue 2008 - PR E09050
Contractor: Ti -Zack Concrete, Inc.
Contract Amount: .$1,519,532.66
QTY Over/
ITEM #
ITEM DESCRIPTION
UNIT
EST.
WORK DONE
CONTRACT
AMOUNT
Over /Under
Under
QUANT
UNIT PRICE
AMOUNT
I
-
8 -20
i emaveandV-epl andinfeftoy.
EA
1
0.00
S 1,320.00
(Irucletding ring crud Gazer} .. .
0
B -21
Remove and replace parking bollards.
EA
0
0.00
S 2,500.00
$0.00
$ -
16
8 -22
��clewaik �n�ncludtigst". p]Ae,cQ�rer
SF
105
0.00
S 27.50
0
8 -23
Traffice control
LS
1
100%
$ 35,000.00
$35 ,000.00
S
0%
B -24
Miscellaneaous demolition and
LS
1
100%
$ 10,000.00
51 0 ,000.00
S
site preparation
0%
B -25
SWPPP
LS
1
100%
S 30,000.00
$30,000.00
$ -
716"�o
B -26
[VlrscellaraxsusAI]ttwattee
LS
1
$ 8,000.00
0%
B -27
Mobilization/Sonds/insura
LS
1
100%
$ 61,000.00
$61,000.00
S -
(A -26/ B -24 Downtown Park)
Change Order No.1 {add 0 CD's)
0' /6
1
Curb ramps - Schatzel and Mesquite
LS
1
100%
$ 14,900.00
$14,900.00
$ -
0%
2
Curb ramps - Masterson and Whitebird
LS
1
100%
S 2,480.00
$2,480.00
$ -
0%
3
King High School Concrete Driveway
LS
1
100 %
$ 18,897.00
$18,897.00
S -
0%
4
Peacock Drive Sidewalk
LS
1
100%
$ 3;708.00
$3,70$.00
$ -
Change Order No. 2 (add 20 CD's)
0%
1
Concrete curb, ramps, gutters. pavement
d LS
1
100%
$ 31,151.16
$31
S -
Ove r'runs only
$ 333,960.18