HomeMy WebLinkAboutC2012-018 - 1/14/2012 - NACITY OF CORPUS CHRISTI
AMENDMENT NO. 6
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "City ", and Freese and Nichols Inc., hereinafter called
"CONSULTANT ", agree to the following amendments to the Contract for Professional Services for Garwood
Water Supply Project Project No. 8424), as authorized and administratively amended by:
Original Contract
October 28, 2003
Motion No. M2003 -394
$116,100.00
Amendment No. 1
October 19, 2004
Motion No. M2004 -387
$285,490.00
Amendment No. 2
December 18, 2007
Motion No. M2007 -334
$911,997.00
Amendment No. 3
March 11, 2009
Administrative Approval
$0.00
Amendment No. 4
March 9, 2010
Motion No. M2010 -051
$9,676,590.00
Amendment No. 5
November 30, 2011
Administrative Approval
$0.00
Amendment No. 6 is a $49,940.00 (Forty Nine Thousand Nine Hundred Forty Dollars and Zero Cents)
amendment that revises project scope for M_ ary Rhodes Pipeline Phase 2 [Project No. E10008] to the
Garwood Water Supply Project as follows:
In the Amendment No. 4, EXHIBIT "A ", PART 1. SCOPE OF SERVICES, SECTION A. BASIC
SERVICES, shall be amended to include supplemental Basic Services as described in the attached
Amendment No. 6 Exhibit "A":
➢ ITEM NO. 2 Preliminary Design Phase in the amount of $2,340.00
• In the Amendment No. 4, EXHIBIT "A ", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL
SERVICES, shall be amended to include supplemental Additional Services as described in the
attached Amendment No. 6 Exhibit "A ":
➢ ITEM NO. 11 ROW Acquisition in the amount of $47,600.00
In the Amendment No. 4, EXHIBIT "A ", PART 3. FEES, SUMMARY OF FEES shall be modified and is
attached as Amendment No. 6 Exhibit "B" for a revised fee not to exceed $49 Fo Nine Thousand
Nine Hundred Forty Dollars and zero cents), for a total restated fee not to exceed $11.040.117.00 (Eleven
Million Forty Thousand One Hundred Seventeen Dollars and zero cents). -'
All other terms and conditions of the October 28, 2003 contract and amendments between the City and
Consultant shall remain in full force and effect.
2012 -018
01/14/12
Freese and Nichols, Inc.
MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 61AMENDMENT N0. 6,DOC
AMEND. NO. 6
i Page 1 of 2
bN D��
CITY OF CORPUS CHRISTI
Oscar R. Martinez, ! Date
Assistant City Manager
RECOMME D
%12
Pete Anaya, P.E. Date
Director of Engineering Services
ATTEST
Armando Chapa, City Secreta
APPROVED AS TO FORM
Assistant City Attorney Date
Project Number: E10008
Funding Source: 550950 -4477- 00000- E10008
Encumbrance Number: E10008AFR
FREESE AND NICHOLS, INC.
1 - 2 -2 .
Ron Gu man, P.E. Date
Vice President/Group Manager
800 North Shoreline Blvd., Suite 160ON
Corpus Christi, TX 78401
361- 561 -6500 Office; 361 - 561 -6501 Fax
ENTERED
K'TNGINEERING DATAEXCHANGEIVELMAPIWATERIEIOOOB MARY RHODES PIPELINE PHASE 21AMENDMENT NO. 61AMENDMENT NO. 6.DOC
AMEND. NO. 6
Page 2 of 2
Exhibit "A"
CITY OF CORPUS CHRISTI
Mary Rhodes Pipeline Phase 2 (Project No. E10008)
Parent Project: Garwood Water Supply Project (Project No. 8424)
Amendment No. 6
SCOPE OF SERVICES
1. Scope Revision
Add the following tasks as shown below:
Preliminary Design Phase and General Items:
• Determine magnitude and coordinate payment to landowners whose property will
be affected by invasive archeological investigation.
• Provide a record of all payments for the CITY's records.
Additional Services
I. Easement Acquisition Services
Add the following activities to the Easement Acquisition Services scope:
• Provide those landowners whose property will be affected by invasive
archeological investigation compensation. Total compensation for all landowners
will not exceed $47,600. Payment will be made by check or money order.
• Provide copies of all payment to landowners for the CITY's records.
B. Fee: The total authorized fee for all services added to the contract with through this
Amendment will be $49,940. Fees for individual additional tasks are shown in the
Summary of Fees table. The table Summary of Fees set forth on the following page
will be used by the Consultant Engineer to determine the amount to be invoiced for
each task. The fee shown for each task is inclusive of all expenses as set forth by
the original contract.
C. Schedule:
Preliminary Design Phase
K: Engineering DataExchange %VELMAPIWATER4E10008 MARY RHODES MPELINE PHASE ZAMENDMENT N0, MEXHIBIT A.doe
March 1, 2012
E BIT "A"
1 of 7
Summary of Fees
Schedule of Fees
TASK
Description
Fee
Original Contract — Phase 1
I.A.1
Screening Study of Delivery Options
$116,100.00
I.A.2
Detailed Study of Delivery Options
TBN
I.A.3
Pipeline Route Study
TBN
I.A.4
Pipeline Surveying, Easement Acquisition, and Permitting
TBN
I.A.5
Pipeline Topographic Survey and Preliminary Design
TBN
I.A.6
Final Design Phase
TBN
I.A.7
Bid, Award, and Construction
TBN
Original Contract Fee
$116,100.00
Amendment No.
1 — Phase 2
2.A
Detailed Study of Delivery Option 5
$152,532
2.13
Detailed Study of Delivery Option 1
$64,328
2.0
Detailed Study of Delivery Option 6
$68,635
Amendment No. 1 Fee
$285,490
Amendment No. 2 — Phase 2A
2A -0001
Field Studies
2A.1.A
— Ownership Mapping
$ 20,631
2A.1.B
—Risk Analysis
$ _
Prepare Risk Analysis
$ 5,853
Risk Analysis Workshop (in CC)
$ 4,533
2A.1.0
Field survey of West Mustang Creek
$ 46,922
2A.1.D
West Mustang Creek Habitat Assessment
$ 34,272
2A.1.E
— Coordination Re- Calib. Of Gannado Gauging Station
$ 6,168
2A.1.F
— Summary
$ _
Prepare Task Summary
Task Summary Workshop (in CC)
$ 11,650
$ 8,383
Total Fee by Classification
$ 138,411
2A -0002
LCRA Agreement
2A.2.A
Agreement Framework
$
Prepare Framework
$ 12,695
Submit Framework
$ 431
Schedule Framework Meeting
$ 451
2A.2.B
— Framework Meeting (Garwood)
$ 7,235
2A.2.0
— Prepare Draft LCRA Agreement
$ 10,525
2A.2.D
—Draft LCRA Agreement Workshop (Garwood)
$ 6,366
2A.2.E
Prepare Final Agreement
$ 8,740
EXHIBIT "A"
Page 2 of 7
K %Engineering DataExchange \VELMAPkWATERXE90008 MARY RHODES PIPELINE PHASE 25AMENDMENT NO.81EXHIBIT A.doc
2A.2.F
Task — Execute Agreement (1 meeting Austin, 1 meeting Corpus
Christi )
$ 8,151
2A.2.G
—Task 2 Summary
$ 14
Total Fee by Classification
$ 69,268
2A -0003
LNRA Agreement
2A.3.A
— Agreement Framework
$ _
Prepare Framework
$ 13,025
Submit Framework
$ 431
Schedule Framework Meeting
$ 451
2A.3.13
— Framework Meeting (Edna)
$ 7,191
2A.3.0
— Prepare Draft Agreement
$ 10,525
2A.3.D
—Draft LNRA Agreement Review Workshop (Edna)
$ 7,191
2A.3.E
— Regulatory Coordination (2 meetings Austin)
$ 10,137
2A.3.F
— Prepare Final LNRA Agreement
$ 6,815
2A.3.G
— Execute Agreement (1 meeting Edna, 1 meeting Austin)
$ 11
2A.3.H
—Task 3 Summary
$ 14,125
Total Fee by Classification
$ 81,250
2A -0004
Permitting and Agency Coordination
2AA.A
—Coord w/ TPWD re: GSM Permit (2 meetings Austin)
$ 3,737
2A 4 B
—Coord w/ TPWD re: LNRA Inflow /Release Agreement (3 meetings
Austin )
$ 5,156
2A.4.0
—Coord w/ TCEQ re: Bed and Banks Permit (3 meetings Austin)
$ 7,104
2A.4.D
—Coord w/ TGLO re: Bed and Banks Permit (3 meetings Austin)
$ 7,104
2A.4.E
— Coordination with TCEQ and TWDB re: Regional Water Planning (2
.. meetings Austin )
$ 1,437
2A.4.F
—Regional Water Planning Group Coordination (1 meeting Austin, 1
meeting Corpus Christi )
$ 2,979
2AA.G
— Monitor LCRA/SAWS Project (2 meetings Garwood)
$ 6,437
2A.4.H
—USAGE Coord (1 meeting Galveston)
$ 8,253
2A.4.1
—TPDES Coordination (1 meeting Austin)
$ 6,566
2A.4.J
— Landowner Issues and Communications (3 meetings Edna)
$ 20,785
2A.4.K
—Meet w/ Environmental Groups
$ -
Prepare Exhibits
$ 13,093
Meeting 1
$ _
Plan
$ 501
Schedule
$ 471
Prepare for Meeting
$ 3,745
Attend Meeting (Austin)
$ 2,376
Meeting 2
$ _
Plan
$ 501
Schedule
$ 471
EXHIBIT "A"
Page 3 of 7
K\Engineedng DataExchangelVELMAPIWATER \E1000B MARY RHODES PIPELINE PHASE 21AMENDMENT NO.61EXHIBIT A.doc
MEngineering DataExchangelVELMAPSWATER1E10008 MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 61EXHI BIT Adec
EXHIBIT "A"
Page 4 of 7
Prepare for Meeting
$ 3,745
Attend Meeting (Austin)
$ 2,376
Meeting 3
$ _
Plan
$ 501
Schedule
$ 471
Prepare for Meeting
$ 3,745
Attend Meeting (Edna)
$ 3,591
2A.4.L
—Task 4 Summary
$ 16,070
Total Fee by Classification
$ 121,216
2A -0005
Permitting Activities
2A.5.A
—Bed and Banks Permit Application
$ ..
Prepare Permit
$ 20
Submit Permit
$ 6,360
Agency Review
$ 8,115
Permit Approval
$ 5,203
2A.5.B
— Prepare Amendment to TPWD/LNRA Inflow & Release Agreement
$ _
Develop Amendment Framework
$ 3,815
Meet with LNRA and TPWD to develop amendment outline (1
mtg Edna )
$ 4,441
Develop Draft Amendment
$ 4,075
Meet with LNRA and TPWD to review Draft Amendment (1 mtg
Edna )
$ 4,441
Prepare Final Amendment
$ 3,735
Obtain Written Approval (1 mtg Austin, 1 mtg Edna)
$ 6,540
2A.5.0
—Water Right Amendment Application
$ _
Prepare Permit
$ 10
Submit Permit
$ 9B1
Agency Review
$ 4,210
Permit Approval
$ 1,023
2A.5.D
— Monitor Permit Application Status
$ 2,045
2A.5.E
— Regulatory Agency Coord During Permit App Process
$ 2,545
2A.5.F
— Develop Supporting Info for Region N Amendment
$ 5
2A.5.G
— Coordinate Region N Amendment (2 meetings CC)
$ 11,475
2A.5.H
—Amend Water Conservation /Drought Management Plan
$ _
Prepare Draft Amendment
$ 3,408
Plan Workshop (CC)
$ 4,533
Submit Draft Amendment
$ 1,120
City Review of Draft Amendment
$ _
Review Workshop (CC)
$ 4,533
City Review Complete
$ _
MEngineering DataExchangelVELMAPSWATER1E10008 MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 61EXHI BIT Adec
EXHIBIT "A"
Page 4 of 7
MEngineering DataExchangelVELMA 3 SWATER1E10008 MARY RHODES PIPELINE PHASE 2VIMENDMENT NO. MEXHIBIT A.doc
E BIT "A"
5of7
Incorporate City Comments /Prepare Final Amendment
$ 3,535
City Council Approval of Final Amendment (CC)
$ 4,533
2A.5.F
—Task 5 Summary
$ 15,227
Total Fee by Classification
$ 142,870
2A -0006
Conceptual Facility Design
2A. 6.A
—GIC Facility Requirement Workshop
$ 330
Schedule Workshop
$ 681
Conduct Workshop (Garwood)
$ 6,393
2A.6.13
— Concept Design of GIC Canal System Improvements
$ 4,800
2A.6.0
— Concept Design of West Mustang Creek Div. Structure
$ 4,800
2A.6.D
— Design Review Workshop
$ _
Schedule Workshop
$ 681
Conduct Workshop (Garwood)
$ 6,393
2A.6.E
W. Mustang Creek Gauging Facility Workshop
$ 6,900
Schedule Workshop
$ 681
Conduct Workshop (Edna)
$ 4,193
2A.6.F
— Concept Design, W. Mustang Creek Gauging Facility
$ 3,960
2A.6.G
—W. Mustang Creek Gauging Facility Workshop
$ _
Schedule Workshop
$ 681
Conduct Workshop (Edna)
$ 6,393
2A.6.H
—Task Summary
$ 10,275
Total Fee by Classification
$ 57,164
2A -0007
Mary Rhodes Pipeline Assessment
2A.7.A
—Data Collection and Review
$ 8,648
2A.7.13
— Facilities Site Visit
$ 23,266
2A.7.0
—Task Kickoff Workshop (Corpus Christi)
$ 8,605
2A.7.D
—Pump Station Assessment
$ 17,008
2A.7.E
—SCADA System Assessment
$ 11,840
2A.75
— Operational Integration of Garwood Water
$ 6,200
2A.7.G
— Alternatives Identification and Screening
$ 27
2A.7.H
— Alternative Control Strategies
$ 11,335
2A.7.1
— Recommended Mary Rhodes Pipeline Improvements
$ 6,205
2A.7.J
--Task 7 Summary
$ _
Prepare Summary
$ 16,200
Attend Workshop
$ 5,768
Total Fee by Classification
$ 142,686
2A -0008
Task 8 — Phase 2A Report
2A.8.A
— Prepare Draft Report
$ _
Prepare Report
$ 25,656
Submit Draft Report to City for Review
$ 1,292
MEngineering DataExchangelVELMA 3 SWATER1E10008 MARY RHODES PIPELINE PHASE 2VIMENDMENT NO. MEXHIBIT A.doc
E BIT "A"
5of7
K: Engrneenng Data ExchangelVELMAPSWATER1E10008 MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 6TXHIBIT A.doc
EXHIBIT "A"
- Page 6 of 7
City Review of Draft Report
$ _
City Review Complete
$ -
2A.8.13
— Prepare Draft Report Presentation
$ 7,112
2A.8.0
—Draft Report Workshop (Corpus Christi)
$ 9,169
2A.8.D
—Draft Report Comments Meeting (Corpus Christi)
$ 9,169
2A.8.E
— Prepare Final Report
$ 10,321
2A.8.F
—Final Report Presentation (up to 3 meetings in Corpus Christi)
$ 34,669
$ 97,388
2A -0009
Project Management
2A.9.AOBC1
Task 9.A— Project Schedule
$ 10,060
2A.9.130BC2
Task 9.13— Progress Reports and Invoices
$ 23,342
2A.9.00BC3
Task 9.0 —Phase 3 Scoping
$ 28,343
Total Fee by Classification
$ 61,744
Amendment No. 2 Fee
$ 911,997
Amendment No.
3
2A -0005
Task 5 - Permitting Activities (Deleted in its Entirety)
$ - 142,870
2A -0008
Task 8 — Phase 2A Report (Deleted in its Entirety)
$ - 97,388
3 -00010
Task 10 - Garwood Alignment Study Scope of Work
3- 0010.1
Data Collection
$ 49,709
3- 0010.2
Preliminary Hydraulic Study
$ 21,975
3- 0010.3
Preliminary Environmental Review
$ 60,294
3- 0010.4
Preliminary Route Analysis
$ 45,364
3- 0010.5
Final Route Analysis
$ 62,916
Amendment No. 3 Fee
$ 0
Amendment No.
4
1
Study Phase
$ 0
2
Preliminary Phase
$ 1,514,814
3
Design Phase
$ 3,068,522
4
Bid Phase
$ 102,000
K: Engrneenng Data ExchangelVELMAPSWATER1E10008 MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 6TXHIBIT A.doc
EXHIBIT "A"
- Page 6 of 7
5
Construction Phase
$ 1,200,000
A - 1
Permitting
$ 267,414
A-2
ROW Acquisition Survey
$ 350,000
A-3
Topographic Survey
$ 891,165
A-4
Subsurface Utility Exploration
$ 286,000
A-5
Aerial Photography
$ 23,750
A-6
Corrosion Engineering
$ 122
A-7
Surge Analysis
$ 104,181
A-8
Geotechnical Investigation
$ 312,737
A -9
Archeological Investigation
$ 984,650
A-10
Hydraulic Modeling
$ 37,398
A — 11
ROW Acquisition
$ 1,060,601
A— 12
Construction Observation Services
$ TBD
A— 13
Start -Up Services
$ TBD
A —14
O &M Services
$ 150,590
A— 15
Warranty Phase
$ TBD
A— 16
Provide SCADA Documentation
$ TBD
Amendment No. 4 Fee
$ 9,676,590
Amendment No.
5
2
Preliminary Phase
$ 0
3
Design Phase
$ 183,179
4
Bid Phase
$ 82,814
A - 1
Permitting
$ 53,696
A - 3
Topographic Survey
$ 37,035
A--4
Subsurface Utility Exploration
$ - 121,045
A-8
Geotechnical Investigation
$ 18,749
A-9
Archeological Investigation
$ - $7
A-10
Hydraulic Modeling
$ 36,102
A — 11
ROW Acquisition
$ - 202,722
Amendment No. 5 Fee
$ 0
Total Fee
$10,990,177
Amendment No.
6
2
Preliminary Prase — Coordination effort associated with Archeological
access compensation
$ 2,340
A-11
ROW Acquisition — Archeological access compensation
$ 47,600
Amendment No. 6 Fee
$ 49,940
Total Fee
$11,040,117
KaEngineermg DataExchange \VELMAPIWATERIE1DOOB MARY RHODES PIPELINE PHASE 21AMENDMENT NO.6IEXHIBiT A.doc
EXHIBIT "A"
Page 7 of 7
Mary Rhodes Pipeline Phase 2 (Project No. E10008)
Parent Project: Garwood Water Supply Project (Project No. 8424)
SUMMARY OF FEES
x�
X
W z
i � 0
0 Z
N [� O
ORIGINAL
CONTRACT
8424
AMEND. NO. 1
8424
AMEND. NO. 2
8424
AMEND. NO. 3
8424
AMEND. NO.4
E10008
BASIC
SERVICES
1
Study Phase
$116,100.00
$285,490.00
$911,997.00
$0.00
$0.00
2
Preliminary Phase Authorized
0.00
0.00
0.00
0.00
1,514,814.00
3
Design Phase (Not Authorized)
0.00
0.00
0.00
0.00
3,068,522.00
4
Bid Phase Not Authorized
0.00
0.00
0.00
0.00
102 ,000.00
5
Construction Phase (Not Authorized)
0.00
0.00
0.00
0.00
1,200,000.00
Subtotal Basic Services
116,100.00
285,490.00
911,997.00
0.00
5,885,336.00
ADDITIONAL SERVICES
1
Permitting (Authorized)
0.00
0.00
0.00
0.00
267,414.00
2
ROW Acquisition Survey (Authorized)
0.00
0.00
0.00
0.00
350,000.00
3
Topographic Survey (Authorized)
0.00
0.00
0.00
0.00
891,165.00
4
Subsurface Utility Exploration Authorized
0.00
0.00
0.00
0.00
286,000.00
5
Aerial Photography Authorized
0.00
0.00
0.00
0.00
23,750.00
6
Corrosion Engineering (Authorized)
0.00
0.00
0.00
0.00
122,768.00
7
Surge Analysis (Authorized)
0.00
0.00
0.00
0.00
104,181.00
8
Geotechnical Investig Authorized
0.00
0.00
0.00
0.00
312,737.00
9
Archeological Investigation Authorized
0.00
0.00
0.00
0.00
184,650.00
10
Hydraulic Modeling (Authorized)
0.00
0.00
0.00
0.00
37,398.00
11
ROW Acquisition (Authorized)
0.00
0.00
0.00
0.00
1,060,601.00
12
Construction Observation Services
0.00
0.00
0.00
0.00
0.00
13
Start-Up Services
0.00
0.00
0.00
0.00
0.00
14
0 & M Services (Authorized)
0.00
0.00
0.00
0.00
150,590.00
15 lvvarranty
Phase
0.00
0.00
0.00
0.00
0.00
16 1
Provide SCADA Documentation
0.00
0.00
0.00
0.00
0.00
Subtotal Additional Services
0.00
0.00
0.00
0.00
3,791,254.00
TOTAL FEE
$116,100.00
$285,490.00
$911,997.00
$0.00
$9,676,590.00
10/28/03
M2003 -394
10/19/04
M2004 -387
12/18/07
M2007 -334
03/11/09
Admin Ap roval
03/09/10
M2010 -051
Mary Rhodes Pipeline Phase 2 (Project No. E10008)
Parent Project: Garwood Water Supply Project (Project No. 8424)
SUMMARY OF FEES
11/30/11
Admin Approval Admin Approval
�M
X
a M
CD z
N 1 D
O Z
N m 0
AMEND. NO. 5
E10008
AMEND. NO. 6
E10008
TOTAL
BASIC SERVICES
1
Study Phase
$0.00
0.00
$1,313,587.00
2
Preliminary Phase (Authorized)
0.00
2,340.00
1,517,154.00
3
Design Phase Not Authorized
183,179.00
0.00
3,251,701.00
4
Bid Phase (Not Authorized)
82,814.00
0.00
184,814.00
5
lConstruction Phase Not Authorized
0.00
0.00
1,200,000.00
Subtotal Basic Services
265,993.00
2,340.00
7,467,256.00
ADDITIONAL SERVICES
1
Permitting Authorized
53,696.00
0.00
321,110.00
2
ROW Acquisition Surve (Authorized
0.00
0.00
350,000.00
3
Topographic Survey (Authorized)
37,035.00
0.00
928,200.00
4
Subsurface Utility Exploration (Authorized)
(121,045.00
0.00
164,955.00
5
Aerial Photography Authorized
0.00
0.00
23,750.00
6
Corrosion Engineering Authorized
0.00
0.00
122,768.00
7
Surge Analy (Authorized)
0.00
0.00
104,181.00
8
Geotechnical Investigation (Authorized)
18,749.00
0.00
331,486.00
9
Archeological Investig ( Authorized)
87,808.00
0.00
96,842.00
10
Hydraulic Modeling Authorized
36,102.00
0.00
73,500.00
11
1 ROW Acquisition (Authorized)
(202,722.00)
47,600.00
905,479.00
12
Construction Observation Services
0.00
0.00
0.00
13
Start-Up Services
0.00
0.00
0.00
14
O & M Services Authorized
0.00
0.00
150,590.00
15
Warranty Phase
0.00
0.00
0.00
16
Provide SCADA Documentation
0.00
0.00
0.00
Subtotal Additional Services
(265,993.00)
47,600.00
3,572,861.00
TOTAL FEE
$0.00
$49,940.00
$11,040,117.00
11/30/11
Admin Approval Admin Approval
�M
X
a M
CD z
N 1 D
O Z
N m 0
SUPPLIER NUMBER
TO BE ASSIGNED BYZ97Y
PURCHASING DIVISION
�ir.r►r.
City of CITY OF CORPUS CHRISTI
a DISCLOSURE OF INTEREST
City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business
with the City to provide the following information. Every question must be answered. If the question is
not applicable, answer with "NA ". See reverse side for Filing Requirements, Certifications and
definitions.
COMPANY NAME; Freese and Niehols, Inc.
P. O. BOX:
STREET ADDRESS 840 N. Shoreline Blvd., Suite 160ON CITY: Corpus Christi
ZIP: 78401
FIRM IS: I. Corporation ® 2_ Partnership e 3. Sole Owner ❑
4. Association 5. Other
DISCLOSURE QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet.
1. State the names of each ` employee" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Job Title and City Department (if known)
N/A NIA
2. State the names of each "official" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Title
NIA N/A
3. State the. names of each "board member" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Board, Commission or Committee
N/A NIA
4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who
worked on py matter related to the subject of this contract and has an "ownership interest"
constituting 3 %.or.more of the ownership in the above named "firm"
Name Consultant
N/A N/A
FILING REQUIREMENTS
If a person who requests official action on a matter knows that the requested action will confer an
economic benefit on any City official or employee that is distinguishable from the effect that the action
will have on members of the public in general or a substantial segment thereof, you sbali disclose that fact
in a signed writing to the City official, employee or body that has been requested to act in the matter,
unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be
made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -344 (d)]
CERTIFICATION
1 certify that all information provided is true and correct as of the date of this statement, that I have not
knowin ly withheld disclosure of any information requested; and that supplemental statements will be
promptly submitted to the City of Corpus Christi, Texas as changes occur.
Certifying Person:
Ron Guzman, P.E. Title: Principal
(Type or Prins)
Signature of Certifying r Date:
_ !0 2I. r i
DEFINITIONS
a. "Board member." A member of any board, commission, or committee appointed by the City
Council of the City of Corpus Christi, Texas.
b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an
effect on that interest that is distinguishable from its effect on members of the public in general or a
substantial segment thereof.
c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-
time basis, but not as an independent contractor.
d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and
whether established to produce or deal with a product or service, including but not limited to, entities
operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint
stock company, joint venture, receivership or trust, and entities which for purposes of taxation are
treated as non - profit organizations.
e. "Official" The Mayor, members of the City Council, City Manager, Deputy City Manager,
Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of
Corpus Christi, Texas.
f. "Ownership Interest" Legal or equitable interest, whether actually or constructively held, in a
firm, including when such interest is held through an agent, trust, estate, or holding entity.
"Constructively held" refers to holdings or control established through voting trusts, proxies, or
special terms of venture or partnership agreements."
g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus
Christi for the purpose of professional consultation and recommendation.