HomeMy WebLinkAboutC2012-018 - 1/14/2012 - NACITY OF CORPUS CHRISTI AMENDMENT NO. 6 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City ", and Freese and Nichols Inc., hereinafter called "CONSULTANT ", agree to the following amendments to the Contract for Professional Services for Garwood Water Supply Project Project No. 8424), as authorized and administratively amended by: Original Contract October 28, 2003 Motion No. M2003 -394 $116,100.00 Amendment No. 1 October 19, 2004 Motion No. M2004 -387 $285,490.00 Amendment No. 2 December 18, 2007 Motion No. M2007 -334 $911,997.00 Amendment No. 3 March 11, 2009 Administrative Approval $0.00 Amendment No. 4 March 9, 2010 Motion No. M2010 -051 $9,676,590.00 Amendment No. 5 November 30, 2011 Administrative Approval $0.00 Amendment No. 6 is a $49,940.00 (Forty Nine Thousand Nine Hundred Forty Dollars and Zero Cents) amendment that revises project scope for M_ ary Rhodes Pipeline Phase 2 [Project No. E10008] to the Garwood Water Supply Project as follows: In the Amendment No. 4, EXHIBIT "A ", PART 1. SCOPE OF SERVICES, SECTION A. BASIC SERVICES, shall be amended to include supplemental Basic Services as described in the attached Amendment No. 6 Exhibit "A": ➢ ITEM NO. 2 Preliminary Design Phase in the amount of $2,340.00 • In the Amendment No. 4, EXHIBIT "A ", PART 1. SCOPE OF SERVICES, SECTION B. ADDITIONAL SERVICES, shall be amended to include supplemental Additional Services as described in the attached Amendment No. 6 Exhibit "A ": ➢ ITEM NO. 11 ROW Acquisition in the amount of $47,600.00 In the Amendment No. 4, EXHIBIT "A ", PART 3. FEES, SUMMARY OF FEES shall be modified and is attached as Amendment No. 6 Exhibit "B" for a revised fee not to exceed $49 Fo Nine Thousand Nine Hundred Forty Dollars and zero cents), for a total restated fee not to exceed $11.040.117.00 (Eleven Million Forty Thousand One Hundred Seventeen Dollars and zero cents). -' All other terms and conditions of the October 28, 2003 contract and amendments between the City and Consultant shall remain in full force and effect. 2012 -018 01/14/12 Freese and Nichols, Inc. MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 61AMENDMENT N0. 6,DOC AMEND. NO. 6 i Page 1 of 2 bN D�� CITY OF CORPUS CHRISTI Oscar R. Martinez, ! Date Assistant City Manager RECOMME D %12 Pete Anaya, P.E. Date Director of Engineering Services ATTEST Armando Chapa, City Secreta APPROVED AS TO FORM Assistant City Attorney Date Project Number: E10008 Funding Source: 550950 -4477- 00000- E10008 Encumbrance Number: E10008AFR FREESE AND NICHOLS, INC. 1 - 2 -2 . Ron Gu man, P.E. Date Vice President/Group Manager 800 North Shoreline Blvd., Suite 160ON Corpus Christi, TX 78401 361- 561 -6500 Office; 361 - 561 -6501 Fax ENTERED K'TNGINEERING DATAEXCHANGEIVELMAPIWATERIEIOOOB MARY RHODES PIPELINE PHASE 21AMENDMENT NO. 61AMENDMENT NO. 6.DOC AMEND. NO. 6 Page 2 of 2 Exhibit "A" CITY OF CORPUS CHRISTI Mary Rhodes Pipeline Phase 2 (Project No. E10008) Parent Project: Garwood Water Supply Project (Project No. 8424) Amendment No. 6 SCOPE OF SERVICES 1. Scope Revision Add the following tasks as shown below: Preliminary Design Phase and General Items: • Determine magnitude and coordinate payment to landowners whose property will be affected by invasive archeological investigation. • Provide a record of all payments for the CITY's records. Additional Services I. Easement Acquisition Services Add the following activities to the Easement Acquisition Services scope: • Provide those landowners whose property will be affected by invasive archeological investigation compensation. Total compensation for all landowners will not exceed $47,600. Payment will be made by check or money order. • Provide copies of all payment to landowners for the CITY's records. B. Fee: The total authorized fee for all services added to the contract with through this Amendment will be $49,940. Fees for individual additional tasks are shown in the Summary of Fees table. The table Summary of Fees set forth on the following page will be used by the Consultant Engineer to determine the amount to be invoiced for each task. The fee shown for each task is inclusive of all expenses as set forth by the original contract. C. Schedule: Preliminary Design Phase K: Engineering DataExchange %VELMAPIWATER4E10008 MARY RHODES MPELINE PHASE ZAMENDMENT N0, MEXHIBIT A.doe March 1, 2012 E BIT "A" 1 of 7 Summary of Fees Schedule of Fees TASK Description Fee Original Contract — Phase 1 I.A.1 Screening Study of Delivery Options $116,100.00 I.A.2 Detailed Study of Delivery Options TBN I.A.3 Pipeline Route Study TBN I.A.4 Pipeline Surveying, Easement Acquisition, and Permitting TBN I.A.5 Pipeline Topographic Survey and Preliminary Design TBN I.A.6 Final Design Phase TBN I.A.7 Bid, Award, and Construction TBN Original Contract Fee $116,100.00 Amendment No. 1 — Phase 2 2.A Detailed Study of Delivery Option 5 $152,532 2.13 Detailed Study of Delivery Option 1 $64,328 2.0 Detailed Study of Delivery Option 6 $68,635 Amendment No. 1 Fee $285,490 Amendment No. 2 — Phase 2A 2A -0001 Field Studies 2A.1.A — Ownership Mapping $ 20,631 2A.1.B —Risk Analysis $ _ Prepare Risk Analysis $ 5,853 Risk Analysis Workshop (in CC) $ 4,533 2A.1.0 Field survey of West Mustang Creek $ 46,922 2A.1.D West Mustang Creek Habitat Assessment $ 34,272 2A.1.E — Coordination Re- Calib. Of Gannado Gauging Station $ 6,168 2A.1.F — Summary $ _ Prepare Task Summary Task Summary Workshop (in CC) $ 11,650 $ 8,383 Total Fee by Classification $ 138,411 2A -0002 LCRA Agreement 2A.2.A Agreement Framework $ Prepare Framework $ 12,695 Submit Framework $ 431 Schedule Framework Meeting $ 451 2A.2.B — Framework Meeting (Garwood) $ 7,235 2A.2.0 — Prepare Draft LCRA Agreement $ 10,525 2A.2.D —Draft LCRA Agreement Workshop (Garwood) $ 6,366 2A.2.E Prepare Final Agreement $ 8,740 EXHIBIT "A" Page 2 of 7 K %Engineering DataExchange \VELMAPkWATERXE90008 MARY RHODES PIPELINE PHASE 25AMENDMENT NO.81EXHIBIT A.doc 2A.2.F Task — Execute Agreement (1 meeting Austin, 1 meeting Corpus Christi ) $ 8,151 2A.2.G —Task 2 Summary $ 14 Total Fee by Classification $ 69,268 2A -0003 LNRA Agreement 2A.3.A — Agreement Framework $ _ Prepare Framework $ 13,025 Submit Framework $ 431 Schedule Framework Meeting $ 451 2A.3.13 — Framework Meeting (Edna) $ 7,191 2A.3.0 — Prepare Draft Agreement $ 10,525 2A.3.D —Draft LNRA Agreement Review Workshop (Edna) $ 7,191 2A.3.E — Regulatory Coordination (2 meetings Austin) $ 10,137 2A.3.F — Prepare Final LNRA Agreement $ 6,815 2A.3.G — Execute Agreement (1 meeting Edna, 1 meeting Austin) $ 11 2A.3.H —Task 3 Summary $ 14,125 Total Fee by Classification $ 81,250 2A -0004 Permitting and Agency Coordination 2AA.A —Coord w/ TPWD re: GSM Permit (2 meetings Austin) $ 3,737 2A 4 B —Coord w/ TPWD re: LNRA Inflow /Release Agreement (3 meetings Austin ) $ 5,156 2A.4.0 —Coord w/ TCEQ re: Bed and Banks Permit (3 meetings Austin) $ 7,104 2A.4.D —Coord w/ TGLO re: Bed and Banks Permit (3 meetings Austin) $ 7,104 2A.4.E — Coordination with TCEQ and TWDB re: Regional Water Planning (2 .. meetings Austin ) $ 1,437 2A.4.F —Regional Water Planning Group Coordination (1 meeting Austin, 1 meeting Corpus Christi ) $ 2,979 2AA.G — Monitor LCRA/SAWS Project (2 meetings Garwood) $ 6,437 2A.4.H —USAGE Coord (1 meeting Galveston) $ 8,253 2A.4.1 —TPDES Coordination (1 meeting Austin) $ 6,566 2A.4.J — Landowner Issues and Communications (3 meetings Edna) $ 20,785 2A.4.K —Meet w/ Environmental Groups $ - Prepare Exhibits $ 13,093 Meeting 1 $ _ Plan $ 501 Schedule $ 471 Prepare for Meeting $ 3,745 Attend Meeting (Austin) $ 2,376 Meeting 2 $ _ Plan $ 501 Schedule $ 471 EXHIBIT "A" Page 3 of 7 K\Engineedng DataExchangelVELMAPIWATER \E1000B MARY RHODES PIPELINE PHASE 21AMENDMENT NO.61EXHIBIT A.doc MEngineering DataExchangelVELMAPSWATER1E10008 MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 61EXHI BIT Adec EXHIBIT "A" Page 4 of 7 Prepare for Meeting $ 3,745 Attend Meeting (Austin) $ 2,376 Meeting 3 $ _ Plan $ 501 Schedule $ 471 Prepare for Meeting $ 3,745 Attend Meeting (Edna) $ 3,591 2A.4.L —Task 4 Summary $ 16,070 Total Fee by Classification $ 121,216 2A -0005 Permitting Activities 2A.5.A —Bed and Banks Permit Application $ .. Prepare Permit $ 20 Submit Permit $ 6,360 Agency Review $ 8,115 Permit Approval $ 5,203 2A.5.B — Prepare Amendment to TPWD/LNRA Inflow & Release Agreement $ _ Develop Amendment Framework $ 3,815 Meet with LNRA and TPWD to develop amendment outline (1 mtg Edna ) $ 4,441 Develop Draft Amendment $ 4,075 Meet with LNRA and TPWD to review Draft Amendment (1 mtg Edna ) $ 4,441 Prepare Final Amendment $ 3,735 Obtain Written Approval (1 mtg Austin, 1 mtg Edna) $ 6,540 2A.5.0 —Water Right Amendment Application $ _ Prepare Permit $ 10 Submit Permit $ 9B1 Agency Review $ 4,210 Permit Approval $ 1,023 2A.5.D — Monitor Permit Application Status $ 2,045 2A.5.E — Regulatory Agency Coord During Permit App Process $ 2,545 2A.5.F — Develop Supporting Info for Region N Amendment $ 5 2A.5.G — Coordinate Region N Amendment (2 meetings CC) $ 11,475 2A.5.H —Amend Water Conservation /Drought Management Plan $ _ Prepare Draft Amendment $ 3,408 Plan Workshop (CC) $ 4,533 Submit Draft Amendment $ 1,120 City Review of Draft Amendment $ _ Review Workshop (CC) $ 4,533 City Review Complete $ _ MEngineering DataExchangelVELMAPSWATER1E10008 MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 61EXHI BIT Adec EXHIBIT "A" Page 4 of 7 MEngineering DataExchangelVELMA 3 SWATER1E10008 MARY RHODES PIPELINE PHASE 2VIMENDMENT NO. MEXHIBIT A.doc E BIT "A" 5of7 Incorporate City Comments /Prepare Final Amendment $ 3,535 City Council Approval of Final Amendment (CC) $ 4,533 2A.5.F —Task 5 Summary $ 15,227 Total Fee by Classification $ 142,870 2A -0006 Conceptual Facility Design 2A. 6.A —GIC Facility Requirement Workshop $ 330 Schedule Workshop $ 681 Conduct Workshop (Garwood) $ 6,393 2A.6.13 — Concept Design of GIC Canal System Improvements $ 4,800 2A.6.0 — Concept Design of West Mustang Creek Div. Structure $ 4,800 2A.6.D — Design Review Workshop $ _ Schedule Workshop $ 681 Conduct Workshop (Garwood) $ 6,393 2A.6.E W. Mustang Creek Gauging Facility Workshop $ 6,900 Schedule Workshop $ 681 Conduct Workshop (Edna) $ 4,193 2A.6.F — Concept Design, W. Mustang Creek Gauging Facility $ 3,960 2A.6.G —W. Mustang Creek Gauging Facility Workshop $ _ Schedule Workshop $ 681 Conduct Workshop (Edna) $ 6,393 2A.6.H —Task Summary $ 10,275 Total Fee by Classification $ 57,164 2A -0007 Mary Rhodes Pipeline Assessment 2A.7.A —Data Collection and Review $ 8,648 2A.7.13 — Facilities Site Visit $ 23,266 2A.7.0 —Task Kickoff Workshop (Corpus Christi) $ 8,605 2A.7.D —Pump Station Assessment $ 17,008 2A.7.E —SCADA System Assessment $ 11,840 2A.75 — Operational Integration of Garwood Water $ 6,200 2A.7.G — Alternatives Identification and Screening $ 27 2A.7.H — Alternative Control Strategies $ 11,335 2A.7.1 — Recommended Mary Rhodes Pipeline Improvements $ 6,205 2A.7.J --Task 7 Summary $ _ Prepare Summary $ 16,200 Attend Workshop $ 5,768 Total Fee by Classification $ 142,686 2A -0008 Task 8 — Phase 2A Report 2A.8.A — Prepare Draft Report $ _ Prepare Report $ 25,656 Submit Draft Report to City for Review $ 1,292 MEngineering DataExchangelVELMA 3 SWATER1E10008 MARY RHODES PIPELINE PHASE 2VIMENDMENT NO. MEXHIBIT A.doc E BIT "A" 5of7 K: Engrneenng Data ExchangelVELMAPSWATER1E10008 MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 6TXHIBIT A.doc EXHIBIT "A" - Page 6 of 7 City Review of Draft Report $ _ City Review Complete $ - 2A.8.13 — Prepare Draft Report Presentation $ 7,112 2A.8.0 —Draft Report Workshop (Corpus Christi) $ 9,169 2A.8.D —Draft Report Comments Meeting (Corpus Christi) $ 9,169 2A.8.E — Prepare Final Report $ 10,321 2A.8.F —Final Report Presentation (up to 3 meetings in Corpus Christi) $ 34,669 $ 97,388 2A -0009 Project Management 2A.9.AOBC1 Task 9.A— Project Schedule $ 10,060 2A.9.130BC2 Task 9.13— Progress Reports and Invoices $ 23,342 2A.9.00BC3 Task 9.0 —Phase 3 Scoping $ 28,343 Total Fee by Classification $ 61,744 Amendment No. 2 Fee $ 911,997 Amendment No. 3 2A -0005 Task 5 - Permitting Activities (Deleted in its Entirety) $ - 142,870 2A -0008 Task 8 — Phase 2A Report (Deleted in its Entirety) $ - 97,388 3 -00010 Task 10 - Garwood Alignment Study Scope of Work 3- 0010.1 Data Collection $ 49,709 3- 0010.2 Preliminary Hydraulic Study $ 21,975 3- 0010.3 Preliminary Environmental Review $ 60,294 3- 0010.4 Preliminary Route Analysis $ 45,364 3- 0010.5 Final Route Analysis $ 62,916 Amendment No. 3 Fee $ 0 Amendment No. 4 1 Study Phase $ 0 2 Preliminary Phase $ 1,514,814 3 Design Phase $ 3,068,522 4 Bid Phase $ 102,000 K: Engrneenng Data ExchangelVELMAPSWATER1E10008 MARY RHODES PIPELINE PHASE ZAMENDMENT NO. 6TXHIBIT A.doc EXHIBIT "A" - Page 6 of 7 5 Construction Phase $ 1,200,000 A - 1 Permitting $ 267,414 A-2 ROW Acquisition Survey $ 350,000 A-3 Topographic Survey $ 891,165 A-4 Subsurface Utility Exploration $ 286,000 A-5 Aerial Photography $ 23,750 A-6 Corrosion Engineering $ 122 A-7 Surge Analysis $ 104,181 A-8 Geotechnical Investigation $ 312,737 A -9 Archeological Investigation $ 984,650 A-10 Hydraulic Modeling $ 37,398 A — 11 ROW Acquisition $ 1,060,601 A— 12 Construction Observation Services $ TBD A— 13 Start -Up Services $ TBD A —14 O &M Services $ 150,590 A— 15 Warranty Phase $ TBD A— 16 Provide SCADA Documentation $ TBD Amendment No. 4 Fee $ 9,676,590 Amendment No. 5 2 Preliminary Phase $ 0 3 Design Phase $ 183,179 4 Bid Phase $ 82,814 A - 1 Permitting $ 53,696 A - 3 Topographic Survey $ 37,035 A--4 Subsurface Utility Exploration $ - 121,045 A-8 Geotechnical Investigation $ 18,749 A-9 Archeological Investigation $ - $7 A-10 Hydraulic Modeling $ 36,102 A — 11 ROW Acquisition $ - 202,722 Amendment No. 5 Fee $ 0 Total Fee $10,990,177 Amendment No. 6 2 Preliminary Prase — Coordination effort associated with Archeological access compensation $ 2,340 A-11 ROW Acquisition — Archeological access compensation $ 47,600 Amendment No. 6 Fee $ 49,940 Total Fee $11,040,117 KaEngineermg DataExchange \VELMAPIWATERIE1DOOB MARY RHODES PIPELINE PHASE 21AMENDMENT NO.6IEXHIBiT A.doc EXHIBIT "A" Page 7 of 7 Mary Rhodes Pipeline Phase 2 (Project No. E10008) Parent Project: Garwood Water Supply Project (Project No. 8424) SUMMARY OF FEES x� X W z i � 0 0 Z N [� O ORIGINAL CONTRACT 8424 AMEND. NO. 1 8424 AMEND. NO. 2 8424 AMEND. NO. 3 8424 AMEND. NO.4 E10008 BASIC SERVICES 1 Study Phase $116,100.00 $285,490.00 $911,997.00 $0.00 $0.00 2 Preliminary Phase Authorized 0.00 0.00 0.00 0.00 1,514,814.00 3 Design Phase (Not Authorized) 0.00 0.00 0.00 0.00 3,068,522.00 4 Bid Phase Not Authorized 0.00 0.00 0.00 0.00 102 ,000.00 5 Construction Phase (Not Authorized) 0.00 0.00 0.00 0.00 1,200,000.00 Subtotal Basic Services 116,100.00 285,490.00 911,997.00 0.00 5,885,336.00 ADDITIONAL SERVICES 1 Permitting (Authorized) 0.00 0.00 0.00 0.00 267,414.00 2 ROW Acquisition Survey (Authorized) 0.00 0.00 0.00 0.00 350,000.00 3 Topographic Survey (Authorized) 0.00 0.00 0.00 0.00 891,165.00 4 Subsurface Utility Exploration Authorized 0.00 0.00 0.00 0.00 286,000.00 5 Aerial Photography Authorized 0.00 0.00 0.00 0.00 23,750.00 6 Corrosion Engineering (Authorized) 0.00 0.00 0.00 0.00 122,768.00 7 Surge Analysis (Authorized) 0.00 0.00 0.00 0.00 104,181.00 8 Geotechnical Investig Authorized 0.00 0.00 0.00 0.00 312,737.00 9 Archeological Investigation Authorized 0.00 0.00 0.00 0.00 184,650.00 10 Hydraulic Modeling (Authorized) 0.00 0.00 0.00 0.00 37,398.00 11 ROW Acquisition (Authorized) 0.00 0.00 0.00 0.00 1,060,601.00 12 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 13 Start-Up Services 0.00 0.00 0.00 0.00 0.00 14 0 & M Services (Authorized) 0.00 0.00 0.00 0.00 150,590.00 15 lvvarranty Phase 0.00 0.00 0.00 0.00 0.00 16 1 Provide SCADA Documentation 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 0.00 0.00 0.00 0.00 3,791,254.00 TOTAL FEE $116,100.00 $285,490.00 $911,997.00 $0.00 $9,676,590.00 10/28/03 M2003 -394 10/19/04 M2004 -387 12/18/07 M2007 -334 03/11/09 Admin Ap roval 03/09/10 M2010 -051 Mary Rhodes Pipeline Phase 2 (Project No. E10008) Parent Project: Garwood Water Supply Project (Project No. 8424) SUMMARY OF FEES 11/30/11 Admin Approval Admin Approval �M X a M CD z N 1 D O Z N m 0 AMEND. NO. 5 E10008 AMEND. NO. 6 E10008 TOTAL BASIC SERVICES 1 Study Phase $0.00 0.00 $1,313,587.00 2 Preliminary Phase (Authorized) 0.00 2,340.00 1,517,154.00 3 Design Phase Not Authorized 183,179.00 0.00 3,251,701.00 4 Bid Phase (Not Authorized) 82,814.00 0.00 184,814.00 5 lConstruction Phase Not Authorized 0.00 0.00 1,200,000.00 Subtotal Basic Services 265,993.00 2,340.00 7,467,256.00 ADDITIONAL SERVICES 1 Permitting Authorized 53,696.00 0.00 321,110.00 2 ROW Acquisition Surve (Authorized 0.00 0.00 350,000.00 3 Topographic Survey (Authorized) 37,035.00 0.00 928,200.00 4 Subsurface Utility Exploration (Authorized) (121,045.00 0.00 164,955.00 5 Aerial Photography Authorized 0.00 0.00 23,750.00 6 Corrosion Engineering Authorized 0.00 0.00 122,768.00 7 Surge Analy (Authorized) 0.00 0.00 104,181.00 8 Geotechnical Investigation (Authorized) 18,749.00 0.00 331,486.00 9 Archeological Investig ( Authorized) 87,808.00 0.00 96,842.00 10 Hydraulic Modeling Authorized 36,102.00 0.00 73,500.00 11 1 ROW Acquisition (Authorized) (202,722.00) 47,600.00 905,479.00 12 Construction Observation Services 0.00 0.00 0.00 13 Start-Up Services 0.00 0.00 0.00 14 O & M Services Authorized 0.00 0.00 150,590.00 15 Warranty Phase 0.00 0.00 0.00 16 Provide SCADA Documentation 0.00 0.00 0.00 Subtotal Additional Services (265,993.00) 47,600.00 3,572,861.00 TOTAL FEE $0.00 $49,940.00 $11,040,117.00 11/30/11 Admin Approval Admin Approval �M X a M CD z N 1 D O Z N m 0 SUPPLIER NUMBER TO BE ASSIGNED BYZ97Y PURCHASING DIVISION �ir.r►r. City of CITY OF CORPUS CHRISTI a DISCLOSURE OF INTEREST City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME; Freese and Niehols, Inc. P. O. BOX: STREET ADDRESS 840 N. Shoreline Blvd., Suite 160ON CITY: Corpus Christi ZIP: 78401 FIRM IS: I. Corporation ® 2_ Partnership e 3. Sole Owner ❑ 4. Association 5. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each ` employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Job Title and City Department (if known) N/A NIA 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title NIA N/A 3. State the. names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee N/A NIA 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on py matter related to the subject of this contract and has an "ownership interest" constituting 3 %.or.more of the ownership in the above named "firm" Name Consultant N/A N/A FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you sbali disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -344 (d)] CERTIFICATION 1 certify that all information provided is true and correct as of the date of this statement, that I have not knowin ly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: Ron Guzman, P.E. Title: Principal (Type or Prins) Signature of Certifying r Date: _ !0 2I. r i DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part- time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non - profit organizations. e. "Official" The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest" Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation.