HomeMy WebLinkAboutC2012-096 - 3/9/2012 - NAAMENDMENT NO. 6
TO CONTRACT FOR
PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "CITY", and CH2M HILL , hereinafter called
"CONSULTANT," agree to the following amendment to the Contract for Professional Services fo
Kostoryz Road, Phase I from Horne to Sunnybrook (BOND 2008) (Project No. 6489), as
authorized and amended by:
Original 0 ntract
Aril
A 91 nril '
Motion No. 2009-095
$1,414,850.00
Amendme 1 40. 1
v
0 em
N ovem ber 17 2009
Motion No. 2009 -828
$92,900.00
Amendment No. 2
%3-
M h
hAnn- 9) -) 0 1 0
Ma
atJv p
Administrative App rov roval
$
$6,720.00
Amendment No.
h June nZ or
J un's
A dministrative Approval
$44,055.00
Amendment No. 4
Ja 09, 2014
Administrative Approval
$49,955.00
Amendment N 5
ru �
Fe;brua!y 09, 2012 1
Administrative Approval
$40,800.00
EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION A. BASIC SERVICES, ITEM NO. 1
PRELIMINARY DESIGN PHASE shall be amended to include additional Preliminary Design Phase
Services as set forth in the attached Amendment No. 6 Exhibit "A".
EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION A. BASIC SERVICES, ITEM NO. 2
DESIGN PHASE shall be amended to include additional Design Phase Services as set forth in the
attached Amendment No. 6 Exhibit "A".
EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION A. BASIC SERVICES, ITEM NO. 3 BID
DESIGN PHASE shall be amended to include additional Bid Phase Services as set forth in the
attached Amendment No. 6 Exhibit "A".
EXHIBIT "A", PART 1. SCOPE OF SERVICES, SECTION A. BASIC SERVICES, ITEM NO. 4
CONSTRUCTION DESIGN PHASE shall be amended to include additional Construction Phase
Services as set forth in the attached Amendment No. 6 Exhibit "A".
EXHIBIT "A" PART 3. FEES SECTION B. SUMMARY OF FEES shall be modified and is attached
as Amendment No. 6 Exhibit "B" for a revised fee not to exceed $40,8000.00 (Forty Thousand
Eight Hundred Dollars and Zero Cents), for a total restated fee notto exceed $1,657 (One
Million Six Hundred Fifty-Seven Thousand Seventy Dollars and Zero Cents).
All other terms and conditions of the April 21, 2009 contract between the City and Consultant will
remain in full force and effect.
CITY OF CORPUS CHRISTI
e2
Oscar R. Martinez (Date)
Assistant City Manager
Daniel Biles, P.E. (Date)
Interim Director of Engineering Services
2012-096 AMD. No. 6
3/9/12 Page I of 2
Mal
4os,6489&6490ftwe7 Koslor y zRoadfr omHornatoSunnybrook , Phase2KOstoryzRoadfromSunnybrooktoSPID\CH2M HILL,
CH2M hill
## D
ATTEST
Armando) Chapa, City Secre ry (D ata )
APP WR,IOIVED S TO FORM
Ci Attorney (Date)
Fund Source:
W $
$
Phase 1 550950-3546-00000-170126 4
!!MR 40,800.00
Phase 2 550950-3546-00000-170121 $0.00
Total $40,800.00
%
LAIMD. No. 6
Pa e 2 2
KAEngineering DataExchange\RotartQ\STREET%Project Nos 6489&649OPhase[KostoryzRoadfromHorneloSunnybrook,Phase2KostaryzRoadfromSunnybrookloSPO)�CH2MBIL, off
ANMNDWNTNO 6WffiNDIvENT No. 6.doc
%d CK
October 31, 2011
Mr. Pete Anaya, P.E.
c/o Armando Gutierrez, P.E.
Director of Engineering Services
City of Corpus Christi
P.O. Box 9277
Corpus Christi, TX 78469 -9277
CH2M HILL
555 N. Carancahua, Suite 310
Corpus Christi, TX 78401
Tel 351.688.8100
Fax 361.688.8600
PN: 390888
1
RE: Kostoryz Road, Phase 1 from Horne to Sunnybrook (Project No. 6489)
Kostoryz Road, Phase 2 from Sunnybrook to S.P.Y.D. (Project No. 6490)
AMENDMENT NO.6
Dear Mr. Anaya:
Please accept this letter as our proposal to amend our original and amended contract to obtain additional
funding for the following items related to Kostoryz Road — Phases 1:
• Construction Observation services increased from 20 hours per week to 30 hours per week for the
length of the accelerated contractor project schedule of 76 weeks for Phase 1.
This Contract Amendment No. 6 includes fees incurred for construction observation services not
authorized in the original contract. The addition of these construction observation services was not a part
of the original Contract Scope of Services and is to be performed as Addendum No. 6. This fee provides
for the addition of ten (10) hours per week to the construction observation services contractual twenty
(20) hours a week, thus increasing the weekly construction observation services to thirty (30) hours a
week for the Contractor accelerated schedule of 76 weeks for Phase 1 Construction. If the completion of
Phase 1 construction exceeds the 76 week duration, an additional contract amendment will be required to
continue Construction Observation Services for Phase 1.
A total additional engineering fee of $40,800.00 will be needed for construction observation services for
Phase 1 Construction.
The following are the proposed changes to the original amended, executed contract.
Scope of Services: Changed Exhibit "A -l" ADDITIONAL SERVICES section 4.0 for Construction
Observation Services to 30 hours per week for 76 weeks (see Exhibit A -1) (changes are shown in
bold).
Schedule: No Changes
Fees:
A. Fee for Basic Services: No changes.
B. Fee for Additional Services: Added to Part 4.0 (changes are shown in bold).
C. Summary of Fees: See the following tables for an explanation of the additional fees (changes
are shown in bold).
AMD. NO. 6
CITYOFC0RPU5CHRISTI\390888 KOSTORYZRDICONTRACTS- CHANGE ORDERMLIENMMENOMENTSL4MENDMENT NO. W011 1631 CONTRAC EXHIBIT "A"
'BITA DOCx Page 1 of 3
Phase 2: KostoW Road from Sunnybrook W
ORIGINAL
AMD,
AMD.
AMD.
AMD-
AMD.
AMD.
.............
TOTAL
Basic Services
CONTRACT
No.1
No.2
No-3
No.4
No.&
No. .
CONTRACT
Phase 1: Kostoryz Road from Home to
$ 40,0M0D
$ 190,000m
1,500.00
S 14,500,00
$ 246,OD .00
$
$
$
$
$
$
$
$ -
$ 23,715-00
$
$ -
$ 23,715.00
S -
$ 1.125.00
$ -
$ 1,125.00
$ ,
S
$
$
$
$ 40,ODO.00
W 00
$ 214,840.00
$ 1.500.00
$ 14,500.00
$ 270.840.00
Basle Services
Preliminary Phase
$ 120,000.00
$
$
$ -
$
1,470.DD
$
I Preliminary Phase
$ 60.000.
phase
$ 740.000.00
$ -
$
1.470.00
$
$ 5,080.00
...... 2 Design Phase
$ 550,000.00
$
12F�
r e
20.340,00
$ 44,980.00
$ s,060
$
$ 620,400.00
3 Bid Phase
T 6
$
$
$
$ -
$ 5D0.00
$
6.500,00
4 Construction Phase
$ 16.000.00
$
TCEQ (allowance)
TDLR (allowance)
$ 1,400.00
$ 6,200,00
$ -
$ 74000
S
$ 18.740,00
Subtotal Basic Services
$ 654. D.00
$
2
$ 20,340,00
$ 44,980.00
$ 7.790.0()
IS 2,880.00
727.11000
Additional Services
1
$ 11,600.D0
$ 2.880.00
3
ROW Acquisi ion, Survey
$ -
$
1$
I
Ponnit Preparation
$ 2.250.00
4
Topographic Survey (authorized)
$ 60,000.00
S 2,500.00
$
TxDOT
$
$
$ 62,500,00
$
Utility Locations and Wastewater tine
Inspection (allowance)
$
$ 36,31 O.00
TCEQ (allowance)
$ 1,400.00
$
$
$
$ 61.310.00
$
$
$ 68,o00.o0
TDLR (allowance) i
$ 6,200.00
$
5
$
$ 2,800.00
$ 68,ODO.00
$
1
Subtotal Permit Preparation
$ 7.600.00
$
$
$
$
$
S 2,800,00
$ 6.200.00
2 RTA Bus StOPS authorized)
$ -
$
$ 3,840.00
$
$
$
$
$
$ 7,600,00
3 ROW Acquisition Survey
$ -
$
-
$
$ 1,600.00
$
$
$ 3,840.00
T_
41TOpopraphic Survey (authorized)
$ 120,000.00
.$
$ 5, 0 00. 00
S
$
$ - - - - -- -
TS
$
1
5 Utility Locations and Wastewater Line
S 419,200.()0
$ 36,810,00 .
$ 2,880.00
$ 23,715.00
$ 3,375.001$
$
$
125-00000
-
trisMlion,(aflowance)
S 50,000,00
$49,090,00
S
$
$
$
$
$
—
Construction Observation Services
$ -
$ 160.400,00
6
Construction Observation Services
(allowance)
$ 221,000.00
$
09000
6
— allowance)
S
S 261.800.00
$
$
$
$ 40800.00
$ 1193,8W.00
7 Public Meeting (authorized)
$ 5 ,350�00
$
5
8 WarrantK (authorized)
Subtotal Additional Services
Total Phase I and Phase 2
$
$ -
$ 5,350.(>G
8 Warranty Phase authorized}
$ 5,700J00
$
$
$ 40,i56.001$
$
$
$
$
$
ES40-900-En
T_
Subtotal Additional Services
$ 341,656�00
$ 54.090.00
$ 3.840.00 1
S
$ 1,600.00
J�
5
$
$ �, '00 00
$ 40�800.15Y
$ 441,980,00
[Phase 1: Total Authorized Fee
.71,1
$
,I89
Phase 2: KostoW Road from Sunnybrook W
ORIGINAL
CONTRACT
AMD.
No. I
AMD.
No.2
AMD.
N0.3
AMD.
N*.4
AMC).
No.6
AVID.
No. 9
TOTAL
CONTRACT
j
Basic Services
1 Prelimin Phase
HEanstrul-tion Phase
Subtotal Basic Services
$ 40,0M0D
$ 190,000m
1,500.00
S 14,500,00
$ 246,OD .00
$
$
$
$
$
$
$
$ -
$ 23,715-00
$
$ -
$ 23,715.00
S -
$ 1.125.00
$ -
$ 1,125.00
$ ,
S
$
$
$
$ 40,ODO.00
W 00
$ 214,840.00
$ 1.500.00
$ 14,500.00
$ 270.840.00
l
Preliminary Phase
$ 120,000.00
$
$
$ -
$
1,470.DD
$
Additional Services
phase
$ 740.000.00
$
S
$ 44.065,00
$ 46.105.00
$ 5,080.00
1
Permit Preparation
12F�
r e
$ 7,500.00
$
$
$ .
$ -
$ 5M.00
$
TxDOT
$ 4,000.00
$
$
$ -
$ -
$ -
$
$ 740.00
—
—
TCEQ (allowance)
TDLR (allowance)
$ 1,400.00
$ 6,200,00
$
$
$
T
$
$
$ 44.055r()0
$
$
$
$ 1,400.00
$ 6.200.00
2
Subtotal Permit Preparation
RTA Bus Stops {authorized)
$ 11,600.00
$ -
$ 1$
$
IS 2,880.00
$
$
1
$ 11,600.D0
$ 2.880.00
3
ROW Acquisi ion, Survey
$ -
$
1$
S 2,250.04.
$ 2.250.00
4
Topographic Survey (authorized)
$ 60,000.00
S 2,500.00
$
$
$
$ 62,500,00
5
Utility Locations and Wastewater tine
Inspection (allowance)
$ 25,000.00
$ 36,31 O.00
$
$
$
$
$
$ 61.310.00
6
Go� nslrt
t Closenalion bervices
(allowa
$ 68,o00.o0
$
$
$
$
$
$ 2,800.00
$ 68,ODO.00
7
Public Meeting (authorized)
$ 2,800.00
$
S
$
$
$
$
S 2,800,00
8
Warranty Phase (authorized)
$ 5,800;00
$
$
$
$
$
$
$ 5,600.00
Subtotal Additional Selvices
$ 173,200,00
$38,810.00
$ 2.880.4D
$
$ 2,250.00
$
$
$ 217,140.00
3
ROW A.SHi�� -
$ .
$
$ -
S
$ 3,850.00
$
$
jPhase 2: Total Authorized Fee
S 419,200.()0
$ 36,810,00 .
$ 2,880.00
$ 23,715.00
$ 3,375.001$
$
$
S 487,984.00
PACITYOFCORPLISCHRISTQ90888 KOSTORYZRMCONTRACTS-CHANGE ORDERS4CLIENT1AMENDMENTS\AMENDMENT NO. 6011 10 31 CONTRAC AMD. NO. 6
EXHIBITALOU EXHIBIT "A"
Page 2 of 3
ORIGINAL
CONTRACT
AMD,
NOA
AMD.
No.2
AMD.
140.3
AMD.
No.4
AMD.
No. 6
AMD.
No. a
TOTAL
CONTRACT
Total Phase I and Phase 2
Basic Services
—
l
Preliminary Phase
$ 120,000.00
$
$
$ -
$
1,470.DD
$
S 121,470.00
phase
$ 740.000.00
$
S
$ 44.065,00
$ 46.105.00
$ 5,080.00
$
$ 835,240.00
12F�
r e
$ 7,500.00
$
$
$ .
$ -
$ 5M.00
$
$ 8,000.00
41Construction
Phase
$ 32,500.00
$
.$
$ -
$
$ 740.00
$
$ 33,240.00
Subtotal Basic Services
$ 9W,000.00
$
$ 44.055r()0
$ 46,105.001
S 7,790.00
$
$ 997,950.00
1
Additional Services
1
Permit Preparation
TxOOT
$ 4,0(1(3.00
$
$
$
$
$
$
$ 4.000.00
_TCEO
(allowance)
$ 2,800.00
S
$
$
$
$
$
$ 2,800.00
—
TDLR (allowance)
$ 12,400.00
S
$
$
$
$
$ 12.4D0,00
Subtotal Permit Preparation
$ 19.200.00
$
S
$
$
S
S 19.200.00
2
RTA Bus Stops (authorized)
$ -
$
$ 6,720.00
$
S
$
$
$ 6,720=
3
ROW A.SHi�� -
$ .
$
$ -
S
$ 3,850.00
$
$
$ 3,850.00
4
Topographic Survey (authorized)
$ 180,000.00
$ 7,500,00
$
$
$ -
1$
187,500
5
Utility Locations and Wastewater Line
hspection (allow3nce)
S 75,000.00
$85,40D.00
$
$
$
$ -
$ 160.400,00
6
Construction Observation Services
(allowance)
$ 221,000.00
$
is
$
$ 40,800.00
S 261.800.00
7
Public Meeting (authorized)
$ 8,150.00
$
$ e
$
$
$ -
8 WarrantK (authorized)
Subtotal Additional Services
Total Phase I and Phase 2
$ 11.500.00
$ 514,850.00
$ 1,414,850.00
$ -
i $ 92,900.00
$92,900,00
$
$ 6,720.00
1 $ 6.720.00
$
$
$ 44.055,001
$
$ 3,850.00
$ 49,955.00
$
$
$ 7,790.00
$
$ 40,i56.001$
11 ,500.00
1,667,070.001
PACITYOFCORPLISCHRISTQ90888 KOSTORYZRMCONTRACTS-CHANGE ORDERS4CLIENT1AMENDMENTS\AMENDMENT NO. 6011 10 31 CONTRAC AMD. NO. 6
EXHIBITALOU EXHIBIT "A"
Page 2 of 3
Very truly yours,
CH2M HILT.
TBPE Firm No.: 2297
Sidney A. Faas, P.E.
Vice President
SAF /lp
PACITYOFCORPUSCHRISTR390888KOSTORYZRDICONTRACTS- CHANGEORDERSICLIENTIAMENDMENTSIAMENDMENTNO .6 0111031CONTRAC AMD. NO.6
ExHI BIT A.DOCX EXHIBIT "A"
Page 3 of 3
EXHIBIT A -1
CITY OF CORPUS CHRISTI
KOSTORYZ ROAD, PHASE 1 (Project No. 6489)
KOSTORYZ ROAD, PHASE 2 (Project No. 6490)
1. SCOPE OF SERVICES
Remaining work on the project is reported and amended as follows:
A. Basic Services
1.0 Preliminary Phase
a.
No change.
b.
No change.
c.
No change.
d.
No change.
e.
No change.
f.
No change.
g.
No change.
h.
No change.
i.
No change.
j.
No change.
k.
No change. .
2.0 Design
Phase
a.
No change.
b.
No change.
c.
No change.
d.
No change.
e.
No change.
f.
No change.
g.
No change.
h.
No change.
i.
No change.
j.
No change.
k.
No change.
1.
No change.
m.
No change.
AMD. NO. 6
EXHIBIT "A -1"
Page 1 of 2
n. No change.
The City staff will:
a. No change.
b. No change.
c. No change.
d. No change.
3.0 Bid Phase
a.
No change.
b.
No change.
c.
No change.
d.
No change.
e.
No change.
4.0 Construction
Phase
a.
No change.
b.
No change.
c.
No change.
d.
No change.
e.
No change.
f.
No change.
g.
No change.
h.
No change.
i.
No change.
j.
No change
B. Additional Services
1 .0 Topographic Survey — No change.
2.0 ROW Survey — No change.
3.0 Permits — No change.
4.0 Provide (PR) construction observation services for 20 30 hr/Week for4o 76
weeks.
AMID. NO. 6
EXHIBIT "A -'I"
Page 2 of 2
KOSTORYZ ROAD, PHASE 1 FROM HORNE TO SUNNYBROOK WITH BRAWNER DITCH
OFF SITE DRAINAGE (Project No. 6489)
KOSTORYZ ROAD, PHASE 2 FROM SUNNYBROOK TO S.P.I.D. (Project No. 6490)
SUMMARY OF FEES
(D UO v
o �o
W � o>
ORIGINAL
CONTRACT
AMD. NO, 1
AMD. NO. 2
AMD. NO. 3
AMD. N0.4
AMD. NO. 5
AMD.NO. 6
TOTAL
: Kost
Phase 1 oryz Road from Horne to
Sunnybrook (including Off - Site Drainage) )
Basic Services
1 Prelimina Phase
$80,000.00 1
$0.00
$0.00
$0.00
$0.00
$1,470.00
$0.00
$81,470.00
2 Design Phase
3
550,000.00
0.00
0.00
20,340.00
44,980.00
5,080.00
0.00
620,400.00
Bid Phase
6,000.00
0.00
0.00
0.00
0.00
500.00
0.00
6,500.00
4 Construction Phase
18,000.00
0.00
0.00
0.00
0.00
740.00
4p,800.00
59,540.00
Subtotal EBasicServices
654,000,00
0.00
0.00
20,340.00
44,980.00
7,790.00
40 ,840.00
767,910.00
ADDITIONAL SERVICES
Preparation
OT
F1 fPermit
EQ (allowance)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
R (allowance)
1400.00
0.00
0.00
000
000
0.00
0.00
1,400.00
Subtotal Permit Preparation
6,200.00
7,600.00
0.001
0.00
0.00
0.00
0.00
0.00
0.00
6,200.00
2 ROW Acquisition Survey
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,600.00
3 Topographic Survey (authorized)
120,000.00
5,000.00
0.00
0.00
0.00
1,600.00
0.00
0.00
0.00
1,600.00
Utility Locations and Wastewater Line
0.00
0.00
125,000.00
4 Inspection (allowance)
50,000.0
49,090.00
0.00
0.00
0.00
0.00
0.00
99,090.00
5 Construction Observation Services (allowance)
153,000. D0
0.00
0.00
0.00
0.00
6 Public Meeting (authorized)
5,350.00
0.001
0.00
0.00
01)0
0.00
0.00
0.00
153,000.00
7 Warranty Phase (authorized)
5,700.00
0.001
0.00
0.00
0.00
0.00
5,350.00
8 I RTA taus Stops (authorized)
0.00
0.00
3,840.00
0'00r
0.00
om
0.00
5,700.00
Subtotal Additional Services
341,650.00
54,090.001
3.840.001
0.0ol
1,600.00
0.00
0.00
0.00
3,840.00
0.00
401,180.00
Phase 1: Total Authorized Fee
$995,650.00
$54,094.00
$3,840.00
- $20,340.001 1
$46,580.00
$7,790.40
$40,840.00
$1,169,090.00
(D UO v
o �o
W � o>
m Eu O
O �
., O
W W
ORIGINAL
CONTRACT
AMD. NO. 1
AMD. NO. 2
AMD. NO. 3
AMD. NO. 4
AMD, NO. 5
AMD. NO. 6
TOTAL
Phase 2: Kostoryz Road from Sunnybrook to SPID
Basic Services
1 Preliminary Phase
$40,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$40,000.00
2 Design Phase
190,000.00
0.00
0.00
23,715.00
1,125.00
OAO
O.Od
214,840 00
3 Bid Phase
1,500.00
0.00
0.00
0.00
0.00
0.00
O.OD
1,500.00
4 Construction Phase
14,500.00
0.00
0.00
0.00
0.00
0.00
0.00
14,500.00
Subtotal Basic Services
246,000.00
0.00
0.00
23,715.00
1,12504
0.00
0.00
270,840.00
ADDITIONAL SERVICES
0.00
1 Permit Preparation
0.00
TxDOT
4,000.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
4,004.00
TCEQ (allowance)
1,400.00
0.00
0.00
0.00
0.00
0.00
0.00
1,400.00
TDLR (allowance)
6,200.00
0.00
0.00
0.00
O.OD
0.00
0.00
6,200.00
Subtotal Permit Preparation
11,600.00
0.00
0.00
0.00
0.00
0.00
0.00
11,60Q.00
2 ROW Acquisition Survey
0.00
0.00
0.00
0.00
2,250.00
0.00
0.40
2,250.00
3 Topographic Survey (authorized)
60,000.00
2,500.00
0.00
0.00
0.00
0.00
0.00
62,500.00
Utility Locations and Wastewater Line
4 Inspection (allowance)
25,000.00
36,310.00
0.00
0.00
0.00
0.00
0.00
61,310.40
5 Construction Observation Services (allowance)
68,000.00
0.00
0.00
0.001
0.00
0 AD
6 Public Meeting (authorized)
2,800.00
0.00
0.00
0.00
0.00
0.00
O.OD
68,00100
7 Warranty Phase (authorized)
I RTA
5,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,804.00
8 Bus Stops (authorized)
0.00
0.00
2,880.00
0.00
0.00
0.00
0.00
5,800.00
2,880.00
Subtotal Additional Services
173,200.00
38,810.00
2,880.00
0.00
2,250.00
0.00
0.00
217,140.00
Phase 2: Total Authorized Fee
$419,200.00
$38,810,001
$2,880.00
$23,715.00
$3,375.00
$0.00
$0.00
$487,980.00
m Eu O
O �
., O
W W
Total Phase 1 and Phase 2
Basic Services
i Preliminary Phase
2 Design Phase
3 Bid Phase
4 Construction Phase
Subtotal Basic Services
ADDITIONAL SERVICES
Ftion Preparation
(allowance)
allowance)
l Permit Preparation
cquisition Survey aphic Survey (auth ocations and Wastewater Line
ion (allowance)
5 Construction Observafion Services (allowance
6 Public Meeting (authorized)
7 Warranty Phase (authorized)
8 RTA Bus Stops (authorized)
Subtotal Additional Services
Total Phase 1 and Phase 2
�Xa
vx9
CD F a
O O
w��
CONTRACT I AMD. NO. 1 AMD. NO. 2 AMD. NO, 3 1 AMD, NO. 4 1 AMD. NO. 5 , AMD. NO.6 I TOTAL
$120,000.00
$O.0o
$0.00
$0.00
$0.00
$1,470.00
$0.00
$121,470.00
740,000.00
0.00
0.00
44,055.00
46,105.00
5,080.00
0.00
835,240.00
7,500.00
0.00
0.00
0.00
0.00
500.00
0.00
8.000A0
32,500.00
0.00
0.00
0.00
0.00
740.00
40,800.00
74,040.00
900,000.00
0.00
0.00
44,055.00
46,105.00
7,790.00
40800.00
1,038,750.00
4,000.00
0.00
0.00
0 nni
n 00
0.00
0.00
4,000.00
2,800.00
0.00
0.00
0.00
0.00
0.00
0.00
2,800.00
12,400.00
0.00
0.00
0.00
0.00
0,00
0.00
12,400.00
19,200.00
0.00
0.00
n nni
0.00
0.00
0.00
19,200.00
0.00
0.00
0.00
0.00
3,850.00
0.00
D.DO
3,850.00
180,000.00
7,500.00
0.00
0.00
0.00
O.DO
0.00
187,500.00
75,000.00
85,400.00
0.00
O.OD
0.00
O.OD
0.00
160,gD0.00
221,000.00
0.00
0.00
0.00
O.00
0.00
0.00
221,000.00
8,150.00
0.00
000
0.00
0.00
0.00
0.00
8,150.00
11,500.00
0.00
0 . 01
0.00
0.00
0.00
0 00
11,500.00
0.00
0.00
6,720.001
0.001
0.00
0.00
0.00
V20.00
514,850.00
92,900.00
6,720.00
0.001
3,850.00
O.OD
0.00
618,320.00
$1,414,850.00
$92,
$6,720.00
$44,055.00
$49,955.00
$7,790.00
$40,800.00
$1,657,070.00
5Ui'I'LIER NUMBER
TOBEASSIGNED BYCITY — `
.� PURCHASING DIVISION
City of CITY OF CORPUS CHRISTI
Corpus
Christi DISCLOSURE OF INTEREST
City of Corpus Christi Ordinance 1 7112, as amended, requires all persons or firms seeking to do
business with the City to provide the following information. Every q
If the question is not applicable, answer with `NA ". See reverse side uestion must be answered.
for Filing Requirements,
Certifications and defenit�ons.
COMPANY NAME: CH2M Hill, Inc.
P. O. BOX:
STREET ADDRESS: 555 N Carancahua, Tower 11 CITY: Corpus Christi Zjp; 78401
FIRM IS: 1. Corporation 2. Panne hi
4. Association 5. Other P B 3. Sole Owner Q
DISCLOSURE QUESTIONS
If additional space is necessa7, please use the reverse side of this page or attach separate sheet.
I. State the names of each `employee" of the City of Corpus Christi having an "ownership
interest" constituting 3% or more of the ownership in the above named "firm.'
NIA
Name Job Title and City Department (if known)
2. State the names of each "official" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm
Name
NIA
Title
3. State the names of each "board member" of the City of Corpus Christi having an "ownership
interest" constituting 3% or more of the ownership in the above named "firm."
N/A Name
Board, Commission or Committee
4. State the names of each employee or officer of a "consultant" for the City of corgus Christi
Who worked on any matter related to the subject of this contract and has an ownership
interest" constituting 3% or more of the ownership in the above named "firm ,
Name
NIA
Consultant
TILING REQUIREMENTS
Ira person who requests otiicial ;tenon on a matter knows that tits requestedi action will confe
action will r an
economic havc on any City offi or employee that is distirt�uish3bie front tine effect hint the
have an members of the public in general or a suhsttutial segment thereof, VOL shah
disclose that fact in a signed tvrittnf to Tile Cit>• official, entltioyee or body that has ], cell
requested to act in the matior. unless t le interest of
w the City Official or employe in the matter is
a parent. The disclosure shall also be made in a signed writing filed wall the City Se
{ thics Ordinance Section 2-349 (d)7 cretary,
I certify that all information provid d is i is an I correct as of the date or Iltis statentenl, that 1
have not knowingly a ithheld disclosure of arty information requested: and that supplemental
statements will be promptly submitted to the City of Corpus Cin•isti. 'texas as changes occur.
Certifying Person: Sidney A. hags Title: Vice President
(Type or Print)
Signature of Certif }'ing
Person: Date: � ZSI
DEFINITIONS
"Board member." A tttember of" any board, commission, nr" committee appointed by the
City Council of the Cite orcorptis Christi. "rc .Xas.
b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to
have an effect on that interest that is distinguishable front its effect on members of the public
in general or a substantial segnncut thereof,
C. "Employee." Any person employed by the Citractor.
y of Corpus Christi Texas either on a fall or
part -tithe basis, bat�not as an independent cont
d. "Firm." Any entity operated for eco,t gain, whetlIer professional, industrial or
commercial, and whether established to produce or deal with a product or service, including
but not limited to, entities operated in the fora, of solo proprietorship, as self - employed
person. partnership. coiporation. ,joint stock company. joint venture. receivership or tnist, and
entities which 1 purposes of taxation are Ireatcd as non - profit organizations.
e. "Official." The Mayor. members ol the City Cotu,cil, City ,Manager, Deputy City
Manager, Assistant City Managers, Department and Division 1.1 ads. and Ivltuticipal Court
Judg of the City of Corpus Christi. "l'exas.
f: "Ownership Interest." Legal or cquimble interest, whether actually or constructively held,
in n firth, including when such interest is held through an agent, ttvst. estate, or holding
entim'. "Constructively held" refers to holdings or control est ablished through voting inisis,
proxies, or special terms of venture or partnership a_reetncuts."
t;. " COnSullant ." Any person or brat, stick is engineers and architects_ hired by the City of
Corpus Christi for tltc purpose of professional consultation anti recominen(fation_