HomeMy WebLinkAboutC2012-137 - 3/27/2012 - Approved2012-137 3/27/12 M2012-067 Austin Traffic Signal Constr. Co. 3�. (Revised 7/5/00) TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT No. 6488 Table of Contents NOTICE TO BIDDERS (Revised 7/5/00) NOTICE TO CONTRACTORS - A (Revised March 2009) Insurance Requirements NOTICE TO CONTRACTORS - B (Revised 8/1/08) Worker's Compensation Insurance Requirements •PART A - SPECIAL PROVISIONS A-1 Time and Place of Receiving Proposals/Pre-Bid Meeting A-2 Definitions and Abbreviations A-3 Description of Project A-4 Method of Award A-5 Items to be Submitted with Proposal A-6 Time of Completion/Liquidated Damages A-7 Workers Compensation Insurance Coverage A-8. Faxed Proposals A-9 Acknowledgment of Addenda A-10 Wage Rates (Revised 7/5/00) A-11 Cooperation with Public Agencies •(Revised 7/5/00) A-12 Maintenance of Services A-13 Area Access and Traffic Control A-14 Construction Equipment. Spillage and Tracking A--15 Excavation and Removals A-16 Disposal/Salvage of Materials A 17 Field Office (NOT USED)- A-18 Schedule and Sequence of Construction A-19 Con.Aruction Staking (NOT USED) A-20 Testing and Certification A 21 Project Sign (NOT USED) A-22 Minority/Minority Business Enterprise Participation Policy (Revised 10/98) l-23 Inspection Acquired (Reviacd 7/5/00) (NOT USED) A-24 Surety Bonds A-25 Salcu Tax Exemption NO LONGER APPLICABLE (6/11/98) A-26 Supplemental Insurance Requirements A-27 Responsibility for Damage Claims. A-28 Considerations for Contract Award and Execution A-29 Contractor's Field Administration Staff A-30 Amended "Consideration of Contract" Requirements A-31 Amended Policy on Extra Work and Change Orders A-32 Amended "Execution of Contract" Requirements A-33 Conditions of Work A-34 Precedence of Contract Documents . . A-36 Other Submittals (Revised 9/18/00) A. 37 Amended "Arrangcmcnt and Charge for Water Furninhcd by thc City"(NOT USED) A-38 Worker's Compensation Coverage for Building or Construction Projects for Government Entities (NOT USED)- (NOT USED) A-40 Amendment to Section B-8-6: Partial Estimates A 41 Ozone Advisory (NOT USED) A -42 OSHA Rules & Regulations A -43 Amended Indemnification & Hold Harmless (9/98) A -44 Change Orders (4/26/99) A-45 As -Built Dimensions and Drawings (7/5/00) .(NOT USED) A -48 Overhead Electrical Wires (7/5/00) A -49 Amend "Maintenance Guaranty" (8/24/00) A -50 Re- routing of Traffic During Construction (12/15/04) A -51 Amended Prosecution and Progress (NOT USED) PART B = GENERAL PROVISIONS PART C - FEDERAL WAGE RATES AND REQUIREMENTS PARTS -- STANDARD SPECIFICATIONS 600 TRAFFIC.SIGNALS STANDARD AND SPECIFICATIONS 635 INTERNALLY ILLUMINATED STREET NAME SIGN 699 RADAR PRESENCE DETECTION DEVICE 1195 BATTERY BACK- UP'SYSTEM FOR SIGNAL CABINETS PART T. - TECHNICAL SPECIFICATIONS * (see note below) 104 REMOVING CONCRETE 416 DRILLED SHAFT FOUNDATIONS 500 MOBILIZATION 502 BARRICADES, SIGNS, AND TRAFFIC HANDLING 529 CONCRETE CURB, GUTTER, AND COMBINED CURB AND GUTTER 531 SIDEWALKS 618 CONDUIT . 620 ELECTRICAL CONDUCTORS 621 TRAY CABLE 624 GROUND.BOXES .628. ELECTRICAL SERVICES . 644 SMALL ROADSIDE SION SUPPORTS AND ASSEMBLIES 666 REFLECTORIZED PAVEMENT MARKINGS - 677 ELIMINATING EXISTING PAVEMENT. MARKING AND MARKERS 680 INSTALLATION OF HIGHWAY TRAFFIC SIGNALS 682 VEHICLE AND PEDESTRIAN SIGNAL HEADS -684 TRAFFIC SIGNAL CABLES 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 687 PEDESTAL POLE ASSEMBLIES . 688 PEDESTRIAN DETECTORS AND VEHICLE LOOP DETECTORS 6007 REMOVING. TRAFFIC SIGNALS 8260 LED COUNTDOWN PEDESTRIAN SIGNAL MODULE 8703 ACCESSIBLE PEDESTRIANN SIGNAL UNITS * Note -- All references to "Texas .Department of Transportation" or any derivation thereof will be substituted with "City of Corpus Christi ". Additional specifications not containecd'herein can be found in the Texas Department of Transportation Standard Specifications fax Construction and Maintenance of Highways, Streets, and Bridges 2004. These specifications may be viewed and . downloaded for no charge via the following internet address: http: / /www. dot. state. tx. us /business /specifications.htm LIST OF DRAWINGS 1. TITLE SHEET- 2. INDEX SHEET: 3. • GENERAL -NOTES 4. - TRAFFIC SIGNAL QUANTITIES (1. OF 2) - 4a'. TRAFFIC SIGNAL QUANTITIES .(2 OF 2) ALAMEDA STREET AND ROBERT DRIVE (BASE BID): 5. EXISTING TRAFFIC SIGNAL LAYOUT 6. RAMP DETAILS 7. PAVEMENT MARKINGS PLAN 8. PROPOSED TRAFFIC SIGNAL LAYOUT 9. POLE AND CONDUCTOR SCHEDULES /ELECTRICAL SERVICE DATA 10. TRAFFIC SIGNAL WIRING DIAGRAM 11. VEHICLE DETECTION ZONES 12. TRAFFIC SIGNAL POLE FOUNDATION MORGAN AVENUE AND CLEO STREET /KOKERNOT STREET (BASE BID) : 13. EXISTING TRAFFIC SIGNAL LAYOUT 14. PAVEMENT MARKINGS PLAN 1.5, PROPOSED TRAFFIC SIGNAL LAYOUT 16. POLE AND CONDUCTOR SCHEDULES /ELECTRICAL SERVICE DATA 17. TRAFFIC SIGNAL WIRING DIAGRAM 18. VEHICLE DETECTION ZONES 19. TRAFFIC SIGNAL POLE FOUNDATION. AYERS STREET. AND HORNS ROAD (BASE BID) : 20. EXISTING TRAFFIC SIGNAL LAYOUT 21. RAMP DETAILS 22. PAVEMENT MARKINGS PLAN 23. - PROPOSED TRAFFIC SIGNAL LAYOUT 24. . POLE AND CONDUCTOR SCHEDULES /ELECTRICAL SERVICE DATA 25. TRAFFIC SIGNAL WIRING DIAGRAM 26. VEHICLE DETECTION ZONES 27. TRAFFIC SIGNAL POLE FOUNDATION PORT AVENUE AND BALDWIN BOULEVARD (BASE BID): 28. EXISTING TRAFFIC SIGNAL LAYOUT 29. •RAMP DETAILS 30. PAVEMENT MARKINGS PLAN 31. PROPOSED TRAFFIC SIGNAL LAYOUT 32. POLE AND CONDUCTOR SCHEDULES /ELECTRICAL SERVICE DATA 33. TRAFFIC SIGNAL WIRING DIAGRAM 34. VEHICLE DETECTION ZONES 35. TRAFFIC SIGNAL POLE FOUNDATION . GOLLIHAR ROAD AND PRESCOTT STREET (ADDITIVE ALTERNATE BID): 36. EXISTING TRAFFIC SIGNAL LAYOUT 37. RAMP DETAILS 38. PAVEMENT MARKINGS PLAN 39. PROPOSED TRAFFIC SIGNAL LAYOUT 40. POLE AND CONDUCTOR SCHEDULES /ELECTRICAL SERVICE DATA 41. TRAFFIC SIGNAL WIRING DIAGRAM 42. VEHICLE DETECTION. ZONES 43. TRAFFIC SIGNAL POLE FOUNDATION STANDARDS 44. RAMP DETAILS 45. PM (1) -03 46. PM(2) -10 47. PM(4) -10 48. PM (5) -01 49. PM(6) -01 50. ED(1) -03 51. ED(2) -03 52. ED(3) -03 53. ED(4) -03 54. ED(5) -03 55. ED(6) -03 56. ED(7)-03 57. ED(8)-03 58. ED(9) -03 59. . ED(10) -03 60. SMA- 100- (1) --99 61. SMA -100 (2) -96 62. MA -C-09 63. MA -D -07 64. TS-CF-04 65. LUM -A -99 66. •CFA-99 67. PEDESTRIAN SIGNAL DETAIL, CORPUS CHRISTI DISTRICT STANDARD 68. BC(1) -07 69. BC(2) -07 70. BC(3) -07 71. BC(4) -07 72. BC(5) -07 73. BC(6) -07 74. BC(7) -07 75. BC(8)-07 76. BC(9) -07 77. BC(i0) -07 78. BC(11). --07 79. BC(12) -07 80. WZ(BTS -1) -03 81. WZ(BTS -2) -03 82. TCP(3 -1) -98 83. OMITTED 84. PED-05 1 OF 4 85. PED -05 2 OF 4 86. PED -05 3 OF 4 87. PED -05 4 OF 4 88. CONCRETE RIPRAP AND SHOULDER DRAINS NOTICE AGREEMENT PROPOSAL /DISCLOSURE STATEMENT PERFORMANCE BOND PAYMENT BOND NOTICE TO BIDDERS NOTICE TO BIDDERS Sealed proposals, addressed to the City of Corpus Christi, Texas for: TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 (PROJECT No. 6488); consists of upgrading existing span wire signals to mast arm signals at the intersections of Alameda Street at Robert Drive, Morgan Avenue at Cleo Street /Kokernot Street, Ayers Street at Horne Road, Port Avenue at Baldwin Boulevard, and Gollihar Road at Prescott Street in accordance with the plans, specifications and contract documents. Total Base Bid will include the intersections of Alameda Street at Robert Drive, Morgan. Avenue at Cleo Street /Kokernot Street, Ayers Street at Borne Road, and Port Avenue at Baldwin Boulevard. Additive Alternate will. include the intersection of Gollibar Road at Prescott Street: The plans will be received at the office of the City Secretary until 2:00 PM on Wednesday, February 22, 2012 and then publicly opened and read. Any bid received after closing time will be returned unopened. A pre -bid 'meeting is scheduled for Wednesday, February 15, 2012 beginning at 2:00 D.M. and will be conducted by the City. The location of the meeting will be the Department of Engineering Services Main Conference Room, Third Floor, City Hall, 1201 Leopard Street, Corpus Christi, TX. A bid bond in the amount of 5% of the highest amount bid must accompany each proposal. Failure to provide the bid bond will constitute a non - responsive proposal which will not be considered. Failure to provide required performance and payment bonds for contracts over $25,000.00 will result in forfeiture of the 5* bid . bond to the City as liquidated damages. • Bidder's plan deposit is subject to mandatory forfeiture to the City if bidding documents Are not returned to the City within two weeks of receipt of bids. Plans, proposal forms, specifications and contract documents may be procured from the City Engineer upon a deposit of Fifty and no /100 Dollars ($50.00) as a guarantee of their return in good condition within two weeks of bid date. Documents can be obtained by mail upon receipt of.an additional ($10.00) which is a non- refundable postage /handling charge. The bidder is hereby notified that the owner has ascertained the wage rates which prevail in the locality in which this work is to be done and that such wage scale is set out in the contract documents obtainable at the office of the City Engineer and the Contractor shall pay not less than the wage rates so shown for each craft or type of "laborer," "workman," or "mechanic" employed on this project. The City reserves the right to reject any or all bids, to waive irregularities and to accept the'bid which, in the City's opinion, seems most advantageous to the City and in the best interest of the public. CITY OF CORPUS CHRISTI, TEXAS /s/ Dan Biles, P.E. Interim Director of Engineering Services /s/ Armando Chapa City Secretary Revised 7/5/00 NOTICE TO CONTRACTORS - A NOTICE TO CONTRACTORS - A INSURANCE REQUIREMENTS Revised March, 2009 A Certificate of Insurance indicating proof of coverage in the following amounts is required: TYPE OF INSURANCE MINIMUM INSURANCE; COVERAGE 30 -Day Notice of Cancellation required on ail.. certificates • - Bodily Injury and Property Damage PER OCCURRENCE / AGGREGATE Commercial. General Liability including: 1. Commercial Form 2.• Premises - Operations 3. Explosion and Collapse Hazard 4. - Underground Hazard . 5.. Products/ Completed Operations Hazard . 6. Contractual Liability 7. Broad-Form Property Damage 8. Independent Contractors 9. Personal Injury $2,000,000 COMBINED SINGLE LIMIT AUTOMOBILE LIABILITY -- OWNED NON -OWNED •OR RENTED . $1,000,000 COMBINED SINGLE LIMIT :WORKERS' COMPENSATION - • EMPLOYERS' LIABILITY WHICH. COMPLIES WITH THE TEXAS WORKERS' -COMPENSATION ACT AND PARAGRAPH II OF THIS EXHIBIT - $500, 000 EXCESS LIABILITY .$1,000,000 COMBINED SINGLE LIMIT PROFESSIONAL POLLUTION LIABILITY/ ENVIRONMENTAL IMPAIRMENT COVERAGE Not limited to:sudden & accidental .discharge; to include long -term environmental impact for the disposal of contaminants '$2,000,000 COMBINED SINGLE LIMIT ❑ •REQUIRED X NOT REQUIRED • • BUILDERS' RISK - See Section B -6 -11 and Supplemental Insurance Requirements ❑ REQUIRED X . • NOT REQUIRED ;INSTALLATION FLOATER See Section B -6 -11 and Supplemental Insurance Requirements X REQUIRED. ■ NOT REQUIRED Page 1 of 2 The City of Corpus Christi must be named- as an additional insured on all coverages except worker's compensation liability coverage. -The name of the project must be listed under "description of operations" on each certificate of insurance. ._For each insurance coverage, the Contractor shall obtain an endorsement to the applicable insurance policy, signed by the insurer, providing the City with. thirty (30) days prior. written notice of cancellation. of or material • change on any coverage. The Contractor shall provide to the- City the. other endorsements to insurance policies or coverages which are specified.in section B-6-11 or Special Provisions section of.the- contract. A completed "Disclosure of Interest" must be submitted with your proposal. Should 'you have any questions regarding insurance requirements, please contact the Contract Administrator at 880 -3500. . Page 2 of 2 NOTICE TO CONTRACTORS - B NOTICE TO CONTRACTORS - B WORKER' S COMPENSATION INSURANCE REQUIREMENTS Pagel of 11 Texas Administrative Code TITLE 28 INSURANCE PART 2 TEXAS DEPARTMENT OF INSURANCE, DIVISION OF WORKERS' COMPENSATION CHAPTER 110 REQUIRED NOTICES OF COVERAGE SUBCHAPTER B EMPLOYER NOTICES RULE §110110 Reporting Requirements for Building or Construction Projects for Governmental Entities (a) The following words and terms, when used in this rule, shall have the following meanings, unless the context clearly indicates otherwise. Terms not defined in this rule shall have the meaning defined in the Texas Labor Code, if so defined. (1) Certificate of coverage (certificate) —A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a workers' compensation coverage agreement (1-WCC -81, TWCC -82, TWCC -83; or TWCC -84), showing statutory workers' compensation insurance coverage for the person's . or entity's employees (including those subject to a coverage agreement) providing services on a project, for the duration of the project. (2) Building or construction Has the meaning defined in the Texas Labor Code, §406.096(e)(1). (3). Contractor A person bidding for or awarded a building or construction project by a governmental entity. (4) Coverage -- Workers' compensation insurance meeting the statutory requirements of the Texas Labor Code, §401.011(44). (5) Coverage agreement - -A written agreement on form TWCC -81, form TWCC -82, form TWCC -83, or form TWCC -84, filed with the Texas Workers' Compensation Commission which establishes a relationship between the parties for pmposes of the Texas Workers' Compensation Act, pursuant to the Texas Labor Code, Chapter 406, Subchapters F and G, as one of employer /employee and establishes who will be responsible for providing workers' compensation coverage for persons providing services on the project. (6) Duration of the project -- Includes the time from the beginning of work on the project until the work on the project has . been completed and accepted by the governmental entity. (7) Persons providing services on the project ( "subcontractor" in §406096 of the Act)--With the exception of persons excluded under subsections (h) and (i) of this section includes all persons or entries performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes but is not limited to independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity furnishing persons to perform services on the project. Page 2 of 11 "Services" includes but is not limited to providing, .hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. (8) Project—Includes the provision of all services related to a building or construction contract for a governmental entity. (b) Providing or causing to be provided a certificate of coverage pursuant to this rule is a representation by the insured that all employees of the insured who are providing services on the project are covered by workers' compensation coverage, that the coverage is based on proper reporting of classification codes and payroll amounts, and that all coverage agreements have been filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading certificates of coverage, or failing to provide or maintain required coverage, or failing to report any change that materially affects the provision of coverage may subject the contractor or other person providing services on the project to wclministrative penalties, criminal penalties, civil penalties, or other civil actions. (c) A governmental entity that enters into a building or construction contract on a project shall: (1) include in the bid specifications, all the provisions of paragraph (7) of this subsection, using the language required by paragraph (7) of this subsection; (2) as part of the contract, using the language required by paragraph (7) of this subsection, require the contractor to perform as required in subsection (d) of this section; (3) obtain from the contractor a certificate of coverage for each person providing services on the project, prior to that person beginning work on the project; (4) obtain from the contractor a new certificate of coverage showing extension of coverage: (A) before the end of the current coverage period, if the contractor's current certificate of coverage shows that the coverage period ends during the duration of the project; and (13) no later than seven clays after the expiration of the coverage for each other person providing services on the project whose current certificate shows that the coverage period ends during the duration of the project; (5) retain certificates of coverage on file for the duration of the project and for three years thereafter; (6) provide a copy of the certificates of coverage to the commission upon request and to any person entitled to them by law; and (7) use the language contained in the following Figure 1 for bid specifications and contracts, without any additional words or changes, except those required to accommodate the specific document in which they are contained or to impose stricter standards of documentation: Attached Graphic Page 3 of 11 (d) A contractor shall: (1) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements; (2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (3) provide the governmental entity, - prior to the end of the coverage period, a new . certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) obtain from each person providing services on a project, and provide to the :governmental entity: (A) a certificate of coverage, prior to that person beginning work on the project, so the governmental: entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (13) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) notify the governmental entity in writing by certified mail or personal delivery, within ten days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the conunnission on the sample notice, without any additional words or changes: Attached Graphic (S) contractually require each person with whom it contracts to provide services on a project to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; a (B) provide a certificate of coverage to the contractor prior to that person beginning work on the project; (C) include in all contracts to provide services on the project the language in subsection (e)(3) of this section; Page4ofll (0) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) obtain from each other person with whom it contracts; and provide to the contractor. (i) a certificate of coverage, prior to the other person beginning work on the project;. and (ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (F) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (G) notify the govermnental entity in writing by certified mail or personal delivery, within ten days after the person knew or should have known, of any .change that materially affects the provision of coverage of any person providing services on the project; and (H) contractually require each other person with whom it contracts, to perform as required by subparagraphs (A) -(H) of this paragraph, with the certificate of coverage to be provided to the person for whom they are providing services. (e) A person providing services on a project, other than a contractor, shall: (1) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements; (2) provide a certificate of coverage as required by its contract to provide services on the project, prior to beginning work on the project; (3) have the following language in its contract to provide services on the project "By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this contract is representing to the governmental entity that all employees of the person signing this contract who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self - insured, with the commission's Division of Self Insurance Regulation. Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions." (4) provide the person for whom it is providing services on the project; prior to the end of the coverage period shown on its current certificate of coverage, a new certificate showing extension of coverage, if the coverage period shown on the certificate of coverage ends during the duration of the project; (5) obtain from each person providing services on a project under contract to it, and provide as required by its contract: • . (A) a certificate of coverage, prior to the other person beginning work on the project; and (B) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; Page 5 of 11 (6) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (7) notify the governmental entity in writing by certified mail or personal delivery, of any change that materially affects the provision of coverage of any person providing services on the project and send the notice within ten days after the person knew or should have known of the change; and (8) contractually require each other person with whom it contracts to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (B) provide a certificate of coverage to it prior to that other person beginning work on the project; (C) include in all contracts to provide services on the project the language in paragraph (3) of this subsection; (D) provide, prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) obtain from each other person under contract to it to provide services on the project, and provide as required by its contract: (i) a certificate of coverage, prior to the other person beginning work on the project; and (ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the contract; (F) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (G). notify the governmental entity in writing by certified mail or personal delivery, within ten days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (1-1) contractually require each .person with whom it contracts, to perform as required by this subparagraph and subparagraphs (A) -(G) of this paragraph, with the certificate of coverage to be provided to the person for whom they are providing services. (f) If any provision of this rule or its application to any person or circumstance is held invalid, the invalidity does not affect other provisions or applications of this rule that can be given effect without the invalid provision or application, and to this end the provisions of this rule are declared to be severable. (g) This rule is applicable for building or construction contracts advertised for bid by a governmental entity on or after September 1, 1994. This rule is also applicable for those building or construction contracts entered into on or after September 1, 1994, which are not required by law to be advertised for bid. Page 6 of 11 (h) The coverage requirement in this rule does not apply to motor carriers who are required pursuant to Texas Civil Statutes, Article 6675c, to register with the Texas Department of Transportation and who provide accidental insurance coverage pursuant to Texas Civil Statutes, Article 6675c, §4(j). CO The coverage requirement in this rule does not apply to sole proprietors, partners, and corporate officers who meet the requirements of the Act, §406.097(c), and who are explicitly excluded from coverage in accordance with the Act, §406.097(a) (as added by House Bill 1089, 74th Legislature, 1995, § 1.20). This subsection applies only to sole proprietors, partners, and corporate executive officers who are excluded from coverage in an insurance policy or certificate of authority to self-insure that is delivered, issued for delivery, or renewed on or after January 1, 1996. Source Note: The provisions of this §110.110 adopted to be effective September 1, 1.994, 19 TexReg 5715; amended to be effective November 6, 1995, 20 TexReg 8609 Page 7 of 11 T28S 110.110(d)(7) 'REQUIRED WORKERS' COMPENSATION COVERAGE" "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 512-40 -3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." Page 8 of 11 T28S110.110(c)(7) Article . Workers' Compensation Insurance Coverage. A. Definitions: Certificate of coverage ( "certifcate')- A copy ofa certificate of insurance, a certificate of authority to self - insure issued by the commission, or a coverage agreement (TWCC -81, TWCC- 82, TWCC -83, or TWCC -84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of project. Duration of the project - includes the time from the beginning of the work on the project until the contractor's /person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ( "subcontractor" in §406.096) - includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner - operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The contractor shall provide coverage, based on proper reporting of classification cation codes and payroll amounts and filing of any coverage agreements, which, meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project.. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The contractor shall obtain from each person providing services on a project, and provide to the governmental entity: • - (1) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. Page 9 of 11 F The contractor shall retain all required certificates ofcoverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially affectts the provision ofcoverage of any person providing services on the project. H The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 1. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: (1) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (2) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (3) provide the contractor, prior to the end ofthe coverage period, a new certificate of coverage showing extension ofcoverage, if the coverage period shown on the current certificate of coverage ends during the duration ofthe project; (4) obtain from each other person with whom it contracts, and provide to the contractor: (a) a certificate ofcoverage, prior to the other person beginning work on the project; and (b) a new certificate of coverage showing extension ofcoverage, prior to the end of the coverage period, f the.coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and far one year thereafter; (6) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of 'any change that materially of fects the provision ofcoverage of any person providing services on the project; and (7) contractually require each person with whom it contracts, to perfor►n as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this contract or providing or causing to be provided a certificate ofcoverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by workers' compensation coverage for the duration ofthe project, that the coverage will be based on proper reporting of class fication codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self - insured, with the commission's Division of self- Page 10 of 11 Insurance Regulation. Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. I. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void ifthe contractor does not remedy the breach within ten days after receipt of notice of breachfrom the governmental entity. • Page 11 of 11 PART A SPECIAL PROVISIONS TRAFFIC SIGNALS (NSW AND SYNCHRONIZATION) BOND 2004. PROJECT No. 6488 SECTION A - SPECIAL PROVISIONS A -1 Time and Place of Receiving Proposals /Pre -Bid Meeting Sealed proposals will be received in conformity with the official advertisement inviting bids for the project. Proposals will be received in the office of the City Secretary, located on the first floor of City Hall, 1201 Leopard. Street, until 2:00 p.m.. Wednesday,February 22, 2012 . Proposals mailed should be addressed in the following manner: City Secretary's Office City of Corpus Christi 1201 Leopard Street Corpus Christi, Texas 78401 ATTN: BID PROPOSAL - CITY OF CORPUS CHRISTI. TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BONG 2004 (PROJECT NO. 6488) Any proposals not physically in possession of the City Secretary's Office at the time and date of bid opening will be deemed late and nonresponsive. Late proposals will be returned unopened to the proposer. The proposer is. solely responsible for delivery to the City Secretary's Office. Delivery of any proposal, by the proposer, their agent /representative, U.S. Mail, or- other delivery service, to any City address or office other than the City Secretary's'Office will be deemed non- responsive if not in possession of the City Secretary's Office prior to the date and time of bid opening. A pre -bid meeting will be held on Wednesday, February '15, 2012 beginning at 2:00 p.m. The meeting will convene at the Engineering Services Main Conference Room, Third Floor, City Hall, 1201 Leopard Street, Corpus Christi, TX. and will include a discussion of the project elements. If requested, a site visit will follow. No additional or separate visitations will be conducted by the City. A -2 Definitions. and Abbreviations Section B -1 of the General Provisions will govern. A -3 Description of Project TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004(PROJECT No. 6488) consists of upgrading existing span wire signals to mast arm signals at the intersections of Alameda Street at Robert Drive, Morgan Avenue at Cleo Street /ICokernot Street, Ayers Street at Horne. Road, Port Avenue at Baldwin Boulevard, and Gollihar Road at Prescott Street in accordance with the plans, specifications and contract documents. Base Alternate bid will include the intersections of Alameda Street at Robert Drive, Morgan Avenue at Cleo Street /Kokernot Street, Ayers Street at Horne Road, and Port Avenue at Baldwin Boulevard. Additive Alternate bid will include the intersection of Gollihar Road at Prescott Street. Section A - SP (Revised 12/15/04) Page 1 of 23 . A -4 Method of Award 1. Total Base Bid (or) .2. Total Base Bid.and Additive Alternate Bid The City reserves the right to reject any or all bids, to waive irregularities and to accept the bid which, in the City's opinion, .is most advantageous to the City and in the best interest of the public. A -5 Items to be Submitted with Proposal The following items are required to be submitted with the proposal: 1. 5% Bid Bond. Must reference "TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 (PROJECT No. 6488)" as identified in the Proposal. (A Cashier's Check, certified check, money order or bank draft from any State or National Bank will also be acceptable.) 2. Disclosure of Interests Statement. A -6 Time of Completion/Liquidated Damages The working time for completion of the Project will be 120 calendar days for Base Alternate Bid and an additional 30 calendar days for the Additive Alternate, if awarded. The Contractor shall commence work within ten (10) calendar days after receipt of written notice from the Director of .Engineering Services or designee ("City Engineer ") to proceed. For each calendar day that any work remains incomplete after the time specified in the Contract for completion of the work or after such time period as extended pursuant. to other provisions of this Contract, $250 per calendar day Will be assessed against the Contractor as liquidated damages. Said liquidated damages are not imposed as .a penalty but as an estimate of the damages that the City will sustain from delay in completion of the work, which damages by their nature are not capable of precise proof. The Director Of. Engineering Services (City.Engineer) may withhold and deduct from monies otherwise due the Contractor the amount of liquidated damages due the City. A -7 Workers Compensation Insurance Coverage If the Contractor's workers' compensation insurance coverage for its employees working on the Project is terminated or canceled for any reason, and replacement workers' compensation insurance coverage meeting the requirements of this Contract is not in effect on the effective date of cancellation of the workers' compensation insurance coverage to be replaced, then any Contractor employee not covered by the required. workers' compensation insurance coverage must not perform any work on the Project. Furthermore, for each calendar day including and after the effective date of termination or cancellation of the Contractor's workers' compensation insurance coverage for its employees working on the Project until the date replacement workers' compensation insurance coverage, meeting the requirements of this Contract, is in effect for those Contractor employees,' liquidated damages will be assessed against and paid by the Contractor at the highest daily rate elsewhere specified in this Contract. Such liquidated damages will accumulate without notice from the City Engineer to the Section A - SP (Revised 12/15/04) Page 2 of 23 Contractor and will be assessed and paid even if the permitted time to complete the Project has not expired. In accordance with other requirements of this Contract, the Contractor shall not permit subcontractors or others to work on the Project unless all such individuals .working on the Project are covered by workers' compensation insurance and unless the required documentation of such coverage has been provided to the Contractor and the City Engineer. A -8 Faxed Proposals. Proposals faxed directly to the City will be considered non - responsive. Proposals must contain original signatures and guaranty and be submitted in accordance with Section B -2 of the General Provisions. A -9 Acknowledgment of Addenda The Contractor shall acknowledge receipt of all addenda received in the appropriate space provided in the proposal. Failure to do so will be interpreted as non- receipt. Since addenda can have significant impact on the proposal, failure to acknowledge receipt, and a subsequent interpretation of non - receipt, could have an adverse effect when determining the lowest responsible bidder. A -10 Wage Rates (Revised 7/5/00) Labor preference and wage rates for HEAVY CONSTRUCTION. In case of conflict, Contractor shall use higher wage rate. Minimum Prevailing Wage Scales The fbrpus Christi City Council has determined the general prevailing minimum hourly wage rates for Nueces County, Texas as set out in Part C. The Contractor and any subcontractor must not pay less than the specified wage rates to all laborers, workman, and mechanics cloyed by them in the execution of the Contract. The Contractor' or subcontractor shall forfeit sixty dollars ($60.00) per calendar day, or portion thereof, for each laborer, workman, or mechanic employed, if such person is paid less than the specified rates for the classification of work performed. The Contractor and each subcontractor mast keep an accurate record showing the tames and classifications of all laborers, workmen, and mechanics employed by then in connaction with the Project and showing the actual wages paid to each worker. The Contractor will make hi-weekly certified payroll submittals to the City Engineer. The Contractor will also Obtain copies of such certified payrolls from all subcontractors and others working on the Project. These documents will also be submitted to the City Engineer bd.-weekly. (See section for Minority/Minority Business-Enterprise Participation Policy for . additiceai requirements concern egg the proper form and content of the payroll submittals.) One and arse -half (1') times the specified hourly wage must be paid for all hours worked in excess of 40 hours in any one week and for all hours worked on Sys or holidays. (See Section 3-1 -1, Definition of Term, and Section B -7 -6, Working Hours.) _ A -11 cooperaatian with Public Agencies (Revised 7/5/00) The Contractor shall cooperate with all public and private agencies with facilities operating within the limits of the Project. -The Contractor shall provide a forty -eight (48) hour notice to any applicable agency when work is anticipated to proceed in the vicinity of any facility by using DIG -'IESS eit 1- 800 - 344 - 8377, the Lone Star Notification Company at 1- 800 -669- L Section A - SP (Revived 12/15/04) Page 3 of 23 8344, and Verizon Dig Alert at 1- 800 -483 -6279. following .telepho]e rninbers are listed. City En i seer Project Engineer MDR paginemare Traffic Engineer Police Department Water Department Wastewater Department Gas Department Storm Water Department Parks &Recreation Department Streets & Solid Waste Services AEP SBC / A T & T Signal /Fiber Optic Locate Cablevision ACSI (Fiber Optic) CenturyTel ChoiceCom (Fiber Optic) CAPROCK (Fiber Optic) Brooks Fiber Optic (MAN) A -12 Maintenance of Services Etc th.e 826 -3500 (512) 904 -3745 826 -3540 886 -2600 826 -1881 826 -1800 885 -6900 826 -1875 826 -3461 826 -1940 1 -877- 373 -4858 881 -2511 (800 -824 -4424 857 -1946 857 -1960 857 -5000 (857 -5060 after hours) 887 -9200 (Pager 800 -724 -3624 225/214 -1169 (225/229 -3202 (M) 881 -5767 (Pager 850 -2981) 512/935 -0958. (Mobile) 972/753 -4355 Contractor's convenience, (826 -1888 after hours) (826 -1888 after hours.) (885 -6900 after'hours) (826 -1888 after hours) after the hours) The. Contractor shall take all precautions in protecting existing utilities, both above and below ground. The Drawings show as much. information as can be reasonably obtained from existing as -built drawings, base maps, utility records, etc. and from as much field work as normally deemed necessary for the construction of this type of project with regard to the location and nature of underground 'utilities, etc. However; the accuracy and completeness of such information is not guaranteed. It is the Contractor's sole and complete responsibility to locate such underground features sufficiently in advance of his operations to preclude damaging the existing facilities. If the Contractor encounters utility services along the line of this work, it is his responsibility to maintain the services in continuous operation at his own expense. In the event of damage to underground utilities, whether shown in the drawings, the Contractor shall make the necessary repairs to place the utilities back in service to construct the work as intended at no increase in the Contract price. All such repairs must conform to the requirements of the company or agency that owns the utilities. Where existing sewers are encountered and are interfered with (i.e. broken, cut, etc.), flow must be maintained. Sewage or other liquid must be handled by the Contractor either by connection into other sewers or by temporary pumping to a satisfactory outlet, 'all with the approval of the City Engineer. Sewage or other liquid must not be pumped, bailed or flumed over the streets or ground surface and Contractor must pay for all fines and remediation that may result if sewage or other liquid contacts the streets or ground surface. It is also the Contractor's responsibility to make all necessary repairs, relocations and adjustments to the satisfaction of the City Engineer at no increase in the Contract price. Materials for repairs, adjustments or relocations of sewer service lines must be provided by the Contractor. Section A. - SP. (Revised 12/15/04) Page 4 of 23 A -13 Area Access and Traffic Control Sufficient traffic control measures must. be used to assure a safe condition and to provide a minimum of inconvenience to motorists and the public. The Contractor will be required to schedule his operations so as to cause minimum adverse impact on the accessibility of the public. This may include, but is not limited to, working driveways in half widths, construction of temporary ramps, etc. The Contractor shall comply with the City of Corpus Christi's Uniform Barricading Standards and Practices as adopted by the City. Copies of this document are available through the City's Traffic Engineering Department. The Contractor shall secure the necessary permit from the City's Traffic Engineering Department. The Contractor shall refer to Special Provisions Paragraph A -50 for additional information and requirements regarding Traffic Control during Construction. All costs for traffic control are considered subsidiary to be included in the appropriate bid items. Therefore, no direct payment will be made to Contractor. A -14 Construction Equipment Spillage and Tracking The Contractor shall keep the adjoining streets free of tracked and /or spilled materials going to or from the construction area. Hand labor and /or mechanical equipment must be used where necessary to keep these roadways clear of job- related materials. Such work must be completed without any increase in the Contract price. Streets and curb line must be cleaned at the end of the work day or more frequently, if necessary, to prevent material from washing into the storm sewer system. No visible material that could be washed into storm sewer is allowed to remain on the Project site or adjoining streets. A -15 Excavation and Removals The excavated areas behind curbs and adjacent to sidewalks and driveways must be filled with "clean" dirt. "Clean" dirt is defined as dirt that is capable of providing a good growth of grass when applied with seed /sod and fertilizer. The dirt must be free of debris, caliche, asphalt, concrete and any other material that detracts from its appearance or hampers the growth of grass. All existing concrete and asphalt within the limits of the Project must be removed unless otherwise noted. All necessary removals including but not limited to pipe, driveways, sidewalks, etc.., are to be considered subsidiary to the bid item for "Street Excavation "; therefore, no direct payment will be made to. Contractor. A -16 Disposal /Salvage of Materials Excess excavated material, broken other unwanted material becomes the removed from the site by the Con considered subsidiary; therefore, asphalt, concrete, broken culverts and property of the Contractor and must be tractor. The cost of all hauling is no . direct payment will be made to Section A - SP (Revised 12/15/04) Page 5 of 23 Contractor. A -17 Field Office NOT USED Y... office on thc site as required by thc City Engineer or his repc..cntativc. A -18 Schedule and Sequence of Construction The Contractor shall submit to the City Engineer a work plan based only on 120 calendar days. This plan must detail the schedule of work and must be submitted to the City Engineer at least three (3) working days prior to the pre - construction meeting. The plan must indicate the schedule of the following work items: 1. Initial Schedule: Submit to the City Engineer three (3) days prior to the Pre - Construction Meeting an initial Construction Progress Schedule for review. 2. Items to Include: Show complete sequence of construction by activity, identifying Work of separate stages and other logically grouped activities. Identify the first work day of each week. 3. Submittal Dates: Indicate submittal dates required for all submittals. 4. Re- Submission: Revise and resubmit as required by the City Engineer. 5. Periodic Update: Submit Updated Construction Progress Schedule to show actual progress of each stage by percentage against. initial Schedule. A 19 Construction rrojcct Layout and Control NOT USED provided by the City or Consultant Project Enginccr. The Contractor shall furnish all lints, slopes and measurements necessary for control of thc work. established by thc City or Consultant Project Engineer as necessary, at no If, for whatever reason, it Is necessary to deviate from proposed lint and would neeee~itate a revision to thc drawings, thc Contractor shall provide Section A - SP' (Revised 12/15/04) Page 6 of 23. supporting measurements as required ter the Eity or Consultant Project Engineer to revise thc drawings. The Contractor shall tic in or. reference all valves and mom, both existing and proposed, for the purpose of adjusting valves and manholes at the •completion of. the .paving preeess. Also, the City or Consultant Project personnel for thc purpose of assisting thc measuring of thc completed work. specifications. Said eempIiance eertifLeatien shall be ffea.4ded and prepared discrepancies Shall be noted by the Third Party Surveyor and certify compliance to any regul Streets: + All curb return: at point of tangency /point of circumference Ctrcct crowns on a 200' interval and at all intersections. Wastewater: • All rim /invert clevatione at manholes; Water: + All top of valves box; Valves vaults rim; Stormwatcr: • All rim /invert cicvation3 at manholes; • • Casing elcva.tiona (top of pipe and flee line) (TXDOT and RR petzmit3) . A -20 Testing and Certification All tests required under this item must be done by a recognized testing laboratory selected by the City Engineer. The cost of the laboratory testing will be borne by the City. In the event that any test fails, that test must be done over after corrective measures have 'been. taken, and the cost of retesting will be borne by the Contractor and deducted from the payment to the Contractor. The Contractor must provide all applicable certifications to the City Engineer. A -21 Project Signs NOT USED the City engineer. Section A - SP (Revised 12 /15/04) Page 7 of 23 A -22 Minority /Minority Business Enterprise Participation Policy (Revised 10/98) 1. Policy It is the policy of the City of Corpus Christi that maximum opportunity is afforded minorities, .women and Minority Business Enterprises to participate in the performance of contracts awarded by the City of Corpus Christi in support of Equal .Employment Opportunity goals and objectives of the Affirmative Action Policy Statement of the City dated October, 1989, and any amendments thereto. In accordance with such policy, the City has established goals, as stated herein, both for minority and female participation by trade and for Minority Business Enterprise. 2. Definitions a. Prime Contractor: Any person, firm, partnership, corporation, association or joint venture as herein provided which has been awarded a City contract. b. Subcontractor: Any named person, firm, partnership, corporation, association, or joint venture as herein identified as providing work, labor, services, supplies, equipment, materials or any combination of the foregoing under contract with a prime contractor on a City contract. c. Minority Business Enterprise: A business enterprise that is owned and controlled by one or more minority person(s). Minority persons include Blacks, Mexican- Americans and other' persons of Hispanic origin, American Indians, Alaskan Natives, and Asians or Pacific Islanders. For the purposes of this section; women are also considered as minorities. Minority person(s) must collectively own, operate and /or actively manage, and share in payments from such an enterprise in the manner hereinafter set forth: 1. Owned (a) For a sole proprietorship to be deemed a minority business enterprise, it must be owned by a minority person. (b) For an enterprise- doing business as a partnership, at least 51.0% of the assets or interest in the partnership property must be owned by one or more minority person(s). ( c) For an enterprise doing business as a corporation, at least 51.0% of the assets or interest in the corporate shares must be owned by one or more .minority person(s). 2. Controlled The primary power, direct or indirect, to manage a business enterprise rests with a minority person(s). 3. Share in Payments Section A - SP (Revised 12/15/04) Page 8 of 23 Minority partners, proprietor or stockholders; of thee' enterprise, as the case may be, must be entitled.to receive 51.0% or more of the total profits, bonuses, dividends, interest payments, commissions, consulting fees, rents, procurement, and subcontract payments, and any other monetary distribution paid by the business enterprise. d. Minority: See definition under Minority Business Enterprise. e. Female Owned Business Enterprise: A sole proprietorship that is owned and controlled by a woman, a partnership at least 51.0% of whose assets or partnership interests are owned by one or more women, or a corporation at least 51.0% of whose assets or interests in the corporate shares are owned by one or more women. f. Joint Venture: A joint venture means an association of two or more persons, partnerships, corporations, or any combination . thereof, founded to carry on a single business activity which is limited in scope and direction. The degree to which a joint venture may satisfy the stated MBE goal cannot exceed the proportionate interest of the MBE as a member of the joint venture in the work to be performed by the joint venture. For example, a joint venture which is to perform 50.0% of the contract work itself and in which a minority joint venture partner has a 50.0% interest, shall be deemed equivalent to having minority participation in 25.0% of the work. Minority - members of the joint venture must have either financial, managerial,. or technical skills in the work to be performed by the joint venture. 3. Goals a. The goals for participation by minorities and Minority Business Enterprises expressed in percentage terms for the Contractor's aggregate work force on all construction work for the Contract award are as follows: Minority Participation Minority Business Enterprise (Percent) Participation (Percent) 45 % 5 % b. These goals are applicable to all the construction work (regardless of federal participation) performed in the Contract, including approved change orders. The hours of minority employment must be substantially uniform throughout the length of the Contract and in each trade. The transfer of minority employees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's percentage is prohibited. 4. Compliance a. Upon completion of the Project, a final breakdown of MBE participation, substantiated by copies of paid invoices, shall be submitted by the Contractor to the City Engineer. b. The Contractor shall make bi- weekly payroll submittals to the City Engineer. The Contractor is to indicate the percent of minority and female participation, by trade, which has been utilized on the Project. Along with the request for final payment on the Project, the Contractor will indicate, in writing, the overall participation Section A - SP (Revised 12/15/04) Page 9 of 23 in these areas which have been achieved. The City Engineer may withhold monthly or final payments to the Contractor for failure to submit bi- weekly payrolls in a timely fashion or to submit overall participation information as required. A 23 Inspection Required (ncvioed 7/5 /-00) (NOT USED) Building Inspection Division at thc various intervals- of work for which a permIt is requ-ired and to assure a final inspection after thc building is amended in that thc Contractor mutt pay all gees and charges levied by the A -24 Surety Bonds Paragraph two (2) of Section B-3-4 of the General Provisions is changed to read as follows: No surety will be accepted by the City from any Surety Company who is now in default or delinquent on any bonds or who has an interest in any litigation against the City. All bonds must be issued by an approved Surety Company authorized to do business in the State of Texas. If performance and payment bonds are in an amount in excess of ten percent (10 %) of the Surety Company's capital and surplus, the Surety Company shall provide certification satisfactory to the City Attorney that the Surety Company has reinsured the portion of the bond amount that exceeds ten percent (10 %) of the Surety Company's Capital and surplus with reinsurer(s) authorized to do business in the State of • Texas. The amount of the bond reinsured by any reinsurer may not exceed ten percent (10 %) of the reinsurer's.capital and surplus. For purposes of this section, the amount of allowed capital and surplus will be verified through the State Board of Insurance as of the date of the last annual statutory financial statement of the Surety Company or reinsurer authorized and admitted to do business in the State of Texas. The Surety shall designate an agent who is a resident of Nueces County, Texas. Each bond must be executed by the Contractor and the Surety. For contracts in excess of $100,000 the bond must be executed by a Surety company that is certified by the United States Secretary of the Treasury or must obtain reinsurance for any liability in excess of $100,000 from a reinsurer that is certified by the United States Secretary of the Treasury and that meets all the above requirements. The insurer or reinsurer must be listed in . the Federal Register as holding certificates of authority on the date the bond was issued." A -25 Sales Tax Exemption (NOT USED) G19.r- - =t_ ?_ __t z_alify for exemptions of Calcc, Excioc, and Use Taxes unlcsa Section 3.291 of Chapter 3, Tax Admini..;rtration of Title 34, Publie Finance of . Section A - SP (Revised 12/15/04) Page 10 of 23 If thc Contractor elects to operate -under a separated contract, he shall. 2. Identify in thc appropriate space on the "Statement of Material° and Other Charges" in the proposal form the cost of materials physically incorporated into the Project. 3. Provide resale certificates to suppliers. proposal value of materials. Subcontractor; are eligible for sales tax exemptions if thc subcontractor J_ issues a resale certificate to his supplier. A -26 Supplemental Insurance Requirements For each insurance coverage provided in accordance with Section B -6 -11 of the Contract, the Contractor shall obtain an endorsement to the applicable insurance policy, signed by the insurer, stating: In the event of cancellation or material change that reduces or restricts the insurance afforded by this coverage part, each insurer covenants to mail prior written notice of cancellation or material change to: 1. Name:City of Corpus Christi Engineering Services Department Attn: Contract Administrator 2. Address: P.O. Box 9277 Corpus Christi, Texas 78469 -9277 3. Number of days advance notice: 30 The Contractor shall provide to the City Engineer the signed endorsements, or copies thereof certified by the insurer, within thirty (30) calendar days after the date the City Engineer requests that the Contractor sign the Contract documents. Within thirty (30) calendar days after the date the City Engineer requests that the Contractor sign the Contract documents, the Contractor shall provide the City Engineer with a certificate of insurance certifying. that the Contractor provides worker's compensation insurance coverage for all employees of the Contractor employed on the Project described in the Contract. For each insurance' coverage provided in accordance with Section B -6 -11 of the Contract, the Contractor shall obtain an endorsement to the applicable insurance policy, signed by the insurer, stating that the City is an additional insured under the insurance policy. The City need not be named as additional insured on Worker's Compensation coverage. Section A - SP (Revised 12/15/04) Page 11 of 23 For contractual liability insurance coverage obtained in accordance with Section B -6 -11 (a) of the Contract, the Contractor shall obtain an endorsement to this coverage stating: Contractor agrees to indemnify, save harmless and defend the City, its agents, servants, and employees, and each of them against and hold it and them harmless from any and all lawsuits, claims, demands, liabilities, losses and expenses, including court costs and attorneys' fees, for or on account of any injury to any person, or any death at any time resulting from such injury, or any damage to any property, which may arise or,which may be alleged to have arisen out of or in connection with the work covered by this Contract. The foregoing indemnity shall apply except if such injury,: death or damage is caused directly by the negligence or other fault of the City, its agents, servants, or employees or any person indemnified hereunder. A -27 Responsibility for Damage Claims Paragraph (a) General Liability of Section B -6 -11 of the General Provisions is amended to include: Contractor must provide Buildcr'a Riak or- Installation Floater insurance coverage for the term of the Contract up to and including the date the City finally accepts the Project or work. Buildcr'a Riak or- Installation Floater coverage must be an "All Risk" form. Contractor must pay all costs necessary to procure such Builder's Riak or Installation. Floater insurance coverage, including any deductible. The City must be named additional insured on any policies providing such insurance coverage. A -28 Considerations for Contract Award and Execution To allow the City Engineer to determine that the bidder is able to perform its obligations under the proposed contract, then prior to award, the City Engineer may require a bidder to provide documentation concerning: 1. Whether any liens have been filed against bidder for either failure to pay for services or materials supplied against any of its projects begun within the preceding two (2) years. The bidder shall specify the name and address of the party holding the lien, the amount of the lien, . the basis for the lien claim, and the date of the release of the lien: If any such lien has not been released, the bidder shall state why the claim has not been paid; and 2. Whether there are any outstanding unpaid claims against bidder for services or materials supplied which relate to any of.its projects begun within the preceding two (2) years. The bidder shall specify the name and address of the claimant, the amount of the claim,, the basis for the claim, and an explanation why the claim has not been paid. A bidder may also be required to supply construction references and a financial statement, prepared no later than ninety (90) days prior to the City Engineer's request, signed and dated by the bidder's owner, president or other authorized party, specifying all current assets and liabilities. Section A - SP (Revised 12/15/04) Page 12 of 23 A -29 Contractor's Field Administration -Staff The Contractor shall employ for this Project, as its field administration staff, superintendents and foremen who are careful and competent and acceptable to the City Engineer. The criteria upon which the City Engineer makes this determination may include the fallowing: 1. The Superintendent must have at least five (5) years recent experience in field management and oversight of projects of a similar size and complexity to this Project. This experience must include, but not necessarily limited to, scheduling of manpower and materials, safety, coordination of subcontractors, and familiarity with the submittal process, federal and state wage rate requirements, and City contract close -out procedures. The superintendent shall be present, on the job site, at all times that work is being performed. 2. Foremen, if utilized, shall have at least five (5) years recent experience in similar work and be subordinate to the superintendent. Foremen cannot act as superintendent without prior written approval from the City. Documentation concerning these requirements will be reviewed by the City Engineer. The Contractor's field administration staff, and any subsequent substitutions or replacements thereto, must be approved by the City Engineer in writing prior to such superintendent assuming responsibilities on the Project. Such written approval of field administration staff is a prerequisite to the City Engineer's Obligation to execute a contract for this Project. If such approval is not obtained, the award may be rescinded. Further, such written approval is also necessary prior to a change in field administration staff during the term of this Contract. If the Contractor fails to obtain prior written approval of the City Engineer concerning any substitutions or replacements in its field administration staff for this Project during the term of the Contract, such a failure constitutes a basis to annul the Contract pursuant to section B -7 -13. A-30 Amended "Consideration of Contract" Requirements Under "General Provisions and 'Requirements for Municipal Construction Contracts" Section B -3 -1 Consideration of Contract add the following text: Within five (5) working days following the public opening and reading of the proposals, the three (3) apparent lowest bidders (based on the Base Bid only) must submit to the City Engineer the following information: 1. A list of the major components of the work; 2. A. list of the products to be incorporated into the Project; A schedule of values which specifies estimates of the cost for each major component of the work; 4. A schedule of anticipated monthly payments for the Project duration. 5. The names and addresses of MBE firms that will participate in the Contract, along with a description of the work and dollar amount for each firm; and substantiation, either through appropriate certifications by federal agencies or signed affidavits from the MBE firms, that such MBE firms meet the guidelines contained herein. Similar substantiation will be required if the Contractor is an MBE. If the responses do not clearly show that MBE participation will meet the requirements above, Section A - SP (Revised 12/15/04) Page.13 of 23 the bidder must clearly demonstrate, to the satisfaction of the City Engineer, that a good faith effort has, in fact, been made to meet said requirements but that meeting such requirements is not reasonably possible. 6. A list of subcontractors that will be working on the Project. This list may contain more than one subcontractor for major components of the work if the Contractor has not completed his evaluation of which subcontractor will perform the work. The. City Engineer retains the right to approve all subcontractors that will perform work on the Project. The Contractor shall obtain written approval by the City Engineer of all of its subcontractors prior to beginning work on the Project. If the City Engineer does not approve all proposed subcontractors, it may rescind the Contract award. In the event that'a subcontractor previously listed and approved is sought to be substituted for or replaced during the term of the Contract, then the City Engineer retains the. right to approve any substitute or replacement subcontractor prior to its participation in the Project. Such approval will not be given if the replacement of the subcontractor will result in an increase in the Contract price. Failure of the Contractor to comply with this provision constitutes a basis upon which to annul the Contract pursuant to Section B -7 -13; 7. A preliminary progress schedule indicating relationships between the major components of the work. The final progress schedule must be submitted to the City Engineer at the pre - construction conference; 8. Documentation required pursuant to the Special Provisions A -28 and A -29 concerning Considerations for Contract Award and Execution and the Contractor's Field Administration Staff. 9. Documentation as required by Special Provision A -35 -K, if applicable. 10. Within five (5) days following bid opening, submit in letter form, information identifying type of entity and state, i.e., Texas (or other state) Corporation or Partnership, and name(s) and Title(s) of individual(s) authorized to execute contracts on behalf of said entity. A -31 .Amended Policy an ' Extra Work and Change Orders Under "General Provisions and Requirements for Municipal Construction Contracts" B -8 -5 Policy on Extra Work and Change Orders the present text is deleted and replaced with the following: Contractor acknowledges that the City has no obligation to pay for any extra work for which a change order has not been signed by the Director of Engineering Services or his designee. The Contractor also acknowledges that the City Engineer may authorize change orders which do not exceed $25,000.00. The Contractor acknowledges that any change orders in an amount in excess of $25,000.00 must also be approved by the City Council. A -32 Amended "E tecutiom of Contract" Requirements Under "General. Provisions and Requirements for Municipal Construction Contracts" B -3 -5 Execution of Contract add the following; The award of the Contract may be rescinded at any time prior to the date the City Engineer delivers a contract to the Contractor which bears the signatures of the Section A - SP (Revised 12/15/04) Page 14 of 23 City Manager, City - Secretary, and City Attorney, or their authorized designees. Contractor has no cause of action of any. kind, including for breach of contract, against. the City, nor is the City obligated to perform under the Contract, until the date the City Engineer delivers the signed Contracts to the Contractor. A -33. Conditions-of Work Each bidder must familiarize himself fully with the conditions relating to the completion of the Project. Failure to do so will not excuse a bidder of his obligation to carry out the provisions of this Contract.- Contractor is reminded to attend the Pre -Sid Meeting referred to in Special Provision A -1. A -34 Precedence of Contract Documents In case of conflict in the Contract documents, first precedence will be given to addenda issued during the bidding phase of the Project, second precedence will be given to the Special Provisions, third precedence will be given to the construction plans, fourth precedence will be given to the Standard Specifications and the General Provisions will be given last precedence. In the event of a conflict between any of the Standard Specifications with any other referenced specifications, such as the Texas Department of Public Transportation Standard Specifications for! Highways, Streets and Bridges, ASTM specifications, etc., the precedence will be given to addenda, Special Provisions and Supplemental Special Provisions (if applicable), construction plans, referenced specifications, Standard Specifications, and General Provisions, in that order. A -35 City Water Facilities: Special Requirements (NOT USED) A. Vioitor /Contractor Orientation Prior to performing work at any City water facility, the Contractor, hie oubcontractoro, and each of their cmploycco must at a Visitor /Contractor Safety Orientation Program esndueted by the Dcpartmcnt peroonncl for thocc percono who do not have ouch a ard, and who dcoirc to perform any work within -any City water facility. For additional information refer to Attachment 1. valve, equipment, .switch, breaker, control, or any otter item related to City water facility at any time. All ouch itcmo must be operatcd by an operator or other authori --ed maintenance cmploycc of thc City Watcr Dcpartmcnt. C. Protection of Water Quality The City mint deliver water of drinking quality to its cuotomcro at. Dcpartmcnt to protect the quality of thc water. Section A - SP (Revised 12/15/04) Page 15 of 23 D. Conformity with ANSI /NSF Standard 61 All materialo and equipment used in thc repair, reasocmbly, inspection of pumps, or any transportation, rcinatallation, and Sanitation Foundation (ANCI /NSF) Standard 61 as dcocribed in the Standard Spccifieationo. Cuch materials include all oolvcnto, cleanero, lubricant°, gackcto, muot not bc uocd unlcao they conform with ANSI /NSF Standard 61 and unleao ouch items are inspected on the Hitt by authorised City peroonncl immediately prior to uso. The Contractor shall providc thc Engineer with copica of written proof of AEI /NCI' Ctandard Cl approval for all materiala which could come into contact with potablc water. subcontractors, must be contained at all time at the water work arcas clean at shall kccp daily. CONTRACTOR'S ON SITE PREPARALTION all time and rcmovc all trash F. Contractor'o peroonncl must wear colored uniform ovcrallo othcr than orangc, bluc, or whitc. Each employee uniform must providc company name and individual employee identification. Plant tcicphoncD arc not available for Contractor use. H. Working houro will be 7:00 A.M. to 5:00 P.M., Monday thru Friday. I. Contractor must not uoc any City facility rcctroomo. Contractor Taunt provide own sanitary facilitica. designated by City Watcr Department staff. All Contractor vehicles meet bc curly labcicd with company name. No private employee vehicles arc allowcd at O. N. Stevens Water 'treatment Plant. All area nor wander through any buildings othcr than for requircd work IC. Contractor Qualifications SCADA. (SUPERVICORY CONTROL ARID DATA ACQUUCITION) changes, scicctiono, furnishing, installing, connecting, Section A - SP (Revised 12/15/04) . Page 16 of 23 operation all hardware and /or software specified or required by 1. He is regularly engaged in the computer bated monitoring and control oyatem buoincon, preferably as applied to, thc and complexity an required in this three prior projccts. 3. He has been actively engaged in thc type of work specified herein for at leant 5 years. 1. Hc employes a Rcgintcrcd Profcnnional Engineer, a Control Systems Engineer, er an Eleetrieal Engineer to supervise or Contract on at . 1 at 5. He cmployo personnel on thin Project who have ouccconfully completed a manufacturcr'n training courec in configuring and implementing the specific computers, RTUS'o, and software proposed for the Contract. G. Hc maintaino a permanent, fully staffed and equipped service facility within 400 milcn of thc Project nits to maintain, repair, alibratc, and program the system° specified hcrcin. 7. He shall furnish equipment which is the product of ono a. not practical, all equipment of a given type will be the thc O. N. Stevens Water Treatment Plant will be used in evaluating which Contractor or Prior performance at required, to add these two ayatems to the exiting City a w . programming blocks which thc City requires to be filled in and given to thc City Engineer- with all cha xgeo made during is not intended to how all of the required sheets. The Contractor will provide all programming blocks used. L. Trenching Requirements shall be allowed on thc project. A -36 Other Submittals 1. Shop Drawing Submittal: The Contractor shall follow the procedure outlined below when processing Shop Drawing submittals: a. Quantity: Contractor shall submit number required by the City to the City Engineer or his designated representative. b. Reproducibles: In addition to the required copies, the Contractor shall also submit one (1) •reproducible transparency for all shop drawings. Section A - SP (Revised 12/15/04) Page 17 of 23 c. Submittal Transmittal Forms: Contractor shall use the Submittal Transmittal Form attached at the end of this Section; and sequentially number each transmittal form. Resubmittals must have the original submittal number with an alphabetic suffix. Contractor must identify the Contractor, the Subcontractor or supplier; pertinent Drawing sheet and detail number(s), and specification Section number, as appropriate, on each submittal form. d. Contractor's Stamp: Contractor must apply Contractor's stamp, appropriately signed or initialed, which certifies that review, verification of Products required, field dimensions, adjacent construction work, and ,coordination of information, is all in accordance with the requirements of the Project and Contract. documents. e. Scheduling: Contractor must schedule the submittals to expedite the Project, and deliver to the City Engineer for approval, and coordinate the submission of related items. f. Marking: Contractor must mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information unique to this Project. g. Variations: Contractor must identify any proposed variations from the Contract documents and any Product or system limitations which may be detrimental to successful performance of the completed work. h. Space Requirements: Contractor must provide adequate space for Contractor and Engineer review stamps on all submittal forms. I Resubmittals: Contractor must revise and resubmit submittals as required by City Engineer and clearly identify all changes made since previous submittal. j- Distribution: Contractor must distribute copies of reviewed submittals to subcontractors and suppliers and instruct subcontractors and suppliers to promptly report, thru Contractor, any inability to comply with provisions. . 2. Samples: The Contractor must submit samples of finishes from the full range of manufacturers' standard colors, textures, and patterns for City Engineer's selection. 3 Test and Repair Report When specified in the Technical Specifications Section, Contractor must submit three (3) copies of all .shop test data, and repair report, and . all on -site test data within the specified time to the City Engineer for approval. Otherwise, the related equipment will not be approved for use on the project. A -37 Amended "Arrangement and Charge for Water Furnished by the City" NOT USED Under "Cenral Provisions and Requirements for Municipal Construction Contracts ", B Conservation and Drought Contingency Ulan as amended the "Plan ") . This Section A - SP (Revised 12/15/04) Page 18 of 23 conditiono. The City Enginccr will providc a copy of thc Plan to Contractor at the pre eenztrnetien meeting. The Centraeter will keep a copy of thc Plan on thc Project site throughout construction." A -38 Worker's Compensation Coverage for Building or Construction Projects for Government Entities The requirements of "Notice to Contractors 'B'" are incorporated by reference in this Special Provision. A -40 Amendment to Section B -8 -6: Partial. Estimates NOT USED General Provisions and Requirements for Municipal Construction Contracts Section B -8 -6: Partial Estimates is amended to provide that approximate estimates from which partial payments will be calculated will not include the net invoice value of acceptable, non - perishable materials delivered to the Project worksite unless the Contractor provides the City Engineer with documents, satisfactory . to the City Engineer, that show that the material supplier has been paid for the materials delivered to the Project worksite. A -41 Ozone Advisory (NOT USED) Priming and hot mix paving operationo must not be conducted on days for which notify Contractor about ozonc alert. If a delay such an thin in cxpericneed� eempenoatcd at the rxnit price indi ated in thc propo al. A -42 OSHA Rules & Regulations It is the responsibility of the Contractor(s) to adhere to all applicable OSHA rules and regulations while performing. any and all City - related projects and or jobs. A -43 Amended Indemnification & Hold Harmless Under "General Provisions and Requirements for Municipal Construction Contracts" B -6 -21 Indemnification & Hold Harmless, text is deleted in its entirety and the following is substituted in lieu thereof: The Contractor shall hold the City, its officials, employees, attorneys, and agents harmless and shall indemnify the City, its officials, employees, attorneys, and agents from any and all damages, injury or liability whatsoever from an act or omission of the contractor, or any subcontractor, supplier, materialman, or their officials, employees, agents, or consultants, or any work done under the contract or in connection therewith by the contractor, or any subcontractor, supplier, materialman, or their officials, employees, agents, or consultants. The contractor shall hold the City, its officials, employees, attorneys, and agents harmless and shall indemnify the City, its officials, employees, attorneys, and agents from any and all damages, .injury, or liability whatsoever from a negligent act or omission of the city, its Section A - SP (Revised 12 /15/04) Page 19 of 23 officials, employees, attorneys, and agents that directly or indirectly . causes injury to an employee of the contractor, or any subcontractor, supplier or materialman. A -44 Change Orders Should a change order(s) be required by the engineer, Contractor shall furnish the engineer a complete breakdown as to all prices charged for work of the change order (unit prices,,hourrly rates, sub - contractor's costs and breakdowns, cost of materials • and equipment, wage rates, etc.). This breakdown information shall be submitted by contractor as a basis for the price of the change order. A -45 As -Built Dimensions and Drawings (7/5/00) (a) Contractor shall make appropriate daily measurements of facilities constructed and keep accurate records of location (horizontal and vertical) of all facilities. (b) Upon completion of each facility, the Contractor shall- furnish Owner with one set of direct prints, marked with red pencil, to show as -built dimensions and locations of all work constructed. As a minimum, the final drawings shad include the following: (1) Horizontal and vertical dimensions due to substitutions /field changes. (2) Changes in equipment and dimensions due to substitutions. (3) "Nameplate" data on all installed equipment. (4) Deletions, additions, and changes to scope of work. (5) Any other changes made. A -46 Disposal of Highly Chlorinated water (7/5/00) (NOT USED) The Contractor shall be responsible fer the disposal of water used for testing, disinfection and lint flushing in an approved manner. Contaminants in- thc water, particularly . high levels of chlorin, will be used for wetlands or environmentally sensitive arcs. These are regulated by numerous thc City for approval. There shall be no separate pay for disposal of highly ch Orinated water. Contractor shall not use the City's sanitary sewer stem for disposal of contaminated water. A -47 Pre- Construction Exploratory Excavations (7/5/00) (NOT USED) trier wtruction whatever on thc project, Contractor shall ex avatc Section A - SP (Revised 12/15/04) Page 20 of 23 thc accurate horizontal and vcrtical loca.tiono of paid parallel pipelines at 300 feet maximum O.C. Contractor shall then prepare. a report and submit it to thc City for approval approximate station thereof, diotancc to the pavement centerline and elevations of thc top of existing pipelines. Contractor shall perr€erm ne eenets-aeetien wezk en the prej-ent until -a-.1 Exploratory cxctiavationo ~hall be paid for on a lump tum baoi . Any pavcmcnt the cotabliohcd until price of pavcmcnt patching. Contractor ohall provide A -48 Overhead Electrical Wires (7/5/00) Contractor shall comply with all OSHA safety requirements with regard to proximity of construction equipment beneath overhead electrical wires. There are many overhead wires crossing the construction route and along the construction route. Contractor shall use all due diligence, precautions, etc., to ensure that adequate safety is provided for all of his employees and operators of equipment and with regard to ensuring that no damage to existing overhead electrical wires or facilities occurs. Contractor shall coordinate his work with ASP /CP&L and inform AEP /CP &L of his construction schedule with regard to said overhead lines. Some overhead lines are shown in the construction plans, while others are not. It shall be the Contractor's sole responsibility to provide for adequate safety with regard to overhead lines whether shown in the plans or not. A -49 Amended "Maintenance Guaranty° (8/24/00) Under "General Provisions and Requirements for Municipal Construction Contracts ", B -8--11 Maintenance Guaranty, add the following: The Contractor's guarantee is a separate, additional remedy available to benefit the City of Corpus Christi. Neither the guarantee nor expiration of the guarantee period will operate to reduce, release, or relinquish any rights or remedies available to the City of Corpus Christi for any claims or causes of action against the Contractor or any other individual.or entity." A -50 Re- routing of Traffic During Construction For each location, traffic control plans have been provided in the drawings. Minor modifications may be required to conform to specific site conditions. Should the Contractor desire to deviate from the provided traffic control details, it shall be the Contractor's responsibility to provide revised traffic control details to the City Traffic Engineer for approval. The plans shall be prepared by a registered engineer in the state of Texas. The plans should be submitted for approval two .weeks in advance prior to its implementation. The Traffic Control Plan submittals should be on the standard 22" x 34" plan sheets and should be readable, legible, clean, proportionate and if possible to scale; and shall meet the City of Corpus Christi's "Uniform Barricading Standards and Practices". Any additional cost incurred Section A - SP (Revised 12/15/04) Page 21 of 23 due to preparation of a revised Traffic Control Plan shall be the Contractor's responsibility: No additional payment will be made. The Contractor shall secure the necessary permit from the City's Traffic Department. Any cost associated with the implementation of the traffic control plan shall be subsidiary to other items in the contract. A -51 Amended Prosecution and Progress Under "General Provisions and Requirements for .Municipal Construction Contracts', B-7 Prosecution and Progress, add the following: "Funds are appropriated by the City, on a Yearly Basis. If funds, for any reason, are not appropriated in. any given year, the City may direct suspension or termination of the contract. If the contractor is terminated or suspended. and the City requests remobilization at a later date, the contractor may request payment for demobilization / remobilization costs. Such costs shall be addressed through a change order to the contract. Section A - SP (Revised 12/15/04) Page 22 of 23 SUBMITTAL TRANSMITTAL DORM PROJECT: TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004, PROJECT NO.6488 OWNER: CITY OF CORPUS CHRISTI ENGINEER: HDR ENGINEERING, INC. CONTRACTOR: SUBMITTAL DATE: SUBMITTAL NUMBER: APPLICABLE SPECIFICATION OR DRAWING SUBMITTAL Section A - SP (Revised 12/15/04) Page 23 of 23 AGREEMENT THE STATE OF TEXAS § COUNTY OF NUECES § THIS AGREEMENT is entered into this 27TH day of MARCH, 2012, by and between the CITY OF CORPUS CHRISTI of the County of Nueces, State of Texas, acting through its duly authorized City Manager, termed in the Contract Documents as "City," and Austin Traffic Signal Construction Co., Inc. termed in the Contract Documents as "Contractor," upon these terms, performable in Nueces County, Texas: In consideration of the payment of $900,348.44 by City and other obligations of City as set out herein, Contractor will construct and complete certain improvements described as follows: TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 - PROJECT NO, 6488 (TOTAL BASE BID + ADD.ALT.BID: $900,348.44) according to the attached Plans and Specifications in a good and workmanlike manner for the prices and conditions set out in their attached bid proposal supplying at their expense such materials, services, labor and insurance as required by the attached Contract Documents, including overseeing the entire job. The Contract Documents include this Agreement, the bid proposal and instructions, The General and Special Provisions and Requirements for Municipal Construction Contracts of the City of Corpus Christi, plans and specifications, including all maps, plats, blueprints, and other drawings, the Performance and Payment bonds, addenda, and related documents all of which constitute the contract for this project and are made a part hereof. Page 1 of 3 Rev. Jun -2010 Contractor shall indemnify, save harmless and defend the City of Corpus Christi in accordance with General Provision B -6 -11 and Special Provision A-26 of the General and Special Provisions and Requirements for Municipal Construction Contracts of the City of Corpus Christi, Texas. The Contractor will commence work within ten (10) calendar days from date they receive written work order and will complete same within 150 CALENDAR DAYS after construction is begun. Should Contractor default, Contractor may be liable for liquidated damages as set forth in the Contract Documents. City will pay Contractor in current funds for performance of the contract in accordance with the Contract Documents as the work progresses. Signed in 4 parts at Corpus Christi, Texas on the date shown above. Page 2 of 3 Rev. Jun -2010 ATTEST: City Secretary APPRO /YED AS TO LEGAL FORM: By: Asst. City Attorney ATTEST: (If Corporation) (Seal Below) (Note: If Person signing for corporation is not President, attach copy of authorization to sign) CITY OF CORPUS CHRISTI By: Oscar Martinez Assistant City Manager Public Works, Utilities, and Transportation By: Daniel Biles, P.E. Interim Director of Engineering Services CONTRACTOR Austin Traffic Signal Construction Co., Inc. Title: 4615 Priem Lane (Address) Pflugerville, TX 78660 (City) (State)(ZIP) 5121255 -9951 * 512/255-0146 (Phone) (Fax) Page 3 of 3 Rev. Jun -2010 BY COUNCIL ...,.,._ 42 .LEL 1 i.CXJ.'K J-4 0.4.•7J-102430 .av4/z Proposal of PROJECT 6488 P R O P O S A L Place: Date: 2- -2-2 - /Z- Austin Traffic Signal Construction Co, Inr, a Corporation organized and existing under the laws of the State of 1 -eXL_N OR a Partnership or Individual doing business as TO: The City of Corpus Christi, Texas Gentlemen: The undersigned hereby proposes to furnish all labor and materials, tools, and necessary equipment, and to perform the work required for: TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT NO. 6488 at the locations set out by the plans and specifications and in strict accordance with the contract documents for the following.prices, to- wit: Proposal Form Page 2 of 29 S LCLSL J.' 1L oJ.VLYLL Jo vLVJ3 Y1 L7VL1111 G V V'X PROJECT 6488 BASE BID Part A. Alameda Street and Robert Drive I II III IV V ITEM QTY Description Unit Price Total ADA ITEMS Al 4 EA CURB RAMPS (TYPE .7) , COMPLETE IN ' PLACE PER EACH 1 CrW $ d j 1 r:s $ ° . A2 33 LF CONC CURB & ,GUTTER (TY I) , COMPLETE IN PLACE, PER LINEAR FOOT r �:cT $. 3C ^r:3 $ (1 S A3 33 SY CONC SIDEWALK (4 "), COMPLETE IN PLACE, PER SQUARE YARDS Jo $ 09 $ el A4 8 EA PEDESTRIAN DETECTION (2 INCH PUSH BUTTONS) , ' COMPLETE IN PLACE, PER: EACH $ J 5 , 0 0 e..+ AS 8 EA LED COUNTDOWN PEDESTRIAN MODULE, COMPLETE IN PLACE, PER EACH �<,.o $ 3;TC U CO GENERAL SIGNAL ITEMS A6 30 SY REMOVING CONC SIDEWALKS,.COMPLETE IN PLACE, PER SQUARE YARDS ,a.;; $ S $ J c, A7 64 LF REMOVING CONC CURB AND GUTTER, COMPLETE IN PLACE, PER LINEAR FOOT dry $ 3C 0� $ 6 ' A8 75 SY BLOCK SODDING, COMPLETE IN. PLACE, PER SQUARE YARDS , $ i 2- . $ A9 57 LF DRILL SHAFT (TRAFFIC SIGNAL POLE) (36 IN) , COMPLETE IN PLACE, PER LINEAR FOOT %;•' $ 11S. - $ Lc( 1 s Al0 1 LS MOBILIZATION, COMPLETE IN PLACE,PER LUMP SUM ,,c-' $ J ` _ $ 1 t r,Q ,, All 1 MO BARRICADES, SIGNS.AND TRAFFIC HANDLING, COMPLETE IN PLACE,.PER• MONTH 02 $ 12L;0: 4o .$ 12,‘,A; Al2 -65 LF CONDUIT (PVC) (SCHEDULE 80) (1 1/4 ") , COMPLETE IN PLACE, PER LINEAR FOOT _ irej;�, $ - - $ 9 A13 95 LF CONDUIT (PVC) (SCHEDULE 80) (2 ") , COMPLETE IN PLACE, PER LINEAR FOOT °f; $ $ _ 6 r A14 270 LF CONDUIT (PVC) (SCHEDULE 80) (2 ") (BORE) , COMPLETE IN PLACE, PER LINEAR FOOT , 4 � , $ 2. .. ;, . $ 12.4 0 A15 100 LF CONDUIT (PVC) (SCHEDULE 80) (4 "), COMPLETE IN PLACE, PER LINEAR FOOT $ ( °. ,r; s !O $ (I � A16 540 LF CONDUIT (PVC) (SCHEDULE 80) (4 ") (BORE) , COMPLETE IN PLACE, PER LINEAR FOOT $ L 45'D $ '1/410 Proposal Form Page 3 of 29 l iCE'!�L L'14 A1171'UUJr7 %MEM CLLVL O LMI- 4- liv- am.LGti.L.LVLV/ nV1tlL G V ur= PROJECT 6488 • 11 . A17 45 LF ELECTRICAL CONDUCTOR(NO. 6)BARE,COMPLETE IN PLACE,PER LINEAR . 6 • $ °fir rs (--.. $.,_ FOOT Al 8 90 LF ELECTRICAL CONDUCTOR (NO. 6) INSULATED, COMPLETE IN PLACE, PER LINEAR FOOT $ 1.-, (4" c2 e cp, A19 .1105 LF ELECTRICAL CONDUCTOR (NO. 8) BARE, COMPLETE IN PLACE, PER. LINEAR $ "1 $ i kj FOOT A20 530 LF ELECTRICAL CONDUCTOR (NO. 8) INSULATED, COMPLETE IN PLACE., PER LINEAR FOOT $ I - 213 c ° A21 568 LF TRAY CABLE (3 CONDUCTOR) (12 AWG) , COMPLETE IN PLACE, PER LINEAR FOOT $ 1-gc, $ t.?ca^ 4! c A22 5 EA GROUND BOX TY D (162922) WITH APRON, COMPLETE IN PLACE, PER. EACH ,0,:, $ _ • o $ 1'c- A23 1 EA ELECTRIC SERVICE TY T 120/240 000 (NS) AL (E) TS (0), COMPLETE IN PLACE, PER EACH za3' - $ I S C �L 4 (A $ I C V 90 LF REFL PAVEMENT MARK TY 1 (W) 4" (BRK) (100MIL), COMPLETE IN PLACE , PER LINEAR FOOT $ -e go $ 10 A25 205 LF REFL PAVEMENT MARK (sLp) (100MIL), COMPLE7 IN PLACE, PER LINEAR FOOT ou A26 469 LF REFL PAVEMENT MARK TY I• (W) 12" (SLD) .(100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ 1` $0 1 ,`) A27 630 LF REFL PAVEMENT MARK TY 1 (W) 24" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT • $ a y $ lig A2 8 2 EA REFL PAVEMENT MARK TY I (W) (ARROW) (100MIL) , COMPLETE IN PLACE, PER EACH 06: $ 11C, 41 G., $ 2,2- - A2 9 2 EA REFL PAVEMENT MARK TY 1 (W) (WORD) (100MIL), COMPLETE IN PLACE, PER EACH 00 $ i'5:.,% r3 0 $ . p A30 590 LF REFL PAVEMENT MARK TY 1•(Y) 4" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ 1„ 2.° $ 7 A31 90 LF . REFL PAVEMENT MARK TY II (W) 4" (BRK), COMPLETE IN PLACE, PER LINEAR FOOT $ ..2,2- $ L'1 v A32 205 LF REFL PAVEMENT MARK TY II (W) 8" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT _ $ 6- S. $ itz_S A33 469 LF REFL PAVEMENT MARK TY II (W) 12" (SLD) , COMPLETE IN PLACE, PER, LINEAR FOOT $ C- $ IC Proposal Form Page 4 of 29 4i1L11'S Vi VLYfl.JW \SISJYI LIJIAL Vii \4iliV Vi \i L.1iiL.a. Va. \1 £, VJ. \i+ faw V'i PROJECT 6488 1LL A34 630 LF REFL PAVEMENT MARK TY II (W) 24" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT .5- '� A3 5 2 EA REFL PAVEMENT MARK TY II (W) (ARROW), COMPLETE IN PLACE, PER EACH $ r,` A36 y REFL PAVEMENT MARK TY II (W) •R■ • . ♦ $ A37 590 LF REFL PAVEMENT MARK TY II (Y) 4" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT $ dam` d' A38 60 LF ELIM PAVEMENT ■ I dA COMPLETE IN PLACE, PER' LINEAR FOOT $ A39 ' 30 LF ELIM PAVEMENT COMPLETE IN PLACE; PER LINEAR FOOT $ 2-1LI. A40 343. LF COMPLETE IN PLACE, PER LINEAR FOOT A41 425 LF ELIM PAVEMENT I COMPLETE IN PLACE PER LINEAR FOOT A42 1 EA INSTALL 1 TRAFFIC { �I. (ISOLATED), COMPLETE IN PLACE, PER EACH 0 Ell * 2 EA REGULATORY • a • EACH 4 EA REGULATORY SIGN PANEL (R10-12/R10- ;sc. :.. MOD), COMPLETE TN PLACE, PER EACH' „ * 1 EA TRAFFIC SIGNAL CONTROLLER/CABINET, . COMPLETE IN PLACE, PER EACH TRAFFIC SIGNAL CONTROLLER FOUNDATION, COMPLETE IN PLACE, PER 1 2 EA 250 ■ A COMPLETE PLACE, ■ . EACH • WIND DAMPENER, COMPLETE IN PLACE, PER l A43 8 EA' BACK PLATE (12IN) (3 SECTION), 0 CC COMPLETE IN PLACE, PER.EACH $ 4;,3 1C4 A214 2 EA BACK fir? COMPLETE .IN PLACE, PER EACH $ ICC- 71,,. A45 2 EA VEHICLE SIGNAL SECTION (12IN) LED ARROW), • jr / PER a $ 1/4 Cc' ■ I • 10 EA COMPLETE VEHICLE SIGNAL. SECTION (12IN) LED y EACH °71) $ -]!"V a+ 2 A47 2 1 VEHICLE SIGNAL SECTION (12IN) LED (YELLOW ARROW), COMPLETE IN PLACE, i oo PER ♦ $ 40 A48 + a SIGNAL VEHICLE SECTION ■ Sr t a $ wAP.) Y a 4.d Proposal Form Page 5 of 29 -J Lt&rr.L o_Lumailo. umw rimy 011.4t- nAviV1Gn11VLVJ .DV1VL 4UL'Z PROJECT. 6488 A49 10 EA VEHICLE SIGNAL SECTION (12IN) LED (RED) , COMPLETE IN PLACE, PER EACH $ iC%- • $'. A50 428 LF TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (4 CONDUCTOR) , COMPLETE IN PLACE, PER LINEAR FOOT • $ 1,:,,,,, 1,1 $ A51 207 LF TRAFFIC SIGNAL CABLE (TY TO (14 AWG) (7 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR FOOT yy gg A52 490 LF TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (16 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR FOOT $ L. gc,. $ uk A53 2 EA' INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (S) 1 ARM (24') ILSN, COMPLETE IN PLACE, PER EACH ,D $ L'S-°C 0 c7, $ %300 A54 2 EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (5) 1 ARM (44') LUMINAIRE AND ILSN, COMPLETE IN PLACE, PER EACH Vic, $ eA20 - 4'4++ $ /. 2f A55 1 EA REMOVING TRAFFIC SIGNALS, PER EACH jg ,2. • $ 000 " A56 2 EA LED ILSN (6 S), COMPLETE IN-PLACE, PER EACH ( $ i dQc k , Ii $ 46tic( ` ' A57. 2 EA LED ILSN (8 S), COMPLETE IN PLACE, PER EACH $Z10‘," $ LiZea {, A58 1 EA MICROWAVE DETECTION PROCESSOR SYSTEM, COMPLETE IN PLACE, PER EACH $-e Q $ eic:O A59 4 EA MICROWAVE. DETECTION .ASSEMBLY, COMPLETE IN PLACE, PER EACH . �. $ 9 '= ,,., cx ✓ $ i' 4 A60 1 EA .MICROWAVE DETECTION SET -UP SYSTEM, COMPLETE IN PLACE, PER EACH �a;,z $ 0_ $. :$'°c' A61 704 LF •MICROWAVE DETECTOR COMM AND POWER CABLE (CAT 5 -E 4C TWISTED PAIR, 24 AWG), COMPLETE IN PLACE, PER LINEAR $ $e: FOOT A62 80 LF CCTV CAMERA #18 2C CABLE POWER, COMPLETE IN PLACE, PER LINEAR.FOOT $ q C - $ 32_0 $ :2-(. A6 3 80 LF CCTV CAMERA COAXIAL CABLE COMM, COMPLETE IN PLACE, PER LINEAR FOOT $ 'to r A64 1 EA PAN -TILT -ZOOM CCTV CAMERA, COMPLETE IN PLACE, PER EACH $"5324; 'yf A65 1 EA ETHERNET SWITCH WITH POWER CORD, PER EACH $ �, $ t) �" A66 1 EA BATTERY BACK -UP SYSTEM, COMPLETE IN PLACE, PER EACH r;;.� , �, 3r $ * Subsidiary to Item A42 SUB- TOTAL PART A - ALAMEDA STREET AND ROBERT DRIVE Bid Items (A1 -66) : Proposal Form Page 6 of 29 $ 17c)_-`514 " 4721.2 e7. 6•5 IKAr Y1C: 5 UDIAU. k & IW AMU aiipiunttumlzA"1. ull) bVIVL A V V'* PROJECT 6488 BASE BID Part B. MORGAN AVENUE AND CLEO STREET /KOKERNOT STREET 11 1 I II III IV V Ell QTY Description Unit Price Total ADA ITEMS B1 11 LF DRILL SHAFT (TRAFFIC SIGNAL POLE) .(24IN), COMPLETE IN PLACE, PER LINEAR FOOT ` $ -1I-- B2 • 2 EA PEDESTRIAN POLE ASSEMBLY, COMPLETE IN PLACE, PER EACH ' 0 `" '; B3 6 EA LED COUNTDOWN PEDESTRIAN MODULE, COMPLETE IN PLACE, PER EACH $ 2_2 5D,� B4 6 EA ACCESSIBLE PEDESTRIAN SIGNAL UNITS,. COMPLETE IN PLACE, PER EACH • •V'.' $ 1 t 1 5 $ Cticrio c;_, GENERAL SIGNAL ITEMS B5 55 LF DRILL SHAFT (TRAFFIC SIGNAL POLE) (36IN), COMPLETE. IN PLACE,.PER LINEAR FOOT $ OS- B6 1 LS LUMP � � 00 $ t.`15, B7 1 MO SIGNS AND TRAFFIC .HANDLING, COMPLETE IN PLACE, PER', MONTH $ 1200 $ B8 75 LF CONDUIT (PVC) (SCHEDULE 80) (1 1/4 ") , COMPLETE IN PLACE, PER LINEAR FOOT 4,/ wp -;,:= B9 80 CONDUIT (PVC) (SCHEDULE 80) (2 "),t' COMPLETE IN PLACE, PER LINEAR FOOT $ `' : $ ZN c?: B10 225 LF CONDUIT (PVC) (SCHEDULE 80) (2") (BORE) , COMPLETE IN PLACE, PER LINEAR FOOT - o;=.{:, $ 1,2-- 0,7 $ 7c- 3 B11. CONDUIT (PVC) (SCHEDULE 80) (4 ") ,r;,� COMPLETE IN PLACE, PER LINEAR FOOT $ $ 1gZ "C' B12 CONDUIT (PVC)• (SCHEDULE 80) (4 ") (BORE) , COMPLETE IN PLACE, PER LINEAR FOOT $ ' °�f `� $ _l B13 ELECTRICAL CONDUCTOR (NO. 6) BARE, COMPLETE.IN PLACE, PER LINEAR $ (r- 3 rr $ FOOT B14 ELECTRICAL CONDUCTOR (NO. 6) INSULATED, COMPLETE IN PLACE, PER LINEAR FOOT S' T B15 970 LF ELECTRICAL CONDUCTOR (NO. 8) BARE, COMPLETE IN PLACE, PER LINEAR $ -1° $I i Qi, FOOT B16 270 LF ELECTRICAL CONDUCTOR (NO. 8) INSULATED, COMPLETE IN PLACE, PER LINEAR FOOT $ l= I`"° $ z ' Proposal Form Page 7 of 29 TRAFFIC SIIsNA.F. 6 (NEW ANU bYNC:HKUJ LZATiU1N) MAW) L V V'f PROJECT 6488 a B17 453 LF TRAY CABLE (3 ' CONDUCTOR) (12 AWG) , COMPLETE IN PLACE, PER LINEAR FOOT $ bd "IC' $_ B18 5 EA_ GROUND BOX TY D (162922) WITH APRON, COMPLETE IN PLACE,- PER EACH • $ 1S $ . B19 1 EA ELECTRIC SERVICE TY T 120/240 -000 (NS) AL (E) TS (0) , COMPLETE IN PLACE, PER EACH 0, $ 1- 0 $ i V-%' " a); B20 90 LF REFL PAVEMENT MARK TY I (W) 8" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ '.4.,i,--' _Qa 0 $ 2-'. °'- B21 162 LF REFL PAVEMENT MARK TY S (W) 24" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ 7- 00 $ 11-4. B22 . I 1 EA REFL PAVEMENT MARK TY I (W) (ARROW) (100MIL) , COMPLETE IN PLACE, PER EACH a •'eE. $ 1 $ 1 B23 . 2 EA REFL PAVEMENT MARK TY I (W) (DOUBLE ARROW) (100MIL), COMPLETE IN PLACE, PER EACH .2. ,. $ Z _ ° _ _ $ " - B24 1 EA REFL PAVEMENT MARK TY I (W) (WORD) (100MIL) , COMPLETE IN PLACE, PER EACH 0;:5 $ C St . • �- $ f CC 6, B25 20 LF REFL PAVEMENT MARK TY I, (Y) 4" (SLD) • (100MIL) , COMPLETE IN PLACE, PER LINEAR FOOT co $ Z.: B26 90 LF REFL PAVEMENT MARK TY II (W) 8" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT $ L`1 -$ ti B27 162 LF REFL PAVEMENT MARK TY II (W) 24" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT $ Z--11" $ L B 1 ' ,f C. B28 1 EA REFL PAVEMENT MARK TY II (W) (ARROW), COMPLETE IN PLACE, PER EACH _ 0 $ .._ . $ 5 _ ., 4= B2 9 2 EA REFL PAVEMENT MARK TY II (W) (DOUBLE ARROW) , COMPLETE IN PLACE, PER EACH ,., , °c� ' 6 $ ` $ 1 co B30 1 EA REFL PAVEMENT MARK TY 11 (W) (WORD) , COMPLETE IN PLACE, PER EACH $ Op - $� B31 20 LF REFL PAVEMENT MARK TY 11 (Y) 4" .(SLD), COMPLETE IN PLACE, PER LINEAR FOOT B3 2 1 EA INSTALL-HIGHWAY TRAFFIC SIGNAL (ISOLATED), COMPLETE IN PLACE, .PER EACH -CP $1' $ 13 5 _ ) * 3 EA REGULATORY SIGN PANEL (R3-8 -VAR), COMPLETE IN PLACE, PER EACH -J } * 2 EA. REGULATORY SIGN PANEL (R10- 12/R10- MOD), COMPLETE IN PLACE, PER EACH _ * 1 EA TRAFFIC SIGNAL CONTROLLER /CABINET, COMPLETE IN PLACE, PER EACH _ - Proposal Form Page 8 of 29 a.L2' L'i'1L 17 .L l7iVlliJA t1Y SJ T\ C11Y1J 1711Y 4111tvi\J./JSS11.Va.YJ PROJECT 6488 * 1 EA TRAFFIC SIGNAL CONTROLLER FOUNDATION, COMPLETE IN PLACE, PER EACH * 1 EA 250 WHPS LUMINAIRE, COMPLETE IN i PLACE, PER EACH * 2-EA WIND DAMPENER, COMPLETE IN PLACE, PER EACH * 2 EA STREET NAME SIGNS, COMPLETE IN PLACE, PER EACH 3 33 6 EA BACK PLATE '(121N) (3 SECTION), COMPLETE IN PLACE, PER EACH �� Z $ . $ 529 �. B34 2 EA BACK PLATE (12IN) (4 SECTION) , COMPLETE IN PLACE, PER EACH zt n $ 1ST ,, u; $ t CC' B35 2 EA BACK PLATE (121N) (5 SECTION), COMPLETE IN PLACE, PER EACH „ $ / $ $ 2-10 (' �? B3 6 4 EA • VEHICLE SIGNAL SECTION (12IN) LED (GREEN ARROW), COMPLETE IN PLACE, PER EACH c" $ � '.. c $ C `' B37 10 EA VEHICLE SIGNAL SECTION (12IN) LED (GREEN), COMPLETE IN PLACE, PER EACH `` $ . '6-'' $ 2- C B38 2 EA VEHICLE SIGNAL. SECTION (121N) LED (YELLOW ARROW), COMPLETE IN PLACE,'-` PER EACH $ $ B39 10 EA VEHICLE SIGNAL SECTION (121N) LED (YELLOW), COMPLETE IN PLACE, PER EACH "' s�f B40 10 EA VEHICLE SIGNAL SECTION (12IN) LED (RED) , COMPLETE IN PLACE, PER EACH �.1,.� $ f o.� $ /0 C,() B41 317 LF. TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (4 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR FOOT $ ° ' .A: • $ ' B42 342 LF TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (7 CONDUCTOR) , COMPLETE IN PLACE, PER LINEAR FOOT $ i °5 —a =' = $ 1 343 420 LE TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (16 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR. FOOT $A $ 6�5` 344 • 2 EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (5) 1 ARM (24') ILSN, COMPLETE IN PLACE, PER EACH $ ,r $ R; 2- B45 1 EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (S) 1 ARM (36') ILSN, COMPLETE IN PLACE, PER EACH $ Z $( 2 c. B46 1 EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (5) 1 ARM (40') LUMINAIRE - AND ILSN, COMPLETE IN PLACE, PER EACH r $ -r0 $ f '7 B47 1 EA. REMOVING TRAFFIC SIGNALS, PER EACH $ 4 ter✓ $ R -' B48 2 EA LED ILSN (6 S), COMPLETE IN PLACE, PER EACH 0° , EP $ ;J.s Proposal Form Page 9 of 29 .Lfi.L1L E.LL 0.1.WM1I.LiD IJNJ.YY a7xm%- Y1rwasL42S11VLVJ DJLIL G JU PROJECT 6488 B4 9 2 EA LED ILSN (8 S), COMPLETE IN PLACE, PER EACH ,z.k $ 10'> $ L1 �.. _. B50 1 EA MICROWAVE DETECTION PROCESSOR SYSTEM, COMPLETE IN PLACE, PER.EACH - $ 24W,2 $ ',-14)0. B51 4 EA MICROWAVE DETECTION ASSEMBLY, COMPLETE IN PLACE, PER EACH ,u. $ LI (46.r' :.. 071 $ it, c-o B52 1 EA MICROWAVE_ DETECTION SET-UP SYSTEM, COMPLETE IN PLACE, PER EACH $ f) c,, $ ` :f { ' B53 622 LF MICROWAVE DETECTOR COMM AND POWER CABLE (CAT 5 -E 4C TWISTED PAIR, 24 AWG), COMPLETE IN PLACE,PER LINEAR $ 1-i7° 0 7 $ IS-S-5.- FOOT B54 55 LF CCTV CAMERA #18 2C CABLE POWER, COMPLETE IN PLACE, PER LINEAR FOOT $ ,'" 4� $ `Z-7S-- 6, I B55. 55 LF CCTV CAMERA COAXIAL CABLE COMM., COMPLETE IN PLACE, PER LINEAR FOOT �4 $ . $ 2--7 B56 1 EA PAN- TILT -ZOOM CCTV CAMERA, COMPLETE IN PLACE, PER EACH c',-, $ ,' St& $ (4A—C-= B57 1 EA .ETHERNET SWITCH WITH POWER CORD, PER EACH _ ,„,;J, $ �: $ L. ,B58 1 EA BATTERY BACK -UP SYSTEM, COMPLETE IN PLACE, PER EACH $v 1143`b3 - $ ; Li 0 * Subsidiary to Item B32 SUB -TOTAL PART B -- MORGAN AVENUE AND CLEO STREET /KOKERNOT STREET Bid Items (61 -58) : larirra.k. 01Vi'13L3 [1v LSYY tiivil iDxmt.fRtVkrF.LLIkLciV1VJ nv1NV PROJECT 6488 BASE BID Part C. AYERS ROAD AND HORNE ROAD Proposal Form Page 11 of 29 II III IV ITEM QTY Description Unit Price Total ADA ITEMS C1 6 LF DRILL SHAFT (TRAFFIC SIGNAL POLE) (24IN), COMPLETE IN PLACE, PER LINEAR FOOT (-" $ IV c ,. €.: C2 58 LF CONC CURB & GUTTER (TY I), COMPLETE IN PLACE, PER LINEAR FOOT $ 3 $ 2 C3 25 LF CONC CURB (TY F), COMPLETE IN PLACE, PER LINEAR FOOT $ 0-- $ c w1 4Y C4 5 EA CURB RAMPS, TY 7, COMPLETE IN PLACE PER EACH �;t $ L Z-S- Li $ - . ' „3, C5 52 SY CONC SIDEWALK (4 "),. COMPLETE IN PLACE, PER SQUARE. YARDS $ IOC" - $ ¶ z Gr C6 .1 EA CURB RAMPS, TY 11, COMPLETE IN PLACE PER EACH ,_ $ 12° �y $ i�S -0. - C7 1 EA PEDESTRIAN POLE ASSEMBLY, COMPLETE IN PLACE, PER EACH _ ,.4- 08 8 EA PEDESTRIAN DETECTION (2 INCH PUSH BUTTONS), COMPLETE IN PLACE, PER EACH s $ 1 � _ �� $ i 4 0£ C9 8 EA LED COUNTDOWN PEDESTRIAN MODULE, COMPLETE IN PLACE, PER EACH c;:: $ ry, $ .c2 GENERAL SIGNAL ITEMS 010 102 SY REMOVING CONC SIDEWALKS, COMPLETE IN PLACE, PER SQUARE YARDS _ �� �� C11 107 LF REMOVING CONC CURB AND GUTTER, COMPLETE IN PLACE, PER LINEAR FOOT _ ,. $ � .. ;_-, $ 2467 C12 36 SY BLOCK SODDING, COMPLETE IN PLACE, PER SQUARE YARDS '',,, $ CC $ ?CVO C13 59 LF DRILL SHAFT (TRAFFIC SIGNAL POLE) (36IN) , COMPLETE IN PLACE, PER LINEAR FOOT ..; $ $ K--''\ 2i C14 1.9 CY RIPRAP (CONC) (4 IN) , COMPLETE IN PLACE, PER CUBIC YARD ,, C15 1 LS MOBILIZATION, COMPLETE IN PLACE,PER LUMP SUM s $ $ .5 K.k C16 1 MO BARRICADES, SIGNS AND TRAFFIC HANDLING, COMPLETE IN PLACE, PER MONTH a`�`� $ 9 J ° , $ 1 c1, .1 Proposal Form Page 11 of 29 iXCU.ri'. '17i171VAAAD UL1YY riLVL AiiV4111CV1Y14ri11V1V) ovIly 6VVt PROJECT 6488 C17 110 LF CONDUIT (PVC) (SCHEDULE 80) (1 1/4 "), COMPLETE IN PLACE, PER LINEAR FOOT c2, $ t $. IL CO C18 285 LF CONDUIT (PVC) (SCHEDULE 80) (1 1/4 ")(BORE), COMPLETE IN PLACE, PER LINEAR FOOT y Fa $ . ,, $ L Z2- C19 90 LF CONDUIT (PVC) (SCHEDULE 80) (2"), COMPLETE IN PLACE, PER LINEAR FOOT $ t' d $ 10%.8x) ,,'.) C20 285 LF. CONDUIT (PVC) (SCHEDULE 80) (2 ") (BORE), COMPLETE IN PLACE, PER LINEAR FOOT ' . c, $ 11,x. gi; $''t2.O C21 80 LF CONDUIT (PVC) (SCHEDULE 80) (4 "), COMPLETE IN PLACE, PER LINEAR FOOT CI $ 011 $ _ a �y r.� ' C22 570 LF CONDUIT (PVC) (SCHEDULE 80) (4 ") (BORE) , COMPLETE IN PLACE, PER LINEAR FOOT $ ;Fs $ i 2Q C23 30 LF ELECTRICAL CONDUCTOR (NO. 6)BARE, COMPLETE IN PLACE, PER LINEAR FOOT fi $ 1 .c $ 3 c C2.4 60 LF ELECTRICAL CONDUCTOR (NO. 6) INSULATED, COMPLETE IN PLACE, PER LINEAR FOOT $ 5 . ,. $ 'C' C25 1,470 LF ELECTRICAL CONDUCTOR (NO. 8) BARE, COMPLETE IN PLACE, PER LINEAR Go 06,11 FOOT C26 680 LF ELECTRICAL CONDUCTOR (NO. 8) INSULATED, COMPLETE IN PLACE, PER LINEAR FOOT $ `� � C .L0 C27 698 LF TRAY CABLE (3 CONDUCTOR) (12 AWG) , COMPLETE IN PLACE, PER LINEAR FOOT • $ 1- r ,9 r $ Ct0- C28 6 EA GROUND' .BOX TY D (162 922) WITH APRON, COMPLETE IN PLACE, PER EACH $ ` S7-3 , ; , $ 4 50° C29 1 EA ELECTRIC SERVICE TY T 120/240 000 (NS) AL (E) TS (0) , COMPLETE IN PLACE, PER EACH &', $ ( n. _ $ 15-0C° C30 280 LF. REFL PAVEMENT MARK TY I (W) 4" (BRK) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT ..� C31 714 LF REFL PAVEMENT MARK TY I (W) 8" (SLD) (100MIL) , COMPLETE IN PLACE, PER LINEAR FOOT ' $ -t" it i3 $ 3-S - C32 612 LF REFL PAVEMENT MARK TY I (W) 12" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT !.6.-. $ , $ L z C33 837 LF REFL PAVEMENT MARK TY I (W). 24" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT �c e,' C34 .10 EA REFL PAVEMENT MARK TY I (W) (ARROW) (100MIL), COMPLETE IN PLACE, PER EACH $ $ Proposal.Fbrm Page 12 of 29 Ty.akrIc 61QMAJAb; (NtSW H1111) X■ei- IKUl\[1GA`1'JUN) bUAV1) 4UU4 PROJECT 6488 C35 6 EA REFL PAVEMENT MARK TY I (W} (WORD) (100MIL), COMPLETE IN PLACE, PER EACH $ f' $ '" -' `~ C36 1,118 LF REFL PAVEMENT MARK TY I (Y) 4" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ $ i0 ,'`" C37 280 LF REFL PAVEMENT MARK TY II (W) 4" (BRK), COMPLETE IN PLACE, PER LINEAR FOOT $ ` 2 -Z- $ (a ka. c' C38 714 LF REEL PAVEMENT MARK TY II (W) 8" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT _ $ _ $ $ . C39 .612 LF REFL PAVEMENT MARK TY II (W) 12" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT - • $ /C4,0 ,, a C40 837 LF REFL PAVEMENT MARK TY II (W) 24" (SLD) , COMPLETE IN PLACE, PER LINEAR FOOT , `, $ 7-' . a $ 2-- - 10 EA REFL PAVEMENT MARK TY II (W) (ARROW) , COMPLETE IN PLACE, PER EACH $ . $ O C4 2 6 EA REFL PAVEMENT MARK TY II (W) (WORD) , COMPLETE IN PLACE, PER 'EACH $ ti. $ t.C' . C43 1,118 .LF REFL PAVEMENT MARK TY II (Y) 4" (SLD), COMPLETE IN PLACE, PER • LINEAR FOOT $ .- :2c2 $ - 1 CA C44 100 LF ELIM PAVEMENT MRK & MRKS (4 "), COMPLETE IN PLACE, PER LINEAR FOOT $ _ 14;') 1 $ i C45 60 ' LF ELIM PAVEMENT MRK & MRKS (8 "), COMPLETE IN PLACE, PER LINEAR FOOT $ 7,2--() $ ki C46 463 LF ELIM PAVEMENT MRK & MRKS (12 "), COMPLETE IN PLACE, PER LINEAR FOOT $ �:'- $ l C47 706 LF ELIM PAVEMENT MRK & MRKS (24 ") , COMPLETE IN. PLACE, PER LINEAR FOOT r. $ 11m 4.2 ,,- $ ' ), C48 3 EA ELIM PAVEMENT MRK & MRKS (ARROW), COMPLETE IN PLACE, PER EACH �,� $ E $ t3 C49 2 EA ELIM PAVEMENT MRK & MRKS (WORD), COMPLETE IN PLACE, PER EACH 4›,p- $ •�� $ 1630 jr` C50 1 EA INSTALL HIGHWAY TRAFFIC SIGNAL (ISOLATED), COMPLETE IN PLACE, PER EACH • 4' $ 14 z. $ VA 1 * 4 EA REGULATORY SIGN PANEL (R3-8-VAR), COMPLETE IN PLACE, PER EACH = ' ' -� * 4 EA REGULATORY SIGN PANEL (R10-12/R10- MOD), COMPLETE IN PLACE, PER EACH �� - ,� * .1 EA TRAFFIC SIGNAL CONTROLLER /CABINET, COMPLETE IN PLACE, PER EACH _ fk �z * 1 EA TRAFFIC SIGNAL CONTROLLER FOUNDATION, COMPLETE IN PLACE, PER EACH T = I,. t ' — Proposal Form Page 13 of 29 'L'KAYYI : 5± ALS MEW AND .yXLVL:HKUN.LAW.I.UN) BUM) LUU% PROJECT 6488 LI I Proposal Form Page 14 of 29 2 EA 250 WHPS LUMINAIRE, COMPLETE IN PLACE PER EACH 4 EA WIND DAMPENER, COMPLETE IN PLACE,fN PER EACH k. 8 EA BACK PLATE '(12IN) (3 SECTION) , COMPLETE IN PLACE, PER EACH . c,,, $ '9 $ LC<f ^ C52 4 EA BACK PLATE (12IN) (5 SECTION); COMPLETE IN PLACE, PER EACH $ LC\� $ q 0.0 C53 4 EA VEHICLE SIGNAL SECTION (121N) LED (GREEN ARROW), COMPLETE IN PLACE,: PER EACH • $ y . $ ,�;c C54 12 EA VEHICLE SIGNAL SECTION (12IN) LED . (GREEN) , COMPLETE IN PLACE, PER EACH = << $ "Zi $ Zsi c o 0 C5 5 4 EA VEHICLE SIGNAL SECTION (12IN) LED . (YELLOW ARROW), COMPLETE IN PLACE, PER EACH c-� $ °� `� $''�� C56 12 EA VEHICLE SIGNAL SECTION (12IN) LED (YELLOW), COMPLETE IN PLACE, PER EACH 1s $ 40 $ .c2-.' C57 12 EA VEHICLE SIGNAL SECTION (12IN) LED (RED) , COMPLETE IN PLACE, PER EACH ,.- $ (rr- • $ L-�-2 2_4- �� C58 492 LF .TRAFFIC SIGNAL•CABLE (TY A) (14 AWG) (4 CONDUCTOR) , COMPLETE IN PLACE, PER LINEAR FOOT 39". 40 ? C''' „3 $ ' C59 426 LF- TRAFFIC SIGNAL CABLE (TY A).(14 AWG) (7 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR FOOT . i 3 9.°' $ (- $ 4. c' C60 595 LF TRAFFIC SIGNAL CABLE (TY A) .(14 AWG) (16 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR FOOT I: 3 C61 1 EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (S) 1 ARM (36')LUMINAIRE AND ILSN, COMPLETE IN PLACE, PER EACH - �,, ,.- $ 7c,) $ �i '4 ` C62. 2 . EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (5) 1 ARM (44') ILSN, COMPLETE IN PLACE, PER EACH , : u0 $ 7 ‘,1 4-'''c' C63 1 EA INSTALL TRAFFIC SIGNAL POLE - ASSEMBLY (S) 1 ARM (44') LUMINAIRE AND ILSN, COMPLETE IN PLACE, PER .EACH j F c,; ry a4 $ t 1C-= $ . nLio ' C64- 1 EA REMOVING TRAFFIC SIGNALS, COMPLETE IN PLACE, PER EACH � $ , to w $ 1 C65 4 EA LED ILSN (6 S), COMPLETE IN PLACE, PER EACH !3. $ '00 $ C66 1 EA MICROWAVE DETECTION PROCESSOR SYSTEM, COMPLETE IN PLACE, PER EACH 0; 4E ., $ 7....'P $ - C67 4 EA MICROWAVE DETECTION ASSEMBLY,,: COMPLETE IN PLACE, PER EACH $4 $ c- , - ')'' Proposal Form Page 14 of 29 Tita'ri u INxi 9 itLVL mat- rinumJ.G4t1VLVJ DVLVL avvz PROJECT 6488 '11 1 EA MICROWAVE DETECTION SET -UP SYSTEM, COMPLETE IN PLACE,PER EACH $ $ ()ca C69 .841 LF MICROWAVE DETECTOR COMM AND POWER CABLE (CAT 5 -E 4C TWISTED PAIR, 24 AWG), COMPLETE IN PLACE,PER LINEAR • $ $ 2 -10_� FOOT C70 55 LF CCTV CAMERA #18 2C CABLE POWER, COMPLETE IN PLACE, PER LINEAR FOOT $ ` t- y �� $ 1` -r. C71 55 LF CCTV CAMERA COAXIAL CABLE COMM, COMPLETE, IN PLACE, PER LINEAR FOOT $ - F $ 2,Z,0 ., 1 EA PAN- TILT -ZOOM CCTV CAMERA, COMPLETE IN PLACE, PER EACH .ak $ �'" $ f C73 1 EA ETHERNET SWITCH WITH POWER CORD,r PER EACH $. eZCC.:' $ ,-Vj) C74 1 EA BATTERY BACK -UP SYSTEM, COMPLETE IN PLACE, PER EACH .- -- $ ! .` . ` SLi0. * Subsidiary to Item C50 . • SUB -TOTAL PART C - AYERS ROAD AND HORNE ROAD Bid Items (C1 -74): Proposal Form Page 15 of 29 LtkO TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 • PROJECT 648.8 BASE BID Part D. SOUTH PORT AVENUE AND BALDWIN BOULEVARD I II III IV V ITEM QTY Description Unit Price Total ADA ITEMS D1 37 LF CONC CURB & GUTTER (TY I), COMPLETE IN PLACE, PER LINEAR FOOT $ 3 $ (2 j u D2 16 LF CONC DRIVEWAY GUTTER, COMPLETE IN PLACE, PER LINEAR FOOT $ le.:„,,,,_, $� w D3 1 E A CURB RAMPS, TY 7, COMPLETE IN PLACE PER EACH ,,,-; . $ i ici $ t �4c D4 29 SY CONC SIDEWALK (4 "), COMPLETE IN PLACE, PER SQUARE YARDS es % $ `z.Cue- D5 4 EA CURB RAMPS, TY 11, COMPLETE IN PLACE PER EACH $ 3124:"‘ t D6 8 EA PEDESTRIAN DETECTION (2 INCH PUSH BUTTONS), COMPLETE IN PLACE, PER EACH $ t � �4 $ 0-',i0 ',..1,:',..1,::, : D7 8 EA LED COUNTDOWN PEDESTRIAN MODULE, COMPLETE IN PLACE, PER EACH �;, $ 1 S , $ c c-; 0 GENERAL SIGNAL ITEMS D8 1 EA REMOVING CONC SIGN FOUNDATION, PER EACH ,:, $ 0- $' D9 64 SY REMOVING CONC SIDEWALKS, COMPLETE IN PLACE, PER SQUARE YARDS _,, $ ' �_ $ 2, D10 . 113 LF REMOVING CONC CURB AND GUTTER,.,.,; COMPLETE IN PLACE, PER LINEAR FOOT $ $0d,� D11 39 SY BLOCK SODDING, COMPLETE IN PLACE, PER SQUARE YARDS 1 $ (. ° $ tO t D12 59 LF DRILL SHAFT (TRAFFIC SIGNAL POLE) (36IN), COMPLETE IN PLACE, PER LINEAR FOOT �_, $ $ DI3 D14 3.1 CY 1 LS RIPRAP (CONC) (4 IN) , COMPLETE IN PLACE, PER CUBIC YARD MOBILIZATION, COMPLETE IN PLACE,PER LUMP SUM $ t-I < $ %'''11 $ Z- $ ,_ —24CDQ D15 1 MO BARRICADES, SIGNS AND TRAFFIC HANDLING, COMPLETE IN PLACE,PER MONTH tea $ 12)'";"° $ il. v y D16 60 LF CONDUIT (PVC) (SCHEDULE 80) (1 1/4 "), COMPLETE IN PLACE, PER LINEAR FOOT $ _ $ D17 95 LF CONDUIT (PVC). (SCHEDULE 80) (2 "), COMPLETE IN PLACE, PER LINEAR FOOT �,-, $ $ 71L) � D18 290 LF CONDUIT (PVC) (SCHEDULE 80) (2 ") (BORE), COMPLETE IN PLACE, PER C. may, Proposal Form Page 16 of 29 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT 6488 Proposal Form Page 17 of 29 LINEAR FOOT D19 80 LF CONDUIT (PVC) (SCHEDULE 80) (4 "), COMPLETE IN PLACE, PER LINEAR FOOT s =,1. $ t 7s $ I j: ,s' D20 580 LF CONDUIT (PVC) (SCHEDULE 80) (4 ") (BORE) , COMPLETE IN PLACE, PER LINEAR FOOT (5-=' $ `• 4..- $ '-` D21 ' 35 LF ELECTRICAL CONDUCTOR (NO. 6)BARE, COMPLETE IN PLACE, PER LINEAR FOOT $ - $ LI ` -- D22 • 70 LF ELECTRICAL CONDUCTOR (NO. 6) INSULATED, COMPLETE IN PLACE, PER LINEAR FOOT $ I ° - � �, $ H2..' D23 1,150 LF ELECTRICAL CONDUCTOR (NO. 8) BARE, COMPLETE IN PLACE, PER LINEAR $ j)- 11)0 $ (Dic FOOT D24. 600 LF ELECTRICAL CONDUCTOR (NO. 8) INSULATED, COMPLETE IN PLACE, PER LINEAR FOOT �� $ t - w �, $. 2. D25 608 LF TRAY CABLE (3 CONDUCTOR) (12 AWG) , COMPLETE IN PLACE, PER LINEAR FOOT $ � W �' $ .7 ��' _7 D26 D27 .5 EA • 1 EA GROUND BOX TY D (162922) WITH APRON, COMPLETE IN PLACE, PER EACH $ $ P ICS ELECTRIC SERVICE TY T 120/240 000 (NS) AL (E) TS (0), COMPLETE IN PLACE, PER EACH - ..---- ' w $I,C)�k $ D28 1 EA REMOVE SM RD SN SUP•& AM, COMPLETE IN PLACE, PER EACH $ 7s- ' $ 7s- D29 270 LF REFL PAVEMENT MARK TY I (W) 4" (BRK) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ a' $ 2 `7 7 D30 266 LF REFL PAVEMENT MARK TY 1 (W) 4" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT 1 c :;> c D31 405 LF REFL PAVEMENT MARK TY 1 (W) 8" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ " - $ :S D32 653 LF .REFL PAVEMENT MARK TY I (W) 12" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ 1. - $ '2, t `7 7 r C' D33 855 LF REFL PAVEMENT MARK TY I (W) 24" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT . (lc, D34 5 EA REFL PAVEMENT MARK.TY I (W) (ARROW) (100MIL), COMPLETE IN PLACE, PER, EACH �,;:,,- $ $ .. $ eg c D35 4 EA REFL PAVEMENT MARK TY I (W) (WORD) (100MIL), COMPLETE IN PLACE, PER'' EACH . "—f $ s $ L,3. =a D36 926 LF REFL PAVEMENT MARK TY 1 (Y) 4" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT • ro c, $ `at 1 , $ Proposal Form Page 17 of 29 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT 6488 REFL PAVEMENT MARK TY II (W) 4" (BRK), COMPLETE IN PLACE, PER 270 LF LINEAR FOOT REFL PAVEMENT MARK TY. II (W) 4" (SLD), COMPLETE IN PLACE, PER 266 LF LINEAR FOOT REFL PAVEMENT MARK TY II (W) 8" (SLD), COMPLETE IN PLACE, PER 405 LF LINEAR FOOT 45 LF 642 LF 4 EA D50 .8 EA D51 4 EA II I REFL PAVEMENT. MARK TY II (W) 12" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT REEL PAVEMENT MARK TY II (W) 24" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT REFL PAVEMENT MARK TY II (W) • (ARROW), COMPLETE IN PLACE, PER EACH REFL PAVEMENT MARK TY II (W) (WORD), COMPLETE IN PLACE,. PER EACH REFL PAVEMENT MARK TY II (Y) 4" (SLD), COMPLETE IN PLACE, PER LINEAR FOOT • ELIM PAVEMENT MRK & MRKS (4 "), COMPLETE IN PLACE, PER LINEAR FOOT ELIM PAVEMENT MRK & MRKS (8 "), COMPLETE IN PLACE, PER LINEAR FOOT ELIM PAVEMENT MRK & MRKS (12 "), COMPLETE IN PLACE, PER LINEAR FOOT ELIM PAVEMENT MRK & MRKS (24 "), COMPLETE IN PLACE, PER LINEAR FOOT INSTALL HIGHWAY TRAFFIC SIGNAL (ISOLATED), COMPLETE IN PLACE, PER EACH REGULATORY SIGN PANEL (R3- -8 -VAR), COMPLETE IN PLACE, PER -EACH REGULATORY SIGN PANEL (R10- 12/R10- MOD), COMPLETE IN PLACE, PER EACH TRAFFIC SIGNAL CONTROLLER /CABINET, COMPLETE IN PLACE, PER EACH TRAFFIC SIGNAL CONTROLLER FOUNDATION, COMPLETE IN PLACE, PER EACH 250 WHPS LUMINAIRE, COMPLETE IN PLACE, PER EACH WIND DAMPENER, COMPLETE IN PLACE, PER EACH BACK PLATE (12IN) (3 SECTION), COMPLETE IN PLACE,. PER EACH BACK PLATE (12IN) (5 SECTION), COMPLETE IN PLACE, PER EACH Proposal Form Page 18 of 29 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 20.04 PROJECT 6488 D52. 4 . EA VEHICLE SIGNAL SECTION (12IN) LED (GREEN ARROW), COMPLETE IN PLACE, PER EACH $ . $ ,Fw . ' D53 - 12 EA VEHICLE SIGNAL SECTION (12IN) LED (GREEN), COMPLETE IN PLACE, PER EACH G, '1 $ �,E�. �'tiJ $ '.°*a�' D54 4 EA VEHICLE SIGNAL SECTION (12IN) LED (YELLOW ARROW), COMPLETE IN PLACE, PER EACH w $ £- $ ` ;, 1 ' ," D55 12 EA VEHICLE SIGNAL SECTION (12IN) LED (YELLOW), COMPLETE IN PLACE, PER EACH ter= $ 2-1 "' $ -2_,- -'' D56 12 EA VEHICLE SIGNAL SECTION (12IN) LED (RED) , COMPLETE IN PLACE, PER EACH $ 2 2_2___c. 4 ^ D57 ..492 LF TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (4 CONDUCTOR) , COMPLETE IN PLACE, PER LINEAR FOOT Y • ,, $ L Cam. $ d D58 326 LF TRAFFIC SIGNAL CABLE (TY A) (14 • AWG) (7 CONDUCTOR) , COMPLETE IN PLACE, PER LINEAR FOOT �.. �,q, $ (` r,. D59 • 525 LF TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (16 CONDUCTOR) , COMPLETE IN PLACE, PER LINEAR FOOT f.a $ ( ' C `7 '" $ it. D60 1 EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (S) 1 ARM (36') ILSN, COMPLETE IN PLACE, PER EACH $ -' $ _ D61 1 EA INSTALL TRAFFIC SIGNAL POLE • ASSEMBLY (S) 1 ARM (44') ILSN, COMPLETE IN PLACE, PER EACH , „:, $ '`' . $ L15-0 D62 2 EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (S) 1 ARM (44') LUMINAIRE. AND ILSN,. COMPLETE IN PLACE, PER EACH ,,, $Q 2-6,0 ,;%;, $ 1 it -” D63 1 EA REMOVING TRAFFIC SIGNALS, PER EACH $ I k(' $ D64 4 EA. LED ILSN (6 S), COMPLETE IN PLACE,• PER EACH ;,, ‘ D65 1 EA MICROWAVE DETECTION PROCESSOR SYSTEM, COMPLETE IN PLACE, PER EACH $ -- -; $ -25.,'t '-.; D66 4 EA MICROWAVE DETECTION, ASSEMBLY, COMPLETE IN PLACE, PER EACH .2P ' • .- .; ` 4.. D67 1 EA. MICROWAVE DETECTION SET -UP SYSTEM, COMPLETE IN PLACE,PER EACH L,�,. $ '' $ 47, D68 771 LF MICROWAVE DETECTOR COMM AND POWER CABLE (CAT 5 -E 4C TWISTED PAIR, 24 AWG), COMPLETE IN PLACE,PER LINEAR L= $ .. - "7' $(.-- G FOOT D69 60 LF CCTV CAMERA #18 2C CABLE POWER, COMPLETE IN PLACE, PER LINEAR FOOT .r_ f- $ w" c., D70 60 LF CCTV CAMERA COAXIAL CABLE COMM, COMPLETE IN PLACE, PER LINEAR FOOT 0 $ $ - ra Proposal Form Page 19 of 29 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT 6488 .ILl D71 1 EA .PAN- TILT -ZOOM CCTV CAMERA, COMPLETE IN PLACE, PER EACH ca $ ` Y'`"? $ S D72 1 EA ETHERNET SWITCH WITH POWER CORD, PER EACH 4,.r ._ 1)73 1 EA BATTERY BACK -UP SYSTEM, COMPLETE PLACE, PER EACH IN ,;; `..2 ''- * Subsidiary to Item D49 SUB -TOTAL PART D - SOUTH PORT AVENUE AND BALDWIN BOULEVARD Bid Items (D1 -73) : Proposal Form Page 20 of 29 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT 6488 ADDITIVE ALTERNATE BID Part E. GOLLIHAR ROAD AND PRESCOTT STREET I.I.I I II III IV V ITEM QTY Description Unit Price Total ADA ITEMS El 17 LF DRILL SHAFT (TRAFFIC SIGNAL POLE) (24IN) , COMPLETE IN PLACE, PER LINEAR ,( ;. $ ' S ,<< $ i is FOOT E2 56 LF CONC CURB & GUTTER (TY I) , COMPLETE IN PLACE, PER LINEAR FOOT _ $ c $ `` -' E3 5 LF CONC DRIVEWAY GUTTER, COMPLETE IN PLACE, PER LINEAR FOOT ., $ c $ 5 c E4 2 EA CURB RAMPS, TY 2, COMPLETE IN PLACE PER EACH ,::a $ 1 2C - $ '1 ST :-= '..„ E5 2 EA CURB RAMPS, TY 7, COMPLETE IN PLACE PER EACH ,:, $ i 2 $ c_ E6 40 SY CONC SIDEWALK (4 "), COMPLETE IN PLACE, PER SQUARE YARDS :;L $ � $ Li c` :. E7 1 EA CURB RAMPS, TY 11, COMPLETE IN PLACE PER EACH $ as-: $ 2,ce.) -' E8 3 EA PEDESTRIAN POLE ASSEMBLY, COMPLETE IN PLACE, PER EACH , $ 7s $'z z.. c ..)., E9 6 EA LED COUNTDOWN PEDESTRIAN MODULE, COMPLETE IN PLACE, PER EACH ems-, $ 1 s $ Z,2, - '3 E10 6 EA ACCESSIBLE PEDESTRIAN SIGNAL UNITS, COMPLETE IN PLACE, PER EACH $ j i r% $ u . Q GENERAL SIGNAL ITEMS Ell 1 EA REMOVING CONC SIGN FOUNDATION, PER EACH '(.'" $, ,� E12- 86 SY REMOVING CONC SIDEWALKS, COMPLETE IN PLACE., PER SQUARE YARDS ,,,_ ,.: $ L� $ 41 :.` E13 139 LF REMOVING CONC CURB AND GUTTER, COMPLETE IN PLACE, PER LINEAR FOOT $ C. $ .il7 E14 40 LF DRILL SHAFT (TRAFFIC SIGNAL POLE) (36IN), COMPLETE IN PLACE, PER LINEAR $ 1 LS $ >'t ___ $ , a.:.. FOOT E15 ' 3 CY RIPRAP (CONC) (4 IN), COMPLETE IN PLACE, PER CUBIC YARD E16 1 LS MOBILIZATION, COMPLETE IN PLACE,PER LUMP SUM'S E17 1 MO BARRICADES, SIGNS AND TRAFFIC HANDLING, COMPLETE IN PLACE, PER MONTH $ 760-' $ e.t. E18 120 LF CONDUIT (PVC) (SCHEDULE 80) (1 1/4 "), COMPLETE IN PLACE, PER LINEAR FOOT $ ( y $ —7-2-g=2, E19 75 LF CONDUIT (PVC) (SCHEDULE 80) (1 1/4 ") (BORE) , COMPLETE IN PLACE, PER e $ :,. $ L, Proposal Form Page.21 of 29 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT 6488 Proposal Form Page 22 of 29 LINEAR FOOT E20 160 LF CONDUIT (PVC) (SCHEDULE 80) (2 ") , COMPLETE IN PLACE, PER LINEAR FOOT $ , i2-'7; C-'. . E21 295 LF CONDUIT (PVC) (SCHEDULE 80) (2 ") (BORE), COMPLETE IN PLACE, PER LINEAR -,.. $ 7 $ a= `` FOOT E22. 170 LF CONDUIT (PVC) (SCHEDULE 80) (4 "), COMPLETE IN PLACE, PER LINEAR FOOT ., $ . $ '- E23 440 LF .CONDUIT (PVC) (SCHEDULE 80) (4 ")(BORE), COMPLETE IN PLACE, PER LINEAR FOOT ° 7 y E24 .145 LF ELECTRICAL CONDUCTOR (NO. 6)BARE, COMPLETE IN PLACE, PER LINEAR FOOT $ (•- :� $ / ,: .. _ ' E25 290 LF ELECTRICAL CONDUCTOR (NO. 6) INSULATED, COMPLETE IN PLACE, PER LINEAR FOOT $ _' � y . $ 1 � t E26 1,195 LF ELECTRICAL CONDUCTOR (NO. 8) BARE, COMPLETE IN PLACE, PER LINEAR FOOT E27 470 LF ELECTRICAL CONDUCTOR (NO. .8) INSULATED', COMPLETE IN PLACE, PER LINEAR FOOT $ 1- $ '-' E28 504 LF TRAY CABLE (3 CONDUCTOR) (12 AWG), COMPLETE IN PLACE, PER LINEAR FOOT $ t '3 i:' $ Sc.:2 $ " '5, �. E29 5 EA GROUND BOX TY D (162922) WITH APRON, COMPLETE IN PLACE, PER EACH . $ (, S ; E30 1 EA ELECTRIC SERVICE TY T 120/240 000 (NS) AL (E) TS (0) , COMPLETE IN PLACE, PER EACH $ i `. ,-:- $k-s-3 E31 • 1 EA REMOVE SM RD SN SUP & AM, COMPLETE IN PLACE, PER EACH $ _ S m W $ '7i- ° .. E32 90 LF REFL PAVEMENT MARK TY I (W) 4" (BRK) (100MIL) , COMPLETE IN PLACE, PER _ LINEAR FOOT $ d E C- $ E33 235 LF REFL PAVEMENT MARK TY I (W) 8" (SLD) (10 OMIT, ) , COMPLETE IN PLACE, PER LINEAR FOOT $�j $ ° r E34 325 LF REFL PAVEMENT MARK TY T (W) 12" (SLD) (100MIL) , COMPLETE IN PLACE, PER LINEAR FOOT •, :� 3 - --.ti 1 "_y E35 492 LF REFL PAVEMENT MARK TY I (W) 24" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR FOOT $ 1 $ f72 E36 5 EA REFL PAVEMENT MARK TY I (W) (ARROW) (100MIL), COMPLETE IN PLACE, PER EACH $ "b;-='' $ - " E37 3 EA REFL PAVEMENT MARK TY I (W) (WORD) (100MIL) , COMPLETE IN PLACE, PER EACH $ B $ c''' e...: E38 550 LF REFL PAVEMENT MARK TY I (Y) 4" (SLD) (100MIL), COMPLETE IN PLACE, PER LINEAR .FOOT . ,4E Proposal Form Page 22 of 29 E39 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 20.04 PROJECT 6488 E40 REFL PAVEMENT MARK TY I (Y) 24" (SLD) (100MIL), COMPLETE IN.PLACE, PER 42 LF LINEAR FOOT 90 LF E41 235 LF REFL PAVEMENT MARK TY II (W) 4 ". (BRK), COMPLETE IN PLACE, PER LINEAR FOOT E42 E43 325 LF 492 LF REFL PAVEMENT MARK (SLD), COMPLETE IN FOOT REFL PAVEMENT MARK (SLD), COMPLETE IN FOOT REFL PAVEMENT MARK (SLD), COMPLETE IN FOOT TY II (W) 8" PLACE, PER LINEAR $ TY II (W) 12" PLACE, PER LINEAR TY II (W) 24" PLACE, PER LINEAR E44 5 EA E4 5 3 EA E46 550 LF E47 42 LF E48 140 LF E49 230 LF E50 41 LF E51 1 EA 3 EA 2 EA 1 EA REFL PAVEMENT MARK COMPLETE IN PLACE, REFL PAVEMENT MARK COMPLETE IN PLACE, REFL PAVEMENT MARK (SLD), COMPLETE IN FOOT REFL PAVEMENT MARK TY II (Y) 24" (SLD) , COMPLETE IN PLACE, PER LINEAR FOOT ELIM PAVEMENT MRK COMPLETE IN PLACE, ELIM PAVEMENT MRK COMPLETE IN PLACE, ELIM PAVEMENT MRK COMPLETE IN PLACE TY II (W) (ARROW), PER EACH TY II (W) (WORD), PER EACH TY II (Y) 4" PLACE, PER LINEAR & MRKS (4 "), PER LINEAR FOOT & MRKS (12 "), PER LINEAR FOOT & MRKS (24 "), PER LINEAR FOOT INSTALL HIGHWAY TRAFFIC SIGNAL (ISOLATED), COMPLETE IN PLACE, PER EACH `s $ REGULATORY SIGN PANEL (R3 -8 —VAR), COMPLETE IN PLACE, PER EACH REGULATORY SIGN PANEL (R10- 12/R10- MOD), COMPLETE IN PLACE, PER EACH E52 E53 TRAFFIC SIGNAL CONTROLLER /CABINET, COMPLETE IN PLACE, PER EACH TRAFFIC SIGNAL CONTROLLER FOUNDATION, 1 EA COMPLETE IN PLACE, PER EACH 250 WHPS LUMINAIRE, COMPLETE IN 2 EA PLACE, PER EACH WIND DAMPENER, COMPLETE IN PLACE, PER 2 EA EACH BACK PLATE (121N) (3 SECTION) , 6 EA COMPLETE IN PLACE, PER EACH BACK PLATE (12IN) (5 SECTION), 1 EA COMPLETE IN PLACE, PER EACH Proposal Form Page 23 of 29 $ 14 °L,I. $ 1 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT 6488 E54 1 EA VEHICLE SIGNAL SECTION (121N) LED (GREEN ARROW), COMPLETE IN PLACE, PER EACH $ $ 2-.c:.'0 ':s o'..> E55 7 EA VEHICLE SIGNAL SECTION (12IN). LED (GREEN) , COMPLETE IN PLACE, PER EACH $,, $ Iu L,''' E56 1 EA VEHICLE SIGNAL SECTION (12IN) LED (YELLOW ARROW), COMPLETE IN PLACE, PER EACH $ ,?7::.- $ 21z;- E57 7 EA VEHICLE SIGNAL SECTION (12IN) LED (YELLOWY, COMPLETE IN PLACE, PER EACH $ 2Ac:: - $ 4, " E58. 7 EA VEHICLE SIGNAL SECTION (12IN) .LED (RED)I• COMPLETE IN FLACE, PER EACH a, 9 $ Col $ (2.5s— °"S• 9 309 LF TRAFFIC•SIGNAL CABLE (TY A) (14 AWG) (4 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR FOOT $ k , $ 1 -' ` E60 406 LF TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (7 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR FOOT $ I °.—_ E61 500 LF TRAFFIC SIGNAL CABLE (TY A) (14 AWG) (16 CONDUCTOR), COMPLETE IN PLACE, PER LINEAR FOOT o shy`, $ I- $ ci '5— E62 1 EA INSTALL TRAFFIC SIGNAL POLE•ASSEMBLY (S) 1 ARM (28') LUMINAIRE AND ILSN, COMPLETE IN PLACE, PER EACH _ �:, $'�Ia' $ 1 ,1' E63 1 EA INSTALL TRAFFIC SIGNAL. POLE ASSEMBLY (5) 1 ARM (32') ILSN, COMPLETE IN PLACE, PER EACH q. $ 5S-CL'. $ 5`s `.:,,, . E64 1 EA INSTALL TRAFFIC SIGNAL POLE ASSEMBLY (S) 1 ARM (36') LUMINAIRE AND ILSN,,Y COMPLETE IN PLACE, PER EACH $ I t E�'.2 $ U J, -'°' E65 1 EA REMOVING TRAFFIC SIGNALS, PER EACH $ - 2. -%Q-'. $ ill E6 6 3 EA LED ILSN (6 S), COMPLETE IN PLACE, PER EACH G- $ 3`'' �` ,;, $�`0° $ ,, t 4_,!� $ 7f.c. is E67 1 EA MICROWAVE DETECTION PROCESSOR SYSTEM, COMPLETE IN PLACE, PER. EACH E68 3 EA MICROWAVE DETECTION-ASSEMBLY, COMPLETE IN PLACE, PER EACH E69 1 EA MICROWAVE DETECTION SET —UP SYSTEM, COMPLETE IN PLACE,PER EACH —,b $ .`� $ =r(.; E70 . 515 LF MICROWAVE DETECTOR COMM AND POWER CABLE (CAT 5—E 4C TWISTED PAIR, 24 AWG), COMPLETE IN PLACE,PER LINEAR $..° c-.-- $ e: �' �`� FOOT E71 180 LF CCTV CAMERA #18 2C CABLE POWER, COMPLETE IN PLACE, PER LINEAR FOOT ,q .:' 1 $ „77 E72 180 LF CCTV CAMERA COAXIAL CABLE COMM, COMPLETE IN PLACE, PER LINEAR FOOT 1-1 $ $ -7 2.'. E73 1 EA PAN- TILT -ZOOM CCTV CAMERA, COMPLETE IN PLACE, PER EACH , $ �� ¢ $;. • E74 1 EA ETHERNET SWITCH WITH POWER CORD, PER - EACH $ ' b $ L--T J- Proposal Form Page 24 of 29 TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT 6488 LL L E75 1 EA BATTERY BACK -UP SYSTEM, COMPLETE IN PLACE, PER EACH M1�F, �' , ` ' °' c ""` * Subsidiary to Item E51 SUB - -TOTAL PART E - GOLLIHAR ROAD AND PRESCOTT STREET Bid Items (E1-75): $ frifido&gc Proposal Form Page 25 of 29 TRAFFIC SIGNALS (NEW AND'SYNCHRONIZATION) BOND 2004 PROJECT 6488 BASE ALTERNATE BID PART A (ITEMS A1-66) PART B (ITEMS B1-58) PART C (ITEMS C1 -74) PART D (ITEMS D1 -73) TOTAL BASE Bid (PARTS A +B +C +D) ADDITIVE ALTERNATE BID PART E (ITEMS E1 -75) BID SUMMARY �l $ N':l ,Lek /$2au.,Lck4 35, 1507 ci $ qQ2 3,2'1 f -710iL °V D/ Proposal Form Page 26 of 29 IL TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 PROJECT 6488 The undersigned hereby declares that he has visited the site and has carefully examined the plans, specifications and contract documents relating to the work covered by his bid or bids, that he agrees to do the work, and that no representations made by ,the City are in any sense a warranty but are mere estimates for the guidance of the Contractor. Upon notification of award of contract, we will within ten (10) calendar days execute the formal contract and will deliver a Performance Bond (as required) for the faithful performance of this contract and a Payment Bond (as required) to insure payment for all labor and materials. The bid bond attached to this proposal, in the amount of 5% of the highest amount bid, is to become the property of the City of Corpus Christi in the event the contract and bonds are not executed within the time above set forth as liquidated-damages for the delay and additional work caused thereby.. Minority /Minority Business Enterprise Participation: The apparent low bidder shall, within five days of receipt of bids, submit to the City Engineer, in writing, the names and addresses of MBE tirms participating in the contract and a description of the work to be performed and its dollar value for bid evaluation purpose. Number of Signed Sets of Documents: The contract and all bonds will be prepared in not less than four counterpart (original signed) sets. Time of Completion: The undersigned agrees to complete the work within 120. calendar days for Base Alternate, and an additional 30 calendar days tor Additive Alternate, if awarded, from the date designated by a Work Order. The undersigned further declares that he_will provide all necessary tools and apparatus, do all the work and furnish all materials and do everything required to carry out the . above mentioned work covered by this proposal, in strict accordance with the contract documents and the requirements pertaining thereto, for the sum or sums above set forth. number) : Receipt of the following addenda is acknowledged (addenda (SEAL - IF BIDDER IS a Corporation) Respectfully Name: By: bm t,V (SIGNATURE) 1/�I J Address : / 3 .O Box) (Stree N zt, 7190 (City) (State) _ (Zip) Telephone: _ -r - �cr� NOTE: Do not detach bid from other papers. Pill in with ink and submit complete with attachod papers. Proposal Form Page 27 of 29 (Revised August 2000) PAYMENT BOND STATE OF TEXAS § COUNTY OF NUECES § KNOW ALL BY THESE PRESENTS: BOND No. (Q1MG That Austin Traffic Signal Construction Co., Inc. of the City of Pflugerville, County of Travis, and State of Texas , as principal ( "Principal "), and LIBERTY MUTUAL INSURANCE COMPANY" , a solvent company duly authorized under the laws of the State of Texas to act as surety on bonds for principals ( "Surety "), are held and firmly bound unto the City of Corpus Christi, a Home Rule municipal corporation of Nueces County, Texas ( "City" or "OWNER "), and unto all Subcontractors, workers, laborers, mechanics and suppliers as their interests may appear, all of whom shall have a right to sue upon this bond in the penal sum of NINE HUNDRED THOUSAND, THREE HUNDRED FORTY -EIGHT AND 44/100 U.S. Dollars ($ 900,348.44 U.S.) to be paid in Nueces County, Texas, for the payment of which sum well and truly to be made, We, said Principal and Surety, bind ourselves and our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: Conditions of this bond are such that, whereas, Principal has entered into a certain written contract with the City of Corpus Christi (OWNER), dated the 27TH day of MARCH, 2012 which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein, for the construction of: TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 - PROJECT NO. 6488 (TOTAL BASE BID + ADD.ALT.BID: $900,348.44) Now, therefore, the condition of this obligation is such, that if said Principal shall well and truly pay all Subcontractors, workers, laborers, mechanics and suppliers, all monies to them owing by said Principals for subcontracts, work, labor, equipment, supplies and materials done and furnished for the construction of improvements of said Agreement, then this obligation shall be and become null and void; otherwise to remain in full force and effect. Surety, for value received, stipulates and agrees that no change to the contract time or contract amount, and no alteration or addition to the terms of the contract, or to the work performed thereunder, or to the plans, specifications, drawings, etc., accompanying the same shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. (Rev. Date May 2611) Payment Bond Page 1 of 3 IL.. Provided further, that this bond is executed pursuant to Chapter 2253, Texas Government Code, as amended. Provided further, that if any legal action be filed on this bond, venue shall lie in Nueces County, Texas. The undersigned agent is hereby designated by the Surety as the Resident Agent in Nueces County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship, as provided by Sections 3503.001 to 3503.005, Texas Insurance Code, as amended. In witness whereof, said Principal and Surety have signed and sealed this instrument in 4 copie , each one of which shall be deemed an original, this the day of � 1 i , 2012. n 'J By: � ( c �C , cs"OL6..- jr()P� Title: ij ' ATTEST: Secreta ry 7izia,(hz SURETY ! EM MUTUAL INSURANCE 00.4.4?-A, By: 11 I orney -in -fact Christine Davis. Address:4(0 [ � c Address: 11"} zet-Ke4ek\ St 7 e �c) ticipalilth (Da) L.0 (Rev. Date May 2011) Telephone: is q50 C� Fax: E -Mail: Payment Bond Page 2 of 3 Name and address of Resident Agent of Surety in Nueces County, Texas, for delivery of notice and service of process: Name: Agency: Address: PAVm NrdQn 6JrdeA Vn NUT\LC\OQS X &■rn McOni eO ia, q-°1 C1°r (Physical Street Address) 0i3\ aft) 1 I A 118q pi (City) (State) (Zip) Telephone: ?mo-i'g g -2j E -Mail: Note: Bond shall be issued by a solvent Surety company authorized to do business in Texas, and shall meet any other requirements established by law or by OWNER under applicable law. Note: Surety Agent's Original Power of Attorney must be attached hereto. Note: Date of Payment Bond must not be prior to date of contract. END Rev. Date May 2011 Payment Bond Page 3 of 3 STATE OF TEXAS PERFORMANCE BOND § BOND No. (:)1gok114et COUNTY OF NUECES § KNOW ALL BY THESE PRESENTS: That Austin Traffic Signal Construction Co., Inc. of the City of Pflu erville, County of Trav's , and State of Texas , as principal ( "Principal "), and kw:ag(\ 4 .viJ . , a solvent company duly authorized under the laws of the State of Texas to acf as s rety on bonds for principals ( "Surety "), are held and firmly bound unto the City of Corpus Christi, a Home Rule municipal corporation of Nueces County, Texas ( "City" or "OWNER "), in the penal sum of NINE HUNDRED THOUSAND, THREE HUNDRED FORTY -EIGHT AND 44/100 U.S. Dollars ($ 900,348.44 U.S.) to be paid in Nueces County, Texas, for the payment of which sum well and truly to be made, We, said Principal and Surety, bind ourselves and our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: Conditions of this bond are such that, whereas, Principal has entered into a certain written contract with the City of Corpus Christi (OWNER), dated the 27TH of MARCH , 2012, which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein, for the construction of: TRAFFIC SIGNALS (NEW AND SYNCHRONIZATION) BOND 2004 - PROJECT NO. 6488 (TOTAL BASE BID + ADD.ALT.BID: $900,348.44) Now therefore, the condition of this obligation is such, that if said Principal shall faithfully perform said Agreement in accordance with the plans, specifications and contract documents, including any changes, extensions, or guarantees, and including all and singular covenants, conditions, and agreements in and by said contract agreed and covenanted by Principal to be observed and performed, and according to the true intent and meaning of said Agreement hereto annexed, and if the Principal shall-repair and /or replace all defects due to faulty materials and/or workmanship that appear within a period of one (1) year from the date of completion and acceptance of improvements by the City(OWNER), then this obligation shall be void; otherwise to remain in full force and effect. Surety, for value received, stipulates and agrees that no change to the contract time or contract amount, and no alteration or addition to the terms of the contract, or to the work performed thereunder, or to the plans, specifications, drawings, etc., accompanying the same shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. (Rev. Date May 2011) Performance Bond Page 1 of 3 IJ Provided further, that this bond is executed pursuant to Chapter 2253, Texas Government Code, as amended. Provided further, that if any legal action be filed on this bond, venue shall lie in Nueces County, Texas. The undersigned agent is hereby designated by the Surety as the Resident Agent in Nueces County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship, as provided by Sections 3503.001 to 3503.005, Texas Insurance Code, as amended. In witness whereof, said Principal and Surety have signed and sealed this instrument in copies, each one of which shall be deemed an original, this the 13 day of ��� , 2012. By: Title: ATTEST: Address: ,--*(kI c , QN4 i(5 ---JEIG6 (Rev. Date May 2011) SURETY LIBERTY MUTUAL INSURANCE COMki LI . By. 1►►. a %It Attorney-in-fact Christine "' Ivis Address: 11 l. rY1Q,1 3t b_)=s),6x\ b1 \15, Telephone: (J2 Fax: E -Mail: Performance Bond Page 2 of 3 Name and address of Resident Agent of Surety in Nueces County, Texas, for delivery of notice and service of process: Name: Agency: �\1eir\ F.�Aen den 1(\ on , Address: 9\k) t (` VIM" (Physical Street Address) Telephone: E -Mail: @OWL @\ ilV ei (Cit (State) (Zip) p) g - [o Note: Bond shall be issued by a solvent Surety company authorized to do business in Texas, and shall meet any other requirements established by law or by OWNER under applicable law. Note: Surety Agent's Original Power of Attorney must be attached hereto. Note: Date of Performance Bond must not be prior to date of contract. END (Rev. Date May 2011) Performance Bond Page 3 of 3 7 trio- t#3Z -tiz4u Detween a:uu am di-1U 4:3u pin : c:0 r SUPPLIER NUMBER TO BE ASSIGNED BY CITY PURCHASING DIVISION CITY OF CORPUS CHRISTI DISCLOSURE OF INTEREST City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. if the question is not applicable, answer with "NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: Austin Trathc Signal Construction Co, 1m P. O. BOX: STREET A /1 Pi& Inb FIRM IS: 1. Corporation 4. Association CITY: fo ZIP :ti 2. Partnership ❑ 3. Sole Owner 6. Other ❑ DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each 'employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Job Title and City Department (if known) 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant Proposal Form Page 28 of 29 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City officials employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -349 (d)1 CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: .�r�,' Title: , Signature of Certifyin Person: DEFINITIONS Date: eras -/L a. "Board member. "A member of any, board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the. City of Corpus Christi, Texas either on a full or part - time basis, but not as an independent contractor. d.. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship; as self - employed person, partnership, corporation, joint stock company, joint venture, receivership or . trust, and entities which for purposes of taxation are treated as non- profit organizations. e. "Official. "The Mayor, members of the City Council, City Manager; Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest. "Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established .through voting trusts, proxies, or special terms of venture or partnership agreements." "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. g. Proposal Form Page 29 of 29 ....VP OUT. ITaI V7 P+lUO 11 I MK ACORD. CERTIFICATE OF LIABILITY INSURANCE DATE(MM,DDryyYY) 4113/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER US! Southwest Austin 7600 -B N. Capital of TX Hwy #200 Austin, TX 78731 512 451 -7555 CONTACT NAME: PHONE Fax No, Ext): 512 451 -7555 jA,c, No): 512 467.0113 E-MAIL ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # 16535 _ INSURER A : Zurich American Insurance Co. INSURED �r Austin Traffic Signal Construction ti Co., Inc. & ATS Drilling, Inc. P.O. Box 130 Round Rock, TX 78680 INSURER a: American Guarantee & Liability 26247 INSURER c : Federal Insurance Company 20281 INSURER D INSURER E CLAIMS -MADE INSURER F : OCCUR - CERTIFICATE NUMBER: • THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITFONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR GENERAL X TYPE OF INSURANCE LIABILITY ,v( COMMERCIAL GENERAL LIABILITY ADDL INSR SUBR 4WD POLICY NUMBER GL0483972300 . POLICY EFF (MM,DDIYYYY) POLICY EXP (MMIDDIYYYY) LIMITS A 03/01/2012 03/01/2013 EACH OCCURRENCE $1,000,000 PR MISE50(Ea alloeurrence) $100,000 $10,000 CLAIMS -MADE X OCCUR - MED EXP (Any one person) Dedt: -0- PERSONAL 8 ADV INJURY $ 1,000,000 GENERAL AGGREGATE \I $2,000,000 GENII AGGREGATE POLICY X LIMIT APPLIES JECT PRO PER: LOC PRODUCTS - COMP/OP AGG $ 2,000,000 $ A AUTOMOBILE X _AUTOS X LIABILITY ANY AUTO ALL OWNED HIRED AUTOS X / SCHEDULED AUTOS AUg ED BAP483972400 03101 /2012 03/01/2013 ( a$adeDtSINGLELIMIT 1,000,000 BODILY INJURY (Per person) .d BODILY INJURY (Per accident} $ PROPERTY DAMAGE (Per accident) $ $ g X UMBRELLA UAB EXCESS LIAR X OCCUR V CLAIMS -MADE AUC549084900 f' 03/01/2012 03/01/2013 EACH OCCURRENCE $20,000,000 $20,000,000 $ AGGREGATE DED RETENT ON $ I b/ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETORIPARTNERJEXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below Y! N N N ! A WC483972200 03101 /2012 03/01/2013 X WC STATU- TORYilMITS OTH_ ER E.L. EACH ACCIDENT $1,000,000 $1,000,000 $1,000,000 ,_ / E.L. DISEASE - EA EMPLOYEE E.L. DISEASE - POLICY LIMIT C Installation / Floater 06639633 04/14/2012 03/01/2013 $350,000 limit $1,000 deductible DESCRIPTION OF OPERATIONS I LOCATIONS ! VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space is required) Re: Job #1379, Project #6488, Traffic Signals (New and Synchronization) Bond 2004 l I City of Corpus Christi is included as an additional insured on the General Liability, Automobile Liability and Umbrella Liability policies as required by written contract. City of Corpus Christi is included as loss payee on the Installation Floater. City of Corpus Christi Department of Engineering Services Attn: Contract Administrator P.O. Box 9277 Corpus Christi, TX 78469 -9277 CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE © 1988 -2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) 1 of 1 The ACORD name and logo are registered marks of ACORD #S71456841M7145575 SXVZP This page has been left blank intentionally: Additional Insured — Automatic — Owners, Lessees Or Contractors ZURICH Policy No. Eff. Date of Pal. Exp. Date of Pol. Eff. Date of End. Producer No. Add'I. Prem Return Prem. GL0483972300 03/01/2012 03/01/2013 03101/2012 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Named Insured: Address (including ZIP Code): This endorsement modifies insurance provided under the: se Commercial General Liability Coverage Part A. Section II — Who Is An Insured is amended to include as an insured any person or organization who you are required to add as an additional insured on this policy under a written contract or written agreement. B. The insurance provided to the additional insured person or organization applies only to "bodily injury ", "property damage" or "personal and advertising injury' covered under Section I — Coverage A — Bodily Injury And Property Damage Liability and Section 1— Coverage B — Personal And Advertising Injury Liability, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf, and resulting directly from your ongoing operations or your work" as included in the "products- completed operations hazard ", which is the subject of the written contract or written agreement. C. However, regardless of the provisions of Paragraphs A. and B. above: 1. We will not extend any insurance coverage to any additional insured person or organization: a. That is not provided to you in this policy; or b. That is any broader coverage than you are required to provide to the additional insured person or organization in the written contract or written agreement; and 2. We will not provide Limits of Insurance to any additional insured person or organization that exceed the lower of: a. The Limits of Insurance provided to you in this policy; or b. The Limits of Insurance you are required to provide in the written contract or written agreement. D. The insurance provided to the additional insured person or organization does not apply to: "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering or failure to render any professional architectural, engineering or surveying services including: 1. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; and 2. Supervisory, inspection, architectural or engineering activities. Includes copyrighted material of Insurance Services Office, Inc., with its permission. U -GL- 1175 -0 CW (10/11) Page 1 of 2 E. The additional insured must see to it that: 1. We are notified as soon as practicable of an "occurrence" or offense that may result in a claim; 2. We receive written notice of a claim or "suit" as soon as practicable; and 3. A request for defense and indemnity of the claim or "suit" will promptly be brought against any policy issued by another insurer under which the additional insured may be an insured in any capacity. This provision does not apply to insurance on which the additional insured is a Named Insured, if the written contract or written agreement requires that this coverage be primary and non - contributory. F. For the coverage provided by this endorsement 1. The following paragraph is added to Paragraph 4.a. of the Other Insurance Condition of Section IV — Commercial General Liability Conditions: This insurance is primary insurance as respects our coverage to the additional insured person or organization, where the written contract or written agreement requires that this insurance be primary and non - contributory with respect to any other policy upon which the additional insured is a Named Insured. In that event, we will not seek contribution from any other such insurance policy available to the additional insured on which the additional insured person or organization is a Named Insured. 2. The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition of Section IV — Commercial General Liability Conditions: This insurance is excess over: Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same "occurrence", offense, claim or "suit ". This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by written contract or written agreement to provide coverage to the additional insured on a primary and non- contributory basis. G. This endorsement does not apply to an additional insured which has been added to this policy by an endorsement showing the additional insured in a Schedule of additional insureds, and which endorsement applies specifically to that identified additional insured. All other terms and conditions of this policy remain unchanged. Includes copyrighted material of Insurance Services Office, Inc., with its permission. U- GL- 1175 -D CW (10111) Page 2of2 POLICY NUMBER: BAP483972400 \1 COMMERCIAL AUTO CA 20 48 02 99 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. r DESIGNATED INSURED This endorsement modifies insurance provided under the following: ` BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are ''insureds" under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Endorsement Effective: 03/01/2012 Countersigned By: (Authorized Representative) Named Insured: SCHEDULE Name of Person(s) or Organization(s): Only those where required by written contract executed prior to Toss. (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to the endorsement.) Each person or organization shown in the Schedule is an "insured" for Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. CA 20 48 02 99 Copyright, Insurance Services Office, Inc., 1998 CA 983 (2 -99) Page 1 of 1 inland Marine Insurance CHHU 13113 Endorsement Policy Period April 14, 2012 to April 14, 2013 Effective Date April 14, 2012 Policy Number 06639633 Insured Austin Traffic Signal Construction Co., Inc. Name of Company Federal Insurance Co. Date Issued April 14, 2012 swIfflerM This Endorsement applies to the Following forms: CONTRACTORS EQUIPMENT, INSTALLATION FLOATER & EDP Blanket Loss Payee inland Marine Insurance Under Conditions, and only with respect to the form shown above, the Loss Payable section is deleted and replaced by: Loss Payee For covered property in which both you, and a Loss Payee: shown in the Schedule of Loss Payees; or listed as such on a Certificate of Insurance on file with us, have an insurable interest, as evidenced in a written document created prior to Toss or damage, we will: adjust losses with you; and pay any claim for loss or damage jointly to you and the Loss Payee, as interests may appear. Such Certificate of Insurance does not modify this contract. All other terms and conditions remain unchanged. • Authorized Representative BLANKET LOSS PAYEE last page Form 04 -02 -0859 (Ed. 6-99) Endorsement Page f Notification to Others of Cancellation ZURICH Policy No. Eff. Date of Pol. Exp. Date of Pol. Eff. Date of End. Producer No. Addl. Prem Return Prem. GL0483972300 3/1/2012 3/1/2013 5/1/2012 36349 -000 N/C THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part Liquor Liability Coverage Part Products /Completed Operations Liability Coverage Part A. If we cancel this Coverage Part(s) by written notice to the first Named Insured for any reason other than nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation: 1. To the name and address corresponding to each person or organization shown in the Schedule below; and 2. At least 10 days prior to the effective date of the cancellation, as advised in our notice to the first Named Insured, or the longer number of days notice if indicated in the Schedule below. B. If we cancel this Coverage Part(s) by written notice to the first Named Insured for nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation to the name and address corresponding to each person or organization shown in the Schedule below at least 10 days prior to the effective date of such cancellation. C. If notice as described in Paragraphs A. or B. of this endorsement is mailed, proof of mailing will be sufficient proof of such notice. All other terms and conditions of this policy remain unchanged. Includes copyrighted material of Insurance Services Office, Inc., with its permission. U- GL- 1446 -A CW (05110) Page 1 of 1 SCHEDULE Name and Address of Other Person(s) 1 Organization(s): Number of Days Notice: City of Corpus Christi Dept. of Engineering Services Attn: Contract Administrator P.O. Box 9277 Corpus Christi, TX 78469 -9277 / / �� 30 . All other terms and conditions of this policy remain unchanged. Includes copyrighted material of Insurance Services Office, Inc., with its permission. U- GL- 1446 -A CW (05110) Page 1 of 1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY 1/1IC 99 06 35 NOTIFICATION TO OTHERS OF CANCELLATION OR NONRENEWAL ENDORSEMENT This endorsement is used to add the following to Part Six of the policy. PART SIX CONDITIONS A. If we cancel or non -renew this policy by written notice to you for any reason other than nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation or non- renewal to the name and address corresponding to each person or organization shown in the Schedule below. Notification to such person or organization will be provided at least 10 days prior to the effective date of the cancellation or non- renewal, as advised in our notice to you, or the longer number of days notice if indicated in the Schedule below. B. if we cancel this policy by written notice to you for nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation to the name and address corresponding to each person or organization shown in the Schedule below at least 10 days prior to the effective date of such cancellation. C. If notice as described in Paragraphs A. or B. of this endorsement is mailed, proof of mailing will be sufficient proof of such notice. All other terms and conditions of this policy remain unchanged. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 5/1/2012 Policy No. WC4839722 -00 Insured: Austin Traffic Signal Construction Co., Inc. Insurance Company: Zurich American Insurance Co. WC 99 06 35 (Ed. 05 -10) Endorsement No. Premium $ N/C Includes copyrighted material of National Council on Compensation Insurance, Inc. with its permission. Page 1 of 1 SCHEDULE Name and Address of Other Person(s) / Organization(s): Number of Days Notice: City of Corpus Christi V 30 Department of Engineering Services Attn: Contract Administrator Pf ,, P.O. Box 9277 Corpus Christi, TX 78469 -9277 All other terms and conditions of this policy remain unchanged. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 5/1/2012 Policy No. WC4839722 -00 Insured: Austin Traffic Signal Construction Co., Inc. Insurance Company: Zurich American Insurance Co. WC 99 06 35 (Ed. 05 -10) Endorsement No. Premium $ N/C Includes copyrighted material of National Council on Compensation Insurance, Inc. with its permission. Page 1 of 1 Inland Marine Insurance Endorsement Policy Period APRIL 14, 2012 TO MARCH 1, 2013 Effective Date MAY 1, 2012 Policy Number 0663 -96 -33 HOU tf' Insured AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO . ; Name of Company FEDERAL INSURANCE COMPANY Date Issued MAY 10, 2012 This Endorsement applies to the following forms: OPEN INSTALLATION FLOATER It is agreed that the following Loss Payee is hereby added. City of Corpus Christi Department of Engineering Services Attn: Contract Administrator P.O. 9277 Corpus Christi, TX 78469 -9277 7 It is further agreed that 30 days notice of cancellation, except 10 days for non payment shall be given with respect to the the above Loss Payee only. All other terms and conditions remain unchanged. Authorized Representative I Li inland Marine insurance LOSS PAYEE/ 30 NOG Reference Copy last page Fpnn 04. 02-0859 (Ed. 6-99) Endorsement Page 1