HomeMy WebLinkAboutC2012-145 - 5/17/2012 - NACITY OF CORPUS CHRISTI
AMENDMENT NO. 2
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "City ", and CH2M HILL agree to the following
amendments to the Contract for Engineering Services for ADA Improvements Group 3 BOND ISSUE
2008 (Project No. E11014) and Accessible Routes in Community Development Block Grant
I(CDBG) FY 2010 (Project No. 10066) , as authorized and administratively amended by:
Original Contract
November 17, 2009
1 Motion No. M2009 -324
$326,715.00
Amendment No. 1
July 12, 2011
1 Motion No. M2011 -145
$392,323.00
EXHIBIT "A ", SECTION 1. SCOPE OF ENGINEERING SERVICES, PART A. BASIC SERVICES, shall
be amended to include supplemental Basic Services, as specified on the attached Exhibit "A"
and Exhibit "A -1
EXHIBIT "A ", SECTION 1. SCOPE OF ENGINEERING SERVICES, PART B. ADDITIONAL
SERVICES, shall be amended to include supplemental Additional Services, as specified on the
attached Exhibit "A" and Exhibit "A -1 ".
EXHIBIT "A ", SECTION 3. FEES, shall be amended as specified on Exhibit "B" Summary of Fees.
All other terms and conditions of the November 17, 2009 contract between the City and Engineer, and of
any amendments to that contract, which are not specifically addressed herein shall remain in full force
and effect.
CITY OF CORPUS CHRISTI
Oscar R. Martinez,�� Date
Assistant City Manager
RECOMMENDED
rO /.z
Daniel Biles, P. E., Date
Interim Director f Engineering Services
Al,,, AA,, .- s A h Z,
CH2M HILL
Sidney A. Fads, Date
Vice President
210 S. Carancahua, Suite 200
Corpus Christi, TX 78401
(361) 888 -8100 Office
(361) 888 -8600 Fax
CDBG Senior Management Assistant
APPR VED AS TO FORM
� � 4-qw � av
Office of Management Date
and'Budget fn
2012 -145 Date
5117/12
Page 1 of 2
CH2M Hill 32 ADA IMPS BOND ISSUE 200&GOLDSTON ENGINEERING E090504AMENDMENT NO. ZI AMENDMENT NO.2.DOG
JNDEXED
ATTEST
Armando Chapa, City Secretary
Project
Fund Source Number
Amount
CDBG Accessible Routes in CDBG Residential Areas
Phase 1
530000- 1059- 00000-
$3,130.00
Project No. 10066
851109
CDBG Accessible Routes in CDBG Residential Areas
Phase 2
550950- 1059- 00000-
9,205.00
Project No. 10066
851209
Total of Amendment No. 2
$12,335.00
Encumbrance Number: E10066ACH
41
Page 2 of 2
K NENGINEERING DATAEXCHANGEWELMAPISTREET56462 ADA IMPS BOND ISSUE 20081GOLDSTON ENGINEERING E090501AMENDMENT NO. 251 AMENDMENT NO.2.DOC
CH2M HILL
April 19, 2012
Mr. Dan Biles, P.E.
Director of Engineering Services
City of Corpus Christi
P.O. Box 9277
Corpus Christi, TX 78469 -9277
210 S. Carancehua, Suite 200
Corpus Christi, TX 78401
Tel 361.888.8100
Fax 361.888.8600
PN: 399615
RE: ADA Improvements — Bond Issue 2008 (Group 3 - Project No. E11014) & Community
Development Block Grant (CDBG) Program FY2010 - Accessible Routes in CDBG
Residential Areas Phase I ( Project No. #10066) & Community Development Block
Grant (CDBG) Program FY2011 - Accessible Routes in CDBG Residential Areas
Phase II ( Project No. #10066)
AMENDMENT NO.2
Dear Mr. Biles:
Please accept this letter as our proposal to amend our original and amended contract to increase
the authorized amount for ADA Improvements Bond 2008 and Accessible Routes in CDBG
Residential Area Phase I and Phase II.
The added location for CDBG Residential Area Phase 11 is approximately 2630 linear feet of five
foot sidewalk with approximately 6 curb ramps located on Flour Bluff Drive from South Padre
Island Drive to Sunbird Street. This amendment would provide funds for topographical survey of
the area and design of sidewalk and curb ramps.
This amendment also addresses an increase to the original and amended contract to augment
funding for the redesign and topographical survey for the CDBG Residential Area Phase I
locations on Live Oak Drive, as redesign and additional topographical survey is required due to
revisions to the desired sidewalk locations.
A total additional engineering fee of $12,335.00 will be needed for the design and topographical
surveys included in this Contract Amendment No. 2.
The following are the proposed changes to the original, executed contract.
1. Scope of Services: The Scope of Services has been revised to include the design of 2630
additional linear feet of five foot sidewalk and six curb ramps; as well as the detailed
topographical survey of approximately 3130 linear feet for four to five foot sidewalks,
AMD. NO. 2
EXHIBIT "A"
P:% CITYOFCORPUSCNRISTM99615 ADAU"ROVSGROUP7( OPEN} 1CONTRACTS - CHANCE ORDERSW4ENU WIF:NT5520120319RXHTR1TA.1)0CX Page 1. of 3
ADA Improvements
Bond Issue 2008
Page 2 of 3
inclusive to this is CDBG Residential Area Phase I (500 linear feet on Live Oak Drive) and
CDBG Residential Area Phase II (2630 linear feet on Flour Bluff Drive), see Attachment A -1
Scope of Services.
2. Schedule: Please see the Revised Schedule below:
U :Tool =[A &T93 : I4
DATE
ACTIVITY
July 12, 2011
Notice to Proceed
September 19, 2011
Preliminary Phase/Letter Report
October 3, 2011
Begin Design Phase
wL.,,e...L,e an o
January S, 2012
Pre -Final Submittal
januaFy 6, 2012
May 30, 2012
Final Design
Jana 23, 2012
June 11, 2012
Advertise for Bids
Febp jar . 1 2042
June 20, 2012
Pre -Bid Conference
Fe bfwwy 9,
June 27, 2012
Receive Bids
wA.�.r�
August 2012
Begin Construction
rnFer 2012
February 2013
Construction Completion
3, Fees:
4. Fee For Basic Services: Added to Part 2 — Design Phase (changes are shown in bold).
5. Fee for Additional Services: Added to Survey Topographic Services (changes are
shown in bold).
6. Summary of Fees: See the following tables for an explanation of the additional fees
(changes are shown in bold).
P: SCI TYOFCORPL ISCHRN ST113996L5ADAIMPROV%GROUP3( OPEN= NT F, AC - rS- CL1ANGE_ORDER5VINIENDMEN =0120419 EXHIBIT A.DOCX
AMD. NO. 2
EXHIBIT "A"
Page 2 of 3
ADA Improvements
Bond Issue 2008
Summary of Fees Table: Changes are shown in bold text.
Page 3 of 3
Very truly yours,
CH2M HILL
TBPE Firm No.: 2297
�R , Ax� —
Sidney A. Faas, P.E.
Vice President
SAF /lp
P: 4CIIYOFCORPUSCHRIST1 5399615AUAIMPROVSGROUP3 (OPEMTON7RAM- CHANGE ORDHps A mNDMENI's12ol2 u4 19 EXHIBIT ADOCX
AMD. NO. 2
EXHIBIT "A"
Page 3 of 3
ORIGINAL
CONTRACT
AMD. No. 1
AMID. No. 2
TOTAL
CDBG
131 2008
CDBG Phase I
CDBG Phase 11 BI 2008
ADA Improvements Bond Issue 2008
BASIC SERVICES
1
Preliminary Design Phase
$ 98,435.00
$ -
$ 84,705.00
S
$
$
$ 183,140.00
2
Design Phase
$ 78,460.00
$ 24,010.00
$ 119,575.00
$ 2,000.00
$ 6,475.00
$
$ 230,520.00
3
Bid Phase
$ 3,200.00
$ -
$ 8,370.00
$ -
$
$
$ 11,570.00
4
Construction Phase
$ 22,020.00
$ -
$ 23,185.00
$
$
$
$ 45,205.00
SUBTOTAL
OF BASIC SERVICES
$ 202,115.00
$ 24,010.00
$ 235,835.00
S 2,000.00
$ 6,475.00
$
$ 470,435.00
ADDITIONAL SERVICES
SumeyTupographicSemices (AuthorimionRequired)
$ 73,000.00
$ 4,400.00
$ 110,000.00
$ 1,130.00
$ 2,730.00
$
$ 191,260.00
2
13
5umeyROWACquisition Se iees(Authoriation Requires)
$ . 8,400.00
$ -
$. 15,200.00
$
$
$
$ 23,600.00
Permitting (Authorized)
$ 2,400.00
$
$ 2,878.00
$
$
$
$ 5,278.00
Construction Observation (Allowance)
$ 40,800.00
$
$ -
$
$
$
$ 40,800.00
Subtotal
of Additional Services
$ 124,600.00
$ 4,400.00
$ 128,078.00
$ 1,130.00
$ 2,730.00
$
$ 260,938.00
TOTAL AUTHORIZED FEE $ 328,715.00
$ 28,410.00
$ 363,913.00
$ 3,130.00
9,205.00
$
$ 731,373.00
Very truly yours,
CH2M HILL
TBPE Firm No.: 2297
�R , Ax� —
Sidney A. Faas, P.E.
Vice President
SAF /lp
P: 4CIIYOFCORPUSCHRIST1 5399615AUAIMPROVSGROUP3 (OPEMTON7RAM- CHANGE ORDHps A mNDMENI's12ol2 u4 19 EXHIBIT ADOCX
AMD. NO. 2
EXHIBIT "A"
Page 3 of 3
EXHIBIT A -1
CITY OF CORPUS CHRISTI
ADA IMPROVEMENTS BOND ISSUE 2008 (GROUP 3)
PROJECT NO. E11014
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM FY 2010
ACCESSIBLE ROUTES IN CDBG RESIDENTIAL AREA PHASE I
PROJECT NO. 10066
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM FY 2011
ACCESSIBLE ROUTES IN CDBG RESIDENTIAL AREA PHASE II
PROJECT NO. 10066
1. SCOPE OF SERVICES:
A. Basic Services
1. Preliminary Phase/Engineering Letter Report — No Change.
2. Desien Phase
Prepare the desigg of approximately 2630 linear feet of five foot sidewalks and six
curb ramps in the CDBG Residential Areas Phase II location Flour Bluff Drive
from South Padre Island Drive to Sun Bird Street. Prepare the redesign of
approximately 500 linear feet of five foot sidewalks and one curb ramp in the CDBG
Residential Area Phase I location on Live Oak Drive, where the desired locations of
sidewalk have been revised.
3. Bid Phase — No Change.
4. Construction Phase — No Change.
B. Additional Services (ALLOWANCE)
This section defines the scope (and ALLOWANCE) for compensation for additional services that
may be included as part of this contract. The Engineer will not begin work on these services
without specific written approval by the Director of Engineering Services. Fees for Additional
Services are an allowance for potential services to be provided and will be negotiated by the
Director of Engineering Services as required. The Engineer will, upon written authorization by
the Director of Engineering Services, do the following:
AMD. NO. 2
EXHIBIT "A -1"
Pagel 02
1. Survey Topoaraphic Services:
a. No Change — The additional curb ramps added to this revised scope will be
considered as part of the original scope of Contract Amendment No. 1.
b. No Change.
C.
CDBG ResidepAial Areas Phase 1 of appr-wifinately 5320 linear- feet of fouf to fiv
Provide detailed topographic
survey of approximately 500 linear feet of four to five foot sidewalks at the
CDBG Phase I location of Live Oak Drive where the desired locations of
sidewalk have been revised. Provide detailed topographic survey of
approximately 2630 linear feet of five foot sidewalks in CDBG Residential
Areas Phase 1I at Flour Bluff Drive from South Padre Island Drive to Sun Bird
Street.
2. Survey Right of Way Services — No Changes.
3. Permitting — No Changes.
4. Construction Observation Services — No Changes.
AMD. NO. 2
EXHIBIT "A -9"
Page 2 of 2
ADA IMPROVEMENTS GROUP 1
BOND ISSUE 2008
PROJECT NO. E09050
SUMMARY OF FEES - CH2M HILL
M M
= rn
@ z
j �v
o -z
,moo
N
ORIGINAL CONTRACT
AMENDMENT NO. 1
AMENDMENT NO. 2
CDBG
Settlement
Agreement
BI X008
TOTAL
CDBG
BI 2008
Total
CDBG Ph. 1
CDBG Ph. 2
Total
TOTAL
10066
E11014
10066
10066
BASIC SERVICES
i
Prelim ina Desi n Phase
$3,937.40
$39,374.00
$55,123.60
$98,435.00
$0.00
$84,705.00
$84,705.00
$0.00
$0.00
$0.00
$183,140.00
2
Design Phase
3,138.40
31,384.00
43,937.60
78,460.00
24,010.40
119,575.00
143,585.00
2,000.00
6,475.00
8,475.00
230,520.00
3
Bid Phase
128.00
1,280.00
1,792.00
3,200.00
0.00
8,370.00
8,370.00
0.00
0.00
0.00
11,570.00
4
Construction Phase
880.80
8,808.00
12,331.20
22,020.00
0.00
23,185.00
23,185.00
0.00
0.00
0.00
45,205.00
Subtotal of Basic Services
8,084.60
80,846.00
113,184.40
202,115.00
24,010.00
235,835.00
259,845.00
2,000.00
6,475.00
8,475.00
470,435.00
ADDITIONAL SERVICES
1
Survey Topographic Services
(Authorized)
2,920.00
29,200.00
40,880.00
73,000.00
4,400.00
110,000.00
114,400.00
1,130.00
2,730.00
3,860.00
191,260.00
2
Survey ROW Acquisition
336.00
3,360.00
4,704.00
8,400.00
0.00
15,200.00
15,200.00
0.00
0,001
0.00
23,600.00
3
Permitting (Authorized)
96.00
960.00
1,344.00
2,400.00
0.00
2,878.00
2,878.00
0.00
0.00
0.00
5,278.00
4
Construction Observation
Allowance
1,632.00
16,320.00
22,848.00
40,800.00
0.00
0.00
0.00
0.00
0.00
0.00
40,800.00
Subtotal of Additional Services
4,984.00
49,840.00
69,776.00
124,600.00
4,400.001
128,078.001
132,478.00
1,130.00
2,730.00
3,860.00
260,938.00
TOTAL AUTHORIZED FEE
$13,068.60
$130,686.00
$182,960.401
$326,715.00
$28,410.001
$363,913.001
$392,323.00
$3,130.001
$9,205.00
$12,335.00
$731,373.00
11/17/09
M2009 -324
ADA Group 1
Project No. E09050
07/12/11
M2011 -145
ADA Group 3
Proj. No. El 1014 ADA Imps B12008
Proj. No. 10066 CDBG Accessible Routes
05/01/12
Administrative Approval
ADA Group 3
Proj. No. 10066 CDBG Accessible Routes
M M
= rn
@ z
j �v
o -z
,moo
N
S T gE AS lY�.'1TY""
PtIItGHASlHl3 DfViSiON
City of CITY OF CORPUS CHRISTI
1 DISCLOSURE OF INTEREST
Citx of Corpus Christi Ordinance 17112 as amended, acquires all persons or firms seeking to do
busyness with the City to provide the following sse Information. Every question must be answered.
If the question is not applicable, answer with `NA ". See reve side for Filing Requirements,
Certifications and definitions.
COMPANY NAME: CH2M Hill, Inc.
F. O. BOX:
STREET ADDRESS: SSS N Camneahua, Tower lI CITY: Corpus Christi ZIP: 78401 .
FIRM IS: 1. Corporation 2. Partnership B 3. Sole Owner ❑
4. Association 5. Other
DISCLOSURE QUESTIONS
If additional space is necessarX please use the reverse side of this ppaagge or attach separate sheet.
I. State the names of each employee" of the City, of Corpus having an "ownership
interest" constituting 3% or more of the ownership in the above named •'firm.
NIA N ame Job Title and City department (if known)
2. State the names of each "ofrcial" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm.
N!A ame Title
3. State the names of each "board member" of the City of Corpus Christi having an "ownership
interest" constituting 3% or more of the ownership in the above named "firm."
NIA Name Board, Commission or Committee
4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi
who worked on any matter related to the subject of this contract and as an ownership
interest" constituting 3% or more of the ownership in the above named "firm."
Name
N/ Consultant
FILING REQUIREMENTS
Ira person who requests, official action on a matter knows that the requested action will confer an
economic benefit on any Cite official or employee that is distinguishabic from the effect that the
action will have on members of the public in general or a substantial segment thereof, you shall
disclose that fact in a signed writing to the City official, employee or body that l,as been
requested to act in the matter, unless the interest of cite City official or employee in the matter is
awarent. The disclosure shall also be made in a signed writing filed wall the City Secretary.
(Uhics Ordinance Section 2 -349 (d)]
I certi that all information provid CERTIFICATION provided is true and correct as ol'thc date of this statement, that
havc not Knowingly withheld disclosure of any infannation requested. and that supplemental
statements will be promptly submitted to the City of Corpus Christi. Texas as changes occur.
Certifying Person: Sidney A. Faas
(T)W or Met)
Title: Vice President
Signature of Certifying iJ DWe:
Person:
d 17"31 —
DEFINITIONS
a. "Board nnember." A mcnther of any board, commission. or committee appointed by the
City Council of the City of Corpus Christi. Texas.
b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to
have an effect on that interest that is distinguishable from its effect on members of the public
in general or a substantial segment thereof.
C. "Employee:' Any person employed by the City of Corpus Christi. Tcsas either on a fall or
part -time basis. but not as an independent contractor.
d. 'Tirm:' Any entity operated for economic gain, wheilver professional, industrial or
commercial, and whether established to produce or deal with a product or service, including
but not limited to, entities operated in the form of sole proprietorship, as stir- employed
person, partnership, corporation, joint stock company, joint venture. receivership or trust, and
entities which for purposes of tatation are treated as non - profit organizations.
e. "Official." 1'lte Mayor, members of the City Council, City Manager, Deputy City
Manager. Assistant City Managers, Department and Division I•leads. and Municipal Court
Judges of the City of Corpus Christi, Texas.
r. "Ownership Interest:' I..cgal or equitable interest, whether actually or constructively held,
in a firm, including when such interest is held through an agent, mist, estate, or holding
ctutity. "Constrictively hotel" refers to holdings or control established through voting trusts,
proxies, or special terms of venture or partnership agreeutcnts."
U. "Consultant." Any person or fine, such as engineers and architects. hired by the City of
Corpus Christi for the purpose of professional consultation and recommendation.