HomeMy WebLinkAboutC2012-195 - 5/30/2012 - NAAMENDMENT NO. 5 TO CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City ", and Freese and Nichols. Inc. hereinafter called "CONSULTANT", agree to the following amendments to the Contract for Professional Services for Staples Street Bond Issue 2008 — Phase 1 from Saratoga to Holly Prolect No. 6494 and Phase 2 from Holly to Williams Pro'ect No. 64951 as authorized by: Original Contract June 9, 2009 Motion No. M2009 -162 $1,665,349.00 Amendment No. 1 Aril 27, 2010 Motion No. M2010 -093 $67,968.00 Amendment No. 2 August 17, 2010 Motion No. M2010 -186 $71,625.00 Amendment No. 3 August 8, 2011 Administrative $47,978.00 Amendment No. 4 March 15, 2012 Administrative Approval $48,755.00 • In the original contract, Exhibit "A ", Section 1. SCOPE OF SERVICES, Section B. Additional Services, 7. Public Involvement Phase shall be amended to provide the City with additional public involvement services as listed below. These methods ensure regularly scheduled updates are provided to the public. The updates will provide the public an understanding of upcoming changes /progress. a. Monitor and provide bi- monthly updates to www.DriveStapies.com website (18 months) b. Monitor and provide bi- monthly updates to DriveStaples twitter account (18 months) c. Development of Quarterly project update mail outs and distribute mail outs to Staples Street database of businesses and owners (5 mail outs total) d. Provide additional stakeholder meeting support during project duration (8 meetings total) • In the original contract, Exhibit "A", Section 3. FEES shall be modified for a total fee not to exceed $37,533.00 (Thirty Seven Thousand Five Hundred Thirty Three Dollars and Zero Cents) for a total restated fee not to exceed $1,939,208.00 One Million Nine Hundred Thirty Nine Thousand Two Hundred Eight Dollars and Zero Cents) as shown in the attached Amendment No. 5, Exhibit "B." All other terms and conditions of the June 9, 2009 contract between the City and Consultant will remain in full force and effect. CITY OF CORPUS CHRISTI Oscar R. Martinez, V Date Assistant City Manager EESE ND NICHOLS, INC. on G zma , P.E. Date Principal 800 N. Shoreline Blvd., Suite 160ON Corpus Christi, TX 78401 361-561-6500 Office; 361- 561 -6501 Fax 2012 -195 5130112 Freese and Nichols Inc. K3Engineerirrg DataExchangeWELMARSTREE RW4 STAPLES FREESE4AMENDMENT NO. 5%AMENDMENT NO. 5.doc AMD. NO. 5 Page 1 of 2 iNDMAMO RECOMMENDED Daniel Biles, P.E. Date Interim Director of Engineering Services AP ROVED AS TO FORM 66"422�- !�041 Office of Management and Budget Date APPR VED S TO FORM Assistan City Attorney Date ATTEST Armando Chapa, City Secretary Staples Street (Bond Issue 2008) Amendment No. 5 Phase 1 from Saratoga to Holly Project No. 6494 550950- 3546- 00000 - 170212 $18,766.50 Phase 2 from Holly to Williams Project No. 6495 550950- 3546- 00000 - 170213 18,766.50 Total $37,533.00 Encumbrance Number: E64 4AFR K\Engineedng DataExchangelVELMAPISTREETro494 STAPLES FREESEL4MENOMENT N0. 54AMENOMENT N0. 5.doc AMD. NO. 5 Pa e 2 of 2 May 10, 2012 Mr. Dan Biles, P.E., PMP Interim Director of Engineering Services City of Corpus Christi P. Q. Box 9277 Corpus Christi, TX 78469 Re: Staples Street Phases 1 & 2 City Project No.: 6494 & 6495 Amendment No. 5 — Additional Public Outreach Dear Mr. Biles, Enclosed is our Amendment #S for your consideration. Please note that this proposed amendment provides for the additional development of the Public Involvement Program for the Staples Street project. The proposed activities outlined in this proposal will ensure regularly scheduled updates that will provide the public an understanding of upcoming changes and progress. This proposal includes bi- monthly monitoring and updating of the Drive Staples website, Staples Street twitter account and development and distribution of quarterly mail -out information to businesses and owners. Please feel free to me at 361.561.6500 should you have any questions. Regards, Freese and Nichols, Inc. Ron Guzman Principal M 5 800 N, Shoreline Blvd.. Suite 160ON • Corpus Christi, Texas 78401 361 -561 -6500 + fax 361- 561 -6501 • wwwSreese.com Staples Street, Phase 9 from Saratoga to Holly (Project No. 6494) Staples Street, Phase 2 from Holly to Williams (Project No, 6495) SUMMARY OF PEES Original Contract Amid, No. 7 Amd. No. 2 1 Amd. No. 3 Amd. No. 4 Staples Street, Phase 7 from Saratoga to Holly (Project No. 6494) Street Storm Water Water Wastewater Total Street Street Street Street Basic Services 1 Preliminary Phase $51,297.00 $34,248.00 $20,592.00 $1,561.00 $107,698.00 $0.00 $0.00 $0.00 $0.00 2 Design Phase 248,096.00 165,641.00 99,593.00 7,553.00 520,883.00 0.00 0.00 0.00 0.00 3 Bid Phase 7,876.00 5,259.00 3,162.00 240.00 16,537.00 0.00 0.00 0.00 0.00 4 Construction Phase 40,015.00 26,716.00 16,063.00 1,218.00 84,012.00 0.00 0.00 0.00 0.00 Subtotal Basic Services 347,284.00 231,864.00 139,410.00 10,572.00 729,130.00 0.00 0.00 0.00 0.00 Additional Services (Allowance) 1 Pemit Preparation TXDOT TCEQ -TPDES Notice of Intentfrermination TDLR- ADArrAS Compliance Subtotal Permit Preparation 4,670.00 0.00 3,193.00 7,863.00 0.00 546.00 0.00 546.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,670.00 546.00 3,193.00 8,409.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 1 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 67,968.00 0.00 8,252.00 0.00 3 ITopooraphic Survey 54,775.00 36,570.00 21,988.00 1,667.00 115,000.00 0.00 0.00 1,121.00 0.00 4 . Environmental Issues 0.00 0.00 a.00 0.00 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 Median/Traffic Impact Assessment 113,139.00 0.00 0.00 0.00 113,139.00 0.00 0100 0.00 0.00 7 Public Involvement Phase 7,068.00 4,719.00 2,837.00 215.00 14,839.00 0.00 0.00 0.00 24,377.50 8 Warranty Phase 5,716.00 3,816.00 2,294.00 174.00 12,000.00 0.00 0.00 0.00 0.00 9 ISubsurface Utility Exploration 0.00 21,253.00 12,778.00 969.00 35,000.00 0.00 0.00 0.00 0.00 10 lRoadway Re- alignment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38,605.00 0.00 Subtotal Additional Services 188,561.00 66,904.00 39,897.00 3,025.00 298,387.00 67,968.00 0.00 47,978.00 24,377.50 Total Phase 1 535.845.001 298,768.00 179,307.001 13,597.001 1,027,517.00 67,968.00 0.00 47,978.001 24,377.50 X M = rn z j CD z C 6 0 KAEnglnearing DataExeharge%VFLMAMTREETM94 STAPLES PREESMAMENOMENT NO. 51SUMMARY -OF FEESSUMMARY OF FEES Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494) Staples Street, Phase 2 from Holly to Williams (Project No. 6495) SUMMARY OF FEES Original Contract Amd. No. 7 Amd. No. 2 1 Amd. No. 3 Amd. No. 4 Staples Street, Phase 2 from Holly to Williams (Project No. 6495) Street Storm Water Water Wastewater Total Street Street Street Street Basic Services 1 Preliminary Phase 47,092.00 13,576.00 4,123.00 9,230.00 74,021.00 0.00 0.00 0.00 0.00 2 Design Phase 223,608.00 64,460.00 19,577.00 43,829.00 351,474.00 0.00 0.00 0.00 0.00 3 Bid Phase 7,482.00 2,157.00 655.00 1,467.00 11,761.00 0.00 0.00 0.00 0.00 4 Construction Phase 32,179.00 9,276.00 2,817.00 6,307.00 50,579.00 0.00 0.00 0.00 0.00 Subtotal Basic Services 310,361.00 89,469.00 27,172.00 60,833.00 487,835.00 0.00 0.00 0.00 0.00 Additional Services (Allowance) 1 Pemit Preparation TXDOT TCEQ -TPDES Notice of Intentrrermination TDLR- ADAlrAS Compliance Subtotal Permit Preparation 0.00 0.00 4,772.00 4,772.00 0.00 544.00 0.00 544.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 544.00 4,772.00 5,316.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 71,625.00 0.00 0.00 3 Topographic Survey 66,145.00 19,068.00 5,791.00 12,965.00 103,969.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 B Medianfrraffic Impact Assessment 0.00 0.00 0.00 0.00 0.00 0100 0.00 0.00 0.00 7 Public Involvement Phase 90,257.00 2,957.00 898.00 2,011.00 16,123.00 0.00 0.00 0.00 24,377.50 8 lWarranty Phase 4,669.00 1,346.00 409.00 915.00 7,339.00 0.00 0.00 0.00 0.00 9 ISubsurface Utility Exploration 0.00 8,696.00 2,641.00 5,913.00 17,250.00 0.00 0.00 0.00 0.00 10 lRoadway Re- alignment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 85,843.00 32,611.00 9,739.00 21,804.00 149,997.00 0.00 71,625.00 0.00 24,377.50 Total Phase 2 396,204.00 122,080.00 36,911.001 82,637.00 637,832.OGI 0.00 71,625,00 0.00 24,377.50 X 1C = M �z oz po 0 KAEnglnearing OaInExchangeyVELMAPISTREETl6494 STAPLES FREESEL4MENOMENT NO.5MMMARY OF FEESSUMMARY OF FEES Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494) Staples Street, Phase 2 from Holly to Williams (Project No. 6495) SUMMARY OF FEES Original Contract Amd. No.1 I Amd. No. 2 Amd. No. 3 1 Amd, No. 4 Staples Street, Phases 1 & 2 (6494 & 6495) Combined Total Street Storm Water Water Wastewater Total Street Street Street Street Basic Services 1 Preliminary Phase 98,389.00 47,824.00 24,715.00 10,791.00 181,719.00 0.00 0.00 0.00 0100 2 Design Phase 471,704.00 230,101.00 119,170.00 51,382.00 872,357.00 0.00 0.00 0.00 0.00 3 Bid Phase 15,358.00 7,416.00 3,817.00 1,707.00 28,298.00 0.00 0.00 0.00 0.00 4 Construction Phase 72,194.00 35,992.00 18,880.00 7,525.00 134,591.00 0.00 0.00 Mo 0.00 Subtotal Basic Services 657,645.00 321,333.00 166,582.00 71,405.00 1,216,965.00 0.00 0.00 0.00 0.00 Additional Services Allowance 1 Pemit Preparation TXDOT TCEQ-TPDES Notice of Inten#ITermination TDI-R- ADAITAS Compliance Subtotal Permit Preparation 4,670.00 0.00 7,965.00 12,635.00 0.00 1,090.00 0.00 1,090.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,670.00 1,090.00 7,965.00 13,725.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 1 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 67,968.00 71,625.00 8,252.00 0.00 3 ITopographio Surve 120,920.00 55,638.00 27,779.00 14,632.00 218,969.00 0.00 0.00 1,121.00 0.00 4 Environm issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 Mo 0.00 0.00 0.00 6 Medianrrraffic Impact Assessment 113,139.00 0.00 0.00 0.00 113,139.00 0.00 0.00 0.00 0.00 7 Public Involvement Phase 17,325.00 7,676.00 3,735.00 2,226.00 30,962.00 0.00 0.00 0.00 48,755.00 8 Warranty Phase 10,385.00 5,162.00 2,703.00 1,089.00 19,339.00 0.00 0.00 0.00 0.00 9 ISubsurface Utility Exploration 0.00 29,949.00 15,419.00 6,882.00 52,250.00 0.00 0.00 0.00 0.00 10 lRoadmay Re- alignment 0.00 0.00 0100 0.00 0.00 0.00 0.00 38,605.00 0.00 Subtotal Additional Services 274,404.00 99,515.00 49,636.00 24,829.00 448,384.00 67,968.00 71,625.00 47,978.00 48,755.00 Total Authorized Fee for Phases 1 & 2 $932,049.00 $420,848.001 $218,218.001 $96,234.00 $1,666,349.00 $67,968.00 $71,626.00 $47,978.00 $48,765.00 06/09/09 M2009 -162 04/27/10 M2010 -093 08/17/10 M2010 -186 08/08/11 Admin Apprval 03/15/12 Admin Apprval 2 M �p Z °, z h K:Englneeft DainExchangelVELMAPISTREET5B494 STAPLES FREESESAMENOMENT NO.5MMMARY OF FEESSUMMARY OF FEES Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494) Staples Street, Phase 2 from Holly to Williams (Project No. 6495) SUMMARY OF FEES Amd_ Nn_ 5 Staples Street, Phase 7 from Saratoga to Holly (Project No. 6494) Street Total Basic Services 1 Preliminary Phase $0.00 $107,698.00 2 Design Phase 0.00 520,883.00 3 Bid Phase 0.00 16,537.00 4 Construction Phase 0.00 84,012.00 Subtotal Basic Services 0.00 729,130.00 Additional Services (Allowance) 1 Pemit Preparation TXDOT TCEQ -TPDES Notice of Intent/Termination TDLR- ADAffAS Compliance Subtotal Permit Preparation 0.00 0.00 0.00 0.00 4,670.00 546.00 3,193.00 8,409.00 2 ROW Acquisition Survey 0.00 76,220.00 3 Topographic Survey 0.00 116,121.00 4 Environmental Issues 0.00 0.00 5 Construction Observation Services 0.00 0.00 6 Median/Traffic Impact Assessment 0.00 113,139.00 7 Public Involvement Phase 18,766.50 57,983.00 8 Warranty Phase 0.00 12,000.00 9 Subsurface Utility Exploration 0.00 35,000.00 10 Roadway Re- alignment 0.00 38,605.00 Subtotal Additional Services 18,766.50 457,477.00 Total Phase 1 18,766.50 1,166,607.00 Q0 K = M z �Wv 0�z o KftEngineeing DataExchangeWELMAP4STREETZ494 STAPLES FREEMAMENDMENT NO. 5MMMARY OF FEESSUMMARY OF FEES Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494) Staples Street, Phase 2 from Holly to Williams (Project No. 6495) SUMMARY OF FEES Amd_ No. 5 Staples Street, Phase 2 from Holly to Williams (Project No. 6495) Street Total Basic Services 1 Preliminary Phase 0.00 74,021.00 2 Design Phase 0.00 351,474.00 3 Bid Phase 0.00 11,761.00 4 Construction Phase 0.00 50,579.00 Subtotal Basic Services 0.00 487,835.00 Additional Services (Allowance 1 Pemit Preparation TXDOT TCEQ -TPDES Notice of Intentlrerminalion TDi_R- ADAITAS Compliance Subtotal Permit Preparation 0,00 0.00 0.00 0.00 0.00 544.00 4,772.00 5,316.00 2 ROW Acquisition Survey 0.00 71,625.00 3 Topographic Survey 0.00 103,969.00 4 Environmental Issues 0.00 0.00 5 Construction Observation Services 0.00 0.00 6 Median/Traffic Impact Assessment 0.00 0.00 7 1 Public Involvement Phase 18,766.50 59,267.00 8 Warranty Phase 0.00 7,339.00 8 ISubsurface Utility Exploration 0.00 17,250.00 10 lRoadway Re- alignment 0.00 0.00 Subtotal Additional Services 18,766.50 264,766.00 Total Phase 2 18,766.50 7527601.00 M 2M tp z Ch o ` z a , o V1 K:SEngineering DateExch2ngeXYELMAPSSTREET46494 STAPLES FREESEAMENDMENT NO. RSUMMARY OF FEESSUMMARY OF FEES Staples Street, Phase 1 from Saratoga to Holly (Project No. 6494) Staples Street, Phase 2 from Holly to Williams (Project No. 6495) SUMMARY OF FEES Am d. No. 5 Staples Street, Phases I & 2 (6494 & 5495) Combined Total Street Total Basic Services 1 Preliminary Phase 0.00 181,719.00 2 Design Phase 0.00 872,357.00 3 Bid Phase 0.00 28,298.00 4 Construction Phase 0.00 134,591.00 Subtotal Basic Services 0.00 1,216,965.00 Additional Services (Allowance) 1 Pemit Preparation TXDOT TCEQ -TPDES Notice of IntentlTermination TDLR- ADA/TAS Compliance Subtotal Permit Preparation 0.00 0,00 0.00 0.00 4,670.00 1,090.00 7,965.00 13,725.00 2 ROW Acquisition Survey 0.00 147,845.00 3 Topographic Survey 0.00 220,090.00 4 Environmental Issues 0.00 0.00 5 Construction Observation Services 0.00 0.00 6 MedianfTraffic Impact Assessment 0.00 113,139.00 7 1 Public Involvement Phase 37,533.00 117,259.00 8 Warranty Phase 0.00 19,339.00 9 ISubsurface Utility Exploration 0.00 52,250.00 10 1 Roadway Re- alignment 0.00 38,605.00 Subtotal Additional Services 37,533.00 722,243.00 Total Authorized Fee for Phases 1 & 2 $37,533.00 $1,939,208.00 Admin Apprval =rn cD z y, -Z Ch K kEngineefing bataExchango%VELMAP4STREET154e4 STAPLES FREEWAMENUMENT NO. S%SUMMARY OF FEESSUMMARY OF FEES i i ^11� t� SUPPLIER NUMBER TO BE ASSIGNED BYCITY -- s PURCHASING DIVISION w� City of CITY OF CORPUS CHRISTI ti DISCLOSURE OF INTEREST City of Cor ws Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with `NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: Freese and Nichols, Inc. P. O. BOX: STREET ADDRESS: 800 N. Shoreline, Suite 160ON CITY: Corpus Christi ZIP: 78401 FIRM IS: 1. Corporation 2. Partnership a 3. Sole Owner ❑ 4. Association S. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this pa a or attach separate sheet. 1. State the names of each `employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm.' Name Job Title and City Department if known) NIA 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title N/A 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or.Committee NIA 4. State the names of each employee or officer of a "consultant" for the who of Corpus Christi who worked on any matter related to the subject of this contract and has an • ownership interest" constituting 310 or more of the ownership in the above named "firm." NIA Name Consultant FILING REQUIREMENTS If a person Who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the C official, employee or body that has been requested to act in the matter, unless the interest o ity the City official or employee in the matter is apparent.. The disclosure shall also be made in a signed writing Fled with the .City Secretary. [Ethics Ordinance Section 2 -349 (d )] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi. Texas as changes occur. Certifying Person: Ran Guzman, P. E. ffype ar Prinl) �• Title: Principal DEFINITIONS a. "Board member." A member of any board. commission. or committee appointed by the City .Council of the City of Corpus Christi, Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. '`Employee." Any person employed by the City of Corpus Christi Texas either on a full. or part -time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional. industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the forth of sole proprietorship, as self - employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non - profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager. Assistant City Managers, Department and Division Heads, and Mtniicipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent. trust, estate. or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies. or special terms of venture or partnership agreements." g. "Consultant. "Any person or firm, such as engineers and architects. hired by the.City of Corpus Christi for the purpose of professional consultation and recommendation.