Loading...
HomeMy WebLinkAboutC2012-331 - 9/27/2012 - NAAMENDMENT NO. 5 TO CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "CITY ", and MAVERICK ENGINEERING INC. hereinafter called "CONSULTANT," agree to the following amendment to the Contract for Professional Services for North Port Avenue from IH 37 to US 181 (Project No. 6264), as authorized and amended by: Original Contract Aril 10, 2007 Motion No. 2007 -095 $749,221.00 Amendment No_ 1 June 10, 2008 Motion No. 2008 -147 $1,970,108.00 Amendment No. 2 October 23, 2008 Administrative Approval $26,173.26 Amendment No. 3 Aril 3, 2009 Administrative Approval $49,750.00 Amendment No. 4 July 11, 2011 Administrative Approval $24,765.00 ■ In the original contract, Section I. SCOPE OF SERVICES, Part A. Basic Services, 4. Construction Phase shall be amended to include additional Construction Phase Services as shown in the attached Amendment No. 5. Exhibit "A." ■ In the original contract, Section III. FEES shall be modified as shown on the attached Exhibit "B" for a revised fee not to exceed. $5,230.50 (Five Thousand Two Hundred Thirty Dollars and Fifty Cents) for a total restated fee not to exceed $ 2,825,247.76 - (Two Million Eight Hundred Twenty Five Thousand Two Hundred Forty Seven Dollars and Seven Six Cents) All other terms and conditions of the original contract and amendments between the City and Consultantwill remain in full force and effect. CITY OF CORPUS CHRISTI t oA,c,r,- q �1 �v Oscar Martinez, Date Assistant City Manager RECOMMENDED Daniel Biles, P. E., Date Director of Engineering Services 6d �z Operating Departure ate APPR D AS O FORM Ass an City Attorney Date t Z " Office of Management and Budget Date MAVERICK ENG E ING, INC. i � - a I William Fordt an, P.E. Date Vice President 400 Mann Street, Suite 200 Corpus Christi, TX 78401 (361) 696 -3500 Office; (361) 696 -3599 Fax ATTEST Project Number: 6264 Funding Source: 55 -4 0050 -3542 -00000- 170525 Encumbrance Numbers E6264AMA 2012 -331 v 9/27/12 FPa7f O. 5 1 Maverick Engineering Inc NORTH PORT AUENUE=NSULTANTAMENDMENT NO.5IAMENDMENT NO.5,DOG IN DEXED f r • r r Y?1�U7U.11!U7J8)'1C�2C]�g 17Eerin g. C�lilll August 24, 2092 Ms. Jamie Pyle, P.E. Project Manager City of Corpus Christi 1201 Leopard Street, 3fd floor Corpus Christi, TX 78469 Re: Contract Amendment No. 5. Additional Scope of Construction Administration Services North Port Avenue Project No. 6264 Hear Ms. Pyle: Maverick Engineering, Inc. would tike to request an amendment to our contract for the Nodh Port Avenue Project. . {Project No. 6254) to cover additional services that were not included in the original scope of services for Amendment No. 1. The amendment will coverthe four concrete bores required by the Texas Department of Transportation (TXDOT) for acceptance of the project. We are proposing a contract amendment of $5,230.50 to the Consul don Administration phase of the contract. We appreciate the opportunity to provide these professional services to the City of Corpus Christ. If you have any questions regarding this proposal, please feel free to contact me at (361) 696.3501. Respectfully, Maverick Engineering, Inc. kgac William fordtran, P.E. C00 400 Mann St., Suite 200 Corpus Christi, Texas 78401 361.696 - 3500 a Fax 361.696 -3599 s tv%Y%v maverickeugineering.com AMEND. NO. 5 EXHIBIT "A" Pa e 1 of 1 NORTH PORT AVENUE FROM IH 37 TO US 181 (PROJECT NO. 6264) SUMMARY OF FEES y XM xm (D W Z O Z �t)p0 C11 ORIGINAL CONTRACT Street and Lightin Storm Water Water Wastewater Total FEE FOR BASIC SERVICES 1 Preliminary Phase Schematic Design) $117,128,00 $29,447.00 $9,870.00 $8,061.00 $164,506.00 2 Design Phase PS &E Development) 0.00 0.00 0.00 0.00 0.00 3 Bid Phase (Letting Phase) 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 117,128.00 29,447.00 9,870.00 8,061.00 164,506.00 FEE FOR ADDITIONAL SERVICES (Allowance) 1 Permit Preparation (as applicable 1.1 TCEQ 1,543.00 388.00 130.00 106.00 2,167.00 1.2 TDLR 6,692.00 0.00 0.00 0.00 6,692.00 1.3 TXDOT 11,912.00 0.00 0.00 0.00 11,912.00 1.4 TX GLO 0.00 6,028.00 0.00 0.00 6,028.00 1.5 THC 1,413.00 355.00 119.00 97.00 1,984.00 1.6 TPWD 713.00 179.00 60.00 50.00 1,002.00 1.7 TPDES 2,147.00 869.00 0.00 0.00 3,016.00 1.8 Union Pacific Railroad 5,418.00 1,362.00 457.00 373.00 7,610.00 1.9 US ACE (NATIONWIDE PERMIT #14) 0.00 0.00 0.00 0.00 0.00 1.10 US FWS 0.00 0.00 0.00 0.00 0.00 2 Topographic Survey 66,862.00 16,809.00 5,634.00. 4,602.00 93,907.00 3 ROW Re- establishment Survey 61,147.00 15,373.00 5,153.00 4,208.00 85,881.00 4 Enviromental Clearance and Public Involvement (CE Process) 4.1 Programmatic Categorical Exclusion 87,412.00 21,976.00 7,366.00 6,016.00 122,770.00 4.2 Formal Public involvement Process 96,710.00 24,313.00 8,150.00 6,655.00 135,828.00 4.3 Environmental Assessment EA 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warrranty Phase 0.00 0.00 0.00 0.00 0.00 7 Subsurface Utility Investigation 0.00 39,906.00 13,387.00 10,915.00 64,208.00 8 Geotechnical Investigation and Testin 8.1 11nitial Geotechnical Investi gation 17,639.00 4,435.00 1,486.00 1,214.00 24,774.00 8.2 lConstruction Testing Program 0.00 0.00 0.00 0.00 0.00 9 Televising Existing Wastewater & Storm Water Lines 0.00 0.00 0.00 0.00 0.00 f0 3D Animation Model 16,936.00 0.00 0.00 0.00 16,936.00 11 1 ROW Acquisition Survey 0.00 0,00 0.001 0.00 0.00 Subtotal Additional Services Fees 376,544.00 131,993.00 41,942.00 34,236.00 584,715.00 Total Authorized Fee $493,672.00 $161,440.00 $51.812,001 $42,297.00 $749,221.00 Date Authorization April 10, 2007 Motion No. M2007 -095 NORTH PORT AVENUE FROM IH 37 TO US 181 (PROJECT NO. 6264) SUMMARY OF FEES mn �x3 m Z o, � z -4 P w AMENDMENT NO. 1 Street and Li hbn Storm Water Water Wastewater Total FEE FOR BASIC SERVICES 1 Preliminary Phase (Schematic Design) $0.00 $0.00 $0.00 $0.00 $0.00 2 Design Phase PS &E Development) 821,620.33 269,785.78 85,840.93 49,051.96 1,226,299.00 3 Bid Phase (Letting Phase ) 16,585.85 5,446.10 1 ,732.85 990.20 24,755.00 4 Construction Phase 13,511.22 4,436.52 1,411.62 806.64 20,166.00 Subtotal Basic Services Fees 851,717.40 279,668.40 88 50,848.80 1,271,220.00 FEE FOR ADDITIONAL SERVICES (Allowance 1 Permit Preparation as applicable) 1.1 TCEQ 0.00 0.00 0.00 0.00 0.00 1.2 TDLR 0.00 0.00 0.00 0.00 0.00 1.3 TXDOT 0.00 0.00 0.00 0.00 0.00 1.4 TX GLO 0.00 0.00 0.00 0.00 0.00 1.5 THC 0.00 0.00 0.00 0.00 0.00 1.6 TPWD 0.00 0.00 0.00 0.00 0.00 1.7 TPDES 0.00 0.00 0.00 0.00 0.00 1.8 Union Pacific Railroad 0.00 0.00 0.00 0.00 0.00 1.9 US ACE (NATIONWIDE PERMIT #14) 6,486.94 2,130.04 677.74 387.28 9,682.00 1.10 US FW5 1 0.00 0.00 0.00 0.00 0.00 2 ITopograehic Survey 31,825.00 .10,450.00 3,325.00 1,900.00 47,500.00 3 FLOW Re- establishment Survey 0.00 0.00 0.00 0.00 0.00 4 Enviromental Clearance and Public Involvement (CE Process) 4.1 Pro rammatic Categorical Exclusion 16,062.58 5,274.28 1,678.18 958.96 23,974.00 4.2 Formal Public Involvement Process 0.00 0.00 0.00 0.00 0.00 4.3 Environmental Assessment (EA) 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 244,550.00 80,300.00 25,550.00 14,600.00 365,000.00 6 Warrranty Phase 6,123.80 2,010.80 639.80 365.60 9,140.00 7 Subsurface Utility Investigation 0.00 0.00 0.00 0.00 0.00 8 Geotechnical Investigation and Testin 8.1 1 Initial Geotechnical Investigation 0.00 0.00 0.00 0.00 0.00 8.2 lConstruction Testing Program 117,901.24 38,713.84 12,318.04 7,038.88 175,972.00 9 Televising Existing Wastewater & Storm Water Lines 0.00 0.00 0.00 0.00 0.00 10 3D Animation Model 0.00 0,001 0.00 0.00 0.00 11 ROW Acquisition Survey 45,305.40 14,876.40 4,733.40 2,704,80 67,620.00 Subtotal Additional Services Fees 468,254.96 153,755.36 48,922.16 27,955.52 698,888.00 Total Authorized Fee $1,319,972.36 $433,423.76 $137,907.56 $78,804.32 $1,970,108.00 Date Authorization June 10, 2008 Motion No. 2008 -147 NORTH PORT AVENUE FROM IH 37 TO US 181 (PROJECT NO. 6264) SUMMARY OF FEES mn X3 = m m �z Lo W P o �op0 AMENDMENT NO. 2 Street and Lightin Storm Water Water Wastewater Total FEE FOR BASIC SERVICES 1 Preliminary Phase Schematic Design) $0.00 $0.00 $0.00 $0.00 $0.00 2 Design Phase PS &E Development) 0.00 0.00 0.00 0.00 0.00 3 Bid Phase (Letting Phase) 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 FEE FOR ADDITIONAL SERVICES (Allowance 1 Permit Preparation as applicable) 1.1 TCEQ 0.00 0.00 0.00 0.00 0.00 1.2 TDLR 0.00 0.00 0.00 0.00 0.00 1.3 TXDOT 0.00 0.00 0.00 0.00 0.00 1.4 TX GLO 0.00 0.00 0.00 0.00 0.00 1.5 THC 0.00 0.00 0.00 0.00 0.00 1.6 TPWD 0.00 0.00 0.00 0.00 0.00 1.7 TPDES 0.00 0.00 0.0D 0.00 0.00 1.8 Union Pacific Railroad 0.00 0.00 0.00 0.00 0.00 1.9 US ACE NATIONWIDE PERMIT #14) 0.00 0.00 0.00 0.00 0.00 1.10 US FWS 0.00 0.00 0.00 0.00 0.00 2 Topographic Survey 0.00 0.00 0.00 s 0.00 0.00 3 ROW Re- establishment Survey 0.00 0.00 0.00 0.00 0.00 4 Enviromental Clearance and Public Involvement CE Process 4.1 Programmatic Categorical Exclusion 0.00 0.00 0.00 0.00 0.00 4.2 Formal Public Involvement Process 0.00 0.00 0.00 0.00 0.00 4.3 Environmental Assessment (EA) 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warrranty Phase 0.00 0.00 0.00 0.00 0.00 7 Subsurface Utility investigation 0.00 0.00 0.00 0.00 0.00 8 Geotechnical Investigation and Testin 8.1 11nitial Geotechnical Investigation 0.00 0.00 0.00 0.00 0.00 8.2. lConstruction Testing Program 0.00 0.00 0.00 0.00 0.00 9 Televising Existing Wastewater& Storm Water Lines 0,00 26,17126 0.00 0.00 26,173.26 10 13D Animation Model 0.00 0.00 0.00 0.00 0.00 11 1 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 26,173.26 0.00 0.00 26,173.26 Total Authorized Fee $0.00 $26,173.26 $0.00 $0.00 $26,173.26 Date Authorization October 23, 2008 Administrative Approval NORTH PORT AVENUE FROM IH 37 TO US 181 (PROJECT NO. 6264) SUMMARY OF FEES w x3 M CD z 4 W �] a, z 4 P AMENDMENT NO. 3 Street and Lightin Storm Water Water Wastewater Total FEE FOR BASIC SERVICES 1 Prelimina Phase Schematic D esig n) $0.00 $0.00 $0.00 $0.00 $0.00 2 Design Phase PS &E Development 0.00 0.00 27,299.50 0.00 0.00 0.00 0.00 0.00 27,299.50 0.00 3 Bid Phase (Letting Phase) 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 27,299.50 0.00 0.00 27,299.50 FEE FOR ADDITIONAL SERVICES (Allowance) 1 Permit Preparation (as applicable 1.1 TCEQ 0.00 0.00 0.00 0.00 0.00 1.2 TDLR 0.00 0.00 0.00 0.00 0.00 1.3 TXDOT 0.00 3,512.20 0.00 0.00 3,512.20 1.4 TX GLO 0.00 0.00 0.00 0.00 0.00 1.5 THC 0.00 0.00 0.00 0.00 0.00 1.6 TPWD 0.00 0.00 0.00 0,00 0.00 1.7 TPDES 0.00 0.00 0.00 0.00 0.00 1,8 Union Pacific Railroad 0.00 0.00 0.00 0.00 0.00 1.9 US ACE NATIONWIDE PERMIT #14 0.00 0.00 0.00 0.00 0.00 1.10 US FWS 0.00 0.00 0.00 0.00 0.00 2 Topographic Survey 0.00 12,000.00 0.00 0.00 12,000.00 3 ROW Re- establishment Survey 0.00 0.00 0.00 0.00 0,00 4 Enviromental Clearance and Public Involvement (CE Process 0.00 4.1 Programmatic Categorical Exclusion 0.00 0.00 0.00 0.00 0.00 4.2 IFormal Public Involvement Process 0.00 0.00 0.00 0.00 0.00 4.3 jEnvironmental Assessment (EA) 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warrranty Phase 0.00 0.00 0.00 0.00 0.00 7 1 Subsurface Utility Investigation 0.00 0.00 0.00 0.00 0.00 8 Geotechnical Investigation and Testin 8.1 11nitial Geotechnical Investigation 0.00 0.00 0.00 0.00 0.00 8.2 Construction Testing Program 0,00 0.00 0.00 0.00 0.00 9 Televising Existing Wastewater & Storm Water Lines 0.00 0.00 0.00 0.00 0.00 10 3D Animation Model 0.00 0.00 0.00 0.00 0.00 11 1 ROW Acquisition Survey 0.00 6,938.30 0.00 0.00 6,938.30 Subtotal Additional Services Fees 0.00 22,450.50 0.00 0.00 22,450.50 Total Authorized Fee $0.00 $49,750.00 $0.00 $0.00 $49,750.00 Date Authorization April 3, 2009 Administrative Approval NORTH PORT AVENUE FROM IH 37 TO US 181 (PROJECT NO. 6264) SUMMARY OF FEES K zm �p Z m ood, 0 Z �pp0 cn AMENDMENT NO. 4 Street and Lig htin g Storm Water Water Wastewater Total FEE FOR BASIC SERVICES 1 Preliminary Phase (Schematic Design) $0.00 $0.00 $0.00 $0,00 $0.00 2 Design Phase PS &E Develo ment 0.00 0.00 0.00 0.00 0.00 3 Bid Phase (Letting Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 8,200.80 2,692:80 856.80 489.60 12,240.00 Subtotal Basic Services Fees 8,200.80 2,692.80 856.80 489.60 12,240.00 FEE FOR ADDITIONAL SERVICES Allowance 1 Permit Preparation (as applicable) 1.1 TCEQ 0.00 0.00 0.00 0.00 0.00 1.2 TDLR 0.00 0.00 0.00 0.00 0.00 1.3 TXDOT 0.00 0.00 0.00 0.00 0.00 1.4 TX GLO 0.00 0.00 0.00 0.00 0.00 1.5 THC 0.00 0.00 0.00 0.00 0.00 1.6 TPWD 0.00 0.00 0.00 0.00 0.00 1.7 TPDES 0.00 0.00 0.00 0.00 0,00 1.8 Union Pacific Railroad 0.00 0.00 0.00 0.00 0.00 1.9 US ACE (NATIONWIDE PERMIT #14) 0.00 0.00 0.00 0.00 0.00 1.10 US FWS 0.00 0.00 0.00 0.00 0.00 2 Topog raphic Survey 0.00 0.00 0.00 0.00 0.00 3 ROW Re- establishment Survey 0.00 0.00 0.00 0.00 0.00 4 Enviromental Clearance and Public Involvement (CE Process) 4.1 Programmatic Categorical Exclusion 0.00 0.00 0.00 0.00 ODD 4.2 Formal Public Involvement Process 0.00 0.00 0.00 0.00 0.00 4.3 Environmental Assessment EA 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 8,391.75 2,755.50 876.75 501.00 12,525.00 6 Warrranty Phase 0.00 0.00 0.00 0.00 0.00 7 Subsurface Utility Investigation 0.00 0.00 0.00 0.00 0.00 8 Geotechnical Investigation and Testin 8.1 11nitial Geotechnical Investigation 0.00 0.00 0.00 0.00 0.00 8.2 lConstruction Testing Program 0.00 0.00 0.00 0.00 0.00 9 Televising Existing Wastewater & Storm Water Lines 0.00 0.00 0.00 0.00 0.00 10 13D Animation Model 0.00 0.00 0.00 0.00 0.00 11 1 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 8,391.75 2,755.50 876.75 501.00 12,525.00 Total Authorized Fee $16,592.55 $5,448.30 $1,733.55 $990.60 $24,765.00 Date Authorization July 11, 2011 Administrative Approval NORTH PORT AVENUE FROM IH 37 TO US 181 (PROJECT NO. 6264) SUMMARY OF FEES X3 �m z o� p P o -Z y - 0 AMENDMENT NO. 5 Street and Lightin Storm Water Water Wastewater Total FEE FOR BASIC SERVICES 1 Preliminary Phase Schernatic Design) $0.00 $0.00 $0.00 $0.00 $0.00 2 Design Phase PS &E Development) 0.00 0.00 0.00 0.00 0.00 3 Bid Phase (Letting Phase) 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 5,230.50 0.00 0.00 0.00 5,230.50 Subtotal Basic Services Fees 5,230.50 0.00 0.00 0.00 5,230.50 FEE FOR ADDITIONAL SERVICES Allowance 1 Permit Preparation as applicable) 1.1 TCEQ 0.00 0.00 0.00 0.00 0.00 1.2 TDLR 0.00 0.00 0.00 0.00 0.00 1.3 TXDOT 0.00 0.00 0.00 0.00 0.00 1.4 TX GLO 0.00 0.00 0.00 0.00 0.00 1.5 THC 0.00 0.00 0.00 0.00 0.00 1.6 TPWD 0.00 0.00 0.00 0.00 0.00 1.7 TPDES 0.00 0.00 0.00 0.00 0.00 1.8 Union Pacific Railroad I US 0.00 0.00 0.00 0.00 0.00 1.9 US ACE (NATIONWIDE PERMIT #14) 0.00 0.00 0.00 0.00 0.00 1.10 FWS 0.00 0.00 0.00 0.00 0.00 2 Topographic Survey 0.00 0.00 0.00 0.00 0.00 3 ROW Re- establishment Survey 0.00 0.00 0.00 0.00 0.00 4 Enviromental Clearance and Public Involvement CE Process) 4.1 Pro rammatic Categorical Exclusion 0.00 0.00 0.00 0.00 0.00 4.2 Formal Public Involvement Process 0.00 0.00 0.00 0.00 0.00 4.3 1 Environmental Assessment EA 0.00 0,00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warrranty Phase 0.00 0.00 0.00 0.00 0.00 7 Subsurface Utility Investigation 0.00 0.00 0.00 0.00 0.00 8 Geotechnical Investigation and Testin 8.1 Onitial Geotechnical Investigation 0.00 0.00 0.00 0.00 0.00 8.2 lConstruction Testing Program 0.00 0.00 0.00 0.00 0.00 9 Televising Existing Wastewater & Storm Water Lines 0.00 0.00 0.00 0.00 0.00 10 13D Animation Model 0.00 0.00i 0.00 0.00 0.00 11 I ROW Acquisition Survey 0.001 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0,001 0100 0.001 0.001 0.00 Total Authorized Fee $5,230.601 $0.001 $0.001 $0.001 $5,230.50 Date Authorization Administrative Approval NORTH PORT AVENUE FROM IH 37 TO US 181 .(PROJECT NO. 6264) SUMMARY OF FEES m> n, x m �z o� -Z - w TOTAL CONTRACT FEE Street and Lighting Storm Water Water Wastewater Total FEE FOR BASIC SERVICES 1 Preliminary Phase Schematic Design) $117,128.00 $29,447.00 $9,870.00 $8,061.00 $164,506.00 2 Design Phase PS &E Development) 821,620.33 297,085.28 85,840.93 49,059.96 1,253,598.50 3 Sid Phase (Letting Phase) 16,585.85 5,446.10 1,732.85 990.20 24,755.00 4 Construction Phase 26,942.52 7,129.32 2,268.42 1,296.24 37,636.50 Subtotal Basic Services Fees 982,276.70 339,107.70 99,712.20 59,399.40 1,480,496.00 FEE FOR ADDITIONAL SERVICES (Allowance) 1 Permit Preparation as applicable) 1.1 JTCEQ 1,543.00 388.00 130.00 106.00 2,167.00 1.2 ITDLR 6,692.00 0.00 0.00 0.00 6,692.00 1.3 TXDOT 11,912.00 3,512.20 0.00 0.00 15,424.20 1.4 TX GLO 0:00 6,028.00 0.00 0.00 6,028.00 1.5 THC 1,413.00 355,00 119.00 97.00 1,984.00 1.6 TPWD 713.00 179.00 60.00 50.00 1,002.00 1.7 TPDES 2,147.00 869.00 0.00 0.00 3,016.00 1.8 1 Union Pacific Railroad 5,418.00. 1,362.00 457.00 373.00 7,610.00 1,9 1 US ACE (NATIONWIDE PERMIT #14 ) 6,486.94 2,130.04 677.74 387.28 9,682.00 1.10 JUS FWS 0.00 0.00 0.00 0.00 0.00 2 Topog raphic Survey 98,687.00 39,259.00 8,959.00 6,502.00 153,407.00 3 ROW Re- establishment Survey 61,147.00 15,373.00 5,153.00 4,208.00 85 ,881.00 4 Enviromental Clearance and Public Involvement (CE Process) 4.1 Programmatic Categorical Exclusion 103,474.58 27,250.28 9,044.18 6,974.96 146,744.00 4.2 Formal Public Involvement Process l Environmentat 96,710.00 24,313.00 8,150.00 6,655.00 135,828.00 4.3 Assessment (EA) 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 252,941.75 83,055.50 26,426.75 15,101.00 377,525.00 6 Warrranty Phase 6,123.80 2,010.80 639.80 365.60 9,140.00 7 Subsurface Utility Investigation 0.00 39,906.00 13,387.00 10,915.00 64,208.00 8 Geotechnical Investigation and Testin 8.1 Initial Geotechnical Investigation 17,639.00 4,435.00 1,486.00 1,214.00 24,774.00 8.2 Construction Testing Program 117,901.24 38,713.84 12,318.04 7,038.88 175,972.00 9 Televising Existing Wastewater & Storm Water Lines 0.00 26,17126 0.00 0.00 26,173.26 10 13D Animation Model 16,936.00 0.00 0.00 0.00 16,936.00 11 1 ROW Acquisition Survey 45,305.401 21,814.701 4,733,401 2,704.80 74,558.30 Subtotal Additional Services Fees 853,190.71 337,127.62 91,740.91 62,892.52 1,344,751.76 Total Authorized Fee $1,835,467.41 $676,235.32 $191,453.11 $122,091.92 $2,825,247.76 Date Authorization 81Si SUPPLIER NUMBER TO BE ASSIGNED BYT77 PURCHASING DNISION VVV City of CITY OF CORPUS CHRISTI pus Chfisti DISCLOSURE OF INTEREST City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: Maverick Engineerinis. Inc. P. O. BOX: STREET ADDRESS: 400 Mann Street. Suite 200 FIRM IS: 1. Corporation ❑ 4. Association CITY: Corpus Christi ZIP: 78401 2. Partnership ❑ 3. Sole Owner E] 5. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Job Title and City Department (if known) NIA 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title NIA 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee NIA 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant NIA FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -344 (d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: William Fordtran, P. E. Title: Vice President (Type or Print) person re of Certifyin ate :. {, — k� I DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. C. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part - time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non- profit organizations. e. "Official_" The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation.