Loading...
HomeMy WebLinkAboutC2012-413 - 12/5/2012 - NACITY OF CORPUS CHRISTI AMENDMENT NO. 5 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City ", and HDR ENGINEERING INC. hereinafter called "Engineer", agree to the following amendments to the Contract for Engineering Services for Packery Channel Dredging and Beach Re- Nourishment Proiect No. E10168), as authorized and administratively amended by: Original Contract November 2, 2010 Admin. Approved $39,700.00 Amendment No. 1 January 11, 2011 Motion No. M2011 -014 $137,400.00 Amendment No. 2 February 8, 2011 Admin. Approved $6,000.00 Amendment No. 3 August 8, 2011 Admin. Approved $9,400.00 Amendment No. 4 October 5, 2011 Admin. Approved $39,970.00 In the Original Contract, Exhibit "A ", Section 1. Scope of Services, Part B. Basic Services shall be amended to include Item No. 5 Additional Construction Phase as set forth in the attached Amendment No. 5, Exhibit "A ". In the Original Contract, Exhibit "A ", Section 3. Fees, Part C. Summary of Fees shall be modified and is attached as Amend No. 5 Exhibit "B" for a fee not to exceed $33,953.00 (Thirty Three Thousand Nine Hundred Fifty Three Dollars and Zero Cents for a total restated fee not to exceed $266,423.00 (Two Hundred Sixty Six Thousand Four Hundred Twenty Three Dollars and Zero Cents). All other terms and conditions of the November 2, 2010 contract between the City and Engineer, and of any amendments to that contract, which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI � �- a" ./ 'L... Oscar R. Martinez Date Assistant City Manager RECOMMENDED Daniel Biles, P. E., Date Director of Engineering Services OperatiPg Departmentl Date APPRO ED #S TO FORM City Attor ey Date 2012 -413ate 0 HDR ENGINEERING, INC. �z Carl E. Crull, P.E. Date Vice President 555 N Carancahua, Suite 1650 Corpus Christi, TX 78401 -0850 (361) 857 -2211 Office (361) 857 -7234 Fax ENTERED jt ,� OCT 9 2012 CONTRACT MANAGERS [ R C IVED NOV X 3 2012 F ND. N0.5 e 1 of 2 HDR Engineering Inc. CHANNEUE10168 PACKERY CHANNEL BREDGING AND BEACH NOURISHMENTIAMENDMENT NO.5 AGREEMENT.DOC INDEXED and Budget ATTEST Armando Chapa City Secretary Project Number: E10168 Funding Source: 550950- 3278 - 00000- E10168 Fund Name: Packery Channel Projects TIF #2 Encumbrance Number: E10168AHD F A MEND. NO. 5 Page 2 of 2 K:IENGINEERING DATAEXCHANGEMOEMIPACKERY CHANNELIE10168 PACKERY CHANNEL BREDGING AND BEACH NOURISHMENTIAMENDMENT NO. 5 AGREEMENT.DOC September 28, 2012 .IR .ED PW 151670 . s City of Corpus Christi OCT 1 2012 Attn: Dan Biles, P.E,.< i_:._ Major. Projects Engineer Er %R2 SF_RV1 -[: P.O. Box 9277. Corpus Christi, TX 78469 -9277: RE; REQUEST FOR AMENDMENT NO. 5 FOR ADDITIONAL CONSTRUCTION PHASE SERVICES, PACKERY CHANNEL 'DREDGING AND BEACH NOURISHMENT (CITY PROJECT NO. E10168) Dear Mr. Biles, Thank you for the opportunity to submit -this proposal for Amendment No.. 5 to . provide additional `services for continuation of the City's maintenance dredging at Packery Channel and associated beach nourishment on North Padre Island along the seawall. This proposal includes construction administration and construction observation, and associated design, needed for the continued work. Having already assisted the City during the previous. regulatory; design bidding, and construction administration phases of this project, we feel well qualified to help. As we understand the project, the City is planning on issuing a Notice to Proceed to the construction contractor by- October 20.12 to continue maintenance dredging of Packery Channel. The'' assumed construction time extension is 90 days. To assist the City with. construction administration and observation, we. propose to provide the Scope of Services described below. We .recommend 'the level of effort described in this `scope based on successful construction-phase services: HDR has provided to the City and other clients on similar dredging and beach nourishment projects. SCOPE- OF.SERVICES HDR's services will consist of the following: a. Participate in , pre- construction (prior to resuming work). 'coordination meeting and ..provide a recommended agenda:for key construction activities and elements of the final phase of the Project.. b. Review shop and working drawings,, materials, acceptance surveys, and `other submittals for general conformance with contract documents. HDR Engineering; Inc.. 555NCarancahua Phone: {36 Texas Registered Engineering Firm F -754 'Suite 165D Fax: (367 ) ' 7 FEND. NO 5 Corpus Christi, TX 78401 -0850 wm.hdri .coEXHIBIT `°A" Page 1 of f Mr. Dan Biles, P.E. PW 151670 City of Corpus Christi September 28, 2012 Page 2 of 6 c. Provide interpretations and clarifications of the contract documents for the Contractor and authorize required changes which do not affect the Contractor's_ price and are not contrary to the general interest of the City under the contract. d. Perform day -to -day project management. As' we have discussed previously, considering the nature of construction required on this project, we propose . to perform periodic construction observation. rather than having a full -time onsite inspector (described in more detail under line . item "i" below). To supplement the periodic. construction' observation, HDR will maintain communication with the Contractor. and City on an approximate daily basis (frequency and extent of communication may vary depending on the nature and progress of construction activities). This will help HDR and the City remain current on the progress of work, and allow HDR to schedule site visits when key work is being performed. Daily communications will 'be through telephone and- email: e. Review Contractor's dredging volume calculations associated with monthly payment applications. Provide recommendations to. .City for payments to Contractor. Anticipated payment applications include 3 interim payments and T final payment. f. Prepare and/or assist in change orders as authorized by the City (coordinate with the City's Engineering Services Construction g. Make final inspection with City staff and provide the City with a Certificate of Completion for the Project. h. Compile red -line drawings of the Project as constructed and deliver to the Engineering Services. As we discussed previously, project specifications for this project require Contractor to provide detailed surveys of the completed .work that will be signed/sealed by an RPLS. Therefore, rather than'develop a comprehensive. set of stand -alone record drawings in Autocad, record drawing package will consist. of an assembly of hand- marked set of engineering plans plus appendices consisting of compilation of Contractor's acceptance surveys. DVD containing AutoCAD files will be included for Contractor's surveys. L HDR will endeavor to provide protection for the City against defects and deficiencies in the Work by performing periodic site observation. The following provides additional detail. 1. General: Endeavor to protect the City in .providing construction observation services; however,. it is understood that HDR does not guarantee the Contractor's performance, nor is HDR responsible for supervision of the Contractor's operations and employees. HDR will not be responsible for the means, methods; techniques., sequences or procedures of construction selected by the Contractor, or any safety precautions and programs relating in any way to the condition of the - premises, the work of the. Contractor or any subcontractor.. HDR will not be responsible for the acts or omissions of any person (except its own employees or agents) at the Project site or otherwise performing any of the work'of the Project. 2. Conference and Meetings: . Attend meetings with Contractor, such as - pre - construction coordination meeting; progress meetings, job conferences and other, Proj cot-related. meetings as required: by the City, and prepare and circulate copies of minutes thereof. HDR Engineering, Inc. 555 N Carancahua Phone: (3 Texas Registered Engineering Firm F -754 Suite 1650 Fax: (361) 7 OtNQ. NQ. 5, Corpus Christi TX 711401-085(l w ww:hdri .caEXHIBIT "A" Page 2 of 6 Mr: Dan Biles., PX; PW151670 City of Corpus Christi. September 28, 2012 Page 3 of 6 3. Liaison: Serve as liaison with Contractor, working principally through Contractor's superintendent, and assist in understanding the intent of the Contract - Documents. 4: Interpretation of Contract Documents: Issue to Contractor clarifications and interpretations as needed. - 5. 'Process shop.Drawings and Samples: i. Receive. Samples furnished at the site by Contractor. ; ii. Record date of receipt of Samples and approved. Shop Drawings. iii: Advise Contractor of -the commencement of any portion of the Work irequiring a Shop Drawing or Sample submittal for which HDR believes that the submittal has not. been approved. 6.. Review of Work and Rejection of Defective Work: i. Conduct. periodic (approximately three times per month) on -site . observations of Contractor's work -in- progress and determine if such, Work is in general accordance with the Contract Documents. .4-.8 hours - are anticipated for each site visit which includes.travel time and reporting. Site visits will be scheduled to occur more frequently when key aspects of work are underway (for example, when active dredging and beach nourishment are occurring) and less frequently when little or no work has occurred. ii. - Report whenever HDR believes that any part of Contractor's work in progress will not' produce a completed Project that conforms to the Contract Documents or will prejudice the integrity of the design concept of the completed Project, or has been - damaged, or does not meet the requirements of any inspection, test or approval required to be. made; and advise City of that part of work in progress that HDR believes should be corrected or rejected or should be uncovere& for observation, or requires special. testing, inspection or approval. iii. Observe whether Contractor has arranged for inspections generally.required by Laws and Regulations, including but not limited to those to be performed. by public agencies having jurisdiction over the Work. 7. Records and Reports: i. Maintain orderly files for correspondence, reports of• job conferences, reproductions of original Contract Documents including all Change Orders,' Field Orders; Work Change: Directives, Addenda, additional Drawings issued subsequent to the Contract, HDR's clarifications and interpretations of the Contract Documents, progress reports, Shop Drawing and Sarnple. submittals received from and delivered to Contractor, and other Project related documents. ii. For each site visit, prepare a construction observation report utilizing approved City format, recording Contractor's presence on the site, weather conditions, data relative to questions of Change Orders, Field Orders, Work . Change Directives, or changed conditions, site visitors,.. daily activities,. decisions, observations in general, and specific observations in more detail as in case of observing test procedures; and send copy to the City. HEM Engineering, Inc. 555 N Carameahua Phone:f3fi . TexasRe&tered Engineering 'Firm F -754 suke.1650 Fax{361J, 7 IEND. NO. 5 Corpus Christi TX 78401 -0850 www:hdri .coEXHIBIT ° `A" Page 3ofB Mr. Dan Biles, P.E. PW151670 City of Corpus Christi September 28, 2012 Page 4.of G iii. Construction observation reports will include photographic documentation as required to document progress of the Work and of Contractor's compliance with the progress schedule and schedule of Shop Drawing and Sample submittals. - iv. Report immediately to the City the occurrence of any known site accidents, any Hazardous Environmental Conditions, emergencies, or -acts of God endangering the Work, and property damaged by fire or other causes, 8. Coilxapletion:. L Before-the 'issue of Certificate. of Completion, submit to Contractor a list of. observed items requiring completion or correction. I Participate in a fmal inspection. in the company of the City and Contractor and prepare a final list of items to be completed or corrected. iii. Observe whether all items on final list have been completed or corrected and - make recommendations concerning acceptance and issuance of the Notice of Acceptability of the Work. The City staff will: a. Designate an individual to have responsibility, authority, and control for coordinating activities for the construction phase. b. Conduct the final acceptance inspections with HDR. c. Contract directly with a third party as needed for any independent quality assurance surveying or other verification of Contractor's acceptance surveys. d. Contract directly with a third party as needed for full - time construction observation. HDR Engineering, Iris- 555 N Careneahua Phone: (n �1A Texas Registered Engineering Firm F -754 Suite .1650 faK AMEND. END. NO. r J Corpus Christi, TX 7801- 085(1' w�rnrr:hdrin .corEXHIBIT "A1" Page 4of6 . Mr. -Dan Biles, P.E. RKED EI V W151670 City of Corpus Cbristi i September 28, 20I2 Page5of6C Z012 Ei�SINEERING SERVIHS PROPOSED FEE,AND REQUESTED ACTION Thank you again for the opportunity to submit this proposal to assist with completion of this important City project. We propose to provide the Scope of Services described above on a lump sum basis in accordance with Fable 1 - Summary of Scope. and Fees. We estimate that our total fee fox construction phase services will be $33,953. if additional services become necessary, we will acquire authorization from the City and bill for these services in accordance with. an agreed -to lump sum fee.. We propose that all work be performed as Amendment No. 5 to our existing agreement for professional services for Project No. E10168 (dated November 2010). Refer to. Table 2, "Summary of Fees," for a summary of the. authorized and proposed fees under our existing contract. As show_ n, the proposed fee for Amendment No. 5 would bring our total contract amount.to $266;270. HDR Engineering, Inc. . Texas Registered Engineering.Firm F -754 Table 1: Summary of Proposed .Scope and Fees for Amendment No. 5 Scope Item Fee 1. Construction Administration a. Pre - Construction Coordination Meeting $1,074 b. Submittals $8,109 c. Interpretations and Clarifications $2,594_ d. Day -to -Day - Project.Mgmt and Coordination with Contractor $5,863 e. Review Dredging Volumes $2,443 f. Change Orders _ $3,458. g. Final Inspection $1,129 h. Compile Red -Line Drawings $2,721 L Periodic Site Visits and Reporting $5,962 TOTAL;: $33,953: Notes 1. Fees are based on a construction time extension of approximately 90 days. 2. Fee for Construction Observation is based on an average of 4- to `8 -hour site visits per month (including travel and reporting time) for approximately 90'days. Travel assumed to be from HDR's, Corpus Christi office. 555 N Carancahua Phone: (361 5 I`I�. N0. 5 Suite 1650 Fax: (361)8 -1 Corpus ChHsti,TX78401 -0850 wvwMw.hdrin om EXHIBIT "A" Page 5 of.6 ='ECEIVE Mr. Dan &iles, P.D. i � - PW151670 City of Corpus Christi i September 28, 2012 � �1L � � 2092 Page 6 of 6 EitiC�;fVEERING SERVICES Table 2: Summary of Fees for Packery Channel Dredging and Beach. Nourishment (Project No. E14168) We look forward to your approval of the above scope and fees; and development of a contract ORIGINAL AMENDMENT AMENDMENT. AMENDMENT AMENDMENT AMENDMENT - - .. CONTRACT NO. 1 NO.�2 N0:3 NO.4 1\10.5 TOTAL BASIC SERVICES 1 Preliminary Phase - - $0.00 $0.00 - $0.00 $ 0:00 $0.00 °' $0.00 , $0,00 2 Design. Phase - - - - C.CO 69,000,00 6,000.00 0.00 0.00 0.00 $75,000.00 3'BidPhase - -- 0.00 0.00 0.00 - 9,400.00 - - - '0.00 0,00 $9,400.00 4 Construction Phase 0.00 0.00 0.00 - 0:00 - 32,050.00 0.00 $32,050.00 5 Additional Construction Phase. (AUTHORIZED) 0.00. 0.00 0.00 0.00 0.00 33,953.00 $33,953.00 Sub -Total Basic Services - 0.00 69,000.00 5,000.00 9,40D.00 32,050.00 $3,953.00'$150,403.00 ADDITIONAL SERVICES 1 Permitting (AUTHORIZED) - - - Beach Nourishment Permitting 39700.00 O.Co 0.00 0,00 0.00 0.00 $39,700.00 Dredging Permitting - 0.00 28,900.00 0.00 - 0.00 0.00 0.00 $28,900.00 2 Right -of- Way (ROW) Acquistien Survey (NOTAUTHORIZED) 0.00 0.00 0.00 0.00 0.00 ,- 0.00 .$0.00 3 Topographic Surrey (AUTHORIZED) - 0.00 33,500.00 - 0.00 0.00 0.00 0.00 $33,500,00 4 Errvironmental . Assessment tNOTAUfHORIZED) 0.00 0.00 13.0D 0.00 0.00 0,00 $0,00 5 Construction Observation Services (AUTHORIZED) _ 0,00 - - O,Co 0.00 0.00 7,920.00 0.00 $7,920.00 6 Public Involvement - - 0.00 5,000.00 0. DO - 0100 - 0.00 - _ ao6 $S moo 7 Warranty (NOTAUTHORIZED) 0.00 0.00 0: DO 0.00 0.00 0,00 $0.00 B Subsurface Utilities Investigation 0.00 1,000,00 . 0.00 0. DO 0.00 0.00 $1,000.00 39,700.00 68,400.00 0.00 0,00 7,920.00 .0.00 $116,020.00 Sub - "fatal Additional Services TOTAL AtrfHORIZED FEE - $39,700.00 $137,400.40 $6;p00.00 - $9,400.00 $39,970.00 - $33,953.00 $266,423.00 We look forward to your approval of the above scope and fees; and development of a contract SUMMARY OF FEES BASIC SERVICES 1. Preliminary Phase 2. Design Phase 3. Bid Phase 4. Construction Phase (NOTAUTHORIZED) Sub -Total Basic Services ADDITIONAL SERVICES 1. Permitting (AUTHORIZED) Beach Nourishment Permitting Dredging Permitting 2. Right -of -Way (ROW) Acquistion Survey (NOT AUTHORIZED) 3. Topographic Survey (AUTHORIZED) 4. Environment Assessment (NOT AUTHORIZED)) 5. Construction Observation Services (NOTAUTHORIZED) 6. Public Involvement 7. Warranty (NOT AUTHORIZED) 8. Subsurface Utility Investigation Sub -Total Additional Services TOTAL AUTHORIZED FEE Date Authorization M ORIGINAL CONTRACT AMENDMENT NO 1 AMENDMENT NO2 AMENDMENT NO3 AMENDMENT N04 AMENDMENT N05 TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 69,000.00 6,000.00 0.00 0.00 0.00 75,000.00 0.00 0.00 0.00 9,400.00 0.00 0.00 9,400.00 0.00 0.00 0.00 0.00 32,050.00 33,953.00 66,003.00 $0.00 $69,000.00 $6,000.00 $9,400.00 $32,050.00 $33,953.00 $150,403.00 39,700.00 0.00 0.00 0.00 0.00 0.00 39,700.00 0.00 28,900.00 0.00 0.00 0.00 0.00 28,900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33,500.00 0.00 0.00 0.00 0.00 33,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,920.00 0.00 7,920.00 0.00 5,000.00 0.00 0.00 0.00 0.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,000-00 0.00 0.00 0.00 0.00 1,000.00 $39,700.00 $68,400.00 $0.00 $0.00 $7,920.00 $0.00 $116,020.00 $39,700.00 $137,400.00 $6,000.00 $9,400.00 $39,970.00 $33,953.00 $266,423.00 010 Administrative Approval 1 11 2011 Motion No. M2011 -014 2/8/2011 Administrative Approval Administrative Approval 10 5 2011 Administrative Approval