Loading...
HomeMy WebLinkAboutC2012-441 - 3/22/2012 - NASUBRECIPIENT GRANT AORREMENT GLO CONTRACT No. 11 -016- 000 -4314 AMENDMENT NO.1 STATE OF TEXAS § COUNTY OF TRAVIS § The GENERAL LAND OFFICE (GLO), a State Agency, and the CITY OF CORPUS CHRISTI, TEXAS ( "Subrecipienf ), parties to that certain Subrecipient Grant Agreement effective April 26, 2011, and denominated GLO Contract No. 11- 016 -000 -4314 (Contract), now desire to amend the Contract. . WHEREAS, due to unavoidable and unforeseen circumstances, the parties desire to extend the terns of the Contract; and WHEREAS, the parties desire to replace the Work Plan and Budget in Attachment A with the revised . Work Plan and Budget attached hereto and incorporated herein for all purposes as Attachment G , and WHEREAS, these revisions will result in no additional encumbrance of grant funds; Now, THEREFORE, the parties hereby agree to amend and modify the Contract as follows: 1. SECTION 3.01 of the Contract, DURATION AND EXTENSION OF TERM, is hereby amended and modified to reflect a termination date of December 31, 2012. 2. SECTION 2.02 of the Contract, PROJECT AND WORK PLAN, is hereby amended and modified by replacing all prior Work Plans and Budgets with the REVISED WORK PLAN AND BUDGET, attached hereto and incorporated herein for all purposes as Attachment G. 3. This Amendment No.1 will be effective as of March 31, 2012. 4. Except as amended and modified by this Amendment No. 1, all terms and . conditions of the Contract shall remain in full force and effect. SIGNATURE PAGE FOLLOWS GLO Contract No. 11- 016 -000 -4314 Amendment No. l Page 1 of 1 2012 -441 3/22/12 Texas General Land Office INDEXED SIGNATURE PAGE FOR AMENDMENT NO.1 UNDER GLO C ONTRACT No. 11-016 GENE PEKE Larry L. Zaine, Chief Clerk/ Deputy Land Commissioner Date of execution: �'--- C N A GC CrrY OF CORPUS CHRISTI By: Name: W o LS Tithe: D t Ree - rop— Date of execution: 3 i ATTACHMENTS TO Tins AMENDMENT No. 1: ATTACHMENT G - .REVISED W ORK PLAN AND BUDGET ATTACHMENTS FOLLOW avp ppa . p o p a p s a o p p a a p s p a s a p p p a o a a a o opp aop Attachment G GLO Contract No. 11 -026 -000 -4314 Page I of 4 Attachment G - Revised Work Plan and Budget Contract Number: 11- 016 -000 -4314 Project Name: Corpus Christi Beach: ADA Water Access Improvements and Promenade Expansion Entity: City of Corpus Christi Project Description: As part of its effort to remove barriers to beach access for people with disabilities, increase public recreational opportunities near and in coastal waters, and promote environmental awareness about coastal natural resources, the City of Corpus Christi requests $100,000 for the infrastructure improvements at Corpus Christi Beach. The City seeks support install: (1) a 10 feet wide by 100 feet long ADA compliant beach/water access mat; (2) a. 1,350 linear feet (13,500 square feet) expansion of the Corpus Christi Promenade; (3) eight educational signs that will interpret the bay's coastal natural resources; (4) native landscaping; (5) a shade structure; and (6) two drinking fountains. Providing beach access for people with disabilities is complicated due to the dynamic nature of coastal shores. Corpus Christi Beach, an urban waterfront within Corpus Christi Bay, provides the perfect location for the installation of a beacbIwater access mat. The mat will be attached to the Corpus Christi Beach Promenade expansion, discussed below, at a location that is close to existing ADA accessible bathrooms and parking. Beach access mats are designed to roll out to the water line and be easily removed prior to storm events. The Corpus Christi Beach Promenade is a I0 -foot wide concrete pathway that parallels the beach. The master plan for the promenade, envisioned by the CMP- funded (Cycle 2;1995) Corpus Christi Beach Action Plan, is to build a promenade from the U.S.S. Lexington Museum parallel to the water to the north jetty, a length of approximately 4,347 Iinear feet. The City proposes to expand the promenade by 1,350 linear feet to connect the existing end point of the promenade at Gulf Spray Avenue to the Beach Avenue parking lot. Expansion of the promenade will allow for the installation of the beach/water access mat and connect it to two existing parking lots with ADA compliant parking spaces. Phase I of the promenade was f5mded by a CMP grant in 2002. The City built Phase II of the promenade with local fiords in 2006. This phase (Phase III) of the promenade expansion is particularly important because it connects the existing promenade to two existing public parking lots. The parking lots, at Gulf Spray Avenue and Beach Avenue, have approximately 64 parking spaces. Phase III extends the promenade out of the hotel district into an area of public beach that is more easily accessible to day visitors. Phase IV will complete the promenade, extending it 2,275 linear feet to the North Jetty. Phase IV will be entirely City funded. Both Phase III and Phase IV are anticipated to be nem Pmb m a a o a a m o a m u r a p s o c � O P Pn0 mmu Attachment G GLO Contract No. 1 1 - 016-000-4314 Page 2 of 4 completed in 2011, prior to the spring tourist season. City voters approved bonds in 2048 to support the completion of the promenade. Along the expanded promenade, the City will install eight interpretative signs. The signs will educate the public about the bay system's coastal natural resources, environmental threats, and actions to protect-the environment. Topics covered will include the need for water conservation, the importance of freshwater inflow, water quality and nonpoint source pollution, ongoing wetland restoration projects within the lacy system, and the importance of using native landscaping. The signs will be spaced along the promenade and offer visitors the opportunity to learn while wailang. Additional improvements to the promenade funded by this proposal will include the installation of two water fountains, which will be wheelchair accessible, the installation of one shade structure, and native landscaping. Improvements will be built on land owned by the Texas General Land trice already under lease to the City for public access improvements. The approval of this application, with ADA beach access and Phase III promenade expansion, along with City's simultaneous funding of Phase N of the promenade expansion, will provide the constituents and visitors of Corpus Christi 1.4 miles of continuous ADA compliant public beach access. oad osa , o v O 0 6 O O B 0 O 0 o e o n s D a o 0 0 o s o 0 0 00 0 o a s • � 0 AOD DOO Attachment G GLO Contract No. 11- 416- 000.4314 Page 3 of 4 Project Budget: Subrecipient Third Party Project Total $0.00 CMP Salaries $0.00 Fringe $0.00 Travel $0.00 Supplies $0.00 Equipment $0.00 Contractual $100,000.00 Other $0.00 Subrecipient Third Party Project Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $67,000.00 $0.00 $167,000.00 $0.00 $0.00 $0.00 Subtotal: $100,000.00 $67,000.00 Indirect $0.00 $0.00 Total: $100,000.00 $67,000.00 $0.00 $167,000.00 $0.00 $0.00 $0.00 $167,000.00 Special Award Conditions: 1. This project must be completed as described in this work plan, 2. The GLO and/or NOAA must approve any changes in the scope of work or budget requests that change the total project cost, 3. In the event that the GLO and NOAA determine that the projector propery is no longer used for its original purpose, the recipient shall reimburse NOAA for the federal funds received for the project. 4. CMP and NOAA logos, including appropriate acknowledgment statement, mast be printed on education/outreach materials, signs, and final reports and/or publications. Task I Description: Construction of Phase Iff Contract for the installation of (1) a 10 feet wide by 100 feet long ADA compliant beach/water access mat; (2) a 1,350 linear feat (13,500 square feet) expansion of the Corpus Christi Promenade; (3) eight educational signs that will interpret the bay's coastal natural resources; (4) native landscaping; (5) a shade structure; and (6) two drinking fountains. The city has already contracted for design services which fall outside the scope of this grant request. Deliverable(s)/Milestone(s): 1. Copies of local building permits. 090 094 a s o 9 0 0 0 0 0 0 0 a ,► �, 0 9 00 � o 0 090 000 Attachment G GLQ Contract No. 13-- 016- 000L4314 Page 4 of 4 2, Copies of authorization from GLO to make improvements to state property. 2. Copies of draft. and final designs and bid documents. 3. Photos of the 1,350 linen feet promenade and ADA beach access mat; one shade structure; two drinking fountains; eight interpretative signs; and native landscaping. Deliverable Due Dge(s): 12/31/2012 •off ass a n, n b 0 a• n e t J P � ma0 •Ju