HomeMy WebLinkAboutC2013-036 - 1/30/2013 - NAl
AMENDMENT NO.7
TO CONTRACT FOR
PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "CITY ", and Hargreaves Associates hereinafter called
"CONSULTANT", agree to the following amendment to the Contract for Professional Services for Ba front Develol2ment
Plan Phase 3 (Project No. 6511) as authorized and administratively amended by:
Original AIE Agreement
December 13, 2011
Motion No. M2011 -292
$1,315,137.50
Amendment No. 1
September 28, 2012
Administrative Approval
$26,570.00
Amendment No. 2
October 24, 2012
Administrative Approval
$16,440.00
Amendment No. 3
November 7, 2012
Administrative Approval
$48,890.00
Amendment No. 4
November 14, 2012
Administrative Approval
$49,100.00
Amendment No. 5
December 4, 2012
Administrative Approval
$39,650.00
Amendment No. 6
December 27, 2012
Administrative Approval
$45,720.00
In the original contract, EXHIBIT "A ", SCOPE OF SERVICES, Contract Task 8.7, Task 1. Utility and ROW Survey
shall be amended to include additional services as shown on the attached Amendment No. 7, Exhibit "A ".
In the original contract, EXHIBIT "D ", SUMMARY OF FEES shall be amended as described in the attached Amendment
No. 2 Exhibit "A" for a revised fee not to exceed $26,806.00 (Forty Five Thousand Seven Hundred Twenty Dollars and
Zero Cents) for a total restated fee not to exceed 1 567 312.50 One Million Five Hundred Sixty Seven Thousand
Three Hundred Twelve Dollars and Fifty Cents)
All other terms and conditions of the Contract and Amendments between the City and Consultant will remain in full force
and effect.
CITY OF CORPUS CHRISTI
Oscar R. Martinez Date
Assistant City Manager
RECOMMENDED
Daniel Biles, P.P. Date
Director of Engineering
Opera ling Department I Date
APPROVE AS TO FORM
; c9 3
Office of M nagement and Budget Date t
Ij) `1
2013 -036 Date
1130113
HARGREAVES ASSOCIATES
1&�/3
Mary Wargaret Jones /Date
President
970 Tennessee Street
San Francisco, CA 94107
(415) 865 -1811 Office
(415) 865 -1810 Fax
ont Devebpment Plant Phase Mmendment No. RAE AGREEMENT.docx
JAN 1 7 P.M. �
-- - - ENTERED
JAN 09 2013
CONTRACT
Hargreaves Associates INDEXE®
ATTEST
I
Armando Chapa, City Se retary Date
Project Number: 6511
Funding Source: 550950- 3126 - 00000 - 170678
Fund Name: B_ayfront Development 09 GO CIP
Encumbrance Number: C&SI
K Engineering aataExchangelClarissaJlParks 16511 - Baytront eve }oprnent Plan Phase 31Amendmenl No 744E AGREEMENT.docx
Ncv, 1 2012
Dan Biles
Department of Engineering Services
120`1: Leopard Street
Corpus Christi, TX 78401
Re, Bayfront.Deve lop ment plat€ Phase 3-- project CVO 6511
Request for Additional Services
HA Project #f: CDB ] 101
We are submitting this scope and fee to you for additional services related to: surrey needs foe
Destination Bayfrpnt, All terms and ca;rtdition.s of the original contract to which this is nn additional
service apply. Additional services are based on =2 hourly rates and are described beto
Contract Task 8.7 - Scope of Services j Fees and Expenses — $2
Tas T. Utility and ROW Survey �!
Tiie Hargreaves Associates Team Nvili prepare a Utility and preliminary ROW Survey per attaclaeci
proposal from Naisrnith Engineering, This survey Will be used to establish Joration and constraints
of key site elements as they relate to existing utilities and to deferm4e piarameter.s for new anti
existing ut:ilifies. Sur „eye btondaries are the south edge of the.Art.Centt r, the east edge of Shvrehne
Mvd South betveen the Art Center and Furman Avenge, .arid. the edge of McGee Beach artcl the
existing breakwater.
Dear Dan,
Topographic and hydrogmphlc dot;: �ttill be surveyed separately; as needed at a later dace, untie
then, the design, team will reii on the Owner trspbgraphic survey information contained it-,
"Bayfront Survey CoCC” and "CCOC Contours 2004 ",
It is understood that the Shoreline Blvd, project may result in some changes to existing.conclitions.
The Hargreaves Team vide incorporate the Shoreline Blvd. design and as-built information into our
base files when it bec� mes avail
In order to assist v, project coordination, t1,e Owner it to provide the folloviing inforration!
Boundary, Deed and Platting Information available for adjacent sit €s
Digital (CAD) Shoreline Boulevard Limit of Work, Demolition Area and Design Flans
m Digital (CAD) Survey Information for Preliminary FEMA Assessment
Fee breaf do%vw
�sisWlh Engineering - S24,585
Ha areaVes Associates (Surrey Review / Coordination) -- $1,220
E E=1B J 11T "A"
ge of 2
Please call me to discuss any comments or questions regarding this proposal,
Thankyou,
— Fw'M
M p g - m m
Lara Rose
Principal
Additional services authorized by:
Signature:
Name Printed: Date:
EXHIBIT "A"
Page 2 of 2
. M
x
CD
o
NW
Corpus Christi Destination Be runt Fee Summary
ORIGINAL
CONTRACT
AMEND. NO.1
AMEND. NO.
2
I AMEND. NO.
3
AMEND. NO.
4
AMEND. N0.
5
AMEND. NO.
6
AMEND. NO.
7
TOTAL
CONCEPT DESIGN TASKS
COST
Task A
Site Analyses and Programing
-
A -1
Data Collection / Site Analyses (Kickoff Meetngs)
$39,960.00
$0.00
$OAO
$0.00
$0.00
$0.00
$0.00
$0.00
$39,960.00
A -2
Shoreline Drive Coordination
$8,660.00
$0.00
$0.00
$O.00
$0.00
$0.00
$0.00
$0.00
$8,660.00
A -3
South Central Development Plan Coordination
$6,260.00
$0.00
$0.00
$0.00
$0.00
$0,001
$0.00
$0.00
$6,260.00
A -4
Programming Validation
$31,760.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$31,780.00
Sub- total:
$86,660,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$86,660.00
Task B
Concept Design and Graphics
B -1
preliminary Concept Design + Draft Graphics (Advisory Group Stakeholders
Community Meetin #1)
$137,440.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$137,440.00
B -2
Order of Magnitude Cost / Potential Phasing Concept Options
$15,050.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.001
$0.00
$15,050.00
B -3
Final Concept Design + Final Graphics
$171,400.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$171,400.00
B -4
Order of Magnitude Cost/ Potential Phasing Final Concept
$16,790.00
$0.00
$o.DD
$0.00
$0.00
$0.00
$0.00
$0.00
$16,790.00
Sub - total:
$340,680.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$340,680.00
Task C
Supplementary Plans - Concept Design
C -1
Economic Opportunities Analysis
$17,780.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$17,780.00
C -2
Ballpark 0 & M Budgets for Options and Final Concept
$12,100.00
$0.00
$0.00
$0.00.
$0.00
$0.00
$0.00
$0.00
$12,100.00
C -3
Park Naming Plan
$5,10D.00
$0.00
$0.00
$0.00
$O.00
$0.00
$0.00
$0.00
$5,100.00
C -4
Revenue Plan based on Concept Design
$20,926.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20,926.00
C -5
i Capital Funding Plan based on Concept Design
$i9,350.00
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
$0.00
$19,350.00
C -G
Review / Input to Programming and Concept Design Options
$21,800.00
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
$0.04
$21,800.00
C -7
Task D
Itemized
Meetings/ Team Coordination
Sub - total:
Sub - Consultant Management Fee
Basic Services Total.
Additional Services
$8,730.00
$105,786.00
$12,700.00
$545,826.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$48,690.00
$48,890.00
$0.00
$48,890.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$57,620.00
$154,676.00
$12,700.00
$594,716.00
41
Base Map Preparation /Surveying
TBD
TBD
TED
$0.00
$0.00
$0.00
$0.00
$0.00
TED
#2
Physical Model a 1" =40' (Not Authorized at this time)
$40,500.00
$0.00
$0.00
$O.nO
$0.00
$0.00
$0.00
$0.00
$40,500.00
12
Additional Trip / Client Group Meeting (time only, see reimbursables
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
#4
Additional Community Meeting (time only, see (eimbursables below)
TBD
TBD
TBD
TBD
TBD
TBD
TBD I
TBD
TBD
#5
Additional Rendering
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TOD
T8D
#6
Master Plan of Adjacent Sites
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TSD
TBD
#7 I
CUB Luncheon and Economic Summit Presentations
$0.00
$16,070.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$16,070.00
8.5
Funding Plan Briefings, Executive Committee and Council Update
$0.00
$0.00
$0,001
$0.00
$0.00
$39,650.00
$0.00
$0.00
$39,650.00
8.6
Schedule Extension and Master Implementation Plan Refinement
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$45,720.00
$0100
8.7
Utility and ROW Survey
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$25,805.00
Additional Services Total:
$40,500.00
$16,070.00
$0.00
$0.00
$0.00
$39,650.00
$45,720.00
$25,805.00
$96,220.00
Reimbursable Expense Estimate
Reimbursable General Estimate - all Consultants
Total
Total
Print, Copy Tele, FedEx, Misc, Regional Travel
$21,32100
$0.00
$0.00
$0.00
$0.00
$0.001
$0.00
$0.00
$21,325.00
Reimbursable Travel Estimate - Non -Local Consultants
Total
Total
Hargreaves Associates (3 people typical per trip)
$19,250.001
$0.00
$13,320.00
$0.00
$0.00
$0.00
$0.00
$0.00
$32,570.00
HR &A (i person typical pertrip(
$5,250.00
$0.00
$0.00
$0.00
$0100
$0.00
$0.00
$0.00
$5,250.00
ETM 0 Person typical per trip(
$1,750.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,750.00
Lake Flato f2 people typical per tri
$3,000.00
$0.00
$3,.170.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6,120.00
TOTAL TRAVEL:
$29,250.00
$0.00
$16,440.00
$0.00
$0.00
$0.00
$0.00
$0.00
$45,690.00
Total Nat -to- Exceed General + Travel Reimbursement Budget:
Total Concept Design Amount for Basic and Additional Services + Reimbursable Esti
$50,575.00
$636,901.00
$0.
$16,070.00
$16,440.00
$16,440.00
$0.00
$48,890.00
$0.001
$0.00
$0.00
$39,650.00
$0.00
$45,720.00
$0.00
$25,805.00
$67,015.0
$757,951.00
12/13/2011 M2011-
292
9128/12
Admin Approval
10/24/2012
Admin Approval
11/7/2012
Admin Approval
11/14/2012
Admin Approval
12/4/2012
Admin Approval
12/27/2012
Admin Approval
Carpus Christi Destination Bayfront Fee Summary
ORIGINAL
CONTRACT
AMEND NO.1
AMEND NO.2
AMEND NO.3
AMEND NO.4
AMEND NO.5
AMEND NO.6
AMEND NO.7
TOTAL
SCHEMATIC DESIGN TASKS
Cost
Task E
Schematic Design Tasks
50% Schematic Design
E -1
Design Development/ Illustrative Graphics
$204,416.00
$0.00
$0.00
$0.00
$0.00
- $0.00
$0.00
$0.00
$204,416,00
Advisory Group/ Stakeholder/ Community Meetings 93
$25,738.00
$0.00
- $0.00
$0.00
$D.00
$0.00
- $G.00i
$0.00
525,738.00
E -2
50% Schematic Design Cast Estimate
100% Schematic Design
$227,396.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$227,396.00
E -3
CAD Document Set /Technical Memos
Advisory Group/ Stakeholder/ Community Meetings a 4
$31,600.00
$0.00
$O.DO
$0.00
$0.00
$0.00
$0.00
$0100
$31,600.00
E -4
100 Schematic Design Cost Estimate
Sub - Total: .
$489,150.00
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
$0.00
$489,150.00
Task F
Supplementary Plans - Schematic Design
_
F -1
Sustainable Opportunities Plan
$31,300.00
$0.00
$D.00
$0.00
$0.01)
$0.00
$0,00
$0.00
$31,100.00
F -2
Programming Plan
$27,500.00
$0.00
$9.00
$0.00
$0.00
$0100
$0.00
$0.00
$27,500.00
F -3
Master Implementation and Phasing Plan
$14,100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$O.OD
$14,100.00
F -4
lRefined Capital Funding Plan based on $D
$9,390.00
$0.00
$O.OD
$0.00
$0.00
$0.00
$0.00
$0.00
$9,390.00
F -5
Refined Revenue Plan based on SO
$9,200.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$9,200.00
F -6
Operations and Maintenance Budget
$17,970.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$17,970.00
F -7
Goverance /Organizational Plan
$20,340.00
$0.00
$0.00
$o -00
$0.00
$0.00
$0.00
$0.00
$20,340.00
F -8
Meetings /Team Coordination
$3,500.Co
$D -CO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,500.00
Sub- Total:
$133,100.40
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$133,100.00
Task G
Sub - Consultant Management Fee
$15,096.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.D0
$0.00
$15,095.50
Basic Services Total:
$637,346.50
$0.00
$0.40
$0.00
$0.00
$0.00
$0.00
$0.00
$637,346.50
Itemized Additional Services
TIR2 and Downtown Special Assessment Work
$O.OD
$10,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$10,500.00
8.4
Task 1. Shoreline Boulevard and Park Streetscape Coordination
$0.00
$0.00
$0.00
$23,800.00
$0.00
$0.00
$D.00
$23,800A0
Task 2. Coastal Projects (Preliminary Coastal Drawings & USACE Coor&nation)
$0.00
$0.00
. $0.00
$25,300.00
$O.DO
$0.40
$0.00
$25,300.00
Additlonal Services Total
$0.00
$10,500.00
$0.00
$0.00
$49,100.00
$0.00
$0.00
$0.00
$59,600.00
Reimbursatrfe Expense Estimate
Reimbursable General Estimate - all Consultants
Total
Print, Copy Tele ,FedEx,Misc,RegionaITravel
$24,890.001
$0.001
.$0.00
$0.00
$0.001
$0.00
$0.00
$0.00
$24,890.00
Reimbursable Travel Estimate - Nan -Local Consultants
Total
Hargreaves Associates (3 people typical per trip)
$10,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$10,500.00
HR &A (1 person typical per trip)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0-00
$0.00
ETM (1 Person typical per trip)
$3,500.00
$0.00
$0.00
$0.00
$0.00
$om
$D.00
$0.00
$3,500.00
Lake Flato (2 people typical per trip)
$2,000.00
$0.00
$0.00
$0.00
$O.OD
$D.00
$0.00
$0.00
$2,000.00
TOTALTRAVEL:
$16,000.00
$o.CO
$0.00
$0.00
$O.OD
$0.00
$0.00
$0.00
$16,000.00
Total Nat -to- Exceed General + Travel Reimbursement Budget:
$40,890.00
$0.00
$0.00
$0x0
$0.00
$000
$0.00
$0.00
$40,890.00
Total Schematic Design Amount for Basic and Additional Services + Reimbursable E
$678,23630
$10,500.00
$0.00
$0.00
$49,100.00
$0,00
$0.00
$0.00
$1,495,787.50
Contract Value for Master Implementation and Phasing Plan Phase (Concept and S
$1,315,137.50
$26,570.00
$16,440.00
$48,890.00
$49,100.00
$39,6$0.00
$45,720.00
$25,805.00
$1,567,312.50
12113/2011
M2011 -292
9/28/12
Admin Approval
10/24/2012
Admin Approval
11/7/2012
Admin Approval
11/14/2012
Admin Approval
12/4/2012
Admin Approval
12/27/2012
Admin Approval
�M
x
CD
N�
0
N�
A
SUPPLIER NUMBER
TO BE ASSIGNED BYCI71 --
PURCHASING DIVISION
City of CITY OF CORPUS CHRISTI
Corpus DISCLOSURE OF INTEREST
Christi
City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business
with the City to provide the following information.. Every question must be answered. If the question is
not applicable, answer with "NA ". See reverse side for Filing Requirements, Certifications and
definitions.
COMPANY NAME: Hargreaves Associates
P. O. BOX:
STREET ADDRESS: 970 Tennessee Street
FIRM IS: 1. Corporation B
4. Association
CITY: San Francisco CA ZIP,
2. Partnership e 3. Sole Owner ❑
5. Other
94107
DISCLOSURE QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet.
1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Job Title and City Department (if known)
2. State the names of each "official" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Title
3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named "firm." .
Name Board, Commission or Committee
4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who
worked on any matter related to the subject of this contract and has an "ownership interest"
constituting 3% or more of the ownership in the above named "firm."
Name Consultant
EXHIBIT "C"
Pa e I of 2
FILING REQUIREMENTS
If a person who requests official action on a matter knows that the requested action will confer an
economic benefit on any City official or em p loyee that is distinguishable from the effect that the action
will have on members of the public in general or a substantial segment thereof, you shall disclose that fact
in a signed writing to the City official, employee or body that has been requested to act in the matter,
unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be
made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 -349 (d)]
CERTIFICATION
I certify that all information provided is true and correct as of the date of this statement, that I have not
knowingly withheld disclosure of any information requested; and that supplemental statements will be
promptly submitted to the City of Corpus Christi, Texas as changes occur. y�
Certifying Person: �'/�(I *
itle: _ s/. � Ll l fog
(Type or Print)
Signature of Certifying Date:
Person:
DEFINITIONS
a. "Board member." A member of any board, commission, or committee appointed by the City
Council of the City of Corpus Christi, Texas.
b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an
effect on that interest that is distinguishable from its effect on members of the public in general or a
substantial segment thereof.
c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part -
time basis, but not as an independent contractor.
d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and
whether established to produce or deal with a product or service, including but not limited to, entities
operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint
stock company, joint venture, receivership or trust, and entities which for purposes of taxation are
treated as non - profit organizations.
"Official." The Mayor, members of the City Council, City Manager, Deputy City Manager,
Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of
Corpus Christi, Texas.
"Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a
firm, including when such interest is held through an agent, trust, estate, or holding entity.
"Constructively held" refers to holdings or control established through voting trusts, proxies, or
special terms of venture or partnership agreements."
g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus
Christi for the purpose of professional consultation and recommendation.
EXHIBIT "C"
Page 2 of 2