HomeMy WebLinkAboutC2013-129 - 4/23/2013 - ApprovedCITY OF CORPUS CHRISTI AMENDMENT NO.4 CONTRACT FOR PROFESSIONAL SERVICES Cit p y ", The it o Corpus Christi, Texas hereinafter called "City", PIPELINE ANALYSIS, LLC , agree to the following _ amendments to the Contract for Engineering Services for Citywide Hydraulic Model - Sanitary Sewer Overflow Initiative (SSOI) (Project No. E10015) as authorized and administratively amended by: Original Contract August 24, 2010 Motion No. M2010 -195 $96,101.00 Amendment No. 1 October 11, 2010 Administrative Approval $48,548.00 Amendment No. 2 December 4, 2010 Administrative Approval $29,176.00 Amendment No. 3 June 21, 2011 Motion No. M2011 -133 $1,989,103.00 EXHIBIT "A ", SECTION 1. SCOPE OF ENGINEERING SERVICES, shall be amended by the additional_ tasks as described in Amendment No. 4. Exhibit "A ". EXHIBIT "A ", SECTION 2. PROJECT SCHEDULE shall be amended as specified in the attached Amendment No. 4 Exhibit "A", Schedule. Exhibit "A ", SECTION 3. FEES shall be amended and is attached as Amendment No. 4 Exhibit "A" for a revised fee not to exceed $179 (One Hundred Seventy Nine Thousand Two Hundred Fiftv One Dollars and Zero Cents) for a total restated fee not to exceed $2,342,179.00 (Two Million Three Hundred Forty -Two Thousand One Hundred Seventy Nine Dollars and Zero Cents] Monthly invoices shall be submitted in accordance with the attached Amendment No. 4 Exhibit "B ". All other terms and conditions of August 24, 2010 contract between the City and Engineer will remain in full force and effect. CITY OF CORPUS CHRISTI 0?7 flV4�- °• Oscar R. Martine l-, Date Assistant City Manager RECOMMENDED Daniel Biles, P.E., ` DAte Director of Engineering Services Operating Department Date APPROVED *S TP FORM Office of Ma agement and Budget Date Pipeline Analysis LLC PIPELINE ANALYSIS, LLC Ja es H. Forbes, Jr., P.E., � Date President 115 Main Street Garland, Texas 75040 (800) 637 -0164 Office 13 I . AU I Hb1r IL&.. € " 2013 -129 4123113 AMEND. NO. 4 M2013 -071 Page 1 of 2 rER\E10015 CITYWIDE SS HYDRAULIC MODEMMENDMENT NO. 41CONTRACTICONTRACT.DOC INDEXED V� b< -1x- -11 Legal Department Date ATTEST Armando Chapa, City Secretary Project No. E10015 Fund Source No. 550950 -4510- 00000- E10015 Fund Name: Wastewater Capital Reserves Encumbrance No, _ 1 �D r ►4 MAR 1 9 2 013 1, CQNTRAL; I MAMUER 311 AMEND. NO. 4 Page 2 of 2 MENGINEERING DATAEXCHANGEUENNIFER4WASTEWATER \E10015 CITYWIDE SS HYDRAULIC MODELLAMENDMENT NO.4 \CONTRACTtCONTRACT.DOC T PIPELINE ANALYSIS"` CWASTEWATER COLLECTION ENGWEERS March 4, 2013 William J. Green, P.E. Assistant Director of Engineering Engineering Services 1201 Leopard Street Corpus Christi, Texas 78401 (361) 826 -3598 - direct (361) 816 -4916 - mobile billg(a,cctexas. corn 1115 Main Sheet Garland, Texas 75040 800- 637 -0164 RE: Contract Amendment No. 4 City -Wide Sanitary Sewer Hydraulic Model Phase 2 Temporary Wet Weather Flow Monitoring (Project No. E10015) Dear Mr. Green, The prime contract provided technical assistance necessary to prepare a SSO Initiative Plan for the Oso service area and a city -wide CMOM (Capacity, Management, Operation & Maintenance) Self -audit to meet TCEQ and proposed EPA regulations. The original contract included the development of a SSO Initiative Plan for the Oso Service Area and Amendment No. l authorized Pipeline Analysis to incorporate the Broadway and Greenwood Service Areas into the SSO Initiative program. Amendment No. 2, in anticipation of future TCEQ actions, included the Allison, Whitecap and Laguna Madre Service Areas. Amendment No. 3 provided for the development of a comprehensive city -wide hydraulic model of the wastewater collection system which included city -wide flow monitoring. Phase 1 flow monitoring of Broadway, Greenwood and Oso Service Areas was completed on schedule; however, Phase 2 flow monitoring did not record sufficient rainfall for model calibration. Amendment No. 4 to this contract is necessary due to the lack of rainfall during the Phase 2 temporary flow monitoring of the Allison, Laguna Madre and Whitecap service areas. Adequate rainfall data is critical in the process of calibrating the hydraulic model. Inadequate rainfall during flow monitoring in 2012 has necessitated the need for additional flow monitoring in May — June, 2013. The hydraulic wastewater system model will equip the wastewater department with the tools for analyzing system conveyance capacities, bottlenecks, and potential overflow locations. The hydraulic model will facilitate system analysis, aid in development of system improvements, produce informational maps /exhibits, and will predict the system's response to future improvements. The hydraulic model will enable the City to assess and predict potential capacity requirements and develop least cost strategies to optimize system performance. The major tasks included in the city -wide project scope for this Amendment No.4 are: • Wastewater Flow Monitoring at 25 key locations within the Allison, Laguna Madre and Whitecap Service Areas. • Rainfall monitoring at 12 locations to establish stone event intensity and duration. AMENB1. N0.4 EXHIBIT "A" Page 1 of 15 The total amount of this Amendment is $179,251 as shown in the breakdown on Attachment "A ". The man hour. and. fee analysis for this Amendment is shown in Attachment "B ". I have also attached the project schedule for the work as shown in Attachment "C ". If you have any questions or require additional information, please give me a call at (800) 637 -0164 or email me at jforbes @pipehneanalysis.com. Very truly yours, PIPELINE ANALYSIS, LLC James H. Forbes, Jr., P.E. Attachments: Attachment "A" Attachment "B" Attachment "C" AIUII =ND. NO. 4 EXHIBIT "A" Page 2 of 15 Attachment A Project No. E10015 Professional Services Contract City of Corpus Christi Sanitary Sewer Overflow Reduction Program Hydraulic Modeling Scope of Services Phase 2 Re -Flow Monitoring Allison, Laguna Madre and Whitecap Service Areas March 2013 PIPELINE ANALYSIS "` N' n•S':it'q:E.PCC_�irt",X3x51T -ix.: '�'.•: �l'1r�4; in association with CoMR&W (OGutiam L.P. mum " RMEW9% €04 eru I ambtte-ru I contraaam AMEND, NO.4 EXHIBIT "A" Page 3 of 15 1 Attachment A SCOPE OF WORK CITY OF CORPUS CHRISTI, TEXAS SANITARY SEWER OVERFLOW REDUCTION PROGRAM WASTEWATER HYDRAULIC MODELING Amendment No.4 Phase 2 Temporary Flow Monitoring CITY PROJECT'E10015 BACKGROUND The approach to the hydraulic modeling of the wastewater collection system is organized around the City's objectives for this project: ■ Reduction in Sanitary Sewer Overflows ■ Cost controls and Least Cost Alternatives ■ Attainment of long -term Infiltration/Inflow solutions ■ Collection System Capacity Assurance ■ Regulatory compliance ■ Customer satisfaction GENERAL INFORMATION A hydraulic wastewater system model will equip the wastewater department with the tool for analyzing system conveyance capacities, bottlenecks, and potential overflow locations. The hydraulic model is calibrated to actual wastewater flows using temporary flow meters placed at key locations within the collection system. Inadequate rainfall during Phase 2 in 2012 has resulted in the need to obtain additional wastewater wet weather flow measurements in order to calibrate the hydraulic model. OBJECTIVES This project will address the following objectives: 1. Install approximately 25 temporary flow meters within the Allison, Laguna Madre and Whitecap service areas and record dry and wet weather wastewater flows. 2. Install 12 temporary rainfall gauges to establish the rainfall intensity and duration. 3. Analyze the recorded data and update the Phase 2 Final Report to include this additional collected data. PROJECT PHASING Phase 2 will consist of the Allison, Laguna Madre, and the Whitecap WWTP basins. The earliest historical optimum period to record wet weather flows is during May and June. MODEL BENEFITS • Flow Capacity Evaluation • Overflow Management • Infiltration/Inflow Modeling • System Deficiency Identification + CIP Development • New System Design 4 of 15 BASIC SERVICES — NIA ADDITIONAL SERVICES The development of a hydraulic model for the six wastewater service areas ensures consistent assessment of future growth, maintenance and system capital requirements for current and future conditions. Furthermore, hydraulic modeling will provide the project team consultants with pertinent data to assess system impacts to various wet weather events and will further enable the project team to test cost effective repair strategies and alternatives. Modeling will allow the team to conduct a series of "what if" scenarios that will help determine least cost solutions. These various scenarios take into account the City of Corpus Christi maintenance and personnel needs, budget, planned growth, capacity issues and can be used to more accurately design relief and/or replacement lines and optimize system rehabilitation. The following tasks are anticipated with the hydraulic modeling effort: 1.6 Wastewater Flow and Rainfall Monitoring Develop a 60 day wastewater flow monitoring plan to collect data that will be used for hydraulic model calibration, establish magnitude of wet weather inflow and prioritize sub - basins for future testing and rehabilitation. Mobilize flow monitoring team and coordinate startup. Establish personnel assignments and responsibilities. Inventory equipment needs and order expendable supplies. Perform meter pre - calibration, prepare mounting rings for various pipe sizes, set -up meter database and project information_ Delineate sub -basin boundaries based on current GIS mapping for each preliminary site such that the linear footage of pipeline within each sub -basin can be determined. 1.61 Preliminary Monitoring Locations —Previously completed 1.6.2 Finalize Flow Monitoring Locations —Previously completed L6.3 Conduct Field Inspections —Previously completed 1.6.4 Conduct Flow Monitoring for 60 days (including Rainfall Gauges) Temporary flow meters will be utilized to establish wastewater flows during dry (and wet) weather conditions. Flow metering equipment will be capable of recording flow under surcharged conditions and will be synchronized to the same clock used for rain gauges. The duration of monitoring will be 60 days_ A total of 25 temporary flow meter sites and 12 rain gauge sites are anticipated based on a preliminary evaluation. The following is a summary of consultant provided equipment: Service Area Flow Meters Rainfall Gauges ALLISON -PH2 8 4 LAGUNA -PH2 10 4 WHITECAP -PH2 7 4 Phase 2 Sub -total 25 12 Pipeline Analysis staff will use sound engineering judgment in adjusting raw depth and velocity data to account for debris, etc. and may use other analysis techniques, such as scatter graphs, AMEND. NO.4 EXHIBIT "A" Page 5 of 15 multiple flow equations and hydrographs to review data integrity or further analyze the flow data. Each meter will be field calibrated prior to installation. Calibration of each meter will consist of an independent verification of the flow depth and velocity. The flow sensors will be secured to a mounting band that fits snugly in the pipeline. The data logger for each site will then be installed and secured in the top of each manhole and the meter will be activated at industry standard user defined sampling intervals not to exceed 15 minutes. Continuously recording rainfall gauges will be installed to obtain each storm event intensity and . duration across the study area. Each rainfall gauge will be installed and calibrated to ensure proper operation and recording. Rainfall gauges are of the tipping bucket type and accurately record rainfall to 0.01 inches. Maintenance logs will be prepared by consultant for each weekly site visit and will show as a minimum the date, time, operational check, verification of recordings, and other applicable maintenance items. The frequency of site visits will be based on the site history and will generally be weekly unless more frequent visits are required due to debris of sensor fouling. Using the collection system maps in association with GIS and supplemented by the City storm water rain gauges, a rainfall distribution analysis will be performed for each major storm event. For each metered sub -area, the volume of rainfall that fell over the surface will be determined using GIS spatial analysis and compared to the discrete wet weather infiltration/inflow. 1. 6.5 Data Collection From Flow Meters Routine maintenance and service will be undertaken to confirm normal operation. Written logs of each site visit will be maintained and will be used to record date and time of visit, meter velocity and depth reading, corresponding independent velocity and depth reading, maintenance items such as battery voltage, etc. A tabular and graphical presentation of the final data will be prepared. Peak, minimum and average flow depths and rates will be generated to assist in data analysis and provided in hardcopy and electronic (MS Excel) formats. 1.6.6 Confirmation of Adequate Wet Weather Data The proposed flow monitoring will be undertaken to obtain adequate hydraulic information for dry (and wet) weather conditions. A review of the dry and wet weather data will establish the number of storm events recorded and a determination if adequate data exists or if the metering period needs to be extended. In general at least three (3) storm events, that cause a noticeable system response, will be necessary to evaluate wet weather flows. The wet weather flow data information will be used to establish rainfall derived infiltration/inflow (RDH). Both cumulative and discrete flows will be evaluated. Should rainfall not be adequate during the 60 day monitoring period then a determination will be made to either extend the flow monitoring on a week by week basis or terminate the monitoring based on forecasts for the area. The City project manager and consultant will review the data collected, review the impact on the hydraulic model, review the National Weather Service long - range precipitation forecast and make a decision on whether to extend the monitoring period. The City project manager will have the final authorization to extend the flow monitoring or terminate the flow monitoring at the end of the 60 day milestone. 1.6.7 Flow Data Analysis PA will analyze the gathered data and develop tabular and graphical summaries. Comparisons with any previous historical flow meter data from previous III Analysis, Sewer System Evaluation Surveys will be summarized and evaluated. The impact of silt and debris will be evaluated. AMEND. NO.4 EXHIBIT "A" Page 6of15 Information obtained during the monitoring period will be used to determine the following for each meter site: 1. Dry weather average daily flow A typical dry weather week will be established that is not impacted by rainfall. Velocity data will be compared to debris levels to analyze the scouring velocity necessary to prevent deposition in the lines. Discrete flows from each metered sub -basin will be calculated. 2. Dry weather peak flow — Peak flows during dry weather will be determined from the recorded meter site data. Wet weather.average daily flow — Wet weather flows for each rainfall event will be analyzed to determine the percentage of rainfall that enters the collections system (also known as the leakiness factor). By comparing the storm event flow with the dry weather flows will establish the Rainfall Derived Infiltration/Inflow (RDII). This value will vary for each storm duration and intensity. The discrete RDII for each sub -basin will be determined and will allow the ranking (prioritization) of each sub -basin by severity of RDIL 4. Wet weather peak flow — Peak flow rates during wet weather are critical to the capacity analysis. Peaking ratios (Peak flow rate to average dry weather flow) will be compared for dry and wet weather. 5. Peak inflow rates — Peak inflow rates are calculated by observing peak flow during a wet weather events. 6. Total I/I volume - The area under each storm event curve will be evaluated to establish the volume of rainfall induced infiltration/inflow. These values can then be normalized to establish the volume of RDII per inch of rainfall. Projections can then be made to accurately determine the impact of RDII during a normal year. During data analysis, the Manning and continuity equations may be plotted for flow. Under ideal free flow hydraulic conditions the two separate equations for flow should provide similar results. However, in a backwater or restrictive hydraulic situation, the Manning equation will over quantify flows and diverge from the continuity equation. Such an occurrence will indicate to the data analyst that a backwater condition was observed and a downstream restriction should be investigated. The project team will use sound engineering judgment and experience in adjusting raw depth and velocity data to account for debris levels. By obtaining accurate velocity and depth data, the engineer can further isolate hydraulic problems within the collection system. 1.6.8 Ranking of Meter Sub - basins A major result of the city -wide flow monitoring program will be the priority ranking of sub - basins based on various factors such as RDII, SSOs, maintenance history, etc. This matrix ranking will be used in a multi -year program to find and fix system defects. Using the rainfall distribution analysis and recorded wet weather flow data, the gallons of rainfall dependent I./I (RDII), per inch of rainfall, per linear feet of service area pipeline (gal/in/If) will be calculated. By performing this matrix analysis, each sub -basin is compared, assessed and ranked on an equal basis. Consultant will prepare a matrix for city review and approval. 1. 6.9 Preparation of SSES Phasing & Cost Estimates Based on the matrix ranking of sub - basins, a phased Sanitary Sewer Evaluation Survey (SSES) AMEND. NO.4 EXHIBIT "A" Page 7 of 15 program will be prepared along with estimated implementation cost estimates. 9.6.10 Review of Uf Study Report PA will prepare three (3) copies of the 111 Analysis Pre - Submittal Final Report which summarizes all findings, observed deficiencies, and recommendations with estimated costs. Review comments will be incorporated into the Final Report and five (5) copies submitted to the City. The final III Study Report will include the following: • Executive Summary • Dry Weather Flows • Wet Weather Flows • Rainfall Distribution Analysis • Distribution of RDII • Priority Ranking of Sub basins • Discussion and estimated cost of a Permanent Flow Monitoring Network • Recommended testing and rehabilitation schedule and cost estimates • Appendix with flow and rainfall data • Electronic spreadsheets, photographs, maps and report on CD included with each report Deliverables: 1. Meter site locations. List of meter sites and location map(s) delineating the basin boundaries will be prepared by Pipeline Analysis 2. Completion of meter site location forms 3. Map showing proposed meter and rain gauge site locations 4. Velocity, depth, and flow data in tabular format 5. Site photographs and site installations sheets 6. Rainfall summary intensity and duration, rainfall volume, rainfall distribution using GIS 7. Matrix and final priority ranking of sub - basins 8. Three (3) copies of Pre -Final Report 9. Five (5) copies of Final Report CITY'S RESPONSIBILITIES CITY will provide ENGINEER at no cost: L Access to sites for placement of equipment and personnel. Assistance (if requested) for placement of rainfall gauges at secure locations such as fire stations, pu - rnp stations, etc. 2. Review and authorization to extend flow and rainfall monitoring beyond 60 days (if applicable) 3. Wastewater treatment plant flow records — average and peak wet weather 4. Meeting room for meetings S. Provide Access 6 Arrange for access to, and make all provisions for, ENGINEER or ENGINEER'S Sub consultants to perform services under this AGREEMENT. AMEND. NQ. 4 EXHIBIT "A" Page 8 of 15 7. City Representative - CITY shall designate both a Wastewater Department and Engineering Department representative to act as a contact persons on behalf of the CITY. SCHEDULE The ENGINEER'S services shall be performed in a timely manner consistent with sound professional practices. The ENGINEER will complete the work according to the following schedule: Phase 1 - Broadway. Greenwood and Oso Service Areas Major. Tasks Week No. Start Duration eeks : ` Week ` End: ACTIVITY 1 1 31 32 Kick -.Off Meetigg 1 Workshop/Data Collection and Review 1.6 8 20 28 Wastewater Flow Monitori 2 16 28 44 Model Development 3 28 64 92 Model Calibration 4 80 12 92 E)dstinq System Analysis 5 80 12 1 92 Future System Anal is 6 80 12 92 Phase 1 Draft Report 7 4 28 32 Manhole Ins eclion 8 4 28 32 Topographic Suve 9 1 135 136 Model Purchase[Trainin 10 1 135 136 lSuppl emental/Conti en 11 1 3 4 1 Traffi c Control Plan 1 135 1 136 IPHASE 1 COMPLETE Phnca 9 - 011innn I —m. KA.A— —A Whif.— Q—A— A— Major . Tasks Week No. Start . Duration (Weeks) Week End ACTNfIY 1 40 28 68 Kick - Off Meeti ng 1 Workshop/Data Collection and Review 1.6 60 56 116 Wastewater Flow Monitoring with Extended Meteri 2 64 36 100 Model Development 3 76 44 1 120 Model Calibration 4 88 36 124 E)dsfinq System Ana is 5 88 40 128 Future Systern Analysis 6 116 16 132 Phase 2 Draft Report 7 36 16 52 Manhole Inspection 8 48 20 68 Topographic Suve 9 1 135 136 Model Purchase(Trainin 10 1 135 136 Suppi ementaUContin en 11 32 4 36 1 Traffic Control Plan 1 135 136 PHASE 2 COMPLETE 2 1 128 8 1 136 1 Combine Phase 1 & 2 Draft Reports into Final City-wide Re ort The time limits set forth in the schedule shall include allowances for reasonable and expected review time by the CITY and approval by authorities having jurisdiction over the PROJECT, and shah not be allowed as cause for delay or adjustments to the schedule. Delays in the design critical path caused by review times by the CITY or a permitting agency exceeding those anticipated by the ENGINEER'S schedule are cause for adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made in writing and acceptable to both parties. The ENGINEER shall begin work within 10 days of receipt of the executed CONTRACT and written Notice to Proceed. A schedule of completed work, including a bar graph schedule showing the percentage complete of each of the items of the scope of work, will be submitted each month to the CITY. AMEND. NO.4 EXHIBIT "A" Page 9 of 15 Attachment A Contract Amendment No. 4 Sanitary Sewer Overflow Initiative Plan Development and Capacity, Management, Operation & Maintenance Self -audit (Project No. E10015) Amendment No. 4 City -Wide Sanitary Sewer Hydraulic Model Phase 2 Temporary Flow Monitoring Summary of Fees Basic Services Contract Amd No. 1 Amd No. 2 Amd No. 3 Amd' No. 4 Total Contract. I. Preliminary Phase $ 17,678.00 $ - $ $ 17,678.00 2, CMOM Self -Audit Interviews $ 59,553.00 $ $ $ 59,553.00 3. CMOM Pre -Final and Final Report $ 8,963.00 $ $ $ 8,963.00 4. Oso SSO Pre -Final and Final Report $ 9,907.00 $ $ $ 9,907.00 5. Greenwood SSOI Plan $ 21,225.00 $ $ 21,225.00 6. Broadway SSOI Plan $ 27,323.00 $ $ 27,323.00 7. Allison, Laguna and Whitecap SSOI Plan $ 29,176.00 $ 29,176.00 8. City -Wide hydraulic Modeling $ 1,989,103.00 $1,989,103.00 9. Phase 2 Temporary Flaw Monitoring $179,251.00 $ 179,251.00 Total Basic Services $ 96,101.00 $ 48,548.00 $29. 176.00 $ 1,989,103.00 $ 179,251.00 1 $ 2,342,179.00 AME=ND. NO.4 EXHIBIT "A" Page 10 of 15 Attachment A Compensation Summary Phase 2 - Allison, Laguna Madre and Whitecap Service Areas Task Description Quantity Unit Price Total 100 Re- mobilization L.S. L.S. $2,860.00 200. Temporary Flow Monitoring a. Installation /Calibration - Flow Meters 25 $ 325-08 $ 8,125_00 b. Flow Montoring - 25 sites at 60 days =1500 1500 $ 88.00 $ 132,000.00 c. Installation /Calibration - Hain Gauges 12 $ 150.00 $ 1,800.00 d. Rain Monitoring -12 sites at 60 days =720 720 $ 18.00 $ 12,960.00 300 Adrrin.,Project Mgt. L.S. L.S_ $2,690.00 400 Data Analysis L.S. L.S_ $5,376.00 500 Final Report L.S. L.S. $13,440.00 Total Not to Exceed $179,251.00 ALLISON -Phase 2 $57,381.00 LAGUNA -Phase 2 $71,699.00 WHITECAP -Phase 2 $50,191.00 Total $179,251.00 AMEND. NO. 4 EXHIBIT "A" Page 11 0115 v CD Z Z —000 N :q Z ADO CJf A Quanti.€ ' Allison. Selvloe Area Floury Meters 8 NWNHOUR AND FEE ANALYSIS AMENDMENT NO. d 1'lJ'fllNLr�NA11'Sl�i "` Rain Gag A CLIENT: CITY OFCORPUS.CHR15T1 PROJECT: WASTEWATER SYSTEM MODELING DESCRIPTION Sr.:6nylitoer PROJECT MGR Project; Engineer 81S Tech Crew€.oador Teahniclan CLERICAL SUB CONTRACTOR NON LABOR TASK TOTAL tlRITE 1r4 $112&0: $107&0: $81 &0 B4.O0 $32.00, 9AD life. Total We. Total Hrs: Total Hrs. Total Hrs. Total Hm. Total firs. Total Expense Exp ense Total ASK 14 Model Building 11 Project €Naosgemenl &Review 5 $770 6 $360 $247U $4.200 1:2, 14c •OffP4eeln ahshap., 0 80 $p 1 $0 1.1 Exisling Data Collection $0 $ 1;4. Exislind Data &3101brf &Val €dalion $0 $p 1.8 wiistewalerflowvs D $p $4 $D 1.6 Flow &RaWouMonitoting 4 $$ ?6 24 $26$8 40 $4;280 0 $0 Spa 86;4&0 1200 $6A0p 4 I SI16 $17,702 $38.2 1:7 Esl a ahllsh Rain Gau Locations $D $ ASK 2!; Population Pr jec€fars $0 1 Exisiing Model Development $p $p .2 AllncalaEi;islin WNFlows $p $ .3 lnf ilirallonllatloW Simulallut $p $p .4 Infrastructure: Updale 0 $p $ p $ A5 Large W W Cuslarners &aNalion $0 $ ASK21: Model Calibration $ 1 Caliliiallon $p so 2. SansitmitAnal is $o 3 TaclWcallvfamcrandurn t $154 2 841107 $5,041 3. 4. Workshop' 2 $300 $2.540 $2,04 ASK d; ExistingSystemAnakmis $p $ ASh.i: Futures tean'Ana is $p 1 Prcrpased F6turo pavelopment 0 $0 $p $ , ,2 A :sate FAUYe Ftoyve $c Craale'$ enaYIP9 g $n ;3 Future Srsler kol ui$ $p $ .4 De�velopSystem livprov emontAternalives $p $ 5 Project Workshop D $0 S0 S0 SK (I: rInal EnginoerlogRepnn $p .1 Final Repoli 4 $516 0 $D $6,454 $707 2 Prel lAhary Planning Level Cos] Esihnalos $p 8 ,3' PrioHi2atiup Maps $. 0 $p 4 Ca;pilaf lmprovament Program (CIP) $ p $ ASK 7:: Manholefnspodion 0 $0 0 $0 0 $0 0 $0 0 0 p 0 $0 SC $ ASKV; Topolfraphle Snrvoy- Elevatlun Data Sp $ ASKfi; ClIkSlaffTralning $ ASK f StrppfatnentalAssrslanco W $0 ASK111: TraffTc Control Plan AlIctmance $p $ 16 $2,464 2D .$3248 42 $4.280. Q $0 100 $6 &00 200 $SADD 4 5116 $16.751 $47,702 $57,361 E 3TIMATED TOTAL COST $ST,3B1 a� 3 n 0 Cl) O CL to -n o C1 (D > f-41 tG Z r+ a O M !y � rA N m WD T_ — lA O w �Z ADO Crr A duaility= Laguna Madre Service Area FloevM0lers 1 10 MAN HOUR AND MR ANALYSIS AMENDMENT NO:4 P1 VI ANAleY51ti`'' Rein6air os 1 4 CLIENT: CITY OF. CORPUS CHRISV PROJECT. WASTEW TERSYSTEA MODELING DE ROJECT DESCRIPTION Sr. Sr.Enginaer - MR: Projoct,Erryinaar 131S:Teeh. grewLeadx 'TC4hni4i an CLERICAL sue COkTRACT6R NONIABOR TASKTOTAL - RATE t$104 192,00 $107.00 $61.00 - $84.00 532,00- $29,00 Hrs Total Hrs Total Hrs Total Hrs I Total Hrs Total Hrs Total Hrs Tatal. Ex nso Expense Tahal T ASK 9: >14odal Building 4a 11 Projed:ManagemeMF,ROriavv 4 $016 10 $1.702 8 95.760 :$8,188 T2 0 $0 1 $0 $0 11 Exi0ftg Data Colection $0 $o 1, 4- Ex' r.: tingp.ajaEvaluziion$.Uai#datfon $0 $p 15 Flave - - 0 $0 $p is Flow K: RainFallMardtorirtg 4 $610 30 "$3:368 48, $5,130 6 $468- 120 $7,660 1240 $7,680 4 1 $116. $410 $23,327 518,011 7 ewhijobRain Gauge Location9 $0 TASK 2: Population Pmleeticn $p 1 Exi lingModol Developmcrrt $p Tp 2.2 AlO-We! EAsWgM Roy,% W $p 2,3' Whralion4n1ow Simulalion 101 g0 2.4 liyhaslrtitlureUpd4te. 0 V $0 $0 2.5 Lorg0 Wtr Cuetom.4s; Evaluation $0 TASK 3: Ododei Calihratlon gp .1. Calilir,0idn $p gip 12- Senaiiv4yY Awly" - $ $p .3 TechikalMemorandum :.2. $308 4 $3831 $4,139 3.4 blratkdtop 2. $306 4 51 68 `$1,068 TASK 4, EArtingSyst ntAm"s $p $6 TASK 5: Future " emAnatyals .$0 5,1 PropowdFutueeDevetaprnent 0 $0 $0 $0 .2: Allocale.FOture F. lows 8 Create Scenari6c $0. $p 3 Future System A mlysis $p. $t1 S.4 Develmp5yst m improvemem Alemplives $0 $0 S Prolpd;WorkahoP. TASK 0: FIMIEnginewingRep - $g 61 FirdReport 4 $610 2 $224 24- $2,566 2 :$122 0 $0 Ko 83 : $8,593. 6.2 Prelimiwra PlanningLeoel Cost k0imates $p $0 .3: Priontr;taiion.Mops $13 $0 .4 CapltallmprovemeMPr5ram(C1Py $0 �0 TASK I. ffhnhofeln ecdcnj - 0 .$0. -a $0 - . 0 -$0 a - $0 . 13- 0 .0 .0. .0'- $0 '$0 $0 TASK 8- Topographic Surdey • Eleoation Dal* $p 9n TASK 9: City StafrTraining $0 TASK 10 ' 6upplanentalAssistance. $p $p TASK 19: TraillcCorrtroIFJanMJcmnco -$0 $0 19: .$2,464 48 1 .$5,376 1 00 1 $7,704 - 10 1 $'61D 1120 1 $7,680 240 $7,600 -4. $116' :$.16;742' $23,327- $71,099 ESTIMATED TOTAL COST $71,699 3 C a p1 1,1 7 CL CL 0 ia CL 5=r NmZ(D 2 iD Z M � ny � N D o =z ,c�v z o a0 SSualjw Whitecap Service. Area FlowMOIDrs 5 MARROUI ANO_FEEANALYSISAMENDMENTNOd �� t 4li 1 N I15S5` "" F7airrC7au ea 5 CLIENT. CITY OF CORPUS CHRISTI r ` PROJECT: WASTEWATER.SYSTEM MODELING GESCRIPTI01i Sr.EnOfneer PROJECT MGR project Englecr GIs Tech Crew Leader Technician CLERICAL sue CONTRACTOR KOMLA13OR TASK TOTAL RATE - $134 :$412.00 - 107.00 $bin . 69,00 92.110 20.00 lim Total Hrs Total Hrs. Total Hrs: Total Hrs. total Mrs Total Hrs Total Ex ensr, Ex ensa To tal RSK1: MadelSUltding $0:00 $ 1.1 PfOJECIMOnagement &Review 1.21Cick•OlfMeelin orksho I.2 Eksling Dete Colection 2 0 .$308 4 $448 2 $3,670.00 .$4,42 $ 1.4 Existing Dala Evaluation '& Validation $g,DO S .5 WastemerFlays. 0 50 so.OD S ,6 Flaw& RainfaFl Moigioring 4 $016 24 $2,699 30 83,210 2 $l22 9G $5,760 1'80 $5,760 .3: $07 $150,00 $16,740 335;13 1.7 EstabOch Raln 0augeLecaitano $0 $ ASK 2: PapulatfanProjections $ .1 Cx4rg Model Deiebpmatt $0.00 $ 2 AIIDceteEilstir19MFlov%e $0.08 $0 .3 InOlt ratio nAnluwSiml ,a W $0,00 $ A infrastructure Update 0 $0 $0.00 $0 .5 L Wd arge CuslomersEvalustlan $0.00 50 kSit 3: Model Callhratlan $ :f Calibration $0,00 $ ,2 Sendtj %y Anatyds 50.00 $ .3 Technleal Memorsndum 2 $3D0 2 $214 1 $61 $1503.00 $2A 9 Workshop ASK41: Existing9yatemAnayraia, ASKS: Pmure System Analysis .i I'mposed Fulnre Developmeril 2 0 $3D$ 10 4 $449 4 $420 1 $61 $1,210.04 $0.00 $D.OD 50.00 $2.46 $ $ S '.2 MWCa10 Future Ham 8 Create'Saenorlos $0.00 $ .3 Future System Arhnlyds $0,00 5 4 Develop 5ystem.lmprovement Allemmiues gp.p0 .5 Prolecl Workshop - 0 .$0 $0,00 ASR 6 : Pinal Engnaering Report $0.00 A firialReporl' 4 '$610 4 $448 :24- $2¢69'. 2 :$122 $2,320.80 dso 2:PueGminar Planriingl:t:velC.'Elln,,,es 3: Priarkixatian Maps A Capital ImprovemenlPtogram Cfl ASK 7: MonhoteInspection ASKS: Topog Suraer •Elwatlan Oma ASR 9; CMy aNTralning ASK 10: SupplareetdalAmfstmea ASK #1: TrafficCarHrofPlanAllovance 0 $B $2;150 D X36 $0: $4;032 0 62. $0, $(4;170 0 $ $O .$306 0 90 .0 SS,ZOG 0 .180 0 .$5;240. 0 - 3 - :$B7 $0 SUZ $0.08 $O,OB $0,00 $H,870.00 $B gp $16,740 $ $g Aw " ;I9, ESTIMATED TOTAL COST S n m > n w W 7 CL h cna3 = �• (D a� Pm 0) (0) Attachment C Contract Amendment No. 4 City -Wide Sanitary Sewer Hydraulic Model REVISED SCHEDULE: CONTRACT AMENDMENT NO. 4 AMEND. NO.4 EXHIBIT "A" Page 15 of 15 Phase 1 - Broadway, Greenwood and Oso Service Areas 12 1 128 1 8 1 136 lCombine Phase 1 & 2 Draft Reports into Final Ci wide Report X� = m z O z s C Basic Services: Preliminary Phase Design Phase Bid Phase Construction Phase Subtotal Basic Services Additional Services: Permitting Warranty Phase Inspection Platting. Survey O & M Manuals SCADA Subtotal Additional Services Summary of Fees Basic Services Fees Additional Services Fees Total of Fees COMPLETE PROJECT NAME Project No. XXXX Invoice No. 12345 Invoice Date: Sample form for: Payment Request Revised 07/27/00 Total Amount Previous Total Percent Contract Amd No. 1 Amd No. 2 Contract Invoiced Invoice Invoice Complete $1,000 $0 $0 $1,000 $0 $1,000 $1,000 100% 2,000 1,000 0 3,000 1,000 500 1,500 50% 500 0 250 750 0 0 0 0% 2,500 0 1,000 3,500 0 0 0 0% $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% $2,000 $0 $0 $2,000 $500 $0 $500 25% 0 1,120 0 1,120 0 0 0 0 % 0 0 1,627 1,627 0 0 0 0 % TBD TBD TBD TBD TBD TBD TBD 0% TBD TBD TBD TBD TBD TBD TBD 0% TBD TBD TBD TBD TBD TBD TBD 0% $2,000 $1,120 $1,627 $4,747 $500 $0 $500 11% $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% 2,000 1,120 1,627 4,747 500 0 500 11 $8,000 $2,120 $2,877 $12,997 $1,250 $1,500 $3,000 23% SUPPLIER NUMBER i1 TO BE ASSIGNED BYCITT PURCHASING DIVISION City of CITY OF CORPUS CHRISTI Corpus DISCLOSURE OF INTEREST Christi City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. . If the question is not applicable, answer with `NA ". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: Pipeline Analysis, LLC P. O. BOX: STREET ADDRESS: 1115 Main Street CITY: Garland. Texas ZIP: 750 FIRM IS: 1. Corporation ® 2. ' Partnership ❑ 3. Sole Owner ❑ 4. Association 5. Other DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each `employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Job Title and City Department (if known) N.A. 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Title N.A. 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee N.A. 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subiect of this contract and has an ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant N.A. FH_ NG REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose.that fact in a signed writing to the City official, employee or body that has been requested to act .in the matter, unless the interest of the City official or employee in the matter is . apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2 - 349 (d )] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: James H. Forbes, Jr., P.E. Title: Pres ident (Type or Print) Signature of Certifying V�o Date: w f Person: 8 DEFMTIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit ". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self - employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non -profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation.