HomeMy WebLinkAboutC2013-254 - 8/27/2013 - Approved AGREEMENT
For
Construction Materials Testing and Engineering Services
This AGREEMENT is between the City of Corpus Christi, Texas, a Texas home-rule municipal
corporation ("CITY"), acting through its duly authorized City Manager or designee ("City Engineer"), and
ROCK ENGINEERING & TESTING LABORATORY INC., a Texas corporation or partnership ("LAB"),
acting through its duly authorized representative who is Curtis A. Rggk__Buslness_Qevelo2ment Manager,
which agree as follows:
1. DECLARATIONS: "CITY" desires to engage "LAB" to provide services in connection with
City's project, described as follows, tr n suet n lan. Phass—! �
_2ro'ect No. 65111
(-PROJECT").
2. SCOPE OF WORK: "LAB" shall provide services to the PROJECT in accordance with the
accompanying Scope of Services and Fee Schedule attached as"Exhibit A".
3. FEE: The "CITY" agrees to pay the "LAB" for services provided in accordance with Exhibit
"X, Scope of Services and Fee Schedule under this AGREEMENT, a total fee not to exceed
t ft Sev n Thousand Nine Hundred Sixty Q liars and Zeray Cen ts . Invoices to be submitted
monthly in accordance with Exhibit"D".
4. INDEMNIFICATION AND HOLD HARMLESS. The "CONSULTANT" agrees to
indemnify, save harmless and defend the "CITY", and it's agents, servants, and employees as more fully
set forth in"Exhibit E".
CITY OF CORPUS CHRISTI ROCK ENGINEERING &TESTING LABORATORY
N
Oscar R. Martinez 7:�i( _,�Zili)- Curtis A. Rock (Date)
Assistant City Manager Business Development Manager
6817 Leopard Street
Corpus Christi, TX 78409
(3 61) 883-4555 Office
RECOMMENDED (361) 883-4711 Fax
Daniel Biles, P.E. (Date)'
Dire cfor of Engiy Services
�g P roj ect N u mber:6511
Funding Source: 550920-3126-00000-170678
Fund Name:
V e ie H. Gra�,P. (Date)
Director of Storm Water and Streets
TO FORM
office _ZA
gmt and Budget (Date)
ATTEST .. RrCF11VED ENTERED
ZaZO I I
Armando Chap a, City Secretary (Date) I I JUL 2 2 QLoj JUL 122013
CONTRACT MANAGER
2013-254
8/27/13
%Z511-Bayal Move Conviruclian Matedess Testing ifor Shatefina RdcwianpMSTING
Or d. 029941
Rock Engineering& Testing
C�
GEOTECHNICAL ENGJNEERING
CONSTRUCTION MATERIALS
ENGINEERING &TESTING
0 0 SOILS a ASPHALT CONCRETE
N
July 10, 2013
City of Corpus Christi
C. Box 9277
Corpus Christi, Texas 78401
Attn: Mr, an Biles, P,E. — Director of Engineering
SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED
Bay front Development Plan, Phase 3
City Project No.: 6511
Corpus Christi, Texas
RETL P
Dear Mr, Biles,
Rock Engineering and Testing Laboratory, Inc ETL) (TBPE Firm No 2101) is pleased to be
selected to perform the required Construction Materials Testing for the above referenced
project, The Estimated Construction Materials Testing Budget for this project is
$57,960.00.
,We understand that we have been chosen to provide these services fortis publicly
funded project. Therefore, by providing cost information we are not in violation o f t he
Texas Professional Services Procurement Act.
The estimated construction materials testing budget is based on a review of the information
provided to RETL. An estimated breakdown of field and laboratory testing required is included
as an attachment,
Please make note that the actual fees invoiced for this project will be based on the actual
testing performed. The total fee assessed will be dependent on the contractor's
construction techniques, number of trips made to the job sit e, elapsed time from
technician arrival to commencement of testing activities, and any time the technician is
required to be on-site but not performing testing activities.
Please be advised that weekend Technician time will be invoiced portal to portal at an
additional rate of 1® per hour.
RETL appreciates your consideration of our firm to assist you during the construction phase of
your project. If you agree with this proposal, please sign the attached Laboratory Testing
Services Agreement, submit the Distribution List and provide billing information Please do not
hesitate to contact me at (361) 883-4555 if you have any questions regarding the proposal or
would like to discuss further.
Sincerely,
k"
Sandra Kirk
Project Estimator EXHIBIT"A"
ROCK ENGINEERING&TESTING LABORATORY, INC. Page I of 5
6817 LEOPARD STREET®CORPUS CHRISTi,TEXAS,78409
OFFICE (361)B83.4555®F (361)8834711 -wwvv rocklesting corn
Coate• Juiy 10 2013
Project Name Oayfront Devetoprnent Plan, Phase 3
City Project No 6511
Contact fir Darr Wes, P F -Director of Engineering
Contact Information City of Corpus Christi
UTILITIES UTILITIES Test Quantity Unit Fee Fee
Initial Sackfill Sample Charge $5700 $5700
Proctor Type Standard 1 $21500 $21500
Final tackfill Sample Charge $5700
$57.100
Procter Type Standard 1 $21500 $21500
Additional Test Atterberg Llrn is and Gradation 1 $18800 $18800
Cement Stabilized Sackfill Sample Charge $5700 $57.00
Proctor Type Standard 1 $21500 $21500
Stormwater
Line Description PCP 18"& 24"
Line Length(LF 909
Test Frequency 1 every 200 LF per'ft 50 $4400 $2,200'60
Number of Lfts 10
tormwater#
Line Description PCP 30"& 36,E
Line Length(0) 1,175
Test Frequency 1 every 204 LF per i=dt 64 $44.00 $2.640 00
Number of Lifts 10
Wastewater
Line Descript can 6"Sanitary Sevier Line(SLOP 26)
Line Length(LF 1.022
Test Frequency 1 every 200 LF per lift 4 $4400 $2,.1'1100 ,
Number of Lifts 0
Wastewater
Line Description Sanitary Suer Fore gain 4"PVC
Lane Length(LF) 122
Test Frequency 1 every 200 LF per?ift 6 $44 0O $35200
Number of Lifts 6
Water
Line Description Water Main Pipe(PVC 6",S"& r2
Line Length(LF) 2,267
Test Frequency 1 every 200 LF per lift 60 S4400 $2,64000
Number of Lifts 5
Gas
Line Description Remove Fxi?shng 4"PW Gas Line
Line Length(LF) 1,125
Test Frequency 1 every 200 LF per lift 36 $44.00 $1,58400
Number of Lifts 6
Manholes
Description Manhole(Type M=Complete)
Number of Manholes 21
Set Size Concrete Cylinders(set of 41 4 $176.00 $70400
Test Schedule 9 @ 7 days&3 @ 28 days
Test Frequency 1 set every 6 sterns
Manholes#2
Description 4' Fiberg ass Type A Manho e
Number of Manholes 6
Set Size Concrete Cyfnders(set of 4) 2 $17600 $352.00
Test Schedule 1 @ 7 clays& 3 @ 26 days
Test Frequency 1 set every 6,;.terns
EXHIBIT"A"
of
1 Csfi
Date , July 10, 2013
Project Name Bayfront Development Plan Phase
City Project No 6511
Contact Mr, Dan BJes, P E - Director of Engmeenng
Contact Information City of Corpus Christi
Test Quantity !In t Fee Fee
Manholes#3
Description Remove 4' Sewer Manhole(Backfi,)
Number of Manholes 4
Test Frequency 1 per"lift per 3 items a $4400 $35200
Number of Lifts 4
Inlets
Number of Inlets 36
Set Size Concrete Cylinders(set of 4) 4 $17600 $704,00
Test Schedule 1 @ 7 days&3 @ 28 days
Test Frequency 1 set every 10 items
PARKING &PAVE
Subgrade
Description 12"Compacted Sub grade (4)Sample Charge $5700 $228,00
Square Footage 124,794
Linear Footage, 6:500
Number of Lanes 2
Proctor Type Standard 4 $21500 $86000
Density Requirements 95%std at or above opt 1`06sture 33 $4400 $1,45200
Test Frequency 1 every 200 LF of Street
Paving Section
Base
9"Type A Grade 1 Flexib'e Base-Crushed
Description Limestone Base (2)Sample Charge $5700 $114 00
Square Yardage 13,866
Linear Footage 6,500
Number of Lanes 2
Proctor Type Modified 2 $253,00 $506.00
Density Requirements 981`x',j std -1 to +331, opt Moisture 22 $4400 $96800
Test Frequency 1 every 300 LF of Street
Additional Test Atterberg Limits and Gradation 2 $188,00 $376,00
Additional Test, Wet Ball MO 2 $32100 $642,00
HM AC
Description, 2'HMAC -Type D & 4 HMAC -Type 6 (13)Sample Charge $57,00 $741.00
Square Yardage 11,226
Tonage 3,705
Full Series Freq 1 every 500 Tons or Day 13 $61600 $8,00800
Cored in Place Freq 1 every 300 LF of Street 14 $9900 $1,386,00
Concrete
Description Stamped Concrete
Cubic Yards 320
Set Size Concrete Beams ,set of 41:, 7 $30000 $2,100,00
Test Schedule 2 @ 7 days&2 @ 28 days
Test Frequency I set per 50 CY 'Per Day's Pour
Additional Test Air Entrainment 7 $2500 $17500
Concrete
Description Concrete Median
Cubic Yards 55
Set Size Concrete Beams(set of 4) $30000 $60000
Test Schedule 2 @ 7'days&2 @ 28 days
Test Frequency 1 set per 50 CY;Per Day`s Pour
Additional Test As Entrainment 2 $ OCH9 T SVP
Page 3 of 5
f 4 f
Date , I July 10, 2013
Project Name Bayfront Development Plan, Phase 3
City Project No 6511
Contact: Mr. Dan Bites, P E.-Director of Engineering
Contact Information City of Corpus Chun
Test Quantity Qnrt Fee Fee
Concrete
Description Controller Foundation
No of Foundations 2
Set Size: Concrete Cylinders(set of 4) 2 $17600 $35200
Test Schedule 1 @ 7 days&3 @ 28 days
Test Frequency I set per Day's Pour
Concrete
Description. Concrete Rip Rap(5"Thick)
Cubic Yards 12
Set Size: Concrete Cylinders(set of 4) 1 $176,00 $17600
Test Schedule 1 @ 7 days&3 @ 28 days
Test Frequency I set per Day's Pour
Curb and Gutter
Description: Concrete Curb& Gutter(Type 1)
Linear Footage; 819
Density Requirements 95%std 2 $4400 $88,00
Density Frequency 1 every 500 LF
Concrete
Set Size! Concrete Cylinders(set of 4)
Test Schedule 1 @ 7 days&3 @ 28 days 1 5176.00 $17600
Test Frequency 1 every 1000 LF
Curb and Gutter#2
Description: Concrete Curb& Gutter(Type 2)
Linear Footage: 8,946
Density Requirements 95%std 18 $4400 $79200
Density Frequency,- 1 every 500 LF
Concrete
Set Size: Concrete Cylinders(set of 4)
Test Schedule: 1 @ 7 days&3 @ 28 days 9 $17600 $1,584,00
Test Frequency: I every 1000 LF
Curb and Gutter#2
Description- Sidewalk Curb(V Wide)
Linear Footage: 130
Density Requirements, 95%std. 1 $4400 $4400
Density Frequency- 1 every 500 LF
Concrete
Set Siz • Concrete Cylinders(set of 4)
Test Schedule 1 @ 7 days&3 @ 28 days 1 $17600 $17600
Test Frequency 1 every 1000 LF
Sidewalk
Description: Concrete Sidewalk(4', 5',6, 8', 10'& 12'Wide)
Square Footage' 67,311
Set Size- Concrete Cylinders(set of 4) 17 $17600 $2,992,00
Test Schedule: 1 @ 7 days& 3 @ 28 days
Test Frequency, I set every 4,000 SF
Ramp
Description: Concrete Curb Ramp(Type 1,2,8& 10)
Square Footage: 48 each
Set Size Concrete Cylinders(set of 4) 5 $17600 $88000
Test Schedule 1 @ 7 days&3 @ 28 days
Test Frequency 1 set per Day's Pour
EXHIBIT�"Ajlp
Page 4 of 5
vf,4,
Oate , e July 10,2013
Project Name Bayfront Deve �pnrrent Plan, Phase 3
City Project No 6511
Contact Mr Can Bres, RE - Director of Engineering
Contact Information City of Corpus Christi
Test Quantity knit Fee —ee
Driveway
Description Conc Driveway(Type C)(6"Wck)(30'x 1 U ea
Set Size Concrete Cylinders(set of 4) 2 6176 0* $35200
Test Scheduie I @ 7 days& 3 @ 28 days
Test Frequency: 1 set every 2,500 SF/Per Day's Pour
CYLINDER PICK-UP FEES
Number of Trips 48 $43,00 $2:064,00
TRANSPORTATION FEES
Loca,Von, Corpus Christi, Texas 224 $45-00 $10,08000
ADMINISTRATION FEES (11 Time Fee per Project) 1 $8500 $6500
10%CONTINGENCY FEE $5,26900
ESTIMATED TOTAL $57,960.00
This is only an estimate. Please make note that the actual fees invoiced for this project will be based on the actual testing
performed. The total fee assessed will be dependent on the contractor's construction techniques, number of trips made to
the Jobsite, elapsed time from technician arrival to commencement of testing activities, and any time the technician is
required to be on-site but not performing testing activities,
EXHIBIT" "
A
r
4 of 4l =
Page 6 of 6
Exhibit
Mandatory Requirements
(Revised November, )
INDEMNIFICATION
Consultant agrees to indemnify,save harmless defend i f Corpus Chriati,and its
officers, agents, servants and employees, and each of them against and hold it and them
harmless from I lawsuits, claims, demands, liabilities, losses
including court costs and reasonable attoc s° ,for cc of any injury
person, or any death at any time lti from c injury, to r ,
to the extent Consultant's negligent performance of services covered by this
contract The foregoi indemnity ll apply except if c injury, r damage is
caused by the sole r concurrent negli c of the City of Corpus Christi, its rc r ,
servants, or employees, or any other person indemnified r u ro
m a
Pa e 1 of 1
TERMS AND CONDITIONS TO AGREEMENT
ARTICLE 1® SERVICES: "LAB"will:
1,11 Provide only those services requested by "CITY ENGINEER" that, in the opinion of "LAB", lie
within the technical or professional areas of expertise of "LAB" and which "LAB" is adequately
staffed and equipped to perform,
1.2 Perform technical services under the supervision of a licensed professional engineer and in
compliance with the basic requirements of the appropriate standards of the American Society for
Testing and Materials, where applicable and other standards designated in writing by the "CITY
ENGINEER,"
1.3 Promptly submit formal reports (printed and electronic copies) of tests, inspections and services
performed indicating, where applicable, compliance with the PROJECT specifications or other
contract documents. Such reports must be complete and factual, citing the tests performed,
methods employed, values obtained, and parts of the structure of THE PROJECT area subjected
to any testing.
1A Utilize testing equipment which has been calibrated according to applicable standards and, upon
request, submit to the "CITY ENGINEER", or his authorized representative, documentation of
such calibration,
Secure representative samples of those materials that the City's Contractor proposes to use
which require testing, together with relevant data concerning such materials including the point of
origin and supplier,
1.5 Consider reports to be confidential, and distribute reports only to those persons, organizations or
agencies specifically designated in writing by the"CITY ENGINEER".
1.6 Retain records relating to services performed for "CITY" for a period of two years following
submission of any reports, during which period the records will be made available to thee" l at
all reasonable times.
1.7 Pay salaries, wages, expenses, social security taxes, federal and state unemployment taxes, and
any other similar payroll taxes relating to the services.
ARTICLE 2® CITY RESPONSIBILITIES- City Engineer or authorized representative will:
2.1 Provide "LAB" with all plans, specifications, addenda, change orders, approved shop drawings
and other infor miation for the proper performance of services by "LAB".
2.2 Issue authorization in writing giving "LAB" free access to THE PROJECT site, and to all shops or
yards where materials are prepared or stored.
2.3 Designate in writing those persons or firms which will act as the "CITY's" representative with
respect to "LAB'S" services to be performed under this AGREEMENT and which must be
promptly notified by "LAB" when it appears that materials tested or inspected are in non-
compliance. Only the "CITY ENGINEER" or his designated representative have authority to
transmit instructions, receive information and data, interpret and define the CITY's policies and
decisions with respect to THE PROJECT. "LAB" acknowledges that certain "CITY"
representatives may have different types of authority concerning THE PROJECT.
1X=H1BlT1f1C11
a 10
a e 1 of 3
P�
2.4 Advise "LAB" sufficiently in advance of any operations so as to allow for assignment of personnel
by "LAB" for completion of the required services. Such advance notice will be in accordance with
that established by mutual agreement of the parties.
2.5 Direct THE PROJECT contractor, either by the Construction Contract or direct written order to,
(a) Stop work at the appropriate times for"LAB" to perform contracted services;
(b) Furnish such labor and all facilities needed by "LAB" to obtain and handle samples at THE
PROJECT and to facilitate the specified inspection and tests;
(c) Provide and maintain for use of "LAB" adequate space at THE PROJECT for safe storage and
proper curing of test specimens which must remain on THE PROJECT site prior to, during, and
up to 60 days after testing.
ARTICLE 3. GENERAL CONDITIONS
3.1 "LAB", by the performance of services covered hereunder, does not in any way assume, abridge
or abrogate any of those duties, responsibilities or authorities with regard to THE PROJECT
which, by custom or contract, are vested in THE PROJECT architects, design engineers, or any
other design agencies or authorities,
12 "LAB" is not authorized to supervise, alter, relax, enlarge or release any requirement of THE
PROJECT specifications or other contract documents nor to approve or accept any portion of the
work. "LAB" does not have the right of rejection or the right to stop the work, "CITY ENGINEER"
will direct THE PROJECT contractor to stop work at appropriate times for "LAB" to conduct the
sampling, testing, or inspection of operations covered by the AGREEMENT,
ARTICLE 4. FIELD MONITORING AND TESTING
4.1 "CITY" and "LAB" agree that "LAB" will be on-site to perform inspections for contracted services.
The "CITY" and "LAB" also agree that "LAB" will not assume responsibility for PROJECT
Contractors means, methods, techniques, sequences or procedures of construction, and it is
understood that the final services provided by "LAB" will not relieve the PROJECT Contractor of
his responsibilities for performing the work in accordance with THE PROJECT plans and
specifications. For the purposes of this AGREEMENT, the word "inspection" is used to can
periodic observation of the work and the conducting of tests by "LAB" as specified in the
AGREEMENT. Continuous monitoring by "LAB" or its subcontractors does not mean that"LAB" is
approving placement of materials. Inspection is not and should not be construed to be a warranty
by "LAB"to the"CITY"or any other party.
4.2 Samples collected or tested by "LAB" remain the property of the "CITY" while in the custody of
the "LAB". "LAB" will retain the samples for a period of 60 days following the date of submission
of any report related to the sample, Following the retention period, "LAB" will dispose of non-
hazardous samples, and return hazardous, acutely toxic, or radioactive samples and samples
containers and residues to "CITY". "CITY" agrees to accept such samples and samples
containers,
ARTICLE 5. STANDARD OF CARE AND WARRANTY
Services performed by "LAB" will be conducted in a manner consistent with that level of care and skill
ordinarily exercised by reputable members of the profession currently practicing under similar conditions
in the same locality. No other warranty either expressed or implied is made or intended by the
AGREEMENT or any reports. "LAB" will not be responsible for the interpretation or use by others of data
developed by"L P®
1 EXHIBIT"C"
Pa e 2 of 3
ARTICLE 6. SAFETY
"CITY" and "LAB" agree that, in accordance with the generally accepted construction practice, the
PROJECT'S general contractor will be solely and completely responsible for working conditions on THE
PROJECT, including safety of all persons and property during the performance of the work, and for
compliance with all municipal, state, and federal laws, rules and regulations, including OSHA. The duty of
"LAB"in providing services is not, therefore, to include any review of, or responsibility for° the adequacy of
the PROJECT'S general contractors safety measures in, on, or near THE PROJECT site.
ARTICLE 7. INVOICES AND PAYMENT
"LAB" will submit progress invoices to "CITY ENGINEER" monthly and final invoice upon completion of
services. Each invoice is due and payable by "CITY"within 30 days of receipt and approval to pay by the
City Engineer,
ARTICLE 8. EXTENT OF AGREEMENT
8.1 This AGREEMENT, including Exhibit "A" and these terms and conditions, represents the entire
AGREEMENT between "CITY" and "LAB" and supersedes all prior negotiation, representations
or agreements, written or oral. This AGREEMENT may be amended only by a written instrument
signed by duly authorized representative of "CITY" and "LAB". If any conflict occurs between
these terms and conditions and this AGREEMENT, these terms and conditions are controlling-
&2 In the event that any one or more of the provisions contained in this AGREEMENT are for any
reason held invalid, illegal or unenforceable in any respect, the remaining terms will be in full
effect and this AGREEMENT will be construed as if the invalid or unenforceable matters were
never included in this AGREEMENT, No waiver of any default will be a waiver of any future
default.
8.3 Neither party will assign this AGREEMENT without the express written approval of the other, but
"LAB" may subcontract laboratory procedures as "LAB"deems necessary to meet the obligations
of this AGREEMENT,
EXHIBIT"C"
Pa e3of3
® 0 IR 0
E
6>f 4$7i' Lr FO 6
T C`d cNi m
0
trwi bf3
a z
E
$2,
f
69. LO LO
t`tr'
P
,0 � '
N l t
Cs ex
CL
��pp p� T SA�4 y�
aep • t1 f9t Xl3 ' 2"IZ ®"Y
r ��qg u
CM W
» € ;
r
_ r ,
aG3
> 0 0 >
r' s 's
5 r 69- 6Ft 69-
® 4? ' S ca M, t
» ,
a
A
0 , im Ol LO, ED
t SYFsy93." ft
CCC �l
r ''Ypf <s
r k:
I s
C,y CL), r
(D o.
Cl) 03
(D tA1
in mf» L)
m
EBB
®
CU U) c 2
m 0
U.
0 _CD < 15
.� 0 c .®
° Exhibit of I
all
CHW (M" (101111US (AIRISTI
DISCLOSURE OF INTEREs'r
Shrou
CaN ol'C.orpus Chrimi Ord Wrice 17112, as nine nded, rquM a H pamwy Hms Whig to do
AMY w4h V My to pro%idu the l'ollowimu intoruumon. I A WV
lu"Wm mum he wK"cmd,
If the josimn 0 n1d;qypHcah1v ,miser "A "\-A- Sce rc% e
km I dwg Rewlimmew,
AM HMM US Und Wria U=
120A1 VAN V NAM E: RM 11Wnceiing& 10m ky I A w MN,. I nc.
It C1 IRM
STREETAMMEST iA17LmVuMS;xmi CITY: CoMusUhiisti 7841
N,
1101 IS. 1, 2 VMMU Jiip
f, ASSUUMULM IT T (.iher
DISMI)SURP QUESTIONS
If addimal sp.ice is necu-oirv. p1wise use We werqv side ni'dii, pa,-�c oraiia w!i vpavaiv ACLI
I. Static the namci ad each "uniplovul' kW bu CAn of 0quis Mimi hady an w%nuiship
inierLSC' LCIIS14111ing 314 w nhwe or the (n"mrshlij W dw :dw%e named Arin,
Mile JW) Ink and LQ
..............
2 e i I ic j ni i n" 411 ow h w �w H cm r t i"In N t i u iwtr halo i M I M%I W I'S h I I M AL I
Wristifuhng mahnienamod -An.
- —-------- ------
----------- ------......
...........- .......
-—--------------------
3. Mmu dw nmnen Mach Waid monber" ofoic c ny ortypn. ciniii iiak iii, tint w"ner.hip
Nam(:
(toumlilwc
wicK miw, w VMh UM11dOILU arwilcurora 'vmwdwnC nvVw ( i" A KqnlaChnal
"ho "naud oil a11% manci I-Ailed 10 1110 '1151)j0(A Of thk 'C0[fli',Ll J11d h&I MI
Name
............... ............... .....................................-
...............---........... ........ ..............
..............
L j
EXI
a DBI "T''E
P 1 oH f ge 1 of 2
....
FILING REQUI[REIVIENTS
If at person who requests official action on a matter knows that the requested action will confer an
economic benefit on any City official ore loee that is distinguishable fro m t e e ffect that the
action will have on members orthe public in general or a substantial segment thereof,you shall
disclose that f a c t in a signed writing t o t he City official,emplo ee or body that has been
requested to act in the matter,to the interest of the City to ore lyee in the matter is
agparent. The disclosure shall also be made in a signed writing riled with the City Secretary.
tic s Ordinance Section 2-349(d)]
CERTIFICATION
I certify that all information provided is true and correct as of the date of this statement, that I
have not knowingly withheld disclosure of any information requested; and that supplemental
statements will be promptly submitted to the City of Corpus Christi,Texas as changes occur.
Certifying Person: cuf,--%"s A Ipor-K Title. lopvwud
(type or Prlal$
Signature of Certifying Date:
Person:
DEFINITIONS
a.. "Board member." A member of any board, commission, or committee appointed by the
C i ry Council of the C ity of Corpus Christi,Texas.
b. "Economic benefie'. An action that is likely to affect an economic interest if it is likely to
have an effect on that interest that is distinguishable from its effect on members of the public
in general or a substantial segment thereof.
c. "Employee." Any person employed by the City of Corpus Christi,Texas either on a full or
part-time basis,but not as an independent contractor.
d. "Firm." Any entity operated for economic gain, whether professional, industrial or
commercial. and whether established to produce or deal with a product or service, including
but not limited to, entities operated in the form of sole proprietorship, as self emp toys
d
person, partnership,corporation,joint stock company.joint venture,receivership or trust,and
entities which for purposes of taxation are treated as non-profit organizations.
e. "Official." The Mayor, members of the City Council, City Manager, Deputy City
Manager, Assistant City Managers, Department and Division Heads. and Municipal Court
Judges of the City of Corpus Christi,Texas.
f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held.
in a firm, including when such interest is held through an agent, trust, estate, or holding
entity. "Constructively held" refers to holdings or control established through voting trusts,
proxies, or special terms of venture or partnership agreements."
g. "Consultant."Any person or fi rm, such as engineers and architects, hired by the City of
Corpus Christi for the purpose of professional consultation and recommendation.
EXHIBIT"ED
a '
Pge 2 of 2