HomeMy WebLinkAboutC2013-284 - 7/23/2013 - NA CITY OF CORPUS CHRISTI
AMENDMENT NO. 5
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "City", and PIPELINE ANALYSIS, LLC, agree to the following
amendments to the Contract for Engineering Services for Citywide Hydraulic Model-Sanitary Sewer Overflow
Initiative (SSOI) (Proiect No. E10015), as authorized and administratively amended by:
Original Contract August 24, 2010 Motion No. M2010-195 $96,101.00
Amendment No. 1 October 11, 2010 Administrative Approval $48,548.00
Amendment No. 2 December 4, 2010 Administrative Approval $29,176.00
Amendment No. 3 June 21, 2011 1 Motion No. M2011-133 $1,989,103.00
Amendment No. 4 Aril 23, 2013 Motion No. M2013-071 $179,251.00
EXHIBIT "A", SECTION 1. SCOPE OF ENGINEERING SERVICES, shall be amended due to the increased level
of effort required to field verify and correct discrepancies in the GIS maps and establish lift station control
elevations. Specific tasks are described in Amendment No. 5. Exhibit"A".
EXHIBIT "A", SECTION 2. PROJECT SCHEDULE shall be amended as specified in the attached Amendment
No. 5 Exhibit"A", Schedule.
Exhibit "A", SECTION 3. FEES shall be amended and is attached as Amendment No. 5 Exhibit "A" for a revised
fee not to exceed $48,990.00 (Forty-Eight Thousand Nine Hundred Ninety Dollars and Zero Cents), for a
total restated fee not to exceed $2,391,169.00 Two Million Three Hundred Nine -One Thousand One
Hundred Sixty Nine Dollars and Zero Cents). Monthly invoices shall be submitted in accordance with the
attached Amendment No. 5 Exhibit "B".
All other terms and conditions of August 24, 2010 contract between the City and Engineer will remain in full force
and effect.
CITY OF CORPUS CHRISTI PIPELINE ANALYSIS, LLC
212 1//—)—
z-1 -13
Oscar R. Martinez, Date James , Jr., P.E., Date
Assistant City Manager President
1115 Main Street
Garland, Texas 75040
RECOMMENDED (800)637-0164 Office
Daniel Biles, P.E., Date
Director of Engineering Services
17 2
Operating Department Date
2013-284
7123113
AMEND. NO. S
Pipeline Analysis LLC Pa e 1 of 2
RLE1D015 CITYWIDE 55 HYDRAULIC MODELVIMENDMENT NO 51CLpNTRACT Dim
INDEXED
I m r
APPROVED AS TO FORM
Office kkanagement and Budget Date
Legal Department bate
ATTEST
Armando Chapa, City Secret
ENTERED
Project No. E10015 Il��� lll' n "201
Fund Source No. 550950-4249-00000-E10015
Fund Name: Wastewater 2012B CIP (Rev Bds) T I MANALAR
Encumbrance No. Inn[ �" �I
AMEND. NO. 5
Page 2 of 2
K4ENGINEERING DATAEXCHANGEUENNIFERIWASTEWATER%E10015 CITYWIOE SS HYDRAULIC MODEMMENDMENT NO MCONTRACT DOC
PIPELINE ANALYSIS"" 1115 Main Street
Garland, Texas 75040
800-637-0164
June 27,2013
William J.Green,P.E.
Assistant Director of Engineering
Engineering Services
1201 Leopard Street
Corpus Christi,Texas 78401 RE: Contract Amendment No.5
(361)826-3598—direct Phase I Task 12—Field Verifications
(361)8164916—mobile Project No.E 100 15
ht[lg@cctexas.com
Dear W. Green,
Amendment No.5 to the above referenced contract is necessary due to the increased level of effort
required to field verify and correct discrepancies in the GIS maps and establish lift station control
elevations. The attached letter from Coym,Rehmet&Gutierrez,L.P.with input from LNV, Inc.
summarize the request and costs. Amendment No.5 totals$48,990 for the Phase 1 service areas(Oso,
Greenwood,and Broadway). Based on conversations with CRG and LNV we anticipate additional effort
will also be required for the Phase 2 service areas to field verify GIS discrepancies.
The major tasks included in the city-wide project scope for this Amendment No.5,Phase 1 —Task 12 are:
• Identify areas of concern and possible inaccurate pipe diameter designations with the GIS
shapefiles
• Field verify discrepancies at multiple locations with the Phase I service areas
• Identify areas of concern and possible inaccurate manhole invert elevations within GIS
shapefiles
• Field verify manhole invert elevation discrepancies(such as negative slopes)and update GIS
where needed
• Coordinate lift station control settings to locate and minimize surcharging conditions
The total amount of this Amendment is $48,990 as shown in the breakdown on Attachment "A". The
man hour and fee analysis for this Amendment is shown in Attachment "B". I have also attached the
project schedule for the work as shown in Attachment"C".
If you have any questions or require additional information, please give me a call at (800) 637-0164 or
email me atjforbes@pipelineanalysis.com.
Very truly yours,
PIPELINE ANALYSIS,LLC
........
Amend.No.5
Exhibit"A"
Page 1 of 14
James H. Forbes,Jr.,P.E.
Project Manager
Attachments: Attachment"A"
Attachment"B"
Attachment"C"
Amend.No.5
Exhibit"A"
Page 2 of 14
Attachment A
Project No. E10015
Professional Services Contract
City of Corpus Christi
Sanitary Sewer Overflow Reduction Program
Hydraulic Modeling
Scope of Services
Phase 1 Task 12 — Field Verifications
June 2013
..P[PELINE ANALYSIS"`
ilVllu„mylM'P/MYk'xadAb III IM'4',rg;A'�n I('�'Y Ai�M'-G
in association with
GoyRM"
B, ,i �yy�p.9
W am�`,1J tma
Amend.No.5
Exhibfl W
Page 3 of 14
Attachment A
Contract Amendment No.5
Sanitary Sewer Overflow Initiative Plan Development
and
Capacity, Management, Operation & Maintenance Self-audit
(Project No. E10015)
Amendment No. 5
City-Wide Sanitary Sewer Hydraulic Model
Phase 1 Task 12 Field Verifications
Amd Amd Amd Amd Amd. Total
Basic Services: Contract No.1 No.2 No.3 No.4 No.S Contract
1.Preliminary Phase S 17,878.00 $ - $ - $ 17,678.00
2.CMOM Self-Audit Interviews $ 59,553,00 S - $ $ 59,553.00
3.CUM Pre-Final and Final Report $ 8,963.00 $ - $ - $ 8,963.00
4.Oso SSO Pre-Rnal and Final Report S 9,907.00 $ - is - $ 9,907.00
5.Greenwood SS01 Plan $ 21,225.00 $ - $ 21.225.00
6.Broadway SS01 Plan $ 27,323.00 S - $ 27.323.00
7.Allison,Laguna and Whitecap SS01 Plan $ 29.176.00 $ 26.178.00
8.Clty.Wlde Hydraulic Modeling S 1,989,103.00 $ 1,989,103.00
9.Phase 2 Temporary Flow Wnitorinq I $ 179,251.00 $ 179,251.00
10.Phase 1,Task 12-Field WriEcsllons $ 48,990.00 $ 48,990.00
Total BasicSeMces $ 90,101.00 13 48,548.00 Is 29,178,90 S 1,989,103.00 1$ 179,251.00 $ 48,990.00 S 2,391,199.00
Amend.No.5
Exhibit"K
Page 4 of 14
Attachment A
SCOPE OF WORK
CITY OF CORPUS CHRISTI,TEXAS
SANITARY SEWER OVERFLOW REDUCTION PROGRAM
WASTEWATER HYDRAULIC MODELING
Amendment No. 5
Phase 1 Task 12
CITY PROJECT E10015
BACKGROUND
The approach to the hydraulic modeling of the wastewater collection system is organized around the
City's objectives for this project:
• Reduction in Sanitary Sewer Overflows
• Cost controls and Least Cost Alternatives
• Attainment of long-term Infiltration/Inflow solutions
• Collection System Capacity Assurance
• Regulatory compliance
• Customer satisfaction
GENERAL INFORMATION
A hydraulic wastewater system model will equip the wastewater department with the tool for analyzing
system conveyance capacities,bottlenecks,and potential overflow locations. The hydraulic model is
critically dependent on the accuracy of maps and physical data associated with each pipeline. During
construction of the hydraulic model some GIS data(pipe diameters,invert elevations,lift station control
elevations,etc.)appeared to be in error and field verification confirmed some but not all discrepancies.
To construct a viable model of the collection system required field verifications for all these
discrepancies. This Amendment No.5 provides for a Task 12—Phase I Field Verification.
OBJECTIVES
This amendment will address the following objectives:
• Identify areas of concern and possible inaccurate pipe diameter designations with the GIS shapefiles
• Field verify discrepancies at multiple locations with the Phase 1 service areas
• Identify areas of concern and possible inaccurate manhole invert elevations within GIS shapefiles
• Field verify manhole invert elevation discrepancies(such as negative slopes)and update GIS
where needed
• Coordinate lift station control settings to locate and minimize surcharging conditions
PROJECT PHASING
The Phase I Task 12-Field Verification requires immediate implementation.
MODEL BENEFITS
• Accurate model construction
• QA/QC on model attribute data
Amend.No.5
Exhibit"A"
Page 6 of 14
BASIC SERVICES—NIA
ADDITIONAL SERVICES TASK 12—FIELD VERIFICATION
The development of a hydraulic model for the six wastewater service areas ensures consistent assessment
of future growth,maintenance and system capital requirements for current and future conditions.
Furthermore,hydraulic modeling will provide the project team consultants with pertinent data to assess
system impacts to various wet weather events and will further enable the project team to test cost
effective repair strategies and alternatives. Modeling will allow the team to conduct a series of"what if'
scenarios that will help determine least cost solutions. These various scenarios take into account the City
of Corpus Christi maintenance and personnel needs,budget,planned growth,capacity issues and can be
used to more accurately design relief and/or replacement lines and optimize system rehabilitation. Task
12—Field Verification is required to verify the hydraulic model connectivity and address possible
discrepancies in pipe diameters,elevations(pipe slopes),pipe and force main layout, lift station control
level elevations,and other GIS discrepancies the must be field verified to confirm accuracy.
SCHEDULE
The ENGINEER'S services shall be performed in a timely manner consistent with sound professional
practices. The ENGINEER will complete the work according to the following revised schedule:
Phase 1 -Broadway,Greenwood and Oso Service Areas
Major Week No. Duration Week ACTNIIY
Tasks Start (Weeks) End
1 1 31 32 Kick-Off Meeting/Workshop/Data Collection and Review
1.6 8 20 28 Wastewater Flow Monitorina
2 16 28 44 Model Development
3 28 64 92 Model Calibration
4 80 30 110 EAstina System Ana is
5 80 30 110 Future System Ana is
6 80 30 110 Phase 1 Draft Re or#
7 4 28 32 Manhole Inspection
8 4 28 32 TopograoNc Suve
9 1 139 140 Model urchasefrraining
10 1 139 1 140 ISupplemental/Confingerm
11 1 3 1 4 1 Traffic Control Plan
1 139 1 140 PHASE 1 COMPLETE
Phase 2-Allison La una Madre and Whiteca Service Areas
Major Week No. Duration Week ACTNIIY
Tasks Start (Weeks) End
1 40 28 68 Kick Off Meeting/Workshop/Data Collection and Review
1.6 60 56 116 Wastewater Flow Monitors with Extended Meters
2 64 56 120 Model Development
3 76 52 128 Model Calibration
4 118 16 132 E)dsdnq 9ystern Ana is
5 88 48 136 Future System Ana is
6 116 24 140 Phase 2 Draft Report
7 36 16 52 Manhole Inspection
8 48 20 68 Topographic Suva
9 1 139 14 1 Model PurchasefTnaininq
10 1 139 140 SuoplementaltConlingency
11 32 4 38 lTraffic Control Plan
1 139 140 1 PHASE 2 COMPLETE
140 1 8 1 148 1 Combine Phase 1 &2 Reports
Amend.No.5
Exhibit A"
Page 6 of 14
The time limits set forth in the schedule shall include allowances for reasonable and expected review time
by the CITY and approval by authorities having jurisdiction over the PROJECT,and shall not be allowed
as cause for delay or adjustments to the schedule. Delays in the design critical path caused by review
times by the CITY or a permitting agency exceeding those anticipated by the ENGINEER'S schedule are
cause for adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made
in writing and acceptable to both parties.
The ENGINEER shall begin work within 10 days of receipt of the executed CONTRACT
AMENDMENT and/or written Notice to Proceed. A schedule of completed work, including a bar graph
schedule showing the percentage complete of each of the items of the scope of work, will be submitted
each month to the CITY.
Amend.No.5
Exhibit"A"
Page 7 of 14
Exhibit A
Compensation Summary
Phase 1—Oso,Broadway and Greenwood SeNoe Areas
Phase 1-Oso,Broadway and Greenwood Service Areas CRG LNV Pipeline Total
Task 12:Field Verification Analysis Amendment 5
12.1 Identify Areas of Concem in Existing GIS $ 3,576 $ 4,606 $ - $ 8,182
12.2 Field Verification of Inaccurate Pipe Diameters $ 10,300 $ 6,840 $ - $ 17,140
12.3 Field Verification of Inaccurate MH Inverts $ 8,140 $ 9,576 $ - I $ 17,716
12.4 Coordination of LS Control Settings $ 3,1201 $ 2,832 $ - 1 $ 5,952
Total $ 25,1361 $ 23,854 1 $ $ 48,990
Amend.No.5
Exhibit W
Page 8 of 14
Attachment B
Amendment No.5
Manhour and Fee Analysis
Amend.No.5
ExhEbH"A"
Page 9 of 14
Ca�mi,Rehmet&Gutierrez
En�1 neen 52 L R 1220is.MMEU04araM4
Orciinr�na•PrANNE rs.suRVinroRs ALMIX78M
TSPE Fhm Reg.No.F-US
June 6,2013
James H.Forbes,Jr.,P.E.
Pipeline Analysis,LLC
1115 Main Street
Garland,Texas 75040
RE: Contract Amendment No. 5
Phase I Task 12—Field Verifications
Sanitary Sewer Overflow Initiative Program
City Wide Hydraulic Model — Oso,
Greenwood & Broadway Service Areas
(Project No. E10015)
Dear Mr. Forbes,
We were recently requested to prepare an Amendment to the referenced contract involving
additional services associated with Phase I Hydraulic Models for the Greenwood (CRG),
Broadway(CRG), and Oso(LNV)Service Areas.
During the course of the hydraulic model construction several areas of incorrect data were
discovered within the GIS shape files provided by the City. Additional efforts are required to
identify, field investigate and correct these areas so that the model will reflect the exact existing
conditions of the sanitary sewer collection systems. In general the following tasks will be
required under this Amendment No. 5, Phase I Task 12—Field Verifications:
• Identifying areas of concern and possible inaccurate pipe diameters designations within the
existing GIS shapefiles for each of the Phase I service areas.
• Field verification of pipe diameter discrepancies within the existing GIS for multiple areas.
• Identifying areas of concern and possible inaccurate manhole inverts within the existing GIS
shapefiles for each of the Phase I service areas.
• Field verification of manhole invert discrepancies within the existing GIS for multiple areas.
• Coordination of lift station control settings to locate and minimize surcharging conditions.
The total amount of this Amendment is shown in the table below and supported in the man-hour
analysis breakdowns from each firm,Attachments"A"&"B".
COYm,Rehmet&Gutierrez En . eerie L.P. CRG $25,136
LNV Inc. S23,854
Total Amount of Contract Amendment No. 5 S49,990
Amend.No.5
Exhibit"A"
Page 10 of 14
Mr.James Forbes.P.E.
Co UrM Amendnmt No.5
hp2of2
If you have any questions or require additional information, please give me a call 361.991-8550
or email me atjcoym@crgei.com.
Very truly yours,
COYM,REHMET&GUTIERREZ
ENGINEERING,L.P.
WJeffoM E.
Attachments: Attachment"A"0 page)
Attachment"B"(1 page)
Amend.No.5
Exhibit"A"
Page 11 of 14
LT
o¢_
_ Z4
�
M CA
ro
cl
ro
a
N
� g
z
o � a
se U
ro
Go
z '_ o
C H $ w 'a z
r y
F
$ iz1J
g
o - w
�u g
gig.Cl g
m
.. n
N b
O � O
O
3 N N
CL $ -4.
O Itl G
rx
rq
V
� V �
IL
N
I N
,• W
r
2
LO ffi
CL Q,
Li
c�
r
N r r
N N N
W
Attachment
Contract Amendment No. 5
City-Wide Sanitary Sewer Hydraulic Model
REVISED SCHEDULE: CONTRACT AMENDMENT NO.
Phase 1 -Broadway,Greenwood and Oso SeMce Areas
Major Week No. Duration Week ACTIVITY
Tasks Start Meeks) End
1 1 31 32 Kick-Off Meeft i Workshy (Data Coection and Relview
1.6 8 20 28 Wastewater Flow MonitoHng
2 16 28 44 Model Development
I'
4 80 30 110 Existing System Anal is
5 80 30 110 Future System Analysis
JIQ P 1 rt
7 4 28 32 Manhole InSoction
8 4 28 32 Topographic Swe
9 1 139 140 Model Purcha /TWm
19 1 1 14Q isippippinjoKinhaggngy
11 1 3 4 Imfig Qgntml Plan
1 139 140 PHASE 1 COMPLETE
Phase 2-Allsom Lamm Me reandlWhithicaoSerNA a Am&
Major Week No„ buraton Week ACTIVITY
Tasks Ste rt eks End
1 49 28 0 K' k-gg Mtong i rich n n ti w
--1-6-- GQ 56 116 sty Flow Monitodng Lvdth Eanded Metabngil
2 64 56 120 Model Development
3 76 52 128 Mode[Calibrabon
4 11§ is UZ F.9 9 ng$v9%M 6M hai"A
5 La 48 136 FutLre SyMm AnahMs
6 116 24 140 Phase 2 Drat Rep2rt
7 36 16 52 Manhole In ection
1 0 29 68 T0000mphir.$My
1 39 140 Model PInhaseffWning
10 1 139 140 ntal/Conti e
11 32 4 36 Traffic Control Plan
1 1112_. 14 PKASF,2C9MPLETE
12 140 ® 148 C no Phase 1&2 Re ooft
Amend.No.5
Exhibit W
Page 14 of 14
L' y O
Cl
rr
402 ti \° \° \° \°
O � O O'.R O D O O O O O O O O O .11o O
w e +r o o O O C) N a a a a a o
i � N
m5 L E
U] fLCC a v
0 0 0 0 0 a a a ❑ ❑ ❑ a a a a
�
T 64 �
H c
G v O 0 a a to 0 � 00 m m m 6s C a 0
•� �
c
CL —
U a
C 643 ti 0 C)a n N
0 •; O E!3 6113. (f} EA r
Ef3
a E
w +r °a °o to °o ep O N N ❑ O ❑ V each m
u 0 0 1- Wi N O T W m m m l- N 1- Qf
L T ci C9 c N -r:T 14 G ' N
Z 0 T-
44).O N d; V
C4 0 0ZZQ O � a N O N 6c3 a (NO m m m CN N 04 a~0
CL .+ ci Z -1 .- T T T- .- N
W 4) 0 Q v ER £R EA EA
1- °
o > E
uj � a
J CL c
T � a ° ° a � N a N ° � N s s a
0 0 a a `- ` - a � T
(� Z T T T N
.O d9 EH ER3
E
° ° ° ° ° ° ° m m a ° ° °
a a a a a
cc aaa PPP
N N � N �14 �O
V
N
N
U N
N
N
N CD
U h co
t�l1 M d) LL U_
C
CD t CD EL L d (A a> � ° LL � Z
t� a �, c 'cn to .c Z � -v y
'� M o m a � c o cn y 00 M CD
O c a o E co O
O
V E os L O m U c
c 0 a o N M U 7 cya v o
m aOmUrn aa � r FOcncn 0co <
AMEND. NO. 6
EXHIBIT"B"
Page 1 of 9
SUPPI„IM NUAIniH
TO BE ASSIGNED 1Vt7Ty-
-_ PURCHASING DIVISION
`♦`""� CITY OF CORPUS CHRISTI
City of DISCLOSURE OF INTEREST
Corpus
Chnsti
City of Corpus Christi Ordinance 17112, as amended, requires all persons or ftrins seeking to do
business with the City to provide the following information. Every uestion must be answered.
If the question is not applicable, answer with "NA". See reverse side for Filing Requirements,
Certifications and definitions.
COMPANY NAME: Pipeline Analysis,LLC
P.O.BOX:
STREET ADDRESS: 1115 Main Street CITY: Garland,Texas ZIP: 75040
FIRM 1S: 1. Corporation 3. Partnership 3, Sole O%ner ❑
4. Association ® 5. Other e
DISCLOSURE QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet.
1. State the names of each "employee" of the City of Corpus Christi having an "ownership
interest'constituting 3%or more of the ownership in the above named"firm:
Name Job Title and City Department(if known)
N.A.
3. State the names of each "official"of the City of Corpus Christi having an "ownership interest"
constituting 3%or more of the ownership in the above named"firm."
Name Title
N.A.
3. State the names of each "board member" of the City of Corpus Christi having an "ownership
interest'constituting 3%or more of the ownership in the above named"firm.'*
Name Board,Commission or Committee
N.A.
4. State the names of each employee or officer of a "consultant" for the City of Cor�us Christi
who worked on any matter related to the subject of this contract and has an 'ownership
interest"constituting 3%or more of the ownership in the above named"firm."
Name Consultant
N.A.
FILING REQULREMENTS
If a person who requests official action on a matter knows that the requested action will confer an
economic benefit on any City official or employee that is distinguishable from the effect that the
action will have an members of the public in general or a substantial segment thereof,. you shall
disclose that fact in a signed writing to the City,official,employee or body that has been
requested to act in the matter, unless the interest of the City official or employee in the matter is
apparent. The disclosure shall also be made in a signed writing filed with the City Secretary,.
[Ethics Ordinance Section 2-339(d)]
CERTIFICATION
I certifv that all information provided is true and correct as of the date of this statement, that I
have not'knowingly withheld disclosure of any information requested. and that supplemental
statements will be promptly submitted to the City of Corpus Christi,Texas as changes occur,
Certifying Person: James H.Forbes,Jr.,P.E. Title: President
crypt of E'rintl ,� r
Signature of Certifying r Date:
Person: lh�1
DEFINITIONS
a. "Board member." A member of any board, commission, or committee appointed kv tite
City Council of the City ofCorpus Christi,Texas.
b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to
have an effect on that interest that is distinguishable from its effect on members of the public
in general or a substantial segment thereof.
c. "Employee." Any person employed by the city of Corpus Christi,Texas either on a full or
part-time basis,but not as an independent contractor.
d. '`Firm." Any entity operated for economic gain, whether professional, industrial or
commercial, and whether established to produce or deal with a product or service, including
but not limited to, entities operated in the farm of sale proprietorship, as self-employed
person, partnership, corporation,joint stock company,joint venture, receivership or trust. and
entities which for purposes of taxation are treated as non-profit organizations.
e. "Official.' The Mayor, members of the City Council, City Manager, Deputy City
Manager, Assistant City Managers, Department and Division Heads, and Municipal Court
Judges of the City of Corpus Christi,Texas,.
f. "Ownership Interest:' Legal or equitable interest, whether actually or constructively held.
in a firm, including when such interest is held through an agent, trust, estate, or holding
entity. "Constructively held" refers to holdings or control established through voting trusts,
proxies,or special terms of venture or partnership agreements."
g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of