HomeMy WebLinkAboutC2013-307 - 8/26/2013 - NA w CITY OF CORPUS CHRISTI AMENDMENT NO. 9 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City", and LNV, Engineering hereinafter called "Engineer", agree to the following amendments to the Contract for Engineering Services for Staples Street BOND ISSUE 2008 Phase 1 from Brawner to Barracuda (Project No. 6468) Phase 2 from Barracuda to Gollihar(Project No. 6469), as authorized and administratively amended by: Original Contract May 18, 2010 Motion No. M2010-118 $1,892,273.00 Amendment No. 1 November 5, 2010 Administrative Approval $44,700.00 Amendment No. 2 December 4, 2010 Administrative Approval $32,400.00 Amendment No. 3 March 8, 2011 Motion No. M2011-063 $94,754.00 Amendment No. 4 September 20, 2011 Administrative Approval $25,176.00 Amendment No. 5 December 6, 2011 Administrative Approval $29,500.00 Amendment No. 6 January 17, 2012 Motion No. M2012-011 $758,964.00 Amendment No. 7 May 22, 2012 Motion No. M2012-098 $98,560.00 Amendment No. 8 July 29, 2013 Administrative Approval $27,200.00 Staples Street (BOND ISSUE 2008) Phase 1 from Brawner to Barracuda (Project No. 6468) is amended as follows: BASIC SERVICES Re-Desi n Lane Configuration to Add Bicycle Lanes for Phase 1 1. Revise pavement marking plans, signage plans and contract quantities to provide on-street bicycle lanes on both sides of Staples Street throughout the limits of Phase 1 (Brawner Parkway to Barracuda Place); for a Lump Sum Fee of$9,462.00 Replace Water Valves on 24-inch Waterline for Phase 1 2. Prepare plans for removing existing water valves and concrete water vaults at two locations for an existing 24-inch waterline and provide new 24-inch water valves; conduct topographic survey; prepare plans for temporary traffic control; for a Lump Sum Fee of$13,584.00 Section 3. Fees, Part C. Summary of Fees is amended as specified in Exhibit "B" Summary of Fees. All other terms and conditions of the May 18, 2010 contract between the City and Engineer, and of any amendments to that contract which are not specifically addressed herein shall remain in full force and effect. 2013-307 8126113 AMEND. NO. 9 LNV Engineering Page 1 of 2 STAPLES L MENMENT NC ELF ENT N® 9.0CC 't r ED CITY OF CORPUS CHRISTI LNV E I I. Mark Van Vleck, P. E., Date) //,DS. Leyendecker, P.E:Interim Assistant City Manager dent for Public Works & Utilities avigation, Suite 300 Corpus Christi, TX 78408 RECOMMENDED (361) 883-1984 Office (361) 883-1986 Fax By Daniel Biles, P. E. ( at ) Director of Engineering Services A APPROV ASO FORM By Assistant City Attorney (Date) APPROV ' By Office o -Management and Budget (Date) ATTEST By Armando Chapa, City S&dretary . ............................. ....... ................ . u,,,, ,.,........., -.w.._®-................. .. _.... , .AMENDM ... . ,-,Fund Source . ..... .,.��.......................�_��.� Project No. Project Title Number Amount ....................................................------.�......... .,,,,,.„,,.........................,, ,,.._.,,._,................ ,.-,,,. _....._._....... ..mm,,,,,,,,,,,,„,,,,,,,,,,,,,,a.n.......N,a,me 6468 Phase 1 from Brawner to Barracuda 550950-3548 00000-770077 -$9,462®O��X4 Sta les Street BOND ISSUE 2008 Street Street 2012 GO CIP Fund Bond 08 0 6468 Phase 1 from Brawner to Barracuda 550950-4091-00000-170077 1__..........mm 4 0,. Staples Street BOND ISSUE 2008 Water Water 2012B CIP Fund (Rev Bds 3,584a 0 6469 Phase 2 from Barracuda to Gollihar "1"I,—.. ......1–.--............................„»,�A_m ........... .....� ......... .... 0 0.. Staples Street (BOND ISSUE 2008) -. ... ....... _ mm Total __ , . ..., ..__.. „ ,,,�_ _ .,�mmm� ,,.,,n,n,nw $23,046.00 Encumbrance Number: E6468ALN (Project No. 6468): E6469ALN (Proiect No. 6469) [AMEND, NO. 9 Pa e 2 of 2 K19NOIAIEERING CAT CFI CE VE RSTREE STAPLES”i ENL} E NO. END ENT NO 9 D C 1 V-- Solutions Today with a ,engineers architects contractors AGO for Tomorrow June 24, 2013 Mr. Daniel Biles, P.E. Dhvdor of Engineering Services City of Corpus Christi P.O. Box 9277 Corpus Christi,Texas 78469-9277 Re: Amendment to Professional Services Contract Staples Street(BOND ISSUE 2008) Phase I firm Brawner to Barracuda(Project No. 6468) Phase 2 from Barracuda to Gollihar(Project No, 6469) Amendment No.9-- Re-Design Lane Configuration to Add Bicycle Lanes for Phase 1 and Replace Water Valves on 24-inch Waterline for Phase 1 Dear Mr. Biles: Please allow this letter to serve as our formal request to arnend our Contract to Extend the basic services as described below for the above referenced project. The fee for the amended scope of services is 523,046 for a total revised contract amount of$3,026,573. This amendment includes revising the pavement marking plans, signage plans and contract quantities to provide on-street bicycle lanes on both sides of Staples Street throughout the limits of Phase 1 (Brawner Parkway to Barracuda Place). This amendment also includes preparing plans for removing existing water valves and concrete water vaults at two locations for an existing 24-inch waterline and providing new 29-inch direct-bury gate valves. One of these locations is outside of the project area which will require topographic surveying and preparing plans for temporary traffic control. These tasks vin'll result in additional work for the contractor which will necessitate a change order. SOINAVIGATION I SU rrE 300 � PUS CHRISn,TEXAS 7 0FHa3fiL=MN I FAX36LMAM I WWW1WHU,0M EEXHIBIT ND. NO.9 "A" e 1 of 2 low engineers � architects I contractors Vision for Tomorrow The cost bads far the fees associated with this amendment is shown below. A�Deslgn Lane Coffiguration 1q Add Bicycle Lanes for Phase 1: Project Manager 12 hours 0$199= $2,388 Engineer 111 22 hours @$123= $2,706 Sr. CAD Tech 48 hours 1 = Task Sub-total: $9A*2 Replace Water Va yes on 244nch W 12dine for Phase 1: Project Manager 16 hours 0$199= $3,184 Engineer 111 30 hours @ $123= $3,690 Sr. CAD Tech 622 hours @ $91 = $5,642 Mn Survey Crew 6 hours Q $178 = $1,068 Task Sub-total: $13,584 Total Amount for Amendment No. 9: $23,046 If you have any questions, please feel free to contact us. Sincerely, LNV TBPE Firm F-366 Dan S. r; P.E. President Attachment: Amendment No. 9 WI NAVIGATION k SUITE300 I! CORPUS CHRISTI,TEXAS 7 Offia 36LM.1984 I FAX 3fiLM.19M r WWWAIMNUOM AMEND. NO.9 EXHIBIT"A" Page 2 of 2 SUMMARY OF FEES ORIGINAL CONTRACT Staples Street,Phase 1-Braner to Barracuda(Project No. 68) Stre t Storm W ter W ter W mew ter Tot I Basic Services 1 Prelimina Des` n Phase $87,274.80 S548001,14 $5,818,32 S4,363.74 $145,458-00 2 Design Phase 162 912.96 89 602.13 10 860,86 8,145.65 271 521.60 3 Bid Phase 872748 4,800.11 581.83 436.37 14 545,80 4 Construction Phase 28:364!76 1560062 11,890,198 1 418124 47 274.60 Subtotal Basic Services 287,280.00 158,004.00 19,152.00 14,364.00 478,1300.00 Additional Services 1 Permit Pre TDLR 8,500-00 0.00 0,00 0.00 8500.00 TCEQ-TPDS 0.00 1500.00 0,00 000 1500.00 uSACE 0.00 0.00 0.00 0.00 0.00 Subtotal Permit Prop 10 000.00 2 Right of WU Acguistition 0.00 0.00 0.00 0.00 0-00 3 Topggraphic Survey 34 243.00 1431980 6,848M 684860 62 260.00 4 Construction Observation 0.00 0,00 0100 0,00 0.00 5 Warranly Phase 2,580.00 1,620.00 66000 1,140.00 6,000.00 6 Public Meetin s 6,450.00 4,050.00 1,650,00 2,850,00 15 00000 7 Sanita Sewer Inves' ation 0.00 0.00 0.00 146 500,00 146 500.00 8 Subsurface Utili loration 0.001 27,M.00 27 225.00 27 225.00 81 675.00 9 Franchise Utilh Coordination 5,000.00: 5,000.00 5,000.00_ 5,000,00__20000,00 10 Off-Site Drainage 0.00 125 000.00 000 0.00 125 000,00 11 CCTV Existing Drainage S st 0.00 0.00 0.00 0,00 0.00 12 Landscaping Design 0.00 0.00 O.0O 0.00 0,00 13 Mike and Bike Design 0.00 0.00 0000 000 0100 Subtotal Additional Services 56,773.00 178,714.801 41,383,601 18R,563,601 466,43500 Total Authorized Fee 344,053.00 336,718801 60,535.601 203,92T661 945,235.00 ORIGINAL CONTRACT Staples t,Phase 2-Barracuda to Golllhar(Project No. 69) St t Storm Water W ter W t r Tat I Basic Services 1 Prelimina Design Phase 99 439.20 54 691.56 6,629,28 4,971-96 165,732,,00 2 Desi n Phase 185 619.84 102 090.91 12 374.66 9,280.99 309 366.40 3 Bid Phase 9,943.92 546916 662,93 497.20 16 573.20 4 Construction Phase 32 319.84 17 775.91 2 154.66 1,615,99 53 866,40 Subtotal Basic Services 327.322.80 180,027.54 21,821 M 16,366.14 545,538 00 Additional Services 1 Permit Pre TDLR 8,500.00 0.00 0..00 0,00 8,500.00 TCEQ-TPDES 0.00 1500.00 0.00 0.00 1500-00 USACE 0.00 0.00 0.00 0.00 0.00 Subtotal Permit Prep 10,000,,00 2 Right of Way Agguistition 0.00 0.00 000 0.00 0.00 3 Top2grag hic Survey 38 054.50 15 913.70 7.610.90 7A10"90 69,190,100 4 Construction Observation 0.00 000 0.00 0.00 0.00 5 WarraqL Phase 2,580.00 11620.00 660.00 1 140,00 6,000.00 6 Public Meefin s 61450.00 4,050.01) 11,650M 2 850,00 15 000,00 7 Sanita Sewer Investigation 0.00 0.00 000 88 000.00 88 000,00 8 Subsurface Utili Exploration 0.00 22 770.00 22 770.00 22 770,00 68,3110M 9 Franchise Utilitv Coordination 5,000.00 51000.00 5,000,00 5.00000 20 000.00 10 Off-Site Drainage 0.00 125 000.00 0.00 0,00 125,000.00 11 CCTV EAsting Drainage S st 0.00 0.00 0.00 0.00 0.00 12 Landscaping Design 0.00 0.00 0.00 0,00 0.00 13 Mike and Bike Desi n 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 60,584.50 175,853.70 37,690.90 127,370.90 401,500.00 Total Authorized Fee 387,907.30 355,881.24 59.512.42 143,737.04 947,038.00 M. j !T" I 7 of SUMMARY OF FEES ORIGINAL CONTRACT Combined Total Street Storm Wter Vgttr W tewater Tot Basic Services 1 Preliminary Deslqn Phase .1 86,714.00 102,692.70 12,447.60 9,335.70 311,190.00 2 Design Phase 348,53Z80 191.693.D4 23,235.52 17,426.64 580,888.00 3 Bid Phase 18,671.40 10,269.27 1,244.76 933.57 31,119.00 4 Construction Phase 60,684.60........33,376.53 4,045.64 .....3034.23 101,141.00 Subtotal Basic Services 614,602.80 338,031.54 40,973.52 30,730.14 1,024,338.00 Additional Services I Permit Prep TDLR 17.000.00 0.00 0.00 0.00 17,000,00 TCEQ-TPDES 0.00 3,000.00 0.00 0.00 3,000.00 -USACE 0-00 0.00 0.00 0.00 0.00 - Subtotal Permit Prep 20,000.00 Right,of Way AcquistWon 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 72,297.50 30,233.50 14,459.50 14,459.50 131,450.00 4 Construction Observation 0.00 0.00 0.00 0.00 0.00 5 Warran!y Phase 5,160.00 3240'00 1,320.00 2 280.00 12,000.00 6 Public Meetings 12,90D.00 8:100.00----------3,300.00. 5:700!00 30.000.00 7 Sanitaq Sewer Inveggation 0.00 0.00 0.00 234,500.00 ......234,500.00 8 Subsurface Utili!y Exploration 0.00 49.995.00 49,995.00 49,995.00 1491985.00 9 Franchise Utili!y Coordination --10 00.00 10,000.00 10,000.00 10,000.00 40000.00 ,0 1 10 Off-Site Drainage 0.00 250,000.00 0.00 0.00 250,000.00 11 CCTV Existing DM!npg§_§pt 0.00 0.00 0,00 0.00 0.00 12 Landscaping Design 0.00 0.00 0.00 0.00 0.00 13 Hike and Bike Design 0.00 0.00 0.00 OZO 0.00 Subtotal Additional Services 117,357.50 354,568.50 79,074.501 316,934,501 867,935.00 Total Authorized Fee $731,96030 $692,600.04 $120,048.02 j $347,664.641 $1,892.273.00 05/18110 Motion No. 2010-118 AMEND. NO. 9 EXHIBIT"B" Page 2 of 8 SUMMARY OF FEES A D.NO.1 AMD.NO.2 A D.NO.3 A D.NO.4 A D.NO.5 A D.NO.6 AMD.N .7 Staples S %Phase i -Bra ner to Barracuda(Project No. 68) S M t Storm W ter Street SL et W ter Storm W ter Street Basic Services 1 Prelimina Design Phase $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 2 Design Phase 0.00 0.00 0.00 0.00 29 500.00 158 523.20 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 6340.80 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 46 71 1.20 0.00 Subtotal Basic Services 0.00 0.00 0.00 0.00 29,500.00 211,575.20 0.00 Additional Services 1 Permit Pre 1TDLR 0.00 0.00 0.00 0.00 0.00 4102.40 0.00 TCEO-TPDES 0.00 0.00 0.00 0.00 0.00 41567.20 0.00 USACE 0.00 0.00 0.00 0.00 0.00 8,256.80 0.00 Subtotal Permit Prep 0.00 0.00 0.00 0.00 0.00 16 926.40 0.00 2 ' ht of Way A uistition 0.00 0.00 0.00 0.00 0.00 36 000.00 0.00 3 To ra hic Survey 0.00 0.00 0.00 0.00 0.00 42 272.80 0.00 4 Construction Observation 0.00 0.00 0.00 0.00 0.00 126 818.40 98560.00 5 Warran Phase 0.00 0.00 0.00 0.00 0.00 5 284.00 0.00 6 Public Meetings 0.00 0.00 0.00 0.00 0.00 19 600.00 0.00 7 Sanitay Sewer Investi anon 0.00 0.00 0.00 0.00 0.00 36 800.00 0.00 8 Subsurface Utility Ex location 0.00 0.00 0.00 0.00 0.00 49 600.00 0.00 9 Franchise Willy Coordination 0.00 0.00 0.00 0.00 0.00 12 694.40 0.00 10 Off-Site Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11 CCTV Existing Draina e S st 0.00 16 200.00 0.00 0.00 0.00 0.00 0.00 12 Landscaping sin 0.00 0.00 0.00 0.00 0.00 _24,000.00 0.00 13 Hike and Bike Design 0.00 0.00 0.00 0.00 0.00 25 600.00 0.00 Subtotal Additional Services 0.001 16,200.00 0.00 0.00 0.00 395,596.00 98,560.00 Total Authorized Fee 0.00 16,200.00 000 0.00 29,500.00 607,171.20 98,560.00 A D.NO.1 A D.NO.2 AMD.NO.3 AMD.NO.4 p D.NO.5 A D.NO.6 A D.NO.7 Staples Street Phase 2-Barracuda to Goillhar(Project No. 6 ) St Tee roe t W ter Storm Water S Basic Services 1 Preliminar, Design Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 Design Phase 32 086.00 0.00 0.00 15 992.00 0.00 39 630.80 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 158520 0.00 4 Construction Phase 12 614.00 0.00 0.001 0.00 0.00 11 677.80 0.00 Subtotal Basic Services 44,70000 0,00 0.00 15,992.00 0.00 52,893.80 0.00 Additional Services 1 Permit Pre TDLR 0.00 0.00 0.00 0.00 0.00 1025.60 0.00 TCE -TPDES 0.00 0.00 0.00 0.00 0.00 1141.80 0.00 USACE 0.00 0.00 0,00 0.00 0.00 2,064.20 0.00 Subtotal Permit Prep 0.00 0.00 0.00 0.00 0.00 4,231-60 0.00 2 Ri ht of Way&qgu istition 0.00 0.00 0,00 0.00 0.00 9,000.00 0.00 3 Toppgraphic Survey 0.00 0.00 0,00 0.00 0.00 10 568.20 0.00 4 Construction Observation 0.00 0.00 94 754.00 0.00 0.00 31 704.60 0.00 5 Waran Phase 0.00 0.00 000 0.00 0.00 1321.00 0.00 6 Public Meetings 0.00 0.00 0.00 0.00 0.00 41900-00 0.00 7 SanitaN,Sewer Investigation 0.00 0.00 000 0.00 0.00 9,200.00 0.00 B 1 Subsurface Utili Exploration 0.00 0.00 0,00 7,776.00 0.00 12 400.00 0.00 9 Franchise Utility Coordination 000 0,00 0.00 1,408.00 0.00 3.17360 0.00 10 -Site Drainage D.00 0.00 0,00 0.00 0.00 0.00 0.00 11 CCTV Existing Draina e t 0.00 16 200.00 0.00 0.00 0.00 0.00 0.00 12 Landscaping Design 0.00 0.00 0.00 0.00 0.00 6,000.00 0.00 13 Hike and Bike Design 0.00 0.00 0.00 0.00 0.00 %400.00 0.00 Subtotal Additional Services 0.00 16,200.00 94,754,00 9,184.00 0.00 98,899.00 0.00 Total Authorized Fee 44,700.001 16,200.00 94,754-00 25,176.00 0.00 151,782.80 0.00 EXHIBIT"B" Pa e3of8i SUMMARY OF FEES AMD.-NO.I AMD.NO.2 AMD.NO.3 AMD.NO.4 AMD.NO.5 AMD.NO.6 AMD.NO.7 Combined Total St Storm Water Street St M21 Water Storm Mter are Basic Services 1 Prelimina Design Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 Design Phase 32,086.00 0.00 0.00 15,992.00 29,500.00 198,154.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 7926.00 0.00 4 Construction Phase 12,614.00 0.00 0.00 0.00 0.00 58,389.00 0-00 Subtotal Basic Services 44.700.00 0.00 0.00 15,992.00 29,500.00 264,469.00 0.00 Additional Services 1 Permit Prep ITDLR 0.00 0.00 0.00 0.00 0.00 5,128.00 0.00 - TCEQ-TPQES 0.00 0.00 0.00 0.00 0.00 5,709.00 0.00 JUSACE 0.00 0.00 0.00 0.00 0.00 10,321.00 0.00 I Subtotal Permit Prep 0.00 0.00 0.00 0.00 0.00 21,158.00 0.00 2 Right of Way Acquistition 0.001 0.00 0.00 0.00 0.00 45,000-00 0.00 3 Toppgraphic Survey 0.00 0.00 0.00 0.00 0.00 52,841.00 0.00 4 Construction Observation 0.00 0.00 ....94,754.00 0.00 0.00 158,523.00 98.560.00 5 Warranly Phase 0.00 0.00 0.00 0.00 0.00 6 605.00 0.00 6 Public Meetings 0.00 0.00 0.00 0.00 0.00 24,500.00 0.00 7 'ganitag Sewer Investigation 0.00 0.00 0.00 0.00 0.00 46,000.00 0.00 8 Subsurface Uti[Lbj gn!oration 0.001 0.00 0.00 7,776.00 0.00 62,000.00 0.00 9 Franchise Utility Coordination 0.00 0.00 0.00 1,408.00 0.00 15,868.00 0.00 10 Off-Site Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11 CCTV Existing DMjaa e S t 0.00 32,400.00 0.00 0.00 0.00 0.00 0.00 12 Landscaping Design 0.00 0.00 0.00 0.00 0.00 30 000.00 0.00 13 Hike and Bike Des!qn 0.00 0.00 0.00 0.00 0.00 32,000.00 0.00 Subtotal Additional Services 0.00 32,400.00 94,754.00 9,184.00 0.00 494,495.00 98,560.00 ITotal Authorized Fee $44.700.00 $32,400-00 $94,754.00 $25.176.00 $29,500.00 758,964.00 $98,560.00 j 11105110 12/04/10 03108/11 09/20111 12L1O6/1 1 01117/12 OW2112 Admin Approv _Admin_8Mrov M2011-063 Admin Approv Admin A ;rjov M2012-011 642012-098 AMEND.EXHIBIT NO.9 "B" Page 4 of 8 SUMMARY OF FEES AMD.NO.B AMD.N0.9 Staples et,phase i - raner Ba cuda(Pro ct o.6468) St t Street W ter Total sic Services 1 Preliminary Design Phase $0.00 $0.00 $0.00 $0.00 2 Design Phase 0.00 9,462.00 13.584.00 23 046.00 3 Bid Phase 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 Subtotal Basic Services 000 9,462.00 13,5 00 23,046.00 Additional Services 1 Permit Pre TDLR 0.00 0.00 0,00 0.00 TCEQ-TPDES 0.00 0.00 0.00 0.00 USACE 0.00 0.00 0.00 0.00 Subtotal Permit Prep_ 0.00 0.00 0.00 0.00 2 R' ht of Way Agggistition 0.00 0.00 0.00 0.00 3 Topographic Survey 0.00 0.00 0.00 0.00 4 Construction Observation 0.00 0.00 0.00 0.00 5 Warranty Phase 0.00 0.00 0.00 0.00 6 Public MestiMs 0.00 0.00 0.00 0.00 7 Sanita S er Investi anon 0.00 0.00 0.00 0.00 B ISubsurlace,l-Itility Exploration 0.00 0.00 0.00 0.00 9 Franchise Utjl!N Coordination 0.00 0.00 0.00 0.00 10 Off Site Draina a 0.00 0.00 0.00 0.00 11 CCTV Existink Drainage S st 0.00 0.00 0.00 0.00 12 Lands ca in sin 0.00 0.00 0.00 0.00 13 Hike and Bike Design 0.00 0.00 0.00 0.00 Subtotal Additional Services 0.00 0.00 0.00 Total Authorized Fee 0.00 9.462.00 13,584.00 23,046.00 A D.NO.8 -K MD.N0.9 Staples Street,Phase 2-Barracuda to Goillhar(Project No. 69) Stmt Street t r Yot I Basic Services 1 Prelimina Desi n Phase 0.00 0.00 0.00 0.00 2 Des' n Phase 0.00 0,00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 Subtotal Basic Services 0.00 0.00 0.00 0.00 Additional Services 1 Permit Pre TDLR 0.00 0.00 0.00 0.00 TCEQ-TPDES 0.00 0.00 0.00 6.60 USAGE 0.00 0.00 0.00 0.00 Subtotal Permit Prep 0.00 0.00 0.00 0.00 2 Right of Way Acguistition 0.00 0.00 0.00 0.00 3 Topographic Survey 0.00 0.00 0.00 0.00 4 Construction Observation 27 200.00 0.00 0.00 0.00 5 Warrantv Phase 0.00 0.00 0.00 0.00 6 Public Meetings 0.00 0.00 0.00 0.00 7 Sanitary Sewer investigation 0.00 0.00 0.00 0.00 8 Subsurface Utili Exploration 0.00 0.00 0.00 0.00 9 Franchise Utility Coordination 0.00 0.00 0.00 0.00 10 -Site Drainage 0.00 0.00 0.00 0.00 11 CCTV Existing Drainage Syg 0.00 0.00 0.00 0.00 12 Landscaping Design 0.00 0.00 0.00 0.00 13 1 Nike and Bike Design 0.00 OZ01 0.00 0.00 Subtotal Additional Services 27,200.00 0.00 0.00 0.00 Total Authorized Fee 27,200.00 0.00 0.06 0.00 IZ M" SUMMARY OF FEES AD. O.8 AMD. O.9 Combined Total I I Street Stcqtt Wgter ----Totpl Basic Services 1 Prelimina Desi n Phase 0.00 0.00 0.00 0.00 2 DesignPhase 0.00 9,462.00 13,584.00 23,046,00 3 Bid Phase 0.00 0.00 0.00 00 4 Construction Phase 0.00 0.00 0.00 0.00 Subtotal Basic Services 0.00 9,462.00 13,584-00 23,04600 Additional Services I Permit Prep TDLR 0,00 0.00 0.00 0.00 TCEO-TPDES 0.00 0.00 0.00 0.00 USAGE 0,00 0.00 0.00 0.00 Subtotal Permit Prep 0.00 0.00 0.00 0.00 2 Right of Way Acquistition 0,00 0.00 0.00 0.00 3 Topographic Survey 0.00 0.00 0.00 0.00 4 Construction Observation 27 200.00 0.00 0.00 0.00 5 Warrantv Phase 0,00 0.00 0.00 0.00 6 Public Meefin s 0,00 0.00 0.00 0.00 7 Sanitary S'ewer Investigation 0,00 0.00 0.00 0.00 8 Subsurface Utili!y Exploration 0.00 0.00 0.00 0.00 9 Franchise-Utility Coordination 0.00 0.00 0.00 0.00 10 Off-Site Drainage 0,00 0.00 0.00 0.00 11 CCTV Existing Drainage Syst 0.00 0.00 0.00 0.00 12 Landscaping Deeign 0-00 0.00 0.00 0.00 13 1 Hike and Bike Desi gn 0.00 0.00 0.00 0.00 I Subtotal Additional Services 27.200,00 0.00 0,00 0.00 I I I I Total Authorized Fee $27,20000 $9,462.0 00 07129113 Admin 8pprov, Admin APDrov- EAMEND. NO.9 EXHIBIT"B" Page 6 Of 8 SUMMARY OF FEES TOTAL Staples et,Phase t•Brawner to Barracuda(Project No. 68) Street Storm Water W ter Malentgr Total Basic Services 1 Preliminaq Design Phase S87,274.80 S48,001.14 S5,818.32 S4.363.74 $145,458.00 2 Design Phase 172 374.96 248,125-33 53,944,86 8145.65 482 590.80 3 Bid Phase 8,727.48 11 140.91 581,83 436.37 20 886.60 4 Construction Phase 28,364,76 62311'82 1,890,98 11418.24 93 985.80 Subtotal Basic Services 296,742.00 369,579.20 62,236.00 14,364.00 742,921.20 Additional Services 1 permit Pre TDLR 8,500.00 410240 0.00 0.00 12 602.40 TCEQ-TPDES 0.00 6:06720 0.00 0.00 6,067.20 USACE 0.00 8,256.80 0.00 0.00 ____8,256.80 Subtotal Permit Pre 2 i a ht of Wa A uistition 0.00 36 000.00 0.00 0.00 36 000.00 3 Top2graphic Survey 34,243-00 56 592.60 6,848.60 6,848.60, 104 532.80 4 Construction Observation 98 560.00 126 818.40 0,00 0.00 225 378.40 5 Warranty Phase 2,580.00 6.904.00 660.00 1 140.00 11,284.00 6 Public Meetings 6,450.00 23 650.00 11,650,00 2 850.00 34 600.00 7 Sanitary Sewer Investigation 0.00 36 800.00 0.00 146 500,00 183 300.00 8 Subsurface Util' Exploration 0.00 76 825.00 27,225001 27,225.001- 131 275.00 9 Franchise Litifty Coordination 5,000.00 17 694.40 5,000-00 5 000.00 32 694.40 10 Off Site Drainage 0.00 125 000.00 0.00 0-00 125 000.00 11 CCTV Existing Draina e S st 0.00 16 200.00 0.00 0.00 16 200.00 12 Lan dsca in Oesi n 0.00 2400000 0.00 0, 24 000.00 13 Hike and Bike sin 0.00 25:600! 0.00 0.00 25 600,00 Subtotal Additional Services 155,333.00 590,510.801 41,38360 189„563.60 976„791.00 Total Authorized Fee 452,075.00 960,690 001 103,619.601 203,927,60 1,,719:,712:20 TOTAL Staples Street Phase 2-Barracuda to Goilihar{Project No.6469) Street Storm Wgle r W ter VgL1Lwjt@r Total Basic Services 1 Prelimina Design Phase 99 439.20 54 691.56 6.629.28 4.971.96 165 732.00 2 Design Phase 233 697.84 141 721.71 12 374.66 9,280.99 397 075.20 3 Bid Phase 9,943-92 71054.361. 662.93 497.20 _,18,158.40 4 Construction Phase 44 933.84 29 453.71 215466 161599 78 158.20 Subtotal Basic Services 388,014.80 232,921.34 21,821.52 16,366.14 659,123.80 Additional Services 1 Permit Pre TDLR 8 500.00 1025`60 0.00 0.00 9,525.60 TCEQ-TPDES 0.00 2 641.80 0.00 0.00 2,641.80 USACE 0.00 2,064.20 0.00 0.00 2,OU.20 Subtotal Permit Pre 2 Right of Way Agggistition 0.00 9,000.00 0.00 0.00 900000 3 To ra hic Survey 38 054.50 26 481.90 7,610.90 7,610.90 79:758!20 4 Construction Observation 121 954.00 31,704.60 0.00 0.00 153 658.60 5 Warranty Phase 2,580.00 2,941.00 660.00 1,140.00 732100 6 Public Meetings 6,450.00 $950.00 1165000 2,850.00 19:900:00 0 7 Sanita Sewer Investigation 0.00 9,200.00 0.00 88 000.00 97 200.00 8 Subsurface Utili Exploration 7,776.00 35 170.00 22 770.00 22 770.00 88 486.00 9 Franchise Utilijy Coordination 6,408.00 8,173.60 5,000.00 5,000.00 24 581.60 10 Off-Site Drainage 0.00 125 000.00 0.00 0.00 125 000.00 11 CCTV Existing Drainage S st 0.00 16 200.00 0.00 0.00 16 200.00 12 Landsca in Design 0.00 fi 000.00 0.00 0.00 6,000.00 13 1 Hike and Bike Desi n 0.00 6,400.00 0.00 0.00 6,400.00 Subtotal Additional Services 191,722.50 290,952.70 37.690.90 127,370.90 647,737.00 Total Authorized Fee 1 579,737.301 523,874.04 59,512.42 143,737.04 1,306,860.80 . EXHIBIT" " SUMMARY OF FEES TOTAL Combined Total Street Storm W11ter W ter W tew ter Tot I Basic Services 1 Prelimina Design Phase 186 714.00 102,692.70 12447.60 9 335.70 311,190,00 2 ties' n Phase 406,072-80 389 647.04 66 319.52 17,426.64 879 666.00 3 Bid Phase 18,671.40 18.195.271 1,244.76 933.57 39 045.00 4 Construction Phase 73,298-60 91 765.53 4,045.64 3,034.23 172 144.00 Subtotal Basic Services 684,756,80 602,500.54 84,057 52 30,73014 1;402,045 00 Additional Services 1 Permit Pre ]TDLR 17 000.00 5,128.00 0.00 0.00 22 128,00 TCEO-TPDES 0.00 8,709,00 0.00 0.00 8:709!00 USACE 0.00 10 321.00 0.00 0.00 10 321.00 Subtotal Permit Prep_ 17 000.00 24158 00 0.00 0.00 41 158,00 2 Right of Way 6gguistition 0.00 45 000,00 0,00 0.00 45 000.00 3 Topograp hic Surve 72 297.50 83 074.50 14 459.50 14 459.50 184 291,00 4 Construction Observation 220 514.00 158 523,00 D.00 0.00 379 037.00 5 Warran Phase 5,160.00 984500 11320,00 2 280.00 18 605 A0 6 Public Meetin s 12 900.00 32:60010 3300,00 5 700.00 54 500.00 7 Sanitay Sewer Investigation 0.00 46 000,00 0.00 234 500.00 280 500.00 8 Subsurface Utilyy Exploration 7,776.00 111 995.00 49 995.00 49 995.00 219 761.00 9 Franchise Utili Coordination 11 408.00 25 858,00 10,000.00 10 000.00 V,276,00 10 Off-Site Drainage 0.00 250 000,00 0.00 0.00 250 00000 11 CCTV Existin Draina e S st 0.00 32 400.00 0.00 0.00 32 40000 12 Landscaping Design 0.00 30 000.00 0.00 0.00 30 00000 13 Hike and Bike Design 0.00 32,000,00 0D0 0,00 32 000,00 Subtotal Additional Services 347,055,50 881,463501 79,074,50 316,934„50 1,624,528.00 Total Authorized Fee 031,812.301 $1.483,964,041 $163,132,021 $347,664,641 $3„026,573.00 AMEND. NO.9 EXHIBIT"B" Page a of 8 P- Iffid'o,"Y ! 'WM"T $ .ts., . ' ca' oamd Zu, may! � 7 reverse s � .. s.• .WW. NOW s MCI P!0r 0ONr � WTI"jWj)XM, 01 Al1Y #,5t 30 Us a" 7 1S: t, 2. flhm:r9up 8 3. SoleOwner 13 4. r oon 5. UIfiCIASVU QX]»►ST!9NS If additional space is aecessar�r,please ase,the reverse side,of this or,attach separate shut. M $fate $be names of each employee" of;the Cityty .ol Coypus sti having an "ow ownership interest 1 copst uting 3%or mope of the ownership in the above aa=9 `hum" N/A ow Job Tide and Oty Department,(if known) 2. State the names of each "official" of the ,City of Corpus Christi having an "ownership interest" constituiimg 3%or more of the ownership in the above named"'fum." Name Tide NIA 3. State the names of each"board member" of the City of Corpus Christi having au "ownership interest" constituting 3%or more of the ownership in the above named'rrm." Name Board.Commission or Quinfinee Dan S. Marina Advisory Board 4. State the natnGS of each employee or officer of a "consultant"` for the City of Corpus Christi who wadmd on mattes mlated o the erect of this contract and has an "owne�ip interee carting 396or more of the ownership in the above named'Yim" Name Consultasrt NIA FIIING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer.an economic benefit on any City official or employee that is d'rstr'ngrrisha a from the effect that the action will have on members of the public in general or a substantial segment themot you.shall disclose that fact in a signed writing to the City official,employee-or body that has been requested to act in the r u=., unless the interest of the City official or amp oyee in the matter is apparerrt. The disclosure shall also be made in a signed writing filed with the City Secretary+. [Ethics Ordinance.Section 2-349(d)] CERTIFICATION I certify that all information provided is true and conmet as of the date of this wit,that I have not y withheld disclosure of any information requested; and that supplemental its will be y submitted to the City of Corpus Christi.Texas as changes occur. Cerb-Wft Person: Dan S.I edcer,PA TWIc Prudent (rIpor Pska � Dater P� C /y DFYR4 TION[S a. 'Board member:' A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi,Texas. b. "Economic Benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its.effect on members,of the public in general or a substantial segment thereof. c. `Employee." Any person employed by the City of Corpus Christi,Texas either on a full or part- time basis,but not as an independent contractor. d. "Fin." Any entity operated for economic gain,whether professional,industrial or commercial.and whether established to produce or deal with a product or service,including but not limited to,entities operated in the form of sole proprietorship.as self-employed person. partnership,corporation,joint stock company.Joint venture. receivership or trust. and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers,Department and Division Heads.and Municipal Court Judges.of the City of Corpus Christi,Texas. f. "Ownership[nearest." Legal or equitable interest, whether .actually or .constructively held, in .a firm, Including whin such interest is held through an agent, .trust, estate. or holding ,entity. "Constructively hold" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership Agreements." g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus Chrristi for the purpose of professional consultation and recommendation.