Loading...
HomeMy WebLinkAboutC2014-024 - 1/17/2014 - NA RATIFICATION OF AMENDMENT NO. 22 TO AGREEMENT For PROFESSIONAL SERVICES This AGREEMENT is between the City of Corpus Christi, Texas, a Texas home-rule municipal corporation, "CITY", acting through its duly authorized City Manager or designee ("City Engineer"), and KSA Engineers, Inc. of Longview, Texas, acting through its duly authorized representative who is Joncie H. Young, President, (ENGINEER), which agree as follows: 1. DECLARATIONS. "CITY" desires to engage "ENGINEER" to provide services in connection with City's project, described as follows: Runway 13-31 Extension, (Project No. E11047) "Project". 2. SCOPE OF WORK. "ENGINEER" shall provide services for the PROJECT in accordance with the accompanying Letters, Scope of Services, and Fee attached as"Exhibit A". 3. FEE. The "CITY" agrees to pay the "ENGINEER" for services provided in accordance with Exhibit"A", Scope of Services, and Fee under this AGREEMENT, a total fee not to exceed $9,500.00 (in figures), (Nine Thousand Five Hundred Dollars and Zero Cents) (in words) for a total revised fee not to exceed $3,781,538.05 (in figures), (Three Million Seven Hundred Eighty One Thousand Five Hundred Thirty Eight Dollars and Five Cents ) (in words) . CITY OF CORPUS CHRISTI KSA ENGINEERS, INC. 't: ��� /r7/1? d�A -Mark Van Vleck ) J• cie Young, • (D-te) Interim Assistant City Manager •resi•-nt For Public Works and Utilities • . Tyler, ` - .00 Longview, TX 75601 (972) 542-2995 (972) 542-6750 RECOMMENDED: 1 3 Daniel Biles, P. E., (Sate) Director of Engineering Services y6/ Fred Segundo (Date) Director of Aviation APPROVED AS TO FORM Project No. E11047 Airport CIP Funding source: 550950-3020B-00000-E11047 Legal epartment (Dati. Net total $9,500.00 Encumbrance Number: 2014-024 1/17/14 \J\AIRPORT\E11047-CCIA RUNWAY 13-31 RUNWAY EXTENSION\AMENDMENT NO.22\AMENDMENT NO.22-KSA KSA Engineers Inc. INDEXED 1 T T APPROVED de.(zootrze Office of Mgmt and Budget (Date) • ATTEST SLI'Lrl- C-, CITY SECRETARY ENTERED DEC 18 2013 CONTRACT MANAGERS K:\ENGINEERING DATAEXCHANGE\CLARISSAJWIRPORT\E11047-CCIA RUNWAY 13-31 RUNWAY EXTENSION\AMENDMENT NO.22\AMENDMENT NO.22-KSA ENGINEERS.DOCX We thank you for your time and consideration and look forward to assisting you with this project and as always, please contact us if we can provide further assistance. Sincerely, LNV, INC. TBPE Firm No. F-366 ( -1 74A. Marcus J. Naiser, RE. Project Manager CC: Bob Jutton, RE. & Steve Creamer, RE. Page 3 of 3 EXHIBIT"A" Page 4 of 4 ..___.......... . .._...._...._....._.__.... . . .._.__..._........ .. • Perform a 48-hour extended period hydraulic simulation for each of the demand configurations, 1.3 Results • Create color coded exhibits identifying the pressures at each node of the distribution system for each demand scenario at 6 hour increments (total of 6 exhibits per demand configuration). • Using the City of Corpus Christi's existing water model and the results of the modeling efforts of Section 1.2, determine the maximum demand threshold. This will be determined based on a minimum 35 psi pressure throughout the entire distribution system. Assumptions: • Holly Pump Station and associated zone separation valves will be removed from the distribution system and all modeling scenarios. Schedule: • All work associated with 48" Transmission Main Modeling at CCIA shall be completed within ten (10) business days of Notice to Proceed, assuming all required information is supplied and meetings scheduled by Owner and Client in a timely manner. Fees: Provider proposed to perform the above listed Scope of Services in accordance with the attached rate schedule. Provider shall perform said services and all acts attendant thereto with a reasonable standard of care. Provider shall not be held to a higher standard of care unless specifically agreed to by the parties and said agreement is spelled out herein as a condition of this contract. The Provider proposes to perform the above listed Scope of Services. Any additional work not listed in the above Scope of Work will also be performed in accordance with the attached rate schedule, only upon authorization by KSA. Fee for Additional Services Authorized: The City will pay the Engineer on an Hourly Basis, Not To Exceed $8,500. Engineer will submit monthly statements for services rendered. Each statement will be based on hours spent at the time of billing in accordance with the attached rate schedule. City will make prompt monthly payments in response to Engineer's monthly statements. Page 2 of 3 EXHIBIT"A" Page 3 of 4 ........____..... . "EXHIBIT A" LNV engineers I architects I contractors Solutions Today with a _ Vision for Tomorrow October 15, 2013 Mr. Elliot Neph, P.E. Project Engineer KSA Engineers, inc. 8875 Synergy Drive McKinney, TX 75070 Re: Water Distribution Modeling Associated with 48" TM Closure at CCIA (LNV PROJECT NO. 130486) Dear Mr. Neph: In response to the KSA's request, we are proposing the following scope of services associated with the 48"transmission main closure at the Corpus Christi International Airport (CCIA). Project Description: KSA Engineers, Inc., hereinafter called "KSA", and LNV, Inc. hereinafter called "Engineer", agrees to the following Contract for services associated with the above referenced project. This effort includes providing KSA with the additional water system analysis and modeling methodology and assumptions necessary in the evaluation of the 48" transmission main at the CCIA, modeled under existing conditions. The evaluation will involve modeling the potential effects of closing the 48"transmission main as runway improvements are underway at the CCiA site. The model will be analyzed under the existing elevated storage tanks and several demand configurations in 10 MGD increments. Scope of Services: The Scope of Services for this contract is comprised of the following tasks: 1.1 Modeling Preparation • Meet with KSA and City of Corpus Christi staff to determine the recommended valve closure locations. • Create new data set and change controls in the model to simulate the 48" transmission main closure. 1,2 Existing System Simulation during Normal Operating Conditions (up to 2 scenarios) This task will provide modeling results of simulated transmission main closure for at least two demand scenarios (70 & 90 MGD). • Create two scenarios and allocate each of the two demands to the model (two separate model runs for this task). EXHIBIT"A" Page 2 of 4 KBA October 29,2013 Grace M.Gonzalez,P.E., M.B.A. Major Projects Engineer Department of Engineering Services City of Corpus Christi 1201 Leopard Street Corpus Christi TX 78401 Re: Request for Amendment No.22 to our Agreement for Professional Services Water Distribution Modeling Associated with 48"TM Closure at CCIA Dear Ms.Gonzalez: KSA respectfully requests that Amendment No.22 to our Agreement for Professional Services be prepared for the work described below: Water Distribution Modeling Associated with 48"TM Closure at CCIA This work will be performed so that the effects of the temporary closure of the 48"water main being relocated around the proposed extension of Runway 13 at Corpus Christi international can be assessed prior to the temporary closure. The specific scope of work can be found in attached Exhibit A. The proposed fee to perform this work is$9,500.00. All work shall be completed within ten(10)days of written Notice to Proceed (NTP). Please call if you have any questions. Thank you. Sincerely, Robert C.lutton, P.E. NE Construction Manager wwwww. saenq.colei EXHIBIT"A" Page 1 of 4 • Exhibit B FEE SCHEDULE KSA Engineers,Inc. CONTRACT FOR PROFESSIONAL A/E SERVICES CITY OF CORPUS CHRISTI FOR CORPUS CHRISTI INTERNATIONAL AIRPORT CORPUS CHRISTI, TEXAS Original Contract TASK FEE Task Order No. 1 — Preparation of Environmental Assessment $161,649.00 Task Order No. 2—AGIS Airspace Analysis and Data Submittal/Upload $286,416.00 Task Order No. 3— Runway 17-35 Extension/Displacement and $566,000.00 Connecting Taxiway Project Task Order No. 4/1000'— Runway 13-31 Extension/Displacement and $720,000.00 Connecting Taxiway Project Task Order No. 4A/600' — Runway 13-31 Extension/Displacement and $148,000.00 Connecting Taxiway Project Task Order No. 5—Taxiway Utilization Study $80,196.00 Total Original Project Fees $1,962,261.00 Amendment No. 1 Topographic Survey, Plats, Metes & Bounds for Right of Way Acquisition for Access to Relocated Approach Lighting System for Runway 17 $ 5,577.50 (Supplement to Task Order No. 2) Amendment No. 2 Task Order No. 6 - North General Aviation Apron $49,400.00 Amendment No. 3 Task Order No. 7 - Pinson Road & Employee Parking Drainage $24,150.00 Improvements Amendment No. 4 Additional Desktop Biological and Jurisdictional Waters Evaluation $4,028.45 (Supplement to Task Order No. 1) Amendment No. 5 Infield Taxiway Connectors/Runway 17-35 Project (Supplement to Task Order No. 3) $100,000.00 Amendment No. 6 Infield Taxiway Connector/Runway 17-35 Project $40,000.00 (Supplement to Task Order No. 3) AMEND. NO. 22 EXHIBIT"B" Page 1 of 3 Amendment No. 7 Infield Taxiway Connectors/Runway 13-31 Project (Supplement to Task Order No. 4) $201,800.00 Amendment No. 8 Revise Environmental Assessment and Perform Environmental Due Diligence Audit (EDDA) for NAVAID Relocations $16,010.00 (Supplement to Task Order No. 1) Amendment No. 9 Task Order No. 8 - Construction Administration Fees for RWY 17-35 $1,000,000.00 Extension/Displacement and Connecting Taxiways Project Amendment No. 10 AGIS Attribute Revisions for the Truncation of RWY 13 Extension from $8,573.25 1600' to 1000' (Supplement to Task Order No. 2) Amendment No. 11 Civil, Electrical and NAVAID Design Revisions for the Truncation of RWY $20,000.00 13 Extension from 1600' to 1000' (Supplement to Task Order No. 4) Amendment No. 12 Taxiway Utilization Study Update for the Truncation of RWY 13 Extension $2,300.00 from 1600' to 1000' (Supplement to Task Order No. 5) Amendment No. 13 Task Order No. 9— Phases 1 & 2 Reconstruction of East General $121,050.00 Aviation Apron (Areas 1 & 2) Amendment No. 14 Task Order No. 10— East General Aviation Apron Extension $140,000.00 Amendment No. 15 Task Order No. 11 — East General Aviation Apron Wash Rack $25,000.00 Amendment No. 16 Task Order No. 12—Gate 10B Replacement $6,549.25 Amendment No. 17 Task Order No. 8 - Construction Administration Fees for RWY 17-35 0.00 Extension/Displacement and Connecting Taxiways Project -Adjustment to Amendment No. 9— E11122, E11046 Amendment No. 18 Task Order No. 8 - Construction Administration Fees for RWY 17-35 0.00 Extension/Displacement and Connecting Taxiways Project -Adjustment to Amendment No. 9— E11046, Testing AMEND. NO. 22 EXHIBIT"B" Page 2 of 3 Amendment No. 19 Task Order No. 8— Repackaging Task Orders 4, 10,11; E11047 10,000.00 Amendment No. 20 Repackage the bid documents of the Runway 17/35 project Extension/ $4,300.00 Displacement and Connecting Taxiway, E11046A Amendment No. 21 Construction Administrative Services for Gate 10B Construction Project $31,038.60 E13062 Amendment No. 22 Water Distribution Modeling Associated with 48"TM Closure at CCIA $9,500.00 Amended Total Fee $3,781,538.05 ADDITIONAL CONTRACTS Sanitizer Installation Design Total Fee $19,680.00 Jetway Bridge Holding Position Markings & Diversion Aircraft Parking Layout Total Fee $16,925.00 Blast Study for Aircraft Powering In and Out of East RON Positions and Add Aircraft Jet Engine Ingestion Zone Markings to the Holding Position Markings at Gates 1, 3B and 6A Total Fee $11,672.50 Resident Project Representative for Sanitizer Installation Total Fee $4,500.00 AMEND. NO. 22 EXHIBIT"B" Page 3 of 3 • , . . • SUPPL®RNUMBER C 1. PO BE PURCHASING DIVISION y f CITY OF CORPUS CHRISTI Qvpus of DISCLOSURE Off' INTEREST City of Corpus Christi Ordinance 17112,as amended requires all persons or firms seeking to do business with the City to.provide the following information. 'Every question must be answered. If the question is not applicable, answer with "NA". See reverse side for Filing Requirements, Certifications and • defim�ons. COMPANY NAME: RSA Engineers,Inc. P.O.BOX: STREET ADDRESS: 140 E.Tyler,Suite 600 CITY: Longview ZIP: 75601 FIRM IS: 1. Corporation 2. Partnership 3. Sole Owner [] . 4. Association 5. Other 0 DISCLOSURE QUESTIONS If additional space is necessary,please use the reverse side of this page or attach separate sheet. 1. State the names of each 'employee" of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." N/A ame Job Title and City Department(if known) • 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Title N/A 3. State the names of each"board member"of the City of Corpus Christi having an-"ownership interest" constituting 3%or more of the ownership in the above named"firm." N/A Name Board,Commission or Committee • 4. State the names of each employee or officer of a"consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" • constituting 3%or more of the ownership in a above named"firm." Name . Consultant N/A • EXHIBIT"C" Page 1 of 2 • • I ♦ 4 PILING REQUIREMENTS • If a person who requests official action on a matter knows that.the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof you shall disclose that fact in a signed wilting to the City official; employee or body that has been renuested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349(d)] • CERTIFICATION I certify that all information provided is true and correct as of the date of this statement,that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptry submitted to the City of Corpus Christi,Texas as changes occur. Certifying Person; Joncie H.Young _ Titl : President (Type or Print) • Person: of Certifying - _� Date: t3/1 dir DE "'m S a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi,Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. • c. "Employee." Any person employed by the City of Corpus Christi,Texas either on a full or part- time basis,but not as an independent contractor. d. "Firm." Any entity operated for economic gain,whether professional,industrial or commercial,and whether established to produce or deal with a product or service,including but not limited to,entities operated in the form of sole proprietorship, as self-employed person, partnership,corporation,joint stock company,joint venture, receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers,Department and Division Heads,and Municipal Court Judges of the City of Corpus Christi,Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a . firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements" g. "Consultant"Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. • • EXHIBIT"C" Page2of2