HomeMy WebLinkAboutC2014-027 - 1/31/2014 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 9 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City", and PIPELINE ANALYSIS, LLC, agree to the following amendments to the Contract for Engineering Services for Citywide Hydraulic Model-Sanitary Sewer Overflow Initiative (SSOI) (Project No. El 0015), as authorized and administratively amended by: Original Contract August 24, 2010 Motion No. M2010-195 $96,101.00 Amendment No. 1 October 11, 2010 Administrative Approval $48,548.00 Amendment No. 2 December 4, 2010 Administrative Approval $29,176.00 Amendment No. 3 June 21, 2011 Motion No. M2011-133 $1,989,103.00 Amendment No. 4 April 23, 2013 Motion No. M2013-071 $179,251.00 Amendment No. 5 Jul 23, 2013 Administrative Approval $48,990.00 Amendment No. 6 September 13, 2013 Administrative Approval $48,130.00 Amendment No. 7 November 6, 2013 Administrative Approval $49,752.00 Amendment No. 8 December 13, 2013 Administrative Approval $48,310.00 EXHIBIT "A", SECTION 1. SCOPE OF ENGINEERING SERVICES, shall be amended due to the increased level of effort required to field verify force main configurations. Specific tasks are described in Amendment No. 9 Exhibit "A". Exhibit "A", SECTION 3. FEES shall be amended and is attached as Amendment No. 9 Exhibit "A" for a revised fee not to exceed $18,775.00 (Eighteen Thousand Seven Hundred Seventy-Five Dollars and Zero Cents), for a total restated fee not to exceed $2,556,136.00 (Two Million Five Hundred Fifty-Six Thousand One Hundred Thirty-Six Dollars and Zero Cents). Monthly invoices shall be submitted in accordance with the attached Amendment No. 9 Exhibit "B". All other terms and conditions of August 24, 2010 contract between the City and Engineer will remain in full force and effect. CITY OF CORPUS CHRI TI PIPELINE ANALYSIS, LLC 12-3 -13 Ma rk Van P.E. Ja 4- •es Jr., T Date Interim Assistant City Manager Presiden for Public Works & Utilities 1115 Main Street Garland, Texas 75040 (800)637-0164 Office RECOMMENDED coo,/ Daniel Biles, P.E., Date Executive Director of Public Works fq O•er. ing sepa m-n' Date 2014-027 1/31/14 AMEND. NO. 9 1 Page 1 of 2 Pipeline Analysis LLC R\E10015 CITYWIDE SS HYDRAULIC MODEL\AMENDMENT NO 9\CONTRACT DOC INDEXED APPRO ED AS TO FORM Legal Department Date APPROVE � l Office of Management and Budget Date ATTEST i.. City Secretary ENTERED Project No. E10015 DEC J 2013 Fund Source No. 550950-4249-00000-E10015 COMM;I MANAtiER Fund Name: Wastewater 2012B CIP (Rev Bds) Encumbrance No. 1 QD i5P P1 RECEIVED JAN 0 8 2014 BY AMEND. NO. 9 Page 2 of 2 K:\ENGINEERING DATAEXCHANGE\JENNIFER\WASTEWATER\E10015 CITYWIDE SS HYDRAULIC MODELWMENDMENT NO.9\CONTRACT.DOC r PIPELINE ANALYSIS"` 1115 Main Street WASTEWATER COLLECTION ENGINEERS Garland, Texas 75040 800-637-0164 September 18,2013 William J. Green,P.E. Assistant Director of Engineering Engineering Services 1201 Leopard Street Corpus Christi, Texas 78401 RE: Contract Amendment No.9 (361)826-3598—direct Phase 1 Task 12—Force Main Field Verification (361)816-4916—mobile Project No.E10015 billg@cctexas.com Dear Mr. Green, Amendment No. 9 to the above referenced contract is necessary due to the increased level of effort required to field verify force main configurations requested by Coym,Rehmet&Gutierrez,L.P. Amendment No.9 totals$18,775 for the Phase 1 Buckingham Lift Station analysis. Based on conversations with CRG this amendment will address force main configuration questions required to field verify GIS discrepancies and update existing GIS mapping. The major tasks included in the city-wide project scope for this Amendment No.9, Phase 1 —Task 12 are: • Install water inflow connection on the blind flange on the manifold of the Buckingham Lift Station. • Pump water into the force main until it reaches the outfall structure at the Wooldridge Road Lift Station • Observe flows at the outfall structure at Wooldridge Road Lift Station • Prepare memorandum describing procedure and results The total amount of this Amendment is$18,775 as shown in the breakdown on Attachment"A". The man hour and fee analysis for this Amendment is shown in Attachment `B". I have also attached the project schedule for the work as shown in Attachment"C". If you have any questions or require additional information,please give me a call at(800)637-0164 or email me at jforbes @pipelineanalysis.com. Very truly yours, PIPELINE ANALYSIS,LLC Attachment"A" Attachment"B" Attachment"C" AMEND. NO. 9 EXHIBIT "A" Page 1 of 9 James H.Forbes,Jr.,P.E. Project Manager Attachment A Project No. E10015 Professional Services Contract City of Corpus Christi Sanitary Sewer Overflow Reduction Program Hydraulic Modeling Scope of Services Amendment No. 9 Phase 1 Task 12 — Field Verification September 2013 PIPELINE ANALYSIS"` WAS/EWAIEE Cd1ECJ7ON SYSIEM ENGINEE•S in association with Coym,Relunet4GutieI `NI �L.n engineers architects contractors ENGWERS•PLANCIS•SURVEYORS 2 AMEND. NO. 9 EXHIBIT "A" Page 2 of 9 Attachment A Contract Amendment No. 9 Sanitary Sewer Overflow Initiative Plan Development and Capacity, Management, Operation & Maintenance Self-audit (Project No. E10015) Amendment No. 9 City-Wide Sanitary Sewer Hydraulic Model Phase 1 Task 12 Field Verification Amd Amd Mid Mid Mid. Amd. Mid. Amd. Mid. Total Basic Services: Contract No.1 No.2 No.3 No.4 No.6 No.6 No.7 No.8 No.9 Contract t Preliminary Phase $ 17,678.00 $ - $ - $ 17678.00 2.CMOM Self-Audit Interviews $ 59,553.00 $ - $ - $ 59,553.00 3.CMOM Pre-Final and Final Report $ 8,96300 $ - $ - $ 8,963 00 4.Oso SSO Pre-Final and Final Report $ 9,907.00 $ - $ - $ 9,907 00 5.Greenwood SSOI Plan $ 21,22500 $ - $ 21,225.00 6.Broadway SSOI Plan $ 27,323.00 $ - $ 27,323.00 7.Allison,Laguna and Whitecap 5001 Plan $ 29,176.00 $ 29,176.00 8.City-Vide Hydraulic Modeling $ 1,989,103.00 $ 1,989,103.00 9.Phase 2 Temporary Flow Monitonng $179,251 00 $ 179,251.00 10.Phase 1 and 2,Task 12-Field Verifications $4899000 $49.752.00 $18,775.00 $ 117,517.00 11.Phase 1 and 2,Task 13-GIS Revisions $48,130.00 048,310.00 $ 96440.00 Total Basic Services $ 96,10100 $ 48,548.00 $ 29,17600 $ 1,989,10300 $179,25100 048,990.00 $48,130.00 $4935200 $48310.00 $18,775.00 $ 2,556.136.00 J AMEND. NO. 9 EXHIBIT "A" Page 3 of 9 • Attachment A SCOPE OF WORK CITY OF CORPUS CHRISTI, TEXAS SANITARY SEWER OVERFLOW REDUCTION PROGRAM WASTEWATER HYDRAULIC MODELING Amendment No. 9 Phase 1 Task 12 CITY PROJECT E10015 BACKGROUND The approach to the hydraulic modeling of the wastewater collection system is organized around the City's objectives for this project: • Reduction in Sanitary Sewer Overflows • Cost controls and Least Cost Alternatives • Attainment of long-term Infiltration/Inflow solutions • Collection System Capacity Assurance • Regulatory compliance • Customer satisfaction GENERAL INFORMATION A hydraulic wastewater system model will equip the wastewater department with the tool for analyzing system conveyance capacities,bottlenecks,and potential overflow locations. The hydraulic model is critically dependent on the accuracy of maps and physical data associated with each pipeline. During construction of the hydraulic model some GIS data(pipe diameters, invert elevations, lift station control elevations,etc.)appeared to be in error and field verification confirmed some but not all discrepancies. To construct a viable model of the collection system required field verifications for all these discrepancies. This Amendment No.9 provides for a continuation of Task 12—Phase 1 Field Verification and GIS map revisions and model update.The Buckingham Estates Lift Station 18"and 24"Force Main extends from Buckingham LS along an approximate 3 mile route to the Wooldridge LS. The flows in the force main are in the Oso service area. The force main was constructed over an approximate 6-year period with portions included in seven different construction contracts. This force main is now ready to be placed into service and the connectivity must be established through this amendment. OBJECTIVES This amendment will address the following objectives: • Install water inflow connection on the blind flange on the manifold of the Buckingham Lift Station. • Pump water into the force main until it reaches the outfall structure at the Wooldridge Road Lift Station • Observe flows at the outfall structure at Wooldridge Road Lift Station • Prepare memorandum describing procedure and results PROJECT PHASING The Phase 2 Task 13-GIS map revisions requires immediate implementation. MODEL BENEFITS • Accurate model construction and QA/QC on model attribute data 4 AMEND. NO. 9 EXHIBIT"A" Page 4 of 9 BASIC SERVICES—N/A ADDITIONAL SERVICES TASK 12—Field Verification Buckingham Force Main The development of a hydraulic model for the six wastewater service areas ensures consistent assessment of future growth,maintenance and system capital requirements for current and future conditions. Furthermore, hydraulic modeling will provide the project team consultants with pertinent data to assess system impacts to various wet weather events and will further enable the project team to test cost effective repair strategies and alternatives. Modeling will allow the team to conduct a series of"what if' scenarios that will help determine least cost solutions. These various scenarios take into account the City of Corpus Christi maintenance and personnel needs,budget,planned growth,capacity issues and can be used to more accurately design relief and/or replacement lines and optimize system rehabilitation. Task 12—Field verification is required to verify the hydraulic model connectivity and address possible discrepancies in pipe diameters,elevations (pipe slopes),pipe and force main layout,lift station control level elevations,and other discrepancies that must be field verified to confirm accuracy. SCHEDULE The ENGINEER'S services shall be performed in a timely manner consistent with sound professional practices. The ENGINEER will complete the work according to the following revised schedule: Phase 1 -Broadway,Greenwood and Oso Service Areas Major Week No. Duration Week ACTIVITY Tasks Start (Weeks) End 1 1 31 32 Kick-Off Meeting/Workshop/Data Collection and Review 1.6 8 20 28 Wastewater Flow Monitoring 2 16 28 44 Model Development 3 28 64 92 Model Calibration 4 80 30 110 Existing System Analysis 5 80 30 110 Future System Analysis 6 80 30 110 Phase 1 Draft Report 7 4 28 32 Manhole Inspection 8 4 28 32 Topographic Suvey 9 1 139 140 Model Purchase/Training 10 1 139 140 Supplemental/Contingency 11 1 3 4 Traffic Control Plan 1 139 140 PHASE 1 COMPLETE Phase 2-Allison, Laguna Madre and Whitecap Service Areas Major Week No. Duration Week ACTIVITY Tasks Start (Weeks) End 1 40 28 68 Kick-Off Meeting/Workshop/Data Collection and Review 1.6 60 56 116 Wastewater Flow Monitoring(with Extended Metering) 2 64 56 120 Model Development 3 76 52 128 Model Calibration 4 116 16 132 Existing System Analysis 5 88 48 136 Future System Analysis 6 116 24 140 Phase 2 Draft Report 7 36 16 52 Manhole Inspection 8 48 20 68 Topographic Suvey 9 1 139 140 Model Purchase/Training 10 1 139 140 Supplemental/Contingency 11 32 4 36 Traffic Control Plan 1 139 140 PHASE 2 COMPLETE 12 I 140 8 I 148 'Combine Phase 1 &2 Reports 5 AMEND. NO. 9 EXHIBIT "A" Page 5 of 9 The time limits set forth in the schedule shall include allowances for reasonable and expected review time by the CITY and approval by authorities having jurisdiction over the PROJECT, and shall not be allowed as cause for delay or adjustments to the schedule. Delays in the design critical path caused by review times by the CITY or a permitting agency exceeding those anticipated by the ENGINEER'S schedule are cause for adjustments in the schedule.Any adjustments made to the agreed upon schedule shall be made in writing and acceptable to both parties. The ENGINEER shall begin work within 10 days of receipt of the executed CONTRACT AMENDMENT and/or written Notice to Proceed. A schedule of completed work, including a bar graph schedule showing the percentage complete of each of the items of the scope of work, will be submitted each month to the CITY. 6 AMEND. NO. 9 EXHIBIT "A" Page 6 of 9 Exhibit A Compensation Summary Amendment No. 9 Task 12 Field Verification-Phase 1 CRG LNV Pipeline Analysis Total 12.1 Identify and Confirm Existing GIS $ - $ - $ - $ - 12.2 Field Verify of Pipe Diameters $ 18,775.00 $ - $ - $ 18,775.00 12.3 Field Verify Manhole Invert Elevations $ - $ - $ - $ - 12.4 Coordinate Lift Station Control Settings $ - $ - $ - $ - $ 18,775.00 $ $ - $ 18,775.00 7 AMEND. NO. 9 EXHIBIT "A" Page 7 of 9 ATTACHMENT'A' 0E1NGINEERR4G,L.P. �IM4OUR AND FEE ANALYSIS-BASIC SERVICES OPII Few Ito.MaFJN CLIENT: PIPEliNE ANALYSIS,LLC. ©0 5656 S.Staples,Sole?J0 Carus Cnt■e.Tx 7141 l PROJECT: CITY WIDE HYDRAULIC MODEL PHASE I,PROJECT E-10015 Mawr 061)WI 1550 Fu.061)9J-7560 AMENDMENT NO.!PHASE I TASK 12-FILED VERIFICATIONS DESCRIPTION PRINCIPAL RPLS DESIGN SRI ENGRJ RPLS SURVEY SUS SUB NON- DESCRIPTION TOTAL NOR.P.E. ENGINEER SURVEY TECH CREW CONTRACTOR LABOR E RATE $135.00 $12100 $110.00 11711.00 S46.00 11140.00 $50.00 7 Skirl Tow _Mrs.[ Toed Hrs.1 Told _Hrs. Total _Hrs1 Toad Hrs.! Total _Hrs.' Tow Expense _ Expanse , Tow C D Task 12-PINd WrElaatlons C 3 FmId WMt:ation d Buckingham _ $0.00 IN 3 C1 o Farce Main Cornet-Ivey 3 $406-. 30 13,750 _ 4 $200 14,420 $11.775.00 a 0 • ± _ _ $0.00 a, = m MOO Of Z a $0.00 3 O W $0.00 01 00 - - - . $0.00 y. $0.00 • $0.00 . $0.00 $0.00 TOTAL FEE $15,77510 3 - 14 171 00 ! P O .. z CD '- Co Attachment C Contract Amendment No. 8 City-Wide Sanitary Sewer Hydraulic Model Phase 1 -Broadway, Greenwood and Oso Service Areas Major Week No Duration Week ACTIVITY Tasks Start (Weeks) End 1 1 31 32 Kick-Off Meeting/Workshop/Data Collection and Review 1.6 8 20 28 Wastewater Flow Monitoring 2 16 28 44 Model Development 3 28 64 92 Model Calibration 4 80 30 110 Existing System Analysis 5 80 30 110 Future System Analysis 6 80 30 110 Phase 1 Draft Report 7 4 28 32 Manhole Inspection 8 4 28 32 Topographic Suvey 9 1 139 140 Model Purchase/Training 10 1 139 140 Supplemental/Contingency 11 1 3 4 Traffic Control Plan 1 139 140 PHASE 1 COMPLETE Phase 2-Allison, Laguna Madre and Whitecap Service Areas Major Week No. Duration Week ACTIVITY Tasks Start _ (Weeks) End 1 40 28 68 Kick-Off Meeting/Workshop/Data Collection and Review 1.6 60 56 116 Wastewater Flow Monitoring (with Extended Metering) 2 64 56 120 Model Development 3 76 52 128 Model Calibration 4 116 16 132 Existing System Analysis 5 88 48 136 Future System Analysis 6 116 24 140 Phase 2 Draft Report 7 36 16 52 Manhole Inspection 8 48 20 68 Topographic Suvey 9 1 139 140 Model Purchase/Training 10 1 139 140 Supplemental/Contingency 11 32 4 36 Traffic Control Plan 1 139 140 _PHASE 2 COMPLETE 12 I 140 I 8 148 'Combine Phase 1 &2 Reports 9 AMEND. NO. 9 EXHIBIT "A" Page 9 of 9 Sample form for: COMPLETE PROJECT NAME Payment Request Revised 07/27/00 Project No. XXXX Invoice No. 12345 Invoice Date: Total Amount Previous Total Percent . Basic Services: Contract Amd No. 1 Amd No. 2 Contract Invoiced Invoice Invoice Complete Preliminary Phase $1,000 $0 $0 $1,000 $0 $1,000 $1,000 100% Design Phase 2,000 1,000 0 3,000 1,000 500 1,500 50% Bid Phase 500 0 250 750 0 0 0 0% Construction Phase 2,500 0 1,000 3,500 0 0 0 0% Subtotal Basic Services $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% Additional Services: Permitting $2,000 $0 $0 $2,000 $500 $0 $500 25% Warranty Phase 0 1,120 0 1,120 0 0 0 0% Inspection 0 0 1,627 1,627 0 0 0 0% Platting Survey TBD TBD TBD TBD TBD TBD TBD 0% O & M Manuals TBD TBD TBD TBD TBD TBD TBD 0% SCADA TBD TBD TBD TBD TBD TBD TBD 0% Subtotal Additional Services $2,000 $1,120 $1,627 $4,747 $500 $0 $500 11% Summary of Fees Basic Services Fees $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% Additional Services Fees 2,000 1,120 1,627 4,747 500 0 500 11% Total of Fees $8,000 $2,120 $2,877 $12,997 $1,250 $1,500 $3,000 23% • . axm m m = z � n. v ri o -lz I▪ pp O Ilit SUPPLIER NUMBER TO BE ASSIGNED IW CITY — = PURCHASING DIVISION City of CITY OF CORPUS CHRISTI Corpus DISCLOSURE OF INTEREST Christi City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every.question must be answered. If the question is not applicable, answer with NA". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: Pipeline Analysis,LLC P.O.BOX: STREET ADDRESS: 1115 Main Street CITY: Garland,Texas ZIP: 75040 FIRM IS: 1. Corporation ® 2. Partnership 8 3. Sole Owner ❑ 4. Association 5. Other DISCLOSURE QUESTIONS If additional space is necessary,please use the reverse side of this page or attach separate sheet. 1. State the names of each "employee" of the City of Corpus Christi having an `ownership interest"constituting 3%or more of the ownership in the above named"firm.' Name Job Title and City Department(if known) N.A. 2. State the names of each"official"of the City of Corpus Christi having an"ownership interest" constituting 3% or more of the ownership in the above named"firm. Name Title N.A. 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest"constituting 3%or more of the ownership in the above named"firm." Name Board,Commission or Committee N.A. 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest"constituting 3%or more of the ownership in the above named"firm." Name Consultant N.A. FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof,you shall disclose that fact in a signed writing to the City official,employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349(d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi,Texas as changes occur. Certifying Person: James H.Forbes,Jr.,P.E. Title: President (Type or Print) Signature of Certifying Date: Person: gcx/rnick 1'bdi2S) ,j� �r. .3_15, DEFINITIONS a. `Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation,joint stock company,joint venture,receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council. City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi,Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies,or special terms of venture or partnership agreements." g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation.