HomeMy WebLinkAboutC2014-168 - 6/17/2014 - Approved AMENDMENT NO. 30 TO
AGREEMENT
For
PROFESSIONAL SERVICES
This AGREEMENT is between the City of Corpus Christi, Texas, a Texas home-rule municipal
corporation, "CITY", acting through its duly authorized City Manager or designee ("City Engineer"), and
KSA Engineers, Inc. of Longview, Texas, acting through its duly authorized representative who is
Joncie H. Young, President, (ENGINEER), which agree as follows:
1. DECLARATIONS. "CITY" desires to engage "ENGINEER" to provide services in
connection with City's project, described as follows: Runway 13/31 Extension Displacement (Project
No. E11047, E12156, E12156A) "Project".
2. SCOPE OF WORK. "ENGINEER" shall provide services for the PROJECT in
accordance with the accompanying Letters, Scope of Services, and Fee attached as"Exhibit A".
3. FEE. The "CITY" agrees to pay the "ENGINEER" for services provided in accordance
with Exhibit "A", Scope of Services, and Fee under this AGREEMENT, a total fee not to exceed
$2,724,339.60 (in figures), (Two Million Seven Hundred Twenty Four Thousand Three Hundred
Thirty Nine Dollars and Sixty Cents) (in words) for a total revised fee not to exceed $6,665,109.71 (in
figures), (Six Million Six Hundred Sixty Five Thousand One Hundred Nine Dollars and Seventy One
Cents) (in words).
CITY�OF CORPUS CHRISTI KSA ENGINEERS, INC.
a .A..,s L... (o• IV•14 , Skip Li
Natasha Fudge, . ra (Date) Jo . Young, P . (D�te)
Director of Capital Progs • esid- t
14' ' . Tyler, ` 600 IF
Longview, TX 75601
(972) 542-2995
(972) 542-6750
RECOMMENDED
"'-4
b a/1 y Project No. E11047, E12156,156, E12156
A
r 1�' Fred Segundo (Date) Airport CIP Grants, Airport 2012 CO
1\N
Director of Aviation Funding source:
(9,,')' 550970-3020-00000-G50E11047 1,610,433.00
550970-3026-00000-G50E11047 178,937.00
APPR ED 550920-3020-00000-G50E11047 481,634.64
. / 550920-3026-00000-G50E11047 53,514.96
_� �`f 550970-3020-00000-G50E12156B 247,338.00
� Offi e3'f gmt and Budget ( ate) 550970-3026-00000-G50E12156B 27,482.00
( 550920-3020-00000-G50E12156B 112,500.00
550920-3026-00000-G50E 12156B 12,500.00
ATTEST
P-e t��, �\ Net total ance Number:
Encumbrance Number:
CITY SECRETARY
1 t 2O +.12-0AU I MU i
2014-168 p /�.y���v� �.
6/17/14 ■SAJWIRPORT\E11047,E12156,E12156A-COMBINED CONSTRUCTION FOR CCIA 13-31 RUNWnAYL I ` •.
M2014-073 NGINEERS.DOCX
KSA Engineers Inc. S€CK'I'AR
INDEXED
EXHIBIT A
CITY OF CORPUS CHRISTI,TEXAS
Construction Administration Phase and Closeout Phase Service Fees for the
Runway 13-31 Extension/Displacement and Connecting Taxiways Project
at the Corpus Christi International Airport
I. SCOPE OF SERVICES
This proposal provides scope, schedule, and budget estimates for Construction Administration Phase
and Closeout Phase services related to the Runway 13-31 Extension/Displacement and Connecting
Taxiways Project at the Corpus Christi International Airport (City of Corpus Christi Project No.
E11047, E12156, &E12156A; FAA Project No. 3-48-0051-050-2013).
This proposal is provided on the basis of construction of the Base Bid, Additive Alternate No. 1,
Additive Alternate No. 2, Additive Alternate No. 5, Additive Alternate No. 6, Additive Alternate No. 7,
and Additive Alternate No. 8. This proposal specifically excludes Construction Administration Phase
services related to the construction of Additive Alternate No. 3 and Additive Alternate No.4.
Proposed fees and information provided in association with Rock Engineering & Testing Laboratories
(RETL); LNV, Inc. (LNV); and Ferguson Consulting, Inc. (Ferguson).
The Engineer shall provide the following services:
A. SCOPE OF WORK
1. Construction Administration Services as described in attached Exhibit C.
2. Resident Project Representative Services as described in Exhibit D.
3. Provide Geotechnical Engineering Services, as required.
4. Provide Construction Materials Testing Services, as required.
5. Provide Surveying Services for Grade Control, as required.
6. Provide Closeout Services as described in attached Exhibit E.
II. SCHEDULE
The Construction Phase will commence with the execution of this Amendment and will terminate upon
written recommendation by the Engineer for final payment to the Contractor. Construction Phase
services are estimated to be completed 630 calendar days after Notice to Proceed with Construction
has been provided to the Contractor.
The Closeout Phase will commence upon Completion of the Construction Phase. Closeout Phase
services are estimated to be completed within 90 days of written authorization by the Owner to proceed
with Closeout Phase services.
III. FEES
The Engineer proposes to provide Construction Administration Phase services on a time and
materials basis with a not-to-exceed budget of$2,724,339.60.
AMEND. NO. 30
EXHIBIT A
Page 1 of 1
KSA Engineers, Inc. Project No. CRP.035
EXHIBIT B
FEE SCHEDULE
KSA ENGINEERS, INC.
CONTRACT FOR PROFESSIONAL NE SERVICES
FOR
CORPUS CHRISTI INTERNATIONAL AIRPORT
CORPUS CHRISTI, TEXAS
Original Contract
Task Fee
Task Order No. 1 —Preparation of Environmental Assessment $161,649.00
Task Order No. 2—AGIS Airspace Analysis and Data Submittal/Upload $286,416.00
Task Order No. 3—Runway 17-35 Extension/Displacement and Connecting $566,000.00
Taxiway Project
Task Order No. 4/1000'—Runway 13-31 Extension/Displacement and $720,000.00
Connecting Taxiway Project
Task Order No.4A/600' —Runway 13-31 Extension/Displacement and $148,000.00
Connecting Taxiway Project
Task Order No. 5—Taxiway Utilization Study $80,196.00
Total Original Project Fees $1,962,261.00
Amendment No. 1
Topographic Survey, Plats, Metes &Bounds for Right of Way Acquisition for
Access to Relocated Approach Lighting System for Runway 17 (Supplement to $5,577.50
Task Order No. 2)
Amendment No. 2
Task Order No. 6 - North General Aviation Apron j $49,400.00
Amendment No. 3
Task Order No. 7- Pinson Road& Employee Parking Drainage Improvements $24,150.00
Amendment No.4
Additional Desktop Biological and Jurisdictional Waters Evaluation (Supplement $4,028.45
to Task Order No. 1)
Amendment No. 5
Infield Taxiway Connectors/Runway 17-35 Project $100,000.00
(Supplement to Task Order No. 3)
Amendment No. 6
Infield Taxiway Connector/Runway 17-35 Project $40,000.00
(Supplement to Task Order No. 3)
Amendment No. 7
Infield Taxiway Connectors/Runway 13-31 Project $201,800.00
(Supplement to Task Order No.4)
Amendment No. 8
Revise Environmental Assessment and Perform Environmental Due Diligence
Audit(EDDA)for NAVAID Relocations $16,010.00
(Supplement to Task Order No. 1)
AMEND. NO. 30
EXHIBIT B
Page 1 of 3
KSA Engineers, Inc. Project No.CRP.035
Amendment No. 9
Task Order No. 8-Construction Administration Fees for RWY 17-35 $1,000,000.00
Extension/Displacement and Connecting Taxiways Project
Amendment No. 10
AGIS Attribute Revisions for the Truncation of RWY 13 Extension from 1600'to
$8,573.25
1000' (Supplement to Task Order No. 2)
Amendment No. 11
Civil, Electrical and NAVAID Design Revisions for the Truncation of RWY 13 $20,000.00
Extension from 1600'to 1000' (Supplement to Task Order No.4)
Amendment No. 12
Taxiway Utilization Study Update for the Truncation of RWY 13 Extension from
$2,300.00
1600'to 1000' (Supplement to Task Order No. 5)
Amendment No. 13
Task Order No. 9—Phases 1 &2 Reconstruction of East General Aviation Apron $121,050.00
(Areas 1 &2)
Amendment No. 14
Task Order No. 10—East General Aviation Apron Extension $140,000.00
Amendment No. 15
Task Order No. 11 —East General Aviation Apron Wash Rack I $25,000.00
Amendment No. 16
Task Order No. 12—Gate 10B Replacement $6,549.25
Amendment No. 17
Task Order No. 8-Construction Administration Fees for RWY 17-35
Extension/Displacement and Connecting Taxiways Project -Adjustment to $0.00
Amendment No. 9—E11122, E11046
Amendment No. 18
Task Order No. 8-Construction Administration Fees for RWY 17-35
Extension/Displacement and Connecting Taxiways Project -Adjustment to $0.00
Amendment No. 9—E11046, Testing
Amendment No. 19
Task Order No. 8—Repackaging Task Orders 4, 10,11; E11047 $10,000.00
Amendment No.20
Repackage the bid documents of the Runway 17/35 project Extension/ $4,300.00
Displacement and Connecting Taxiway, E11046A
Amendment No.21
Construction Administrative Services for Gate 10B Construction Project E13062 $31,038.60
Amendment No. 22
Water Distribution Modeling Associated with 48"TM Closure at CCIA $9,500.00
Amendment No. 23
Multi-User Flight Information Display System (MUFIDS) Modifications at CCIA I $36,000.00
AMEND. NO. 30
EXHIBIT B
Page 2 of 3
KSA Engineers, Inc. Project No.CRP.035
Amendment No.24
17-35 Runway NAVAIDs additional scope to provide Environmental Due $5,800.00
Diligence Audit(EDDA)waivers
Amendment No.25
Gate 10B—Additional Scope of Construction Administration and Inspection $7,371.50
Services
Amendment No.26
17-35 Runway Additional Survey Scope $2,300.00
Amendment No. 27
13-31 Runway Supplemental Field Investigation Scope $9,315.00
Amendment No.28
Construction Administration Fee Adjustment/Contract Reallocation and
Additional Fees for the Runway 17-35 Extension/Displacement and Connecting $49,680.56
Taxiways Project
Amendment No.29
Enhanced Safety Improvements in State Highway 44 Right-of-Way $48,765.00
Amendment No. 30
Construction Administration Phase and Closeout Phase Service Fees for the $2,724,339.60
Runway 13-31 Extension/Displacement and Connecting Taxiways Project
Amended Total Fee $6,665,109.71
ADDITIONAL CONTRACTS
Sanitizer Installation Design
Total Fee $19,680.00
Jetway Bridge Holding Position Markings& Diversion Aircraft Parking Layout
Total Fee $16,925.00
Blast Study for Aircraft Powering In and Out of East RON Positions and Add
Aircraft Jet Engine Ingestion Zone Markings to the Holding Position Markings at
Gates 1, 3B and 6A
Total Fee $11,672.50
Resident Project Representative for Sanitizer Installation
Total Fee $4,500.00
AMEND. NO. 30
EXHIBIT B
Page 3 of 3
KSA Engineers, Inc. Project No.CRP.035
EXHIBIT C
CONSTRUCTION ADMINISTRATION SERVICES
I. SCOPE OF SERVICES
The Engineer shall provide the following services:
1. General Administration of Construction Contract: Consult with the Owner and act as the Owner's
representative as provided in the General Conditions. The extent and limitations of the duties,
responsibilities, and authority of the Engineer as assigned in said General Conditions shall not be
modified, except as the Engineer may otherwise agree in writing. All of the Owner's instructions to
the Contractor will be issued through the Engineer, who shall have authority to act on behalf of the
Owner in dealings with the Contractor to the extent provided in this Agreement and said General
Conditions except as otherwise provided in writing.
2. Provide a full time on-site professional engineer as Construction Manager.
a. The Engineer shall provide a full time on-site Professional Engineer to serve as Construction
Manager in order to observe as an experienced and qualified design professional the progress
of the Contractor's executed Work. The Construction Manger will determine if the Work is
proceeding in accordance with the Contract Documents, and shall keep the Owner informed of
the progress of the Work.
b. The purpose of the Construction Manager is to provide for the Owner a greater degree of
confidence that the completed Work will conform to the Contract Documents and that the
Contractor has implemented and maintained the integrity of the design concept of the
completed Project as a functioning whole as indicated in the Contract Documents. The
Construction Manager shall not, supervise, direct, or have control over the Work, nor shall the
Construction Manager have authority over or responsibility for the means, methods,techniques,
sequences, or procedures of construction selected or used by the Contractor, for security or
safety at the Site, for safety precautions and programs incident to the Contractor's Work, or for
any failure of the Contractor to comply with Laws and Regulations applicable to the Contractor's
furnishing and performing the Work. Accordingly, the Construction Manager neither guarantees
the performance of any Contractor nor assumes responsibility for any Contractor's failure to
furnish or perform the Work in accordance with the Contract Documents.
3. Resident Project Representative (RPR): Provide the services of an RPR at the Site of the Specific
Project to assist the Construction Manager and to provide more extensive observation of the
Contractor's work. Duties, responsibilities, and authority of the RPR are as set forth in attached
Exhibit D. The furnishing of such RPR services will not limit, extend, or modify the Engineer's
responsibilities or authority.
4. Independent Testing Laboratory:P rovide the services of an independent testing laboratory to
perform all inspections, tests, and approvals of samples, materials, and equipment required by the
Contract Documents, or to evaluate the performance of materials, equipment, and facilities of
Owner, prior to their incorporation into the Work for the Specific Project with appropriate
professional interpretation thereof.
5. Pre-Construction Conference: Participate in a pre-construction conference prior to commencement
of Work at the Site.
6. Schedules: Receive, review, and determine the acceptability of any and all schedules that the
Contractor is required to submit to the Engineer, including the Progress Schedule, Schedule of
Submittals,and Schedule of Values.
AMEND. NO.30
EXHIBIT C
Page 1 of 3
KSA Engineers, Inc. Project No.CRP.035
7. Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for locating the
Work which in the Engineer's judgment are necessary to enable Contractor to proceed.
8. Defective Work: Reject Work if, on the basis of the Engineer's observations, the Engineer believes
that such Work(a) is defective under the standards set forth in the Contract Documents, (b) will not
produce a completed Project that conforms to the Contract Documents or(c)will imperil the integrity
of the design concept of the completed Project as a functioning whole as indicated in the Contract
Documents.
9. Clarifications and Interpretations; Field Orders: Issue necessary clarifications and interpretations of
the Contract Documents as appropriate to the orderly completion of the Work. Such clarifications
and interpretations will be consistent with the intent of and reasonably inferable from the Contract
Documents. Subject to any limitations in the Contract Documents, the Engineer may issue Field
Orders authorizing minor variations from the requirements of the Contract Documents.
10. Change Orders and Work Change Directives: Recommend change orders and work change
directives to Owner, as appropriate, and prepare change orders and work change directives as
required.
11. Shop Drawings and Samples: Review and approve or take other appropriate action in respect to
Shop Drawings and Samples and other data which the Contractor is required to submit, but only for
conformance with the information given in the Contract Documents and compatibility with the
design concept of the completed Project as a functioning whole as indicated in the Contract
Documents. Such reviews and approvals or other action will not extend to means, methods,
techniques, sequences, o r procedures of construction or to safety precautions and programs
incident thereto. The Engineer shall meet any Contractor's submittal schedule that Engineer has
accepted.
12. Substitutes and "or-equal": Evaluate and determine the acceptability of substitute or "or-equal"
materials and equipment proposed by the Contractor, but subject to any provisions below regarding
additional compensation for evaluation of such substitute or"or equal"submittals.
13. Inspections and Tests: Require such special inspections or tests of the Work as deemed
reasonably necessary, and receive and review all certificates of inspections, tests, and approvals
required by Laws and Regulations or the Contract Documents. The Engineer's review of such
certificates will be for the purpose of determining that the results certified indicate compliance with
the Contract Documents and will not constitute an independent evaluation that the content or
procedures of such inspections, tests, or approvals comply with the requirements of the Contract
Documents. The Engineer shall be entitled to rely on the results of such tests.
14. Disagreements between Owner and Contractor: Render formal written decisions on all duly
submitted issues relating to the acceptability of the Work or the interpretation of the requirements of
the Contract Documents pertaining to the execution, performance or progress of the Work; review
each duly submitted Claim by the Owner or the Contractor, and in writing either deny such Claim in
whole or in part, approve such Claim, or decline to resolve such Claim if the Engineer in its
discretion concludes that to do so would be inappropriate. In rendering such decisions,the Engineer
shall be fair and not show partiality to the Owner or the Contractor and shall not be liable in
connection with any decision rendered in good faith in such capacity.
15. Applications for Payment: Based on the Engineer's observations as an experienced and qualified
design professional and on review of Applications for Payment and accompanying supporting
documentation:
a. Determine the amounts that the Engineer recommends the Contractor be paid. Such
recommendations of payment will be in writing and will constitute the Engineer's representation
to the Owner, based on such observations and review, that, to the best of the Engineer's
knowledge, information and belief, the Work has progressed to the point indicated, the Work is
AMEND. NO. 30
EXHIBIT C
Page 2 of 3
KSA Engineers,Inc. Project No.CRP.035
generally in accordance with the Contract Documents (subject to an evaluation of the Work as
a functioning whole prior to or upon Substantial Completion, to the results of any subsequent
tests called for in the Contract Documents and to any other qualifications stated in the
recommendation), and the conditions precedent to the Contractor's being entitled to such
payment appear to have been fulfilled in so far as it is the Engineer's responsibility to observe
the Work. In the case of unit price work, the Engineer's recommendations of payment will
include final determinations of quantities and classifications of the Work (subject to any
subsequent adjustments allowed by the Contract Documents).
b. By recommending any payment, the Engineer shall not thereby be deemed to have
represented that observations made by the Engineer to check the quality or quantity of the
Work as it is performed and furnished have been exhaustive, extended to every aspect of the
Work in progress, or involved detailed inspections of the Work beyond the responsibilities
specifically assigned to the Engineer in this Agreement and the Contract Documents. Neither
the Engineer's review of the Work for the purposes of recommending payments nor the
Engineer's recommendation of any payment including final payment will impose on the
Engineer responsibility to supervise, direct, or control the Work in progress or for the means,
methods, techniques, sequences, or procedures of construction or safety precautions or
programs incident thereto, or Contractor's compliance with Laws and Regulations applicable to
Contractor's furnishing and performing the Work. It will also not impose responsibility on the
Engineer to make any examination to ascertain how or for what purposes the Contractor has
used the moneys paid on account of the Contract Price, or to determine that title to any portion
of the Work in progress, materials, or equipment has passed to the Owner free and clear of any
liens, claims, security interests, or encumbrances, or that there may not be other matters at
issue between the Owner and the Contractor that might affect the amount that should be paid.
16. Contractor's Completion Documents: Receive, review and transmit to the Owner maintenance and
operating instructions, schedules guarantees, bonds, certificates, or other evidence of insurance not
previously submitted and required by the Contract Documents, certificates of inspection, tests and
approvals, Shop Drawings, Samples and other data approved as provided above, and transmit the
annotated record documents which are to be assembled by the Contractor in accordance with the
Contract Documents to obtain final payment. The extent of such review by the Engineer will be
limited as provided above.
17. Substantial Completion: Promptly after notice from the Contractor that the Contractor considers the
entire Work ready for its intended use, in company with the Owner and the Contractor, visit the Site
to determine if the Work is Substantially Complete. If after considering any objections of the Owner,
the Engineer considers the Work Substantially Complete, the Engineer shall deliver a certificate of
Substantial Completion to Owner and Contractor.
18. Final Notice of Acceptability of the Work: Conduct a final payment inspection to determine if the
completed Specific Project of Contractor is acceptable so that the Engineer may recommend, in
writing,final payment to Contractor.
19. Defective Work: Together with the Owner, visit the Site to observe any apparent defects in the
Work, assist the Owner in consultations and discussions with the Contractor concerning correction
of any such defects, and make recommendations as to replacement or correction of Defective
Work, if any.
20. Correction Period: Together with the Owner or the Owner's representative, visit the Site within one
month before the end of the Correction Period to ascertain whether any portion of the Work is
subject to correction.
AMEND. NO. 30
EXHIBIT C
Page 3 of 3
KSA Engineers, Inc. Project No.CRP.035
EXHIBIT D
RESIDENT PROJECT REPRESENTATIVE
I. RESIDENT PROJECT REPRESENTATIVE
1. The Engineer shall furnish a Resident Project Representative (RPR) to assist the Engineer in
observing progress and quality of the Work. The RPR may provide full time representation or may
provide representation to a lesser degree.
2. Through the RPR's observations of the Contractor's work in progress and field checks of materials
and equipment, the Engineer shall endeavor to provide further protection for the Owner against
defects and deficiencies in the Work. However, the Engineer shall not, during such RPR field
checks or as a result of such RPR observations of the Contractor's work in progress, by the RPR,
supervise, direct, or have control over the Contractor's work, nor shall the Engineer (including the
RPR) have authority over or responsibility for the means, methods, techniques, sequences, or
procedures selected or used by any contractor, for security or safety at the Site, for safety
precautions and programs incident to any contractor's work in progress, or for any failure of a
contractor to comply with Laws and Regulations applicable to such contractor's performing and
furnishing of its work. The Engineer (including RPR) neither guarantees the performances of any
contractor nor assumes responsibility for any contractor's failure to furnish and perform the Work in
accordance with the Contract Documents. In addition, the specific limitations set forth in Exhibit C
as incorporated in the contract are applicable.
3. The duties and responsibilities of the RPR are limited to those of the Engineer in the Agreement
with the Owner and in the Contract Documents,and are further limited and described as follows:
a. General:The RPR is the Engineer's representative at the Site,will act as directed by and under
the supervision of the Engineer, and will confer with the Engineer regarding the RPR's actions.
1) The RPR's dealings in matters pertaining to a Contractor's work in progress shall in general
be with the Engineer and the Contractor.
2) The RPR's dealings with Subcontractors shall only be through or with the full knowledge
and approval of the Contractor.
3) The RPR shall generally communicate with the Owner only with the knowledge of and
under the direction of the Engineer.
b. Schedules: Review the progress schedule, schedule of Shop Drawing and Sample submittals,
and schedule of values prepared by a Contractor and consult with the Engineer concerning
acceptability.
c. Conferences and Meetings: Attend meetings with the Contractor, such as preconstruction
conferences, progress meetings, job conferences and other project-related meetings, and
prepare and circulate copies of minutes thereof.
d. Liaison:
1) Serve as the Engineer's liaison with the Contractor. Working principally through the
Contractor's authorized representative or designee, and assist in providing information
regarding the intent of the Contract Documents.
2) Assist the Engineer in serving as the Owner's liaison with the Contractor when the
Contractor's operations affect the Owner's on-Site operations.
AMEND.NO.30
EXHIBIT D
Page 1 of 4
KSA Engineers,Inc. Project No.CRP.035
3) Assist in obtaining from the Owner additional details or information, when required for
proper execution of the Work.
e. Interpretation of Contract Documents: Report to the Engineer when clarifications and
interpretations of the Contract Documents are needed and transmit to the Contractor
clarifications and interpretations as issued by the Engineer.
f. Shop Drawings and Samples:
1) Record date of receipt of Samples and approved Shop Drawings.
2) Receive Samples which are furnished at the Specific Project Site by the Contractor, and
notify the Engineer of availability of Samples for examination.
3) Advise the Engineer and the Contractor of the commencement of any portion of the Work
requiring a Shop Drawing or Sample submittal for which RPR believes that the submittal
has not been approved by the Engineer.
g. Modifications:Consider and evaluate Contractor's suggestions for modifications in Drawings or
Specifications and report such suggestions, together with the RPR's recommendations, to the
Engineer. Transmit to the Contractor in writing decisions as issued by the Engineer.
h. Review of Work and Rejection of Defective Work:
1) Conduct on-Site observations of the Contractor's work in progress to assist the Engineer in
determining if the Work is in general proceeding in accordance with the Contract
Documents.
2) Report to the Engineer whenever the RPR believes that any part of the Contractor's work in
progress will not produce a completed project that conforms generally to the Contract
Documents or will imperil the integrity of the design concept of the completed Specific
Project as a functioning whole as indicated in the Contract Documents, or has been
damaged, or does not meet the requirements of any inspection, test or approval required to
be made; and advise the Engineer of that part of work in progress that the RPR believes
should be corrected or rejected or should be uncovered for observation, or requires special
testing, inspection or approval.
i. Inspections, Tests, and System Start-ups:
1) Consult with the Engineer in advance of scheduled inspections, tests, and systems start-
ups.
2) Verify that tests, equipment, and systems start-ups and operating and maintenance training
are conducted in the presence of appropriate the Owner's personnel, and that the
Contractor maintains adequate records thereof.
3) Observe, record, and report to the Engineer appropriate details relative to the test
procedures and systems start-ups.
4) Accompany visiting inspectors representing public or other agencies having jurisdiction
over a Specific Project, record the results of these inspections, and report to the Engineer.
j. Records:
1) Maintain at the Site orderly files for correspondence, reports of job conferences,
reproductions of original Contract Documents including all change orders,field orders,work
change directives, addenda, additional Drawings issued subsequent to the execution of the
AMEND. NO. 30
EXHIBIT D
Page 2 of 4
KSA Engineers, Inc.Project No.CRP.035
Construction Contract, the Engineer's clarifications and interpretations of the Contract
Documents, progress reports, Shop Drawing and Sample submittals received from and
delivered to the Contractor, and other Specific Project-related documents.
2) Prepare a daily report or keep a diary or log book, recording the Contractor's hours on the
Site, weather conditions, data relative to questions of change orders, field orders, work
change directives, or changed conditions, Site visitors, daily activities, decisions,
observations in general, and specific observations in more detail as in the case of
observing test procedures; and send copies to the Engineer.
3) Record names, addresses, fax numbers, e-mail addresses, web site locations and
telephone numbers of all Contractors, Subcontractors, and major Suppliers of materials
and equipment.
4) Maintain records for use in preparing project documentation.
5) Upon completion of the Work,furnish original set of all RPR Specific Project documentation
to the Engineer.
k. Reports:
1) Furnish to the Engineer periodic reports as required of progress of the Work and of the
Contractor's compliance with the progress schedule and schedule of Shop Drawing and
Sample submittals.
2) Draft and recommend to the Engineer proposed change orders, work change directives,
and Field Orders. Obtain backup material from the Contractor.
3) Furnish to the Engineer and the Owner copies of all inspection, test, and system startup
reports.
4) Immediately notify the Engineer of the occurrence of any Site accidents, emergencies, acts
of God endangering the Work, damage to property by fire or other causes, or the discovery
of any Constituent of Concern.
I. Payment Requests:
1) Review applications for payment with the Contractor for compliance with the established
procedure for their submission and forward with recommendations to the Engineer, noting
particularly the relationship of the payment requested to the schedule of values, Work
completed, and materials and equipment delivered at the Site but not incorporated in the
Work.
m. Certificates, Operation and Maintenance Manuals:
1) During the course of the Work, verify that materials and equipment certificates, operation
and maintenance manuals and other data required by the Specifications to be assembled
and furnished by a Contractor are applicable to the items actually installed and in
accordance with the Contract Documents, and have these documents delivered to the
Engineer for review and forwarding to the Owner prior to payment for that part of the Work.
n. Completion:
1) Participate in visits to the Project to assist in determining Substantial Completion, assist in
the determination of Substantial Completion and the preparation of lists of items to be
completed or corrected.
AMEND. NO. 30
EXHIBIT D
Page 3 of 4
KSA Engineers,Inc. Project No.CRP.035
2) Participate in a final visit to the Project in the company of the Engineer, the Owner, and the
Contractor and prepare a final list of items to be completed and deficiencies to be
remedied.
3) Observe whether all items on the final list have been completed or corrected and make
recommendations to the Engineer concerning acceptance.
4. Resident Project Representative shall not:
a. Authorize any deviation from the Contract Documents or substitution of materials or equipment
(including"or-equal"items).
b. Exceed limitations of Engineer's authority as set forth in this Agreement.
c. Undertake any of the responsibilities of a Contractor, subcontractors, suppliers, or a
Contractor's superintendent.
d. Advise on, issue directions relative to, or assume control over any aspect of the means,
methods,techniques, sequences or procedures of the Contractor's work.
e. Advise on, issue directions regarding, or assume control over security safety practices,
precautions and programs in connection with the activities or operations of the Owner or the
Contractor.
f. Participate in specialized field or laboratory tests or inspections conducted off-site by others
except as specifically authorized by the Engineer.
g. Accept Shop Drawing or Sample submittals from anyone other than the Contractor.
h. Authorize the Owner to occupy a Specific Project in whole or in part.
AMEND. NO. 30
EXHIBIT D
Page 4 of 4
KSA Engineers,Inc.Project No.CRP.035
EXHIBIT E
CLOSEOUT PHASE SERVICES
I. SCOPE OF SERVICES
The Engineer shall provide the following services:
1. Assist the Owner in training the Owner's staff to operate and maintain Specific Project equipment
and systems.
2. Provide the Owner with a CD containing the final test and quality control report documenting the
results of all tests performed, highlighting those tests that failed or did not meet the applicable test
standard and resulting actions(s) taken. The report shall include any pay reduction applied and
reasons for accepting any out of tolerance material.
3. Prepare and submit one CD containing plan drawings in single page monochrome TIFF format at
a minimum resolution of 400 dpi or a maximum sheet size of ANSI D (22" x 34") showing those
changes made during the construction process based on the marked-up prints, drawings, and
other data furnished by the Contractor(s) to the Engineer and those changes which the Engineer
considers significant.
4. Update the existing Airport Layout Plan (ALP) as necessary to indicate items completed during
construction. Field verification of runway end coordinates and elevations are required if they
have been altered during construction. Transfer the updated existing ALP to a computer aided
design and drafting (CAD) format as directed by the Owner. The Engineer shall furnish the
Owner with three (3) review copies, and upon approval, fifteen (15) copies of the ALP and one
CD containing a CAD copy of the ALP. If aerial photography is necessary for the ALP update,the
Engineer shall furnish the Owner with one copy of aerial photographs.
5. Furnish the Owner with four (4) bound copies of all approved catalog cuts, warranties,
maintenance data, parts lists, and names of equipment and materials suppliers.
6. Furnish the Owner and the FAA each with one (1) copy of all RPR Specific Project
documentation.
7. Furnish the Owner and the FAA with a copy of the Contractor's Notice of Termination (NOT) to
TCEQ as necessary for SWP3.
8. Prepare a Notice of Termination (NOT) for the Owner and the FAA to submit to TCEQ as
necessary for SWP3.
9. Conduct an inspection of the Project prior to the expiration of any warranty period and advise the
Owner of any recommended action to be taken under the terms of any warranty.
AMEND. NO. 30
EXHIBIT E
Page 1 of 1
KSA Engineers, Inc. Project No.CRP.035
•
104 LAI
SUPPLIER NUMBER
TO BE ASSIGNED BY CI'1 Y
PURCHASING DIVISION
CITY OF CORPUS CHRISTI
Corpus us r DISCLOSURE OF INTEREST
Christi
City of Corpus Christi Ordinance 17112, as amended,requires all persons or firms seeking to do business
with the City to provide the following information. Every question must be answered. If the question is
not applicable, answer with "NA". See reverse side for Filing Requirements, Certifications and
definitions.
COMPANY NAME: KSA Engineers,Inc.
P. O.BOX:
STREET ADDRESS: 140 E. Tyler, Suite 600 CITY: Longview ZIP: 75601
FIRM IS: 1. Corporation X 2. Partnership 3. Sole Owner ❑
4. Association ❑ 5. Other _
DISCLOSURE QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet.
1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named"firm."
Name Job Title and City Department(if known)
N/A
2. State the names of each "official" of the City of Corpus Christi having an "ownership interest"
constituting 3%or more of the ownership in the above named"firm."
Name Title
N/A
3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest"
constituting 3%or more of the ownership in the above named"firm."
Name Board, Commission or Committee
N/A
4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who
worked on any matter related to the subject of this contract and has an "ownership interest"
constituting 3%or more of the ownership in the above named"firm."
Name Consultant
N/A
EXHIBIT "F"
Page 1 of 2
FILING REQUIREMENTS
If a person who requests official action on a matter knows that the requested action will confer an
economic benefit on any City official or employee that is distinguishable from the effect that the action
will have on members of the public in general or a substantial segment thereof,you shall disclose that fact
in a signed writing to the City official, employee or body that has been requested to act in the matter,
unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be
made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349 (d)]
CERTIFICATION
I certify that all information provided is true and correct as of the date of this statement,that I have not
knowingly withheld disclosure of any information requested; and that supplemental statements will be
j... ,
promptly submitted to the Ci of Corpus Christi, Texas as changes oc .
Certifying Person: (4-1, Title: re,.cdcfct
(Type or Print)
Signature of Certifying Date: 42-7//(.(
Person:
1110 i .
DEFINITIONS
a. "Board member." A member of any board, commission, or committee appointed by the City
Council of the City of Corpus Christi, Texas.
b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an
effect on that interest that is distinguishable from its effect on members of the public in general or a
substantial segment thereof.
c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-
time basis, but not as an independent contractor.
d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and
whether established to produce or deal with a product or service, including but not limited to, entities
operated in the form of sole proprietorship, as self-employed person, partnership, corporation,joint
stock company,joint venture, receivership or trust, and entities which for purposes of taxation are
treated as non-profit organizations.
e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager,
Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of
Corpus Christi,Texas.
f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a
firm, including when such interest is held through an agent, trust, estate, or holding entity.
"Constructively held" refers to holdings or control established through voting trusts, proxies, or
special terms of venture or partnership agreements."
g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus
Christi for the purpose of professional consultation and recommendation.
EXHIBIT "F"